Alstom Presentation

March 2017 Disclaimer

This presentation contains forward-looking statements which are based on current plans and forecasts of ’s management. Such forward-looking statements are by their nature subject to a number of important risk and uncertainty factors (such as those described in the documents filed by Alstom with the French AMF) that could cause actual results to differ from the plans, objectives and expectations expressed in such forward-looking statements. These such forward-looking statements speak only as of the date on which they are made, and Alstom undertakes no obligation to update or revise any of them, whether as a result of new information, future events or otherwise.

ALSTOM – February 2016 – P 2

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. A dynamic market with solid long-term drivers

URBANISATION GOVERNMENTAL FUNDING SUSTAINABLE DEVELOPMENT ECONOMIC GROWTH

Market size in 2016/18  Solid growth drivers €51bn  Market worth more than €100 bn bn €31  Market driven by urban €18bn €10bn & integrated systems  Dynamic growth in Asia Pacific

Average annual growth AMERICAS ASIA EUROPE MIDDLE EAST between 13/15 – 19/21 PACIFIC AFRICA + 2.3 % + 5.4 % + 3.0 % + 3.2 %

Note: Annual average– Accessible market Source: UNIFE Market Study 2016

ALSTOM – February 2016 – P 3

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Activities: a complete range of solutions

 Tram, metro, suburban/regional, high speed, very high speed, locomotive  Components: traction, bogie, motor 46%

 Maintenance  Modernisation  Spare parts, repairs & overhaul 21%  Support services

 Signalling solutions portfolio for: main lines, urban, control and security  Sold as products or solutions 19%

 Integrated solutions  Infrastructure 14%

Note: % of H1 2016/17 sales ALSTOM – February 2016 – P 4

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. H1 2016/17 key figures

% change % change In € million H1 2015/16 H1 2016/17 reported organic

Backlog 27,719 33,570 21% 22%

Orders 3,897 6,212 59% 66%

Sales 3,303 3,570 8% 7%

Adjusted EBIT 167 200 20%

Adjusted EBIT margin 5.1% 5.6%

Net income – Group share (57) 128

Free cash flow (1,336) 333

ALSTOM – February 2016 – P 5

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. An ambitious strategy for 2020

OUR VALUES TEAM, TRUST & ACTION ETHICS & COMPLIANCE

1 CUSTOMER-FOCUSED ORGANISATION OUR ORGANIC 2 COMPLETE RANGE OF SOLUTIONS GROWTH VISION OUR BOOSTED PREFERRED 3 VALUE CREATION THROUGH INNOVATION STRATEGY BY PARTNER FOR SELECTIVE 4 OPERATIONAL AND ENVIRONMENTAL EXCELLENCE TRANSPORT ACQUISITIONS SOLUTIONS 5 DIVERSE AND ENTREPRENEURIAL PEOPLE

OUR BRAND POSITIONING DESIGNING FLUIDITY

ALSTOM – February 2016 – P 6

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Customer-focused organisation and multi-local presence

 31,000 employees working on 105 sites in 60 countries serving 200 customers

• Regions: close to customers, in charge of execution

EUROPE

• Operational functions: AMERICAS 21,250 EMPLOYEES global cohesion, processes and platforms MIDDLE EAST 4,850 ASIA PACIFIC EMPLOYEES AFRICA

3,200 1,700 EMPLOYEES • Support functions: finance, legal, HR EMPLOYEES global efficiency

Being a reference player in each region

ALSTOM – February 2016 – P 7

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. A complete range of solutions

Tramway integrated system for Lusail Sydney metro & signalling Coradia Nordic Bogie in Sweden for Citadis

FULLY BUNDLED OFFER INTEGRATED SYSTEM BETWEEN INDIVIDUAL 2 SOLUTIONS SOLUTION COMPONENTS

Systems, Signalling and Services to represent around 60% of sales by 2020

ALSTOM – February 2016 – P 8

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Staying a step ahead

1 2 3

Boost technical Invest in Optimise innovation to increase competitiveness- customers’ total cost differentiation oriented technology of ownership

Citadis X05 Attractis tramway system Coradia maintenance

An R&D strategy focused on differentiation and competitiveness Sustain R&D expenses and reach 30% of total orders coming from newly developed products by 2020

ALSTOM – February 2016 – P 9

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Operational excellence

 Competitive offering • Sourcing • Global footprint

 Excellence in delivery • Global business transformation underway • Strong project management skills • Flawless execution Production of Citadis Spirit for Ottawa, Hornell (USA)  A digitalisation plan to create an agile and effective information system

 Cash focus programme

To remain competitive while supporting margin improvement

ALSTOM – February 2016 – P 10

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 2020 objectives confirmed

2020 OBJECTIVES

 Sales expected to grow at 5% per year organically  Adjusted EBIT margin to reach around 7%  c. 100% conversion from net income to free cash flow

ALSTOM – February 2016 – P 11

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. www.alstom.com Appendices

1 Alstom H1 2016/17

2 Alstom 9M 2016/17

3 Alstom 2020 strategy

4 Alstom 2020 objectives

ALSTOM – February 2016 – P 13

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Customer-focused organisation Continued strong commercial performance

Orders (in € billion) 3.9 6.2  Strong order intake of €6.2bn 0.3 1.3 +59%  Book to bill above 1.7 0.6 2.6 1.0  New record-breaking backlog of €33.6bn 0.8 1.4 2.1

H1 2015/16 H1 2016/17 Europe Americas MEA Asia Pacific

3.9 6.2 1.6 +59% 0.4 0.8 1.3 0.9 0.5 3.0 1.6

H1 2015/16 H1 2016/17

Trains Systems Signalling Services % change reported

ALSTOM – February 2016 – P 14

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Complete range of solutions Organic sales growth of 7%

Sales (in € billion) 3.6  5% growth in standalone Trains 3.3 0.7 0.8 • Suburban, regional and high-speed trains in Europe 0.7 0.5 (France, Italy, Sweden, etc.) +8% 0.5 0.4 • On-going execution of PRASA project 1.6 1.6 • Tramway deliveries in Algeria

H1 2015/16 H1 2016/17  20% growth in Systems • Progress on metro system in Saudi Arabia Trains Systems Signalling Services • Tramway systems in Brazil and Qatar • Infrastructure in UK 3.6 3.3  33% growth in Signalling 0.3 0.4 0.5 • Deliveries in Canada 0.5 +8% 0.5 0.6 • Contribution of GE signalling

2.0 2.1  Slight decrease in Services • Adverse forex impact on UK contract H1 2015/16 H1 2016/17 Europe Americas MEA Asia Pacific % change reported ALSTOM – February 2016 – P 15

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Operational excellence Continued strong operational performance

 Volume increase Adjusted EBIT (in € million)  Portfolio mix improvement with accretive As % of sales acquisitions

 On-going initiatives for operational excellence +20% 200 167

5.6% 5.1%

H1 2015/16 H1 2016/17 % change reported

ALSTOM – February 2016 – P 16

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Income statement

In € million H1 2015/16* H1 2016/17

Sales 3,303 3,570

Adjusted EBIT 167 200 Adjusted EBIT margin 5.1% 5.6% Restructuring charges (14) - Other charges (29) (32) EBIT 124 168

Financial result (86) (71) Tax result (2) (32) Share in net income of equity investees 13 47 Minority interests from continued op. (8) (8) Net income – Discontinued operations ** (98) 24

Net income – Group share (57) 128

* Includes mainly the reclassification of separation costs of €(23) million from other charges to net income - discontinued operations ** Group share

ALSTOM – February 2016 – P 17

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Free cash flow

In € million H1 2015/16 H1 2016/17  High contribution of operating profit Adjusted EBIT 167 200  Positive evolution of working Depreciation & amortisation 74 69 capital Restructuring cash-out (24) (18) • Several large down-payments Capex (50) (43) • Volatility on short period R&D capitalisation (28) (21)  Phasing of both capex and Change in working capital (164) 188 legacy cash-out Financial cash-out (83) (11) Tax cash-out (162) (40) Other* (1,066) 9

Free cash flow (1,336) 333

*includes free cash flow from discontinued operations

ALSTOM – February 2016 – P 18

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Capex developments

 Control of recurring capex Capex* (in € million)  Slow ramp up of transformation capex

50 43

H1 2015/16 H1 2016/17

* excluding capitalised development costs

South Africa: beginning of site construction

New sites to meet customers’ growing demand for a local presence c. €300m transformation capex expected over next 3 years

ALSTOM – February 2016 – P 19

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Liquidity and gross debt

Liquidity position In € billion Liquidity 2.7 2.4  €2.3bn cash and cash equivalents as of 30 September 2016

 €400m revolving credit facility ; fully undrawn

 Flexibility with Energy JVs put options Mar-16 Sept-16 Undrawn credit line Gross cash

In € million Gross debt Gross debt 596  €2bn outstanding bonds as of 30 September 2016 453 371  Next maturity in February 2017 (c.€0.5bn) 272 283

Feb 2017 Oct 2017 Oct 2018 July 2019 March 2020 Interest rate 4.125% 2.25% 3.625% 3% 4.5%

ALSTOM – February 2016 – P 20

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Net cash & equity

In € million Net cash/(debt) In € million Equity

(43) 128 (85) 333 (33) 44 3,415 54 3,328

(203)

Mar-16 FCF Acq. & disposals* Forex & other Sept-16 Mar-16 Net income Pensions Forex & other Sept-16

* includes GE related separation impact (e.g. IS&T)

ALSTOM – February 2016 – P 21

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Appendices

1 Alstom H1 2016/17

2 Alstom 9M 2016/17

3 Alstom 2020 strategy

4 Alstom 2020 objectives

ALSTOM – February 2016 – P 22

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 9M 2016/17 Orders

Orders by region Orders by products (in € million) (in € million)

7,235 7,235 6,255 6,255

9M 2015/16 9M 2016/17 9M 2015/16 9M 2016/17

Europe Americas MEA Asia Pacific Trains Systems Signalling Services

ALSTOM – February 2016 – P 23

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 9M 2016/17 Sales

Sales by region Sales by product (in € million) (in € million) 5,225 5,225 4,916 4,916

+ 5 % + 5 %

% organic growth

9M 2015/16 9M 2016/17 9M 2015/16 9M 2016/17

Europe Americas MEA Asia Pacific Trains Systems Signalling Services

ALSTOM – February 2016 – P 24

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Appendices

1 Alstom H1 2016/17

2 Alstom 9M 2016/17

3 Alstom 2020 strategy

4 Alstom 2020 objectives

ALSTOM – February 2016 – P 25

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Railway traffic evolution

Worldwide traffic evolution from 2007 to 20151 Average Growth growth vs LY (2007–2015) Urban +1.8% +5.3% Mainline Freight +1.6% +4.0%

-10.9% -0.2%

Passenger traffic for urban & mainline keeps growing, but freight is strongly decreasing

1 Urban traffic figures are for Top 30 cities worldwide; mainline & freight traffic figures are for all major national operators worldwide. ALSTOM – February 2016 – P 26

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Market forecast

Average annual accessible market (€bn) 13/15 – 19/21 13/15 – 19/21 CAGR CAGR 101 110 122 +3.2% 101 110 122 +3.2% 11 +3.2% 10 +4.6% 10 9 11 Middle-East Africa 22 +5.4% 9 Urban trains +4.1% 18 8 10 9 Asia Pacific 16 Regional trains 8 7 4 15 +12.1% Mainline trains 13 34 16 31 Freight trains -0.6% Americas 30 +2.3% 38 36 +3.1% Services 32

55 Europe 46 51 +3.0% 25 Infrastructure 21 23 +3.2%

Signalling 11 12 14 +2.9%

2013-2015 2016-2018 2019-2021 2013-2015 2016-2018 2019-2021

Significant growth in all geographical regions confirmed by latest market study

Source: UNIFE Market Study 2016 ALSTOM – February 2016 – P 27

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Share of systems within the urban market

System market within urban market Share of urban market addressed through systems Annual average 2017-2019

Rest of NAM urban market MEA

LAM 43% Metro 30% system Europe Tram system APAC 2013-2015 2017-2019 UNIFE UNIFE (past market) forecast Market addressed through systems Rest of the urban market

 Systems continue to grow up to ~40% of the urban market, especially in MEA, LAM and APAC

Source: Alstom estimation, UNIFE Market Study 2016 ALSTOM – February 2016 – P 28

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. An ambitious strategy for 2020

OUR VALUES TEAM, TRUST & ACTION ETHICS & COMPLIANCE

1 CUSTOMER-FOCUSED ORGANISATION OUR ORGANIC 2 COMPLETE RANGE OF SOLUTIONS GROWTH VISION OUR BOOSTED PREFERRED 3 VALUE CREATION THROUGH INNOVATION STRATEGY BY PARTNER FOR SELECTIVE 4 OPERATIONAL AND ENVIRONMENTAL EXCELLENCE TRANSPORT ACQUISITIONS SOLUTIONS 5 DIVERSE AND ENTREPRENEURIAL PEOPLE

OUR BRAND POSITIONING DESIGNING FLUIDITY

ALSTOM – February 2016 – P 29

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 1 Customer-focused organisation and multi-local presence

 31,000 employees working on 105 sites in 60 countries serving 200 customers

• Regions: close to customers, in charge of execution

EUROPE

• Operational functions: AMERICAS 21,250 EMPLOYEES global cohesion, processes and platforms MIDDLE EAST 4,850 ASIA PACIFIC EMPLOYEES AFRICA

3,200 1,700 EMPLOYEES • Support functions: finance, legal, HR EMPLOYEES global efficiency

Being a reference player in each region

ALSTOM – February 2016 – P 30

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 1 Strategic acquisitions and partnerships

2010  Russia - TMH (trains) 2014  Kazakhstan - EKZ (locos) - 25 % additional shares  Kazakhstan - EKZ (locos)

 UK - SSL (signalling)*  Algeria - CITAL (trams)  India - Madhepura (locos) 2011  France - Metrolab (R&D) 2015  Sweden – Motala Train AB (services)*  Morocco – Cabliance (cabling)  Russia - TMH (trains) - 8 % additional shares  Worldwide - General Electric signalling*  France - SpeedInnov (trains)

2012  France - NTL (trams) 2016  South Africa - Ubunye (modernisation)  Morocco – Cabliance (cabling)*

2013  South Africa - Gibela (suburban trains)  Kazakhstan - KEP (signalling)

* Acquisitions

Solid, efficient and well-established network of partners

ALSTOM – February 2016 – P 31

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 1 Case study: Prasa project

 Scope • Design, manufacture and supply 600 trains for South Africa fleet renewal • Parts supply & technical support for 19 years • Gibela Joint Venture led by Alstom (61%), local factory, 65% average local content

 Status • First train delivered from Brazil end 2015 • Local factory construction started in March 2016 • First train to be manufactured in South Africa end 2017/18

Largest contract ever in Alstom history (c. €4bn), well on its way

ALSTOM – February 2016 – P 32

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 1 Case study: eLoco project in India

 Scope • 800 electric locomotives • Associated maintenance: 13 years for the first 250 locos and 4 years for the following 250 • €200m investment incl. set up of manufacturing plant and two depots • JV with Indian Railways (74%/26%)

 Status • Contract signed in November 2015 with Indian Railways • Booking in Q4 2015/16 • Deliveries expected between 2018 and 2029

€3.2bn contract for 800 electric locomotives and maintenance

ALSTOM – February 2016 – P 33

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 1 Case study: NTV in Italy

 Options of previous contract signed in October 2015

 4 trains and related maintenance services

 Extension of maintenance services for NTV’s entire fleet from 20 to 30 years

 Delivery scheduled end 2017 and ready to enter into service in 2018

NTV’s renewed confidence in Alstom expertise

ALSTOM – February 2016 – P 34

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 2 A complete range of solutions

Tramway integrated system for Lusail Sydney metro & signalling Coradia Nordic Bogie in Sweden for Citadis

FULLY BUNDLED OFFER INTEGRATED SYSTEM BETWEEN INDIVIDUAL 2 SOLUTIONS SOLUTION COMPONENTS

Systems, Signalling and Services to represent around 60% of sales by 2020

ALSTOM – February 2016 – P 35

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 2 Case study: a fully integrated metro system in Dubai for Expo 2020 link

 Alstom, leader of ExpoLink consortium

 50 Metropolis trainsets and electromechanical works

 New route extends 15 km and serves Expo 2020

 Delivery of the system before 2020

Dubai: Expo 2020 metro station

A fully integrated metro project for Alstom, with a non-negotiable deadline

ALSTOM – February 2016 – P 36

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 2 Case study: Dubai tramway system

 Scope • Fully integrated tramway solution incl. trains, signalling, infrastructure and 13 years maintenance contract

 Status: already a success • Availability and punctuality above 99.5% • Robust operation under heavy rain and sand storm • Up to 30,000 passengers / day at peak

Customer: Roads and Transport Authority Phase 1 (done): 11 km and 11 stops

A fully integrated world premiere

ALSTOM – February 2016 – P 37

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 2 Case study: Riyadh lines 4,5 & 6 metro system

 Scope • 69 driverless Metropolis trains • Signalling system • Infrastructure: third rail and track, using Appitrack and power supply incl. Hesop substations

 Status • Train production started in Katowice in Nov. 2015

Customer: Arriyadh Development Authority Contract: 2013 – 2018 Lines length: 65.1 km # of stations: 25

First driverless metro in Saudi Arabia and biggest contract ever for an urban system project (€1.2bn)

ALSTOM – February 2016 – P 38

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 3 Staying a step ahead

1 2 3

Boost technical Invest in Optimise innovation to increase competitiveness- customers’ total cost differentiation oriented technology of ownership

Citadis X05 Attractis tramway system Coradia maintenance

An R&D strategy focused on differentiation and competitiveness Sustain R&D expenses and reach 30% of total orders coming from newly developed products by 2020

ALSTOM – February 2016 – P 39

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 3 Main innovative programmes

Complete renewal of the ranges:  Avelia range  Citadis Spirit, Citadis X05  Coradia iLint  New range of standard metro  Silicon carbide (SiC)

 HealthHub  Predictive maintenance

 Atlas, main lines ERTMS  Urbalis, CBTC  ATO, geolocalisation, 4G

 Axonis metro system  Attractis tramway system  Hesop, reversible power-supply substation

ALSTOM – February 2016 – P 40

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 3 Sustained level of R&D

R&D* (in € million) Main R&D programmes  Renewal of mainline and urban train ranges As % of sales  Signalling programmes  Predictive maintenance

85 71

2.1% 2.4%

H1 2015/16 H1 2016/17 * R&D including externally-funded programmes, excluding capitalisation and amortisation

ALSTOM – February 2016 – P 41

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 3 Case study: High speed train contract with - US

 28 Avelia Liberty trains, new generation of Alstom very high speed trains

 Optimised maintenance costs

 Improved energy management

 Enhanced comfort for passengers

 A €1.8bn contract: deliveries expected to

start in 2021 Avelia Liberty for Amtrak

A new generation of train with high level of innovation for both passenger and operator

ALSTOM – February 2016 – P 42

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 3 Case study: Nice tramway project

€91m project

Awarded in October 2015

Scope  19 Citadis X05 tramway  SRS, Static Recharge System  Citadis Ecopack

Latest generation of tramway for the city of Nice

ALSTOM – February 2016 – P 43

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Operational excellence

 Competitive offering • Sourcing • Global footprint

 Excellence in delivery • Global business transformation underway • Strong project management skills • Flawless execution Production of Citadis Spirit for Ottawa, Hornell (USA)  A digitalisation plan to create an agile and effective information system

 Cash focus programme

To remain competitive while supporting margin improvement

ALSTOM – February 2016 – P 44

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Competitive offering: Sourcing contribution (1/2)

Integration  Body shell 60% of Alstom products cost are

Gangway HVAC purchased Interior linings, windows • c.€4bn external supplies Doors Electrical Seat harness

Bogies  Partnership Auxiliary supply • 90 global partners (50% of the spend), able to Battery box follow Alstom worldwide Brake resistor • 750 suppliers covering 80% of the spend Traction Air supply

MAKE BUY

• Sourcing, a key cost reduction driver

ALSTOM – February 2016 – P 45

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Competitive offering: Sourcing contribution (2/2)

Savings per lever  Volume • Bundle approach: different products under one negotiation • Total cost of ownership: improve full product life cycle cost under Low cost one negotiation and protect our margin on after sales 20% countries Design to cost  Design to cost 50% Volume • Catalogue approach: on sub-systems: HVAC, doors, etc. 30%

 Low cost countries • Steady increase of sourcing volume in India

• Objective to increase sourcing savings to €250m /year (cost to complete)

ALSTOM – February 2016 – P 46

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Competitive offering: Global footprint

 Worldwide trains manufacturing  Bangalore (India) engineering center ramp up

FY 14/15 2020 Objective 2020 Objective Signalling

Trains

Rest of the world 33% Rest Western Western of the world Europe Europe 60%

• Rapid growth of global manufacturing and engineering capabilities • Adaptation to workload in Europe

ALSTOM – February 2016 – P 47

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Competitive offering: update as end Sept. 2016

Sourcing Global footprint

 Alstom Alliance  India ramp-up • Premium partnerships with strategic suppliers to • 2,300 people as end of September 2016 support geographical expansion, share innovations and mutualise development of key components • Quality, cost-effective and reliable solutions • Total of 34 members with 10 new ones during Innotrans fair

 Global sourcing • Increase of India sourcing volume • Above one third purchased in low cost countries

ALSTOM – February 2016 – P 48

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Optimised train product ranges: a platform approach

 Optimised costs

 Improved modularity and design

 Better energy efficiency

Urban Mainline

Metropolis Citadis Coradia Avelia

ALSTOM – February 2016 – P 49

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 First successes for our new generation of Coradia trains

79 Intercity trains for the Netherlands 150 regional trains for Trenitalia with first operator order of 47 trains

. €0.8 billion . €0.9 billion for the frame contract . First deliveries by 2020 . First deliveries by early 2019

Optimised layout, weight, modularity and cost

ALSTOM – February 2016 – P 50

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Excellence in delivery

 New tools deployment started • Alstom integrated information system massive roll- out launched (10 countries deployed in 15/16)

• APSYS, lean manufacturing system extending to Engineering and Project Management Manufacturing execution system

• New electrical organisation (NEO) in main sites in Europe

New electrical organisation (NEO)

ALSTOM – February 2016 – P 51

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Excellence in delivery: Project management

Key practices Results

 Anticipation before tendering 1. Intense activity

• 20 tenders per month  Stringent Go / No Go decision • 3 months average per tender  Rigorous transfer from tender to project (tender transfer meeting) • c.450 major contracts in execution

 Management involvement (winning roadmap, 2. Hit rate: [30-40] % monthly project review, global project review)

Strong project management skills from tender to execution

ALSTOM – February 2016 – P 52

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Cash focus programme

Main levers Key practices • Worldwide training (e.g. sales community)  Terms and conditions • Upfront review of cash information, • Level of down payment now stabilised from the anticipation phase • Regular meetings during project execution  Design to cash actions such as:

• Planning of supplies Example • Manufacturing lead-time • Time to market of new standard metro: 12 months • Inventory management, … (actual 15 months)

Strong management actions in place to optimise working capital

ALSTOM – February 2016 – P 53

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 A responsible company

 Ecodesigned & environmental-friendly solutions

Since 2011, Alstom has been included in the  Alstom sites showcase its commitment Dow Jones Sustainability Indices (DJSI). to safeguarding the environment

 A culture based on health & safety

State-of-the-art spray booths, Katowice site (Poland) Villeurbanne site (France)

ALSTOM – February 2016 – P 54

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 4 Environmental excellence

 Improve our environmental footprint • Continue our efforts on energy saving,

waste and CO2 ENERGY INTENSITY REDUCTION BY 10% • ISO 14001 for all operational units with more than 200 people

 Improve energy consumption for solution • Better sizing and energy consumption measurement ENERGY CONSUMPTION REDUCTION BY 20%

 Safety at work • Alstom Zero Deviation Plan • Zero Severe Accidents on High Risk Activities IFR1 AT 1 BY 2020

ALSTOM – February 2016 – P 55

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. A culture based on diversity & entrepreneurship

 Diversity in terms of gender, generation, nationality, social and cultural background targeted:  25% women in management or professional role by 2020  Training plans, development programmes…

ALSTOM – February 2016 – P 56

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. The Alstom Foundation to support local communities

Support and financing for projects proposed by Alstom employees aimed at improving living conditions of communities local to where Alstom has a presence whilst protecting the environment.

ALSTOM – February 2016 – P 57

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Sharing a common culture of ethics and values

 Ethics & Compliance (E&C) • Certified procedures • A Code of Ethics and an Integrity Programme applicable to each and every employee around the world

 Team, Trust and Action

ALSTOM – February 2016 – P 58

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Organic growth boosted by selective acquisitions

 Small to mid-size acquisitions

 Support international expansion and strengthen leading positions

 2015/16 acquisitions • GE Signalling • SSL, Signalling in UK • Motala Train AB, Services in Sweden

ALSTOM – February 2016 – P 59

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Appendices

1 Alstom H1 2016/17

2 Alstom 9M 2016/17

3 Alstom 2020 strategy

4 Alstom 2020 objectives

ALSTOM – February 2016 – P 60

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Sales evolution

Sales (in €bn) 5% annual organic growth 6.9 6.2

FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20

Current backlog of c.€30bn* providing strong visibility on future sales

*at 31 March 2016 ALSTOM – February 2016 – P 61

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Progressive margin improvement

Adjusted EBIT margin (in % of sales) Volume/Price  Cost absorption driven by solid top-line growth c. 7%  Partly offset by price dynamics and competitive Excellence Footprint environment Sourcing 5.0% Portfolio mix  Growth towards more profitable activities  Services, signalling, systems to represent c. 60% of sales in 2020 Operational excellence  Sourcing savings  Global footprint

Adjusted EBIT Volume/Price Portfolio mix Operational Adjusted EBIT  Excellence in delivery with solid project execution H1 2015/16 excellence FY 2019/20

Adjusted EBIT margin to reach around 7% in 2020

ALSTOM – February 2016 – P 62

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Cash conversion objective

2016/17 2017/18 2018/19 2019/20

 Short-term impact of legacy cash-out and transformation capex

 Working capital stabilised

 Possible volatility on short periods

 Key focus with strong management actions in place

Core free cash flow Legacy cash-out Transformation capex

c. 100% FCF/net income conversion in 2020

ALSTOM – February 2016 – P 63

© ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. www.alstom.com