Airway Centre Marketing Flyer

Total Page:16

File Type:pdf, Size:1020Kb

Airway Centre Marketing Flyer THE CENTRE 5915-5955 Airport Road Mississauga, Ontario FOR MORE INFORMATION PLEASE CONTACT: *Sales Representative GLENN THACKERAY* JOHN POTTER* Vice President, LEED GA Vice President 416 798 6281 416 798 6242 [email protected] [email protected] 5915 AIRPORT ROAD Total of 20,258 sq. ft. Available 5925 AIRPORT ROAD Total of 19,232 sq. ft. Available 5935 AIRPORT ROAD Total of 43,159 sq. ft. Available 5945-5955 AIRPORT ROAD NET RENT Total of 19,119 sq. ft. Available $14.00 per sq. ft. T&O (2017 Estimate) 5915-5935: $16.01 per sq. ft. 5945-5955: $15.57 per sq. ft. PARKING 4.0 per 1,000 sq. ft. (5915-5935 has a combination of surface and covered garage.) YOUR OFFICE T.I. ALLOWANCE Please Contact Listing Agents AMENITIES Whether restaurants, hotels, or cafés, you’ve never done it like this. VE T DRI ES W H T R O D N ORLANDO DRIVE HIGHWA Y 409 HIGHWAY 27 Airport Gate Steak & Grill HIGHWAY 427 ATTWELL DRIVE CARLINGVIEW DRIVE Zet’s Restaurant VISCOUNT ROAD AMERICAN DRIVE Mother Tucker’s Marketplace DIXON ROAD Airport Gate Cafe & Grill Zachary’s AIRPORT ROAD DIXON ROAD SKYWAY AVENUE Toronto Pearson International Airport The Bistro Arizona B-Bar & Grill POTTER - THACKERAY 2016 Mother Tucker s Marketplace Located in Toronto’s accessible west end Airway Business Corridor, with great on-site amenities, with direct shuttle DIXON ROAD Airport Gate Cafe & Grill Zachary’s connection to Toronto’s Pearson InternationalAIRPORT ROAD Airport and in close proximity to four major highways, Airway Centre is a prime location for any business.DIXON ROAD Fast access to Highway 427, 401, 409 and 407, TTC, Mississauga and Brampton Transit accessible and withinSKYWAY AVENUE close proximity to Union Pearson Express and Malton GO Train station make commuting a breeze. Hassle free access to Pearson International Airport save business travellers and out of town clients or partners time and money, while the building and area amenities provide plenty of options to entertain. The Bistro Arizona B-Bar & Grill The Airway Centre provides employees with an amazing platform of on-site amenities including a fi tness centre, restaurants, zip cars, conference centre, prayer room, 24/7 security and outdoor patio space. PUBLIC TRANSIT FFINCHINCH TTTCTC SSTATIONTATION DDOWNSVIEWOWNSVIEW MALTON TTTCTC SSTATIONTATION GO KITCHENER LINE UNION PEARSON EXPRESS GO BARRIE LINE PPEARSONEARSON IINTERNATIONALNTERNATIONAL HIGHWAY 427 YONGE-UNIVERSITY TTC LINE TTC YONGE-UNIVERSITY AAIRPORTIRPORT EGLINTON PEARSON AVENUE AIRPORT TTC STATION KIPLING TTC STATION RENFORTH GATEWAY MISSISSAUGA BRT DDUNDASUNDAS WWESTEST TTTCTC STATIONSTATION KKIPLINGIPLING TTTCTC & BLOOR-DANFORTH TTC LINE GGOO SSTATIONTATION E N LI E R O GO MILTON LINE H S E K A L O G UUNIONNION Lake Ontario SSTATIONTATION Malton GO Station is Opening Mid 2017. running from Renforth Downtown Toronto to approximately 4 Kilometres or Drive to Winston Churchill, and with bus Pearson International 7 Minutes to Airway Centre connections to the Bloor-Danforth TTC Line Airport in 25 Minutes, every with connections to MiWay and & Westwood Mall, Bramalea and City Centre 15 Minutes from 5:30 AM - Brampton Transit. Transit Terminals 1:00 AM daily. THE COMING SOON: PARADISE MISSION DELIMARK CAFÉ AT 5925 EATERY CAFÉ AT 5915 AT 5935 AIRPORT ROAD AIRPORT ROAD AIRPORT ROAD • ON-SITE PROPERTY MANAGEMENT • ZIP CAR • 24/7 ON-SITE SECURITY • CONFERENCE CENTRE FITNESS FACILITY AT 5945-5955 AIRPORT ROAD SHUTTLE SERVICE TO PEARSON INTERNATIONAL AIRPORT MONDAY TO FRIDAY 8AM TO 4PM 52B Lawrence West to Westwood Mall 115 Airport Express 7 Airport to Westwood BUS STOPS 52D Lawrence West to Bramalea Transit Mall and City Centre ON SITE to McNaughton Terminal Transit Terminal THE COMPLEX Take advantage of the on-site amenities in the complex. A great platform for employee attraction and retention. AVAILABILITES Offi ce suites of from 650 sq. ft. to 17,632 sq. ft. Available for Lease 5915 AIRPORT ROAD SUITE 1000 10th 14,397 SQ. FT. SUITE 800 8th Available Feb 2017 Leased 902 SQ. FT. SUITE 640 6th Leased 1,163 SQ. FT. SUITE 410 4th Leased 1,354 SQ. FT. st SUITE 115 SUITE 110A Leased 1 1,078 SQ. FT. 1,364 SQ. FT. 5925 AIRPORT ROAD *Contiguous for a total of 17,632 sq. ft. SUITE 1005* SUITE 1000* 10th Available January 2017 7,625 SQ. FT. 10,007 SQ. FT. st SUITE 110 Leased 1 1,600 SQ. FT. Last Updated: December 13th, 2016 5935 AIRPORT ROAD *Contiguous for a total of 10,752 sq. ft. SUITE 800* SUITE 805* 8th Leased 8,675 SQ. FT. 2,077 SQ. FT. SUITE 400 4th Leased 10,180 SQ. FT. SUITE 300 3rd 17,485 SQ. FT. SUITE 200 2nd Leased 3,496 SQ. FT. st SUITE 115 1 1,246 SQ. FT. Leased Unique ground fl oor suite with private exterior entrances. 5945 5955 SUITE 174 SUITE 177 SUITE 180 SUITE 306 1st Leased 3rd Leased Available Jan. 2017 3,329 SQ. FT. 1,165 SQ. FT. 1,703 SQ. FT. 7,382 SQ. FT. SUITE 218 2nd Available Jan. 2017 Leased 2,500 SQ. FT. SUITE 103 SUITE 129 SUITE 140 1st Leased 602 SQ. FT. 1,030 SQ. FT. 1,408 SQ. FT. Last Updated: December 13th, 2016 FOR LEASE 5915-5955 AIRPORT ROAD MISSISSAUGA, ONTARIO FOR MORE INFORMATION PLEASE CONTACT: *Sales Representative GLENN THACKERAY* Vice President, LEED GA 416 798 6281 [email protected] JOHN POTTER* Vice President 416 798 6242 [email protected] CBRE Limited | 5935 Airport Road | Suite 700 | Mississauga, ON L4V 1W5 | www.cbre.ca This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verifi ed by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affi liated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved. Mapping Sources: Canadian Mapping Services [email protected]; DMTI Spatial, Environics Analytics, Microsoft Bing, Google Earth.
Recommended publications
  • (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
    Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion.
    [Show full text]
  • Kitchener Corridor Air Quality Study Report
    GO Rail Network Electrification Project Final Environmental Project Report Addendum APPENDIX F3: Kitchener Corridor Air Quality Study Report Local Air Quality Study – Kitchener Corridor GO Rail Network Electrification Project 03-Dec-2020 Prepared by: Contract: QBS-2017-CKU-001 Revision DE Authorization X X Alain Carriere Amber Saltarelli Senior Project Manager Project Manager X Andy Gillespie Program Manager REVISION HISTORY Revision Date Purpose of Submittal Comments DA 17-Jul-2019 Draft submission to Metrolinx N/A DB 08-Sep-2020 Revision addressing Metrolinx comments N/A DC 05-Oct-2020 Revision addressing Metrolinx comments N/A DD 09-Oct-2020 Revision addressing Metrolinx comments N/A DE 03-Dec-2020 Revised Submission N/A This submission was completed and reviewed in accordance with the Quality Assurance Process for this project. Revision DE 03-Dec-2020 Executive Summary Metrolinx and Hydro One (as co-proponents) jointly completed the GO Rail Network Electrification Transit Project Assessment Process (TPAP) in 2017 to convert six Metrolinx-owned Rail Corridors from diesel to electric propulsion. Once electrification is implemented, the system will operate with a mixed fleet of diesel and electric trains, as not all tracks on all corridors will be electrified. Metrolinx currently has a fleet of 91 diesel locomotives, of which 17 are relatively new or recently refurbished models that comply with the most stringent emission limits (Tier 4), while the remainder cover a range of ages and emission levels (Tier 0 to Tier 3). Since 2017, Metrolinx has developed a more detailed design and schedule for how increased passenger service will be delivered for the GO Rail Expansion Program in the future, involving further infrastructure and rail traffic changes.
    [Show full text]
  • Kitchener GO Rail Service Expansion Preliminary Design Business Case March 2021
    Kitchener GO Rail Service Expansion Preliminary Design Business Case March 2021 Kitchener GO Rail Service Expansion Preliminary Design Business Case March 2021 Contents Introduction 4 Background 5 Business Case Overview 5 The Case for Change 7 Introduction 8 Problem Statement 8 Key Drivers 8 Travel Behaviour 8 Transport Service Provision 8 Transport Infrastructure and Technology 9 Government Policy and Planning 9 Stakeholder Input 10 Summary of Key Drivers 11 Strategic Outcomes and Objectives 13 Strong Connections 13 Complete Travel Experiences 13 Sustainable Communities 13 Investment Options 14 Introduction 15 Option Development 15 Option Scoping 15 Business as Usual 16 Business as Usual with State of Good Repair Improvements (BAU+SOGR) 17 Option 1: Two-Way Service to Kitchener with Existing Crossing at Silver Junction 18 Option 2: Two-Way Service to Kitchener with Grade Separated Silver Junction 19 i Strategic Case 21 Introduction 22 Strategic Evaluation 22 Strong Connections 22 Complete Travel Experiences 27 Sustainable Communities 29 Strategic Case Summary 31 Economic Case 33 Introduction 34 Methodology 34 Costs 35 Optimism Bias 36 User Impacts 37 External Impacts 37 Wider Economic Impacts 38 Economic Case Summary 39 Financial Case 40 Introduction 41 Capital Costs 41 Operating and Maintenance Costs 41 Revenue Impacts 42 Funding Sources 42 Financial Case Summary 42 Deliverability and Operations Case 44 Introduction 45 Project Delivery 45 Project Sponsor and Governance Arrangements 45 ii Major Project Components 45 Environmental Assessment
    [Show full text]
  • Shantz Aaron.Pdf (7.260Mb)
    Understanding Factors Associated With Commuter Rail Ridership A Demand Elasticity Study of the GO Transit Rail Network by Aaron Shantz A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of Master of Environmental Studies in Planning Waterloo, Ontario, Canada, 2021 © Aaron Shantz 2021 Author’s Declaration I hereby declare that I am the sole author of this thesis. This is a true copy of the thesis, including any required final revisions, as accepted by my examiners. I understand that this thesis may be made electronically available to the public. ii Abstract Mode share in major North American cities is currently dominated by private automobile use. Planners have theorized that transitioning commuter rail systems to regional rail networks is a viable method to increase ridership and stabilize mode share. This process is currently underway in Ontario, Canada, as the amount and frequency of service is being increased throughout the GO Transit rail network via the GO Expansion Program. However, previous studies have shown that transit demand does not solely respond to service quantity expansions. Variables related to the built environment, regional economy, network characteristics, and socioeconomic status of the customer base can influence transit demand to varying degrees. Further, the literature states that the travel behavior of commuter rail users is unique, as access mode, distance, socioeconomic status, and the utility derived from varying trip types can differ compared to local transit users. These findings suggest that supplementary policies might be needed to reduce automobile reliance and stimulate demand for regional transit. Many transit researchers have conducted demand elasticity studies to identify what factors are significantly associated with transit ridership.
    [Show full text]
  • General Committee
    General Committee Date 2017/04/05 Time 9:00 AM Location Civic Centre, Council Chamber, 300 City Centre Drive, Mississauga, Ontario, L5B 3C1 Members Mayor Bonnie Crombie Councillor Jim Tovey Ward 1 Councillor Karen Ras Ward 2 (Chair) Councillor Chris Fonseca Ward 3 Councillor John Kovac Ward 4 Councillor Carolyn Parrish Ward 5 Councillor Ron Starr Ward 6 Councillor Nando Iannicca Ward 7 Councillor Matt Mahoney Ward 8 Councillor Pat Saito Ward 9 Councillor Sue McFadden Ward 10 Councillor George Carlson Ward 11 Contact Sacha Smith, Legislative Coordinator, Legislative Services 905-615-3200 ext. 4516 Email [email protected] Find it Online http://www.mississauga.ca/portal/cityhall/generalcommittee Meetings of General Committee streamed live and archived at Mississauga.ca/videos General Committee 2017/04/05 2 INDEX – GENERAL COMMITTEE- APRIL 5, 2017 1. CALL TO ORDER 2. APPROVAL OF AGENDA 3. DECLARATION OF CONFLICT OF INTEREST 4. PRESENTATIONS - Nil 5. DEPUTATIONS 5.1. Roy Wierenga, Student Transportation of Peel Region with respect to the amendment to the Highway Traffic Act - Bill 94 and a request for support for the initiative. 5.2. Jim Kozij, resident with respect to property tax increases. 5.3. Item 8.1 Shawn Slack, Director, IT and Chief Information Officer 5.4. Item 8.2 Susan Tanabe, Manager, Transportation Planning 6. PUBLIC QUESTION PERIOD - 15 Minute Limit (Persons who wish to address the General Committee about a matter on the Agenda. Persons addressing the General Committee with a question should limit preamble to a maximum of two (2) statements sufficient to establish the context for the question.
    [Show full text]
  • UNLOCKING the POTENTIAL of the AIRPORT MEGAZONE Pamela Blais October 2016 a Neptis Policy Brief
    UNLOCKING THE POTENTIAL OF THE AIRPORT MEGAZONE Pamela Blais October 2016 A Neptis Policy Brief Planning for Prosperity: Globalization, Competitiveness, and the Growth Plan for 1 The Basics ∙ p2 the Greater Golden Horseshoe was released by the Neptis Foundation in late 2 Employment Types ∙ p3 2015. This research report was intended to contribute to the Province of 3 Employment Change ∙ p6 Ontario’s Coordinated Review of the Growth Plan for the Greater Golden 4 Employment Geography ∙ p7 Horseshoe, Greenbelt Plan, Oak Ridges Moraine Plan, and Niagara Escarpment 5 Development Potential ∙ p9 Plan. The report described the changing economy and economic landscape of 6 Economic Assets ∙ p11 the Greater Golden Horseshoe, identifying important considerations for the 7 Travel, Transportation Growth Plan. Patterns, and Transit Use ∙ p12 8 Conclusions ∙ p15 In particular, Planning for Prosperity identifed three major regional employment 9 Appendix ∙ p16 “megazones.” These are large, economically signifcant employment areas that represent major sources of auto travel and traffc congestion, as well as green- house gas emissions. The megazones were not recognized in nor addressed by the Growth Plan. Because they extend across municipal boundaries, planning for them has been fragmented at best. Planning for Prosperity stressed the need to integrate land use planning, transportation planning, and economic development strategies in planning for employment. This integrated approach is not common in the GGH. Given the importance of these megazones to the regional, provincial, and national economies, and their potential role in achieving key Growth Plan objectives, Neptis commissioned additional research on these areas to support integrated planning and policy development. This policy brief profles the Airport megazone.
    [Show full text]
  • High Speed Rail in Ontario: Transforming Mobitity, Connecting Communities, Integrating Centres of Innovation and Fostering Regionat Economic Growth and Devetopment
    High Speed Rail in Ontario: Transforming mobitity, connecting communities, integrating centres of innovation and fostering regionat economic growth and devetopment Special Advisor for High Speed Rail: Final Report December 2016 December 2, 2016 Dear Minister, Just over a year ago, the Government of Ontario asked me to be Special Advisor on its commitment to establish High Speed Rail service in the Toronto-Windsor corridor. Throughout the past year I have worked with a dedicated and talented team of officials from the Ministry of Transportation on the concept, preliminary business case, governance structure, financing, and next steps for delivery of High Speed Rail (HSR). Over the course of this work I have engaged widely with local municipalities, Indigenous communities and public and private sector stakeholders to obtain their advice and considerations on how HSR should be implemented. I have drawn from the experiences other countries have had with HSR, including the United States, United Kingdom, France, Germany, Spain, Japan and China. There have been thorough market soundings with the private sector, organized by Infrastructure Ontario. All of this work has led me to the conclusion that a business case exists for HSR in the corridor, which would connect Toronto, Pearson Airport, Guelph, Kitchener-Waterloo, London, Chatham and Windsor. I have also concluded that there are opportunities to engage the private sector in financing and delivering the project. I encourage the Government of Ontario to proceed with: detailed project planning; the environmental assessment process; further engagement with Indigenous communities, and key stakeholders including municipalities, the two national freight railway companies, VIA Rail, Metrolinx (GO Transit) and regulatory bodies at both the Ontario and federal level; evaluation of appropriate financing and delivery models; and seeking financial approvals.
    [Show full text]
  • Metrolinx—Public Transit Construction Contract Awarding and Oversight
    Chapter 3 Section 3.09 Metrolinx—Public Transit Construction Contract Awarding and Oversight tracks, building tunnels and bridges for trains, and 1.0 Summary upgrading existing GO stations. Metrolinx’s construction projects proceed differ- ently depending on the contractor Metrolinx works Metrolinx is an agency of the Ministry of Transpor- with. Of the $4.1 billion Metrolinx spent over the tation responsible for operating a network of train past five years, about $3.4 billion (82%) was on and bus routes across more than 11,000 square projects where Metrolinx contracted out all of the kilometres (km) in the Greater Toronto and Hamil- work. That is, external firms designed the project, ton Area. Currently valued at $11 billion, Metrolinx constructed it and oversaw it. For almost all of uses about 680 km of railway track on seven train these projects, Metrolinx contracted with a separate lines, 66 train stations and 15 bus terminals. In company to design the project and a different com- total, about 69 million passenger boardings occur pany to construct it (this is the traditional model for Chapter 3 • VFM Section 3.09 annually on Metrolinx vehicles. delivery of construction projects). Metrolinx was established in 2006 as a planning The other $725 million (18%) of construction agency, and then merged in 2009 with GO Transit dollars Metrolinx spent in the past five years was (GO), which had been operating the regional tran- paid to Canada’s two major railway compan- sit system since 1967. With this merger, Metrolinx ies—the Canadian National Railway (CN) and the became responsible for operating, maintaining Canadian Pacific Railway (CP).
    [Show full text]
  • Kitchener GO Line
    21 20 10 / MOUNT PLEASANT APRIL 16, 2020 1 6 ) alk n w mi 0 (1 s iu ad r m 0 0 8 AVE WORTHINGTON 1 0 BOVAIRD DR W MTSA Station, 800m Buffer Preliminary Boundary Delineation Urban Growth Centre (UGC) Designated Greenfield Area (DGA) Provincially Significant Employment 0 100 200 300 400m Zone N MTSA Preliminary Boundary Delineation Station: Mount Pleasant Corridor Type: Priority Transit Corridor Area (ha) 18 Municipality: City of Brampton Combined Station: n/a Corridor: Kitchener GO Target Density: 150 ppj/ha Population 1 Employment 6 • Station Ready 33 ANALYTICAL LENS 32 Total Density (ppj/ha) 0.4 MOBILITY • GO train service at Mount Pleasant GO 31 Additional People and Jobs to 2,600 • Cycling and pedestrian infrastructure Achieve Target Density (ppj) 35 • High availability of vacant land 30 MTSA 800m Radius MARKET AND GROWTH • High development pipeline activity 29 Area (ha) 201 POTENTIAL • Large parcel sizes within 800m radius Population 6,104 LAND USE AND • Low flood risk BUILT FORM • GP Built Up Urban Area, Designated Greenfield 1 8 Employment 418 Area (DGA) 27 28 25 26 Total Density (ppj/ha) 32.5 • Availability of sports and recreational facilities COMMUNITY CONSIDERATIONS • Brampton Library Mount Pleasant Village Branch 11 24 *DataAdditional source: Scenario People 16, prepared and by Hemson Jobs Consulting to for23,600 the RegionAchieve of Peel (2016 Target Census Density Data) (ppj) 23 34 22 37 8 9 7 1 2 1 3 6 1 7 5 1 4 1 3 2 96 79 99 78 82 93 77 76 75 81 74 64 63 62 97 61 73 60 59 57 56 55 54 72 84 71 53 86 70 69 95 68 67 1 00
    [Show full text]
  • Southwestlynx: Integrated High-Performance Public Transportation for Southwestern Ontario by Greg Gormick on Track Strategies June 2018
    SouthwestLynx: Integrated High-Performance Public Transportation for Southwestern Ontario By Greg Gormick On Track Strategies June 2018 oxfordcounty.ca SouthwestLynx: Integrated High-Performance Public Transportation for Southwestern Ontario By Greg Gormick On Track Strategies June 2018 Table of Contents Acknowledgements ......................................................................................................................................4 Executive Summary ......................................................................................................................................5 1.0 Introduction: A Question of Destiny .....................................................................................................7 2.0 Southwestern Ontario’s Mobility Gap ...................................................................................................8 2.1 VIA Rail Canada ..........................................................................................................................9 2.2 Intercommunity Transportation................................................................................................15 2.3 Urban Transit ............................................................................................................................19 2.4 Intermodal Connectivity ...........................................................................................................20 3.0 The Benefits of Integrated Public Transportation Investment .............................................................22
    [Show full text]
  • GO Rail Network Electrification Environmental Project Report Addendum Executive Summary
    GO Rail Network Electrification Final Environmental Project Report Addendum – Executive Summary 2021-02-16 Prepared by: Contract: QBS-2014-IEP-002 GO Rail Network Electrification Final Environmental Project Report Addendum Executive Summary Project Overview On December 11, 2017, the Minister of the Environment and Climate Change (now referred to as Minister of the Environment, Conservation and Parks) issued a Notice to Proceed to Metrolinx and Hydro One (as Co-Proponents) for the GO Rail Network Electrification Environmental Project Report (EPR) to convert six GO owned rail corridors from diesel to electric propulsion. Metrolinx subsequently issued a Statement of Completion for the GO Rail Network Electrification Transit Project Assessment Process on December 15, 2017. The purpose of this EPR Addendum is to document and assess the potential environmental impacts of changes to the project design associated with new/upgraded tracks, new layover facilities, (which are the subject of the New Track and Facilities TPAP and the Scarborough Junction Grade Separations TPAP), additional infrastructure required within the Union Station Rail Corridor (USRC) and surrounding areas to address identified conflicts with existing Hydro One transmission infrastructure and revisions required to update noise, vibration and air quality studies that have occurred since the completion of the 2017 GO Rail Network Electrification EPR (see Figure 0-1 for a map of the Study Area). EPR Addendum Process As per Section 15(1), Ontario Regulation 231/08, any change that is inconsistent with a previously approved EPR requires a reassessment of the effects associated with the project, the identification of potentially new mitigation measures, and potentially new monitoring systems in an Addendum to the previously approved EPR.
    [Show full text]
  • Mitransit-Jan-30-2012.Qxd:Intransit-Jan/05.Qxd 12/21/11 4:25 PM Page 1
    MiTransit-Jan-30-2012.qxd:inTransit-JAn/05.qxd 12/21/11 4:25 PM Page 1 Fares effective JANUARY 30, 2012 January 30, 2012 MiWay Fare Changes: January 30, 2012 January 30, 2012 miFARES Pre-School Child (must be accompanied by fare paying passenger) FREE Student and Child Transit Fares to The new routing will service some areas previously served by Route 31-Folkway-Homelands on Sundays. Person with Vision Loss (with C.N.I.B. Card) FREE Remain Discounted TRANSIT Buses will depart stops every 40 minutes. Support Person(A person whose presence is essential to provide care and FREE On January 30, 2012, fares for students and children mi MAJOR CHANGES TO WEEKEND SERVICE assistance to a person with disabilities. One support person per disabled customer will travel at 3 – Bloor - Sunday New Routing 31 – Folkway-Homelands - Sunday Cancelled no cost. A support person accompanying a person with vision loss must pay a regular fare) will not change; however, other fares will change to maintain a balance between providing affordable The Sunday routing will now follow the Monday to Due to a decline in overall customer demand for this CASH FARE (All Passengers) $3.25 fare options for riders and addressing rising Saturday routing. The schedules will be revised – please service on Sundays, it will no longer be provided as per the service rationalization measures contained in Child Ten Tickets (Five Tickets - $8.25) $16.50 operational costs. check up-to-date schedules online.The route map is (Grades 1 to 8) also available online. the latest budget.
    [Show full text]