Proposed by E.C.Senniappan
Total Page:16
File Type:pdf, Size:1020Kb
Form-1 (As per EIA notification 2006) For the Proposed Black Granite (Dolerite) Quarry Project- 2.59.0Ha S.F.No: 49 and 50/3B, Kodiyalam Village, Denkanikottai Taluk, Krishnagiri District, Tamilnadu Proposed by E.C.Senniappan Application Form for Obtaining Environmental Clearance from State Level Environmental Impact Assessment Authority (SEIAA) Tamilnadu FORM I (I) BASIC INFORMATION S.No Item Details 1 Name of the project/s Kodiyalam Black Granite Quarry project 2 S. No. in the schedule 1(a) 3 Proposed capacity/area/length/tonnage The proposed quantity of reserves (10%) is about 3498m3 to be handled/command area/lease of Black Granite for a remaining scheme period of five area/number of wells to be drilled years. Area = 2.59.0 Ha. It is New proposal Black Granite Quarry Project (the area 4 New/ Expansion/ Modernization has been quarrying operation earlier) in Kodiyalam Village. Existing capacity/Area etc. The proposed quantity of reserves (10%) is about 3498m3 (or) 618 Lorry Loads of Black Granite for a remaining scheme period of five years. The quarry operation is proposed Black Granite up to a depth of 22m (2m topsoil+ 20m Black Granite) during scheme period. Granite side Total Descriptio Reserves waste Topso ROM burde waste n 10%(m3) 90% il (m3) 5 (m3) n (m3) (m3) (m3) Geological 227990 22799 205191 21722 - 205191 reserves Mineable 80675 8068 72607 15924 1730 74337 Reserves Five years Scheme of 34960 3498 31462 5700 1730 33192 mining plan 6 Category of project i.e. `A’ or ‘B’ Category - B2 Does it attract the general condition? If 7.5m safety distance maintained from the all along the 7 yes, please specify. boundary barrier. Does it attract the specify condition? If 50m safety distance is maintained from the odai passing 8 yes, please specify. on the southeastern side. Location Topo sheet No: 57 -H/10 9 Latitude: 12°35'57''N to 12°36'10''N Longitude: 77°43'43''E to 77°43'58''E Plot/ Survey/ Khasra No. 49 and 50/3B Village Kodiyalam Taluk Denkanikottai District Krishnagiri State Tamilnadu Nearest railway station/ airport along Hosur Railway station - 18km - NE 10 with distance in kms Bangalore Airport - 43km - NW Nearest Town, city, District Town – Denkanikottai - 10km - SE 11 Headquarters along with distance in Nearest City – Krishnagiri - 54km - SE kms District – Krishnagiri - 54km - SE Village Panchayats, ZilaParishad, Village - Kodiyalam Municipal Corporation, Local body Panchyat Union - Denkanikottai 12 (complete postal addresses with Taluk - Denkanikottai telephone nos. to be given) District - Krishnagiri 13 Name of the applicant E.C.Senniappan, E.C.Senniappan, Prop. M/s.Annamar Granites, 14 Registered Address 413/296, Sathy Road, Erode Address for correspondence: Name E.C.Senniappan, Designation (Owner/Partner/CEO) Proprietor M/s.Annamar Granites, Address E.C.Senniappan, Prop. M/s.Annamar Granites, 413/296, Sathy Road, 15 Erode Pin Code 638 003 E-mail [email protected] Telephone No. 94430 46262 Fax No. - Details of Alternative Sites examined, There is no alternative sites are examined. The project is 16 if any. Location of these sites should site specific. be shown on a Topo sheet. 17 Interlinked Projects There is no interlinked project. Whether separate application of This project is site specific to win the Black Granite blocks 18 interlinked project has been from the parent sheet mass; hence separate application for submitted? interlinked project has not submitted. This project is site specific to win the Black Granite blocks 19 If yes, date of submission from the parent sheet mass; hence separate application for interlinked project has not submitted. This site specific project involves Black Granite Quarry 20 If no, reason only. Whether the proposal involves approval/ clearance under: if yes, (a) The project does not attract the Forest details of the same and their status to (Conservation) Act 1980. be given. (a) The Forest (Conservation) Act, (b) There is no wild life in the project site area under 21 1980? the Wildlife (protection) Act 1972. (b) The Wildlife (Protection) Act, 1972? (c) The project area does not fall the C.R.Z (c) The C. R. Z. Notification, 1991? Notification, 1991. The Mining lease was granted in G.O. (3D) No: 32, Industries ( MMB-2 ) Department Dated: 23.02.2006 Whether there is any Government 22 Order/ Policy relevant/ relating to the The Mining Plan was Approved by the Commissioner of site? Geology and Mining, Chennai vide Letter No: 11158/MM5/2005 Dated: 15.02.2006 (Enclosed as Annexure – I). 23 Forest land involved (hectares) There is no forest land involved in the lease area. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? There is no court case pending, litigations relating to the 24 (a) Name of the Court (b) Case No. project directly and indirectly. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use changes in water bodies, etc.) Information/Checklist Yes/ Details thereof (with approximate quantities/rates, S. No confirmation No wherever possible) with sources of information data The topography will be changed after the quarrying of Black Granite as per the Mining plan, Open cast Semi Mechanized Mining with 5.0 meter vertical bench with a bench width of 5.0 meter is being proposed. Topography will change in respect to overburden excavation. However, measures will be implemented as per mining Plan. As the area of the quarry remains the same, there will not be any increase in intensity of local land use. After the end of the life of the quarry Permanent or temporary change the waste material will be backfilled in the mined work in land use, land cover or out area. 1.1 topography including increase in Yes Area to be Area to be intensity of land use (with Present Required at required at respect to local land use plan) Description Area the present the End of (Ha.) scheme the lease period(Ha) period(ha) Area under 0.50.3 0.31.8 1.58.0 quarry Waste dump Nil 0.21.9 Backfilled Infrastructure Nil 0.01.0 0.01.0 Roads 0.01.0 0.01.0 0.02.0 Green Belt Nil 0.12.5 0.25.5 Stocking Blocks 2.07.7 1.39.5 0.72.5 Grand Total 2.59.0 2.07.7 2.59.0 Clearance of existing land, There is no vegetation and building in this project 1.2 vegetation and building? No lease area. The total quarrying activity is proposed to carry out within the quarry lease applied area. Hence, there is no proposal for creating of new land uses. Temporary approach road within the area will be form for the easy 1.3 Creation of new land uses? No access of men and machinery which will be well maintained. The Trailers/ trucks will transport the Black Granite to the needy customer by existing road. The fresh Black Granite is clearly visible, hence pre- Pre-construction investigations 1.4 No construction investigation and soil testing is not e.g. bore houses, soil testing? proposed before quarrying operation. There will be no major civil works, Other than the following: Office building, storeroom, toilet and first 1.5 Construction works? No aid room which will be provided as permanent structures within the quarry lease applied area, after the grant of quarry lease. There are no existing building within the lease applied 1.6 Demolition works? No area hence no demolition work is involved. Temporary sites used for Sites service on permanent structure will be 1.7 construction works or housing of Yes constructed only after grant of quarry lease, hence no construction workers? temporary sites are proposed. Above ground buildings, There are no tall buildings or linear structure found structures or earth works 1.8 No within the quarry site. There is no requirement of including linear structures, cut and fill or excavations cutting and filling in the site. Underground works including Open cast semi mechanized quarrying will be adopted. 1.9 No mining or tunneling? No underground mining or tunneling is proposed. It’s a fresh project and it is proposed plan only 22m (2m topsoil+ 20m Black Granite) for during this scheme 1.10 Reclamation works? Yes period. Hence, after mine reaches ultimate limit of 22m the remaining waste will be refilled in the worked out mine area. It’s an inland opencast quarrying operation, hence 1.11 Dredging? No dredging activities are not proposed. It’s an opencast quarrying operation, There is no such 1.12 Offshore structures? No type of activities involved. There is no production or manufacturing is involved in the Black Granite Quarrying. It’s an opencast Production and manufacturing 1.13 No quarrying operation with shallow drilling and limited processes? blasting. The rough Black granite blocks are either exported or sold to needy domestic factories. There is no proposal for storage of material within the Facilities for storage of goods or quarry lease applied area. The Black Granite Blocks 1.14 No materials? will be loaded directly to the trailers and transported to needy customers. The proposed Recovery of Dimensional stone is 10%.The Remaining 90% Granite waste and total waste will be dumped on the southeastern side and later will be used for backfilling at end of life of quarry. Facilities for treatment or There is no toxic effluent anticipated in the form disposal of solid waste or liquid of solid and liquid or gas.