Guri Hydro Power

Total Page:16

File Type:pdf, Size:1020Kb

Guri Hydro Power CompanyCompany ProfileProfile ofof HPCHPC VenezuelaVenezuela C.A.C.A. (VHPC)(VHPC) HPCHPC VenezuelaVenezuela C.A.C.A. OctOct 20082008 CompanyCompany ProfileProfile ofof VHPCVHPC (1)(1) Hitachi Ltd. (Japan) 68%: Shareholder Hitachi Plant Technologies, Ltd (Japan) (HPT) 100%: Shareholder HPC Venezuela C.A. (VHPC) 2 CompanyCompany ProfileProfile ofof VHPCVHPC (2)(2) ¾ Affiliate company of Hitachi Plant Technologies Ltd, Japan (HPT):100% shareholder ¾ Project Execution Experience from 1978 (as HPT, Japan) ¾ Establishment date of VHPC: January 1988 ¾ Execution Experience: - Hydroelectric Power(Guri, Macagua, Caruachi) - Thermal Power (CADAFE,TACOA, ELEVAL) - Direct Reduction plant(OPCO, ORINOCO IRON) - Pellet Plant (FMO) - Railway Project-DEPOT (IAFE) 3 CompanyCompany ProfileProfile ofof VHPCVHPC (3)(3) ¾ Paid-in capital: 240,000,000 Bolivars ¾ Total Sales (from 1979 to present) : more than 600 MUS$ ¾ Main Bank: The bank of Tokyo Mitsubishi UFJ ltd / Banco Provincial Venezuela “Accumulated Local Management Know-how” “Advanced Technology Transferred from HPT Japan” 4 HistoryHistory ofof VHPCVHPC HPC Venezuela, C.A. was established in January 1988 1978 1988 Hitachi Plant Technologies ,Ltd HPC Venezuela, C.A (Former: Hitachi Plant Engineering and Construction Guri Dam Co., Ltd) Macagua Dam 5 Location:Location: Venezuela,Venezuela, PuertoPuerto OrdazOrdaz VHPC is located in Puerto Ordaz, Bolivar State of Venezuela Caracas Puerto Ordaz 6 BusinessBusiness AreaArea ofof HPTHPT ● Water treatment systems and equipment ●Large-size pumps ●Compressor R&D ●Converters Engineering ● LC transport systems ● LC manufacturing ● Nuclear power plant equipment ● Thermal power plant Public and municipal/ ● Printed board printer ● Dust collection system industrial Systems ● Cranes ● Hydropower plant Business Energy systems Mechatronics Domain ConstructionConstruction Design ● Chemical/Pharmaceutical plants ● Air conditioning/clean room for industrial factory ●Food Plants ● Chemical equipment ● Air conditioning for building Air conditioning Industrial Plant ● Enviromental Preservation systems Systems Systems Fabrication & Manufacturing 7 BusinessBusiness AreaArea –– ConstructionConstruction businessbusiness ¾ Installation work of Mechanical equipment ¾ Piping work ¾ Electrical work ¾ Instrumentation work ¾ Insulation work, Panting, Ducting work ¾ Supply of auxiliary equipment ¾ Supply of materials (e.g. piping, cable, tray, conduit) ¾ Inland transportation and unloading work ¾ Foundation work (civil work) ¾ Supply of Steel Fabrication ¾ Maintenance work etc 8 GlobalGlobal Network:Network: OfficesOffices && SitesSites HPT New York Office HPT China (New York) (Shanghai) (Suzhou) Canadian TaiwanBranch. Hitachi Plant (Shenzhen) (Saskatchewan) UK Branch (London) Vietnam Office (Ho Chi Minh) Head Office Tokyo HPC Thailand Egypt Branch (Bangkok) (Alexandria) PHPC Co.Ltd.Inc. (Manila) Guatemala Qatar Office Hitachi Plant India UAE. Office Office (Dubai) (Abu Dhabi) Sri Lanka Office HPC Venezuela C.A. (Estado Bolivar) HPC Australia HPC Engineering(M) Pty.Ltd. : Head Office (Kuala Lumpur) (Brisbane) : Branch Office : Project Office Singapore Branch Indonesia Rep.Office (Jakarta) : Subsidiary Asia Middle East Branch Office 9 VHPC’sVHPC’s HumanHuman ResourcesResources As of 2008 Peak time ¾ Japanese (permanent): 5 p. 5 p. ¾ Japanese (for construction) : 5 p. 50 P. ¾ Management staff : 10 p. 50 P. ¾ Engineers: 20 p. 50 P. ¾ Supervisory staffs: 50 p. 100 P. ¾ Workers: 200 p. 3,000 P Total: 290 p. 3,255 P *The number of personnel depends on construction volume 10 ProjectProject SiteSite LocationLocation MapMap Tacoa Thermal Power OPCO / Orinoco ELEVAL / Iron / FMO Plants CADAFE Thermal Power Macagua Hydro Caracas IAFE VHPC Railway DEPOT Tocoma Hydro Guri Hydro Caruachi Hydro 11 CADAFECADAFE ThermalThermal PlantPlant ¾ 1978– 1984 ¾ PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4, and Unit 5 ¾ Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y FOMENTO (CADAFE) ¾ Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and Associated equipment for 400 MW generating Units No 3 & 4, AFE including erection of Steel Structures of the Boilers. ¾ Unit 5: Installation of 1,400 Ton/Hour boiler for 400 MW generation unit. 12 GuriGuri IIII HydroHydro PowerPower (1)(1) ¾ 1978 - 1986 ¾ GURI HYDRO ELECTRIC POWER STATION STAGE II ¾ Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA) ¾ Installation of 10 units of 730 MW water turbine and 805 MVA AC generators including associated utility system. Supply and/or installation of auxiliary equipment which included 42 transformers, 9 overhead cranes, 38 vertical pumps, 10 sets of insulated phase bus ducts, 5 units of 765 KV SF-6 gas insulated bus duct, 6 elevators, 3 diesel engine generators, structure bridge for discharge canel, complete set of electrical panels, instrumentation, piping, cabling, illumination and painting work. 13 GuriGuri IIII HydroHydro PowerPower (2)(2) Total generating capacity 10,300MW Guri,Venezuela 14 OPCOOPCO HBIHBI plantplant ¾ 1987 - 1989 ¾ “OPCO” HOT BRIQUETTED IRON PLANT ¾ Owner: OPERACIONES AL SURDEL ORINOCO (OPCO) ¾ Installation of 800,00 Ton/Year Hot Briquetted Iron Plant. ¾ Work involved dismantling, removal and refurbishing the (OPCO) old plant and constructing a new plant system. Erection in all phase of mechanical, electrical and instrumentation work were undertaken. 15 MacaguaMacagua HydroHydro PowerPower (1)(1) ¾ 1988 - 1998 ¾ MACAGUA II AND III HYDRO ELECTRIC POWER STATIONS ¾ Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA) ¾ MACAGUA II: Installation of 12 units of 216 MW FRANCIS type water turbines and 250 MVA generators. ¾ MACAGUA III: Installation of 2 units of 86 MW KAPLAN type turbine and 102 MVA generators. 16 MacaguaMacagua HydroHydro PowerPower (2)(2) MACAGUA Ⅱ Hydropower Station(Venezuela) 17 OrinocoOrinoco IronIron HBIHBI plantplant (1)(1) ¾ 1998 - 2000 ¾ HOT BRIQUETTED IRON PLANT (FINMET PROCESS) ¾ Owner : ORINOCO IRON, C.A. ¾ Hot Briquetted Iron Plant. The work was the complete Mechanical Installation of the Core Plant which consisted of the Process Plant (Reactor and Briquetting), Gas Generation Plant, Structure Buildings, Pipe Racks, Pipings, Utilities, Insulation, Refractory, Painting and all Main and Auxiliary Equipment related there do. In Addition Pipe Rack Fabrication and Partial Piping Pre- Fabrication was carried out. The Total Weight Installation was 46,000 Tons. 18 OrinocoOrinoco IronIron HBIHBI plantplant (2)(2) 19 GuriGuri IIII HydroHydro Power:Power: 55 unitsunits FirstFirst stagestage ¾ Construction period: 2002 - 2005 ¾ Project name: GURI No.2 HYDRO ELECTRIC POWER STATION STAGE I – 5 units ¾ Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA) ¾ Client: GE Hydro (NORCAN) ¾ HPT & VHPC’s scope - Disassembly, Refurbishment and Reassembly work 20 CaruachiCaruachi HydroHydro PowerPower (1)(1) ¾ Construction period: 2000 - 2006 ¾ Project Name: CARUACHI HYDRO ELECTRIC POWER STATION 281MW x 12 units ¾ Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA) ¾ Client: GE Hydro (KENSA) ¾ HPT & VHPC Scope - Installation and Testing of KAPLAN Type Water Turbines and Generators. - Installation and Testing of the excitation systems, Transformers (7 Units) and Power House Bridge Cranes (3 Units) 21 CaruachiCaruachi HydroHydro PowerPower (2)(2) 22 TacoaTacoa DCSDCS ThermalThermal PowerPower plantplant (1)(1) ¾ Construction period: 2004-2005 ¾ Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed digital controls) project ¾ Owner: La Electricidad de Caracas (EDC) ¾ Client: Toshiba Corporation (Mitsui & Co., ltd) ¾ Site: Caracas ¾ HPT & VHPC’s scope - Installation and electrical works - Supply of cables & materials 23 TacoaTacoa DCSDCS ThermalThermal PowerPower plantplant (2)(2) 24 ELEVALELEVAL H25H25 PowerPower plantplant (1)(1) ¾ Construction period: 2005-2006 ¾ Project name: ELEVAL H25 GTG x 1 units ¾ Owner : ELEVAL ¾ Client: Hitachi Ltd (Mitsui & Co., ltd) ¾ Site: VALENCIA, Venezuela ¾ HPT & VHPC’s scope - Installation and electrical works - Foundation work - Inland transportation and material supply 25 ELEVALELEVAL H25H25 PowerPower plantplant (2)(2) 26 CaracasCaracas Railway:Railway: DEPOTDEPOT facilityfacility ¾Construction period: 2006-2007 ¾Project name: Caracas Railway project / DEPOT ¾Owner : IAFE ¾Client: Kawasaki Plant systems ¾Site: Charallave ¾HPT & VHPC’s scope - Installation of DEPOT Equipment 27 FMOFMO PelletPellet plantplant ExpansionExpansion ¾ Construction period: 2006-2007 ¾ Owner : CVG FERROMINERA ORINOCO, C.A. (FMO) ¾ Client: Kobe Steel, Ltd Japan / Venezuela ¾ Site: Matanzas Industrial Area ¾ HPT & VHPC’s scope - Installation and electrical works 28 GuriGuri IIII HydroHydro Power:Power: No.15No.15 GeneratorGenerator ¾ Construction period: 2006 - 2007 ¾ Project name: GURI HYDRO ELECTRIC POWER STATION STAGE II – Rehabilitation work of No.15 generator ¾ Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA) ¾ Client: ALSTOM Hydro Venezuela S.A. ¾ VHPC’s scope - Rehabilitation of site work 29 GuriGuri HydroHydro Power:Power: OverheadOverhead CraneCrane ¾ Construction period: 2006 - 2009 ¾ Project name: GURI No.2 HYDRO ELECTRIC POWER STATION– Renovation of overhead crane ¾ Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA) ¾ Client: ALSTOM Hydro Venezuela S.A. ¾ VHPC’s scope - Renovation of site work Under Construction 30 GuriGuri HydroHydro No.1No.1 PowerPower 4units4units RehabilitationRehabilitation ¾ Construction period: 2007 - 2010 ¾ Project name: GURI HYDRO ELECTRIC No.1 POWER STATION Unit #7- #10 (4units) Renovation project ¾ Owner : C.V.G. ELECTRIFICACION
Recommended publications
  • Social and Environmental Effects of Bujagali Dam
    FACULTY OF ENGINEERING AND SUSTAINABLE DEVELOPMENT Department of Building, Energy and Environmental Engineering SOCIAL AND ENVIRONMENTAL EFFECTS OF BUJAGALI DAM MUWUMUZA LINDA 2014 MASTER OF SCIENCE THESIS, Credits: H.E 30 DIVISION OF SUSTAINABLE ENERGY Supervisor: DR. JEEVAN JAYASURIYA A/PROF DR. JOHN BAPTIST KIRABIRA Dedication Well yes Mum, I did as we discussed and so this is for you. You spoke, I listened and this is the outcome. I pray you are proud of me. Love you always. Acknowledgements I would love to thank the following people for their contribution towards the finishing of my project. I would not have finished it successfully without you. My Family Daddy Angella Stephen Amanda College of Engineering, Design, Art and Technology My local facilitators Dr. Sabiiti Adam Hillary Kasedde My Supervisors Dr. Jeevan Jayasuriya Dr. John Baptist Kirabira The Ministry of Energy and Mineral Development especially: Eng. Moses Murengezi: Advisor to the Chairman Energy and Mining Sector Working group Eng. Paul Mubiru: Permanent Secretary, Ministry of Energy and Mineral Development The Bujagali Energy Limited Company especially: Mr. John Berry: Chief Executive Officer of BEL Ms. Achanga Jennifer: Environmental Engineer of BEL Francis Mwangi: Technical Manager Allan Ikahu: Infrastructure and Project Engineer My Friends: John, Anthony, Mue, Winnie, Arthur, Vincent, Hajarah, Fildah, Winnie, Richard and all the rest List of Acronyms ADB African Development Bank AES Applied Energy Services BEL Bujagali Energy Limited MEMD Ministry of Energy and Mineral Development NGO Non Government Organization O&M Energy Operations and Maintenance Energy Limited PAP Project Affected Persons USAID United States Agency for International Development Abstract There has been a steady increment in economic growth in Uganda and as the economy is on the rise, the demand for energy also increases.
    [Show full text]
  • The State of Venezuela's Forests
    ArtePortada 25/06/2002 09:20 pm Page 1 GLOBAL FOREST WATCH (GFW) WORLD RESOURCES INSTITUTE (WRI) The State of Venezuela’s Forests ACOANA UNEG A Case Study of the Guayana Region PROVITA FUDENA FUNDACIÓN POLAR GLOBAL FOREST WATCH GLOBAL FOREST WATCH • A Case Study of the Guayana Region The State of Venezuela’s Forests. Forests. The State of Venezuela’s Págs i-xvi 25/06/2002 02:09 pm Page i The State of Venezuela’s Forests A Case Study of the Guayana Region A Global Forest Watch Report prepared by: Mariapía Bevilacqua, Lya Cárdenas, Ana Liz Flores, Lionel Hernández, Erick Lares B., Alexander Mansutti R., Marta Miranda, José Ochoa G., Militza Rodríguez, and Elizabeth Selig Págs i-xvi 25/06/2002 02:09 pm Page ii AUTHORS: Presentation Forest Cover and Protected Areas: Each World Resources Institute Mariapía Bevilacqua (ACOANA) report represents a timely, scholarly and Marta Miranda (WRI) treatment of a subject of public con- Wildlife: cern. WRI takes responsibility for José Ochoa G. (ACOANA/WCS) choosing the study topics and guar- anteeing its authors and researchers Man has become increasingly aware of the absolute need to preserve nature, and to respect biodiver- Non-Timber Forest Products: freedom of inquiry. It also solicits Lya Cárdenas and responds to the guidance of sity as the only way to assure permanence of life on Earth. Thus, it is urgent not only to study animal Logging: advisory panels and expert review- and plant species, and ecosystems, but also the inner harmony by which they are linked. Lionel Hernández (UNEG) ers.
    [Show full text]
  • Hydropower Energy
    Hydropower Associate Professor Mazen Abualtayef Environmental Engineering Department Islamic University of Gaza, Palestine Adapted from a presentation by S. Lawrence Leeds School of Business, Environmental Studies University of Colorado, Boulder, CO, USA 1 Course Outline Renewable Sustainable Solar Power Hydrogen & Fuel Cells Hydro Power Nuclear Wind Energy Fossil Fuel Innovation Oceanic Energy Exotic Technologies Geothermal Integration Biomass Distributed Generation 2 Hydro Energy Video 1 Video 2 Video 3 3 Hydrologic Cycle 4 http://www1.eere.energy.gov/windandhydro/hydro_how.html Hydropower to Electric Power Electrical Potential Energy Energy Electricity Kinetic Energy Mechanical Energy 5 Hydropower in Context 6 Sources of Electric Power - world In the USA 7 Renewable Energy Sources 8 World Trends in Hydropower 9 Boyle, Renewable Energy, 2nd edition, Oxford University Press, 2003 World hydro production 10 IEA.org Major Hydropower Producers 11 World’s Largest Dams Max Annual Name Country Year Generation Production Three Gorges China 2009 18,200 MW Itaipú Brazil/Paraguay 1983 12,600 MW 93.4 TW-hrs Guri Venezuela 1986 10,200 MW 46 TW-hrs Grand Coulee United States 1942/80 6,809 MW 22.6 TW-hrs Sayano Shushenskaya Russia 1983 6,400 MW Robert-Bourassa Canada 1981 5,616 MW Churchill Falls Canada 1971 5,429 MW 35 TW-hrs Iron Gates Romania/Serbia 1970 2,280 MW 11.3 TW-hrs Aswan Dam Egypt 1950 2,100 MW Ranked by maximum power. The Electricity production from hydroelectric sources in Egypt was 12.863 (TWh) in 2009, according to a
    [Show full text]
  • Relatório 2A: Argentina, Brasil. Chile, Peru, Colômbia E Venezuela
    Renewable Energy forI Electricity Generation in Latin America:NSERIR the FOTOS market, technologies and DE RENOVAVEIS PARA outlook PREENCHER O ESPAÇO BRANCO 2010 Copper Connects Life TM Renewable Energy for Electricity Generation in Latin America Page i EXECUTION Gilberto De Martino Jannuzzi University of Campinas – UNICAMP and International Energy Initiative – IEI, Brazil Odón de Buen Rodríguez Energía, Tecnología y Educación, S.C. – ENTE, S.C., Mexico João Gorenstein Dedecca International Energy Initiative – IEI, Brazil Larissa Gonçalves Nogueira International Energy Initiative – IEI, Brazil Rodolfo Dourado Maia Gomes International Energy Initiative – IEI, Brazil Judith Navarro Energía, Tecnología y Educación, S.C. – ENTE, S.C., Mexico Renewable Energy for Electricity Generation in Latin America Page ii COPYRIGHT © 2010 International Copper Association DISCLAIMER Although this document has been prepared with due care, the ICA and any other participating institution are not responsible for the information and analysis presented, which shall be credited directly to the authors of the study. International Copper Association Latin America Av. Vitacura 2909, Oficina 303 Las Condes, Santiago Chile www.procobre.org Renewable Energy for Electricity Generation in Latin America Page iii Contents 1 CONCLUSIONS AND RECOMMENDATIONS ...................................................................... 1 1.1 GLOBAL FACTORS ............................................................................................................1 1.2 LOCAL POLICY
    [Show full text]
  • The Impact of Human Rights Abuses and Emigration in Venezuela
    The University of Akron IdeaExchange@UAkron Williams Honors College, Honors Research The Dr. Gary B. and Pamela S. Williams Honors Projects College Summer 2021 The Impact of Human Rights Abuses and Emigration in Venezuela Caroline Hanna [email protected] Follow this and additional works at: https://ideaexchange.uakron.edu/honors_research_projects Part of the International Relations Commons Please take a moment to share how this work helps you through this survey. Your feedback will be important as we plan further development of our repository. Recommended Citation Hanna, Caroline, "The Impact of Human Rights Abuses and Emigration in Venezuela" (2021). Williams Honors College, Honors Research Projects. 1439. https://ideaexchange.uakron.edu/honors_research_projects/1439 This Dissertation/Thesis is brought to you for free and open access by The Dr. Gary B. and Pamela S. Williams Honors College at IdeaExchange@UAkron, the institutional repository of The University of Akron in Akron, Ohio, USA. It has been accepted for inclusion in Williams Honors College, Honors Research Projects by an authorized administrator of IdeaExchange@UAkron. For more information, please contact [email protected], [email protected]. The Impact of Human Rights Abuses and Emigration in Venezuela Caroline Hanna Honors Research Project – Political Science Introduction This research paper analyzes the connection between human rights abuses committed by the Nicolas Maduro regime and the high levels of emigration. These human rights issues are addressed by the research
    [Show full text]
  • This File Has Been Cleaned of Potential Threats. If You Confirm That the File Is Coming from a Trusted Source, You Can Send
    This file has been cleaned of potential threats. If you confirm that the file is coming from a trusted source, you can send the following SHA-256 hash value to your admin for the original file. df3659a1293400662558553853d02eda094e7f9846726c7fb2f8281517a956ad To view the reconstructed contents, please SCROLL DOWN to next page. The text that follows is a PREPRINT. O texto que segue é um PREPRINT. Please cite as: Favor citar como: Gerlak, A.K.; M. Saguier, M. Mills- Novoa, P.M. Fearnside & T.R. Albrecht. 2019. Dams, Chinese Investments, and EIAs: A Race to the Bottom in South America? Ambio https://doi.org/10.1007/s13280-018- 01145-y ISSN: 0044-7447 (print version) ISSN: 1654-7209 (electronic version) Copyright: Royal Swedish Academy of Sciences & Springer Science+Business Media B.V. The original publication is available at: A publicação original está disponível em: https://doi.org/10.1007/s13280-018-01145-y 1 Dams, Chinese Investments, and EIAs: A Race to the Bottom in South America? Andrea K. Gerlak, Marcelo Saguier, Megan Mills-Novoa, Philip M. Fearnside, and Tamee R. Albrecht Abstract: The political economy of dam development in South America is changing as a result of a resurgence in water infrastructure investments. The arrival of Chinese funded projects in the region has altered a context traditionally dominated by multilateral development banks. Tensions are escalating around new dam projects and the environmental impact assessment process is increasingly the site of politicization around water in the region. In this Perspective, we examine the most recent surge in dam development in South America, the resulting environmental and social impacts, and the mobilization of civil society and environmental groups that have developed in response to these projects.
    [Show full text]
  • Challenges in the Quest for Clean Energies 4
    SERIES ARTICLE Challenges in the Quest for Clean Energies 4. Other Renewable Resources and Conclusion Sheela K Ramasesha Water, biomass and geothermal are also renewable resources for use in power generation stations. Many countries around the world use these energy resources in their energy mix. The technologies needed for each of these renewable resources and how they are applied is discussed in the article. Their scenario Sheela K Ramasesha is in India is also presented. currently working on renewable energy In the concluding remarks, the role of using renewable energy technologies with primary resources in electricity generation in the light of reduction of focus on photovoltaics at Green House Gas (GHG) emission into the atmosphere is Divecha Centre for Climate Change, Indian Institute of deliberated. The pros and cons of renewable resources are Science, Bangalore. She is discussed in detail and how they should be used responsibly is involved in a wide variety highlighted. The most important step towards reduction of of projects in the field. Her GHG is to reduce consumption of energy in our routine, in hobbies include traveling, music and movies. addition to using renewable sources to generate the much needed electricity. In Part 1 of this series we learnt that our energy-intensive lifestyle has increased the greenhouse gas concentrations in the atmo- sphere that has lead to many disastrous events in the world. Previous articles: 1. Background, Vol.18, No.3, Earth’s surface temperature has gone up by a few degrees centi- 2013. grade resulting in melting of ice and hence rising of sea levels.
    [Show full text]
  • Climate and Security in Latin America and the Caribbean
    CLIMATE AND SECURITY IN LATIN AMERICA AND THE CARIBBEAN Adriana Erthal Abdenur, Giovanna Kuele and Alice Amorim, eds. 2019 IGARAPÉ INSTITUTE | DECEMBER 2019 INDEX INTRODUCTION Adriana Erthal Abdenur, Giovanna Kuele and Alice Amorim ................. 2 HOW CLIMATE CHANGE RISKS MAGNIFY ECONOMIC AND SECURITY VULNERABILITIES CASE STUDY: VENEZUELA AND ITS NEIGHBORS Oliver Leighton Barrett ......................................................................................... 13 CLIMATE CHANGE, INEQUALITY AND SECURITY IN COLOMBIA: SOME REFLECTIONS ON THE SUBJECT Saul Rodriguez ............................................ 27 CLIMATE CHANGE, SOCIAL CONFLICT AND THE COMPLEXIFICATION OF CRIME IN BOLIVIA: AN ANALYSIS OF THE IMPACT OF FLOODS AND STORMS IN CHAPARE AS A COCA GROWING REGION Marilia Closs ............ 40 TOWARDS AN INTEGRATED GOVERNANCE OF TRANSBOUNDARY AQUIFERS IN SOUTH AMERICA: BALANCING SECURITY, HUMAN RIGHTS AND TERRITORIALITY Beatriz Mendes Garcia Ferreira ......................................... 52 CLIMATE AND SECURITY IN BRAZIL: THE ROLE OF THE PRESS IN THE DISCUSSION AND PROMOTION OF PUBLIC POLICIES Eloisa Beling Loose ..... 64 CLIMATE CHANGE AND SECURITY IN THE AMAZON: VULNERABILITY AND RISKS FOR INDIGENOUS PEOPLES ON THE ACRE - UCAYALI BORDER Marco Cepik and Hannah Machado Cepik ................................................................ 76 CLIMATE EVIDENCE-BASED POLICING: THE INFLUENCE OF RAINFALL ON THE CRIMINAL DYNAMICS OF THE CITY OF MANAUS Moisés Israel Silva dos Santos, Antônio Gelson de Oliveira Nascimento, Márcio
    [Show full text]
  • Dams, Indigenous Peoples and Ethnic Minorities
    WCD Thematic Reviews Social Issues I.2 Sharing Power Dams, Indigenous Peoples and Ethnic Minorities Final Version : November 2000 Prepared for the World Commission on Dams (WCD) by: Marcus Colchester - Forest Peoples Programme Secretariat of the World Commission on Dams P.O. Box 16002, Vlaeberg, Cape Town 8018, South Africa Phone: 27 21 426 4000 Fax: 27 21 426 0036. Website: http://www.dams.org E-mail: [email protected] World Commission on Dams Orange River Development Project, South Africa, Draft, October 1999 i Disclaimer This is a working paper of the World Commission on Dams - the report published herein was prepared for the Commission as part of its information gathering activity. The views, conclusions, and recommendations are not intended to represent the views of the Commission. The Commission's views, conclusions, and recommendations will be set forth in the Commission's own report. Please cite this report as follows: Colchester, M. 2000 - Forest Peoples Programme : Dams, Indigenous Peoples and Ethnic Minorities, Thematic Review 1.2 prepared as an input to the World Commission on Dams, Cape Town, www.dams.org The WCD Knowledge Base This report is one component of the World Commission on Dams knowledge base from which the WCD drew to finalize its report “Dams and Development-A New Framework for Decision Making”. The knowledge base consists of seven case studies, two country studies, one briefing paper, seventeen thematic reviews of five sectors, a cross check survey of 125 dams, four regional consultations and nearly 1000 topic-related
    [Show full text]
  • FULLTEXT01.Pdf [125] Adamo, N
    Journal of Earth Sciences and Geotechnical Engineering, Vol. 11, No.1, 2020, 347-438 ISSN: 1792-9040 (print version), 1792-9660 (online) https://doi.org/10.47260/jesge/1119 Scientific Press International Limited Dams Safety: Review of Satellite Remote Sensing Applications to Dams and Reservoirs Nasrat Adamo1, Nadhir Al-Ansari2, Sabah Hussain Ali3, Jan Laue4 and Sven Knutsson5 Abstract Remote sensing is the collection and interpretation of information of an object, area or phenomenon by a recording device that is not in physical or intimate contact with the object or phenomenon under study. It generally refers to the use of satellite borne or airborne sensors to capture the spectral and spatial relations of objects and materials on Earth from the space. This is done by sensing and recording reflected or emitted electromagnetic radiation from the objects. A brief history of satellite remote sensing is given in this review but the bulk of it is devoted to the scientific satellites launched into orbit and their sensors tracking, and presenting changes in water resources fields. The used technologies and satellite systems for monitoring movements and changes include American GNSS, GPS, the Russian GLONASS, Europe’s European Satellite Navigation System (GALILEO), China’s COMPASS/BeiDou, the Indian (IRNSS); Japan’s (QZSS) and many others. Details are presented on the present (LANDSAT), the Moderate Resolution Imaging Spectroradiometer (MODIS), as well as Synthetic Aperture Radar (SAR), and RADARSAT, JERS‐1, and ERS, which are developed by various countries, especially the USA. These sensors have the refined capability of providing estimates of variables, which depending on the purpose and design of the sensor, can follow critical issues related to water management problems.
    [Show full text]
  • Manual for Assessing Hydraulic Safety of Existing Dams - Volume I
    Manual for Assessing Hydraulic Safety of Existing Dams - Volume I Doc. No. CDSO_MAN_DS_04_v1.0 June 2021 Central Water Commission Ministry of Jal Shakti Department of Water Resources, River Development & Ganga Rejuvenation Government of India Front Cover Photograph: Sardar Sarovar Dam (India) during the monsoon flood. Copyright © 2020 Central Water Commission. All rights reserved. This publication is copyright and may not be resold or reproduced in any manner without the prior consent of Central Water Commis- sion. Government of India Central Water Commission Central Dam Safety Organization Manual for Assessing Hydraulic Safety of Existing Dams June 2021 Dam Safety Rehabilitation Directorate 3rd Floor, New Library Building R. K. Puram New Delhi - 110066 Doc. No. CDSO_MAN_DS_04_v1.0 Page i Government of India Central Water Commission Central Dam Safety Organization Disclaimer The Central Water Commission under the Dam Safety and Improvement Project has undertaken to prepare this Manual for Assessing Hydraulic Safety of Existing Dams to provide necessary guidance for ensuring the safety of existing dams against adverse hydrologic and hydraulic events. The design studies and measures required will vary from dam to dam depending on the type of prob- lems encountered. While every effort has been taken to incorporate all basic details as per the latest state of the art, yet it is not possible to cover all the conditions/problems which may be faced in the field. CWC absolves itself from any responsibility in this regard and dam owners and others involved with the dam rehabilitation activity should use their discretion in imple- menting the guidelines contained in this Manual. For any information, please contact: The Director Dam Safety Rehabilitation Directorate Central Dam Safety Organization Central Water Commission 3rd Floor, New Library Building (Near Sewa Bhawan) R.
    [Show full text]
  • Hydropower: Past and Future
    THE GREAT TRANSITION: Shifting from Fossil Fuels to Solar and Wind Energy Lester R. Brown, with Janet Larsen, J. Matthew Roney, and Emily E. Adams © Earth Policy Institute 2015 8 Hydropower: Past and Future In 1966, at the age of 72, Mao Zedong famously swam in Asia’s longest river, the Yangtze, to demonstrate his vigor and the strength of the Cultural Revolution. A dip in the fast-moving waters a decade earlier had inspired him to write a poem about how a dam on the Yangtze—a project that had been envisioned for flood control as early as 1919 by the founder of the Republic of China, Sun Yat-sen—could change the world. In 1994, some 18 years after Mao’s death, construction began on what would become the largest hydroelectric project ever seen: the Three Gorges Dam. First online in 2003 and fully completed in 2012, the 600-foot-tall Three Gorges Dam has an estimated electricity generating capacity of 22,500 megawatts. Its annual output of some 83 million megawatt-hours is equal to the power from burning 45 million tons of coal or running 12 nuclear reactors. Yet despite its major elec- tricity contribution, the monumental dam—like many of the 300 mega-dams worldwide—has had a profound environmental, social, and economic impact. The problems associated with the Three Gorges Dam Hydropower: Past and Future 115 are highly visible. Its construction flooded 244 square miles and displaced over 1.4 million people. The Chinese government’s promise to provide them with a home and life after relocation comparable to their previous liveli- hoods in economic terms has simply not materialized.
    [Show full text]