Minutes of the

3Lz'n MEETTNG

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY

Date: 07.O6.2OLB MINUTES OF THE 312th MEETING OF THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORIW HELD ON 07.05.2018

Agenda File Description Minutes No. No. The minutes of the 311th meeting of the Confirmation of the minutes of the 311th a) Authority held on 05.06.2018 was meeting of the Authority held on 05.05.2018 confirmed. The Member Secretary tabled the action The Action taken on the decisions of the 311th b) taken report on the decisions of the 311th meeting of the Authority held on 05.05.2018 meeting and discussed. 1. To consider the grant of Terms of Reference 505 Discussed in detail, the Authority decided to (ToR) under EIA Notification 2005 for the recommend the proposal for the grant of project by M/s. Saveetha Medical & ToR in addition to the following additional

Educational Trust. !nstitutional Campus ToR: Project "saveetha University" at S. Nos: 78/3, 1. The EIA study should include the

] 79, go, 8L, 8211, 8212, 83ltA, 8312, 84, 8512, source of water supply and its

I 86148, 299 of Mevalurkuppam Village and impact on the surroundings due to

I s.Nos.300,301, 3O2,303lt to 303/6,303/8 to drawal of water.

I 303hO,3O4lt to 304lt2, 305/38, 30514,306, 2. Detailed biodiversity study ana

I 308 of Chettipedu Vi!!age, Sriperumbudur impact on the existing water

I Taluk, Kancheepuram District, bodies, agricultural activities near

under Category "B2" and Schedule S,No. 8(b) the project site to be conducted. Townships and Area Development Projects. 3. The proponent should provide sump of 14000 KLD capacity for collection of rain water. 4. The study should include storm I water management for the entire

I

s. ;"i r,^ study shoura incruae trre

I details of water supply (source and

I quantity) right from the

I commissioning of the project. 6. The proponent shall utilize the excess treated sewage in the .. available vacant land of 22 Hectares / \,^rr./ ;rilsEcRErARY qr} /ro'*rorn for irrigation. Furnish the proposal

for the same.

7. The proponent should revise the EMP covering all the components including scientific disposal of solid

waste, planting, etc.

2. To consider the grant of Term of References 433 Discussed in detail, the Authority decided to

(ToR) under EIA Notification 2005 for the recommend the proposal for grant of ToR

project by M/s. SPR&RG Constructions (P) subject to the following additional ToR: Ltd..Multistoried Residential Building Complex 1. The proponent should submit the "Osian Chlorophyll"at S. No. t37lL, L38lt, copy of the MOU with corporation l48l5A, l48l7A of Karambakkam Village, for disposal of excess treated Maduravoyal Taluk, Thiruvallur District, sewage. Tamilnadu under Category "81" and Schedule 2. The proponent should revise the S.No. 8(b) Building and Construction Projects EMP covering all the components including scientific disposal of MSW, disposal of excess treated sewage, etc. 3. The proponent should complete the following activity and submit the

same while applying for EC in the

EIA report: a) The proponent should provide a sump of capacity 1400 Kt for collection of rain water

b) The OWC should be installed and it should be ready for operation

c) ln STP blower, sludge handling pump & treated

sewage pump shall have

stand by provisions.

1- W/ MEMBER SECRETARY MEMBER CHAIRMAN The proponent should earmark play area of 2000 sq.m and visitors car parking area separately and furnish the revised copy of the layout plan.

3. To consider the grant of Terms of Reference 1195 Discussed in detail, the Authority decided to

(ToR) under EIA Notification 2006 for the defer the proposal for further discussion. project by M/s Dugar Housing Limited.

Residential Building Complex located at S.Nos: llTll & 119 of Ayanambakkam Village, Ambattur Taluk, Thiruvallur District, Tamil

Nadu under Category "B2" and Schedule S.No. 8(a) Building and Construction Projects.

4. To consider the grant of Environmental 1342 Discussed in detail, the Authority decided to

Clearance under EIA Notification 2005 for the recommend the proposal for grant of ToR

project by M/s. Dugar Housing Limited. subject to the following additional ToR: Residential Cum Commercial Building Complex 1. The proponent should submit the entitled "Lake Dugar at S. Nos; S. No. 77912A, copy of the MOU with corporation 28,2C,2D,2E & 2F, Korattur Village, Ambattur for disposal of excess treated Taluk, Thiruvallur District under Category "B2" sewage. and Schedule S.No. 8(a) Building and 2. The proponent should revise the Construction Projects EMP covering all the components including scientific disposal of MSW, disposal of excess treated sewage, planting, etc. 3. The proponent should complete the following activity and submit the

same while applying for EC in the

EIA report: a) The proponent should provide a sump of capacity 550K1 for collection pf rain \. , #'*RETARY 6"ffi water

b) The OWC should be installed and it should be ready for operation

c) ln STP blower, studge handling pump & treated sewage pump shall have stand by provisions.

d) The proponent should earmark play area of 1000 sq.m and visitors car

parking area separately and furnish the revised copy of the layout plan.

5. To consider grant of Environmental Clearance 6485 Discussed in detail, the Authority decided to

for the Proposal to expand the existing defer the proposal for further discussion.

residential development by M/s. Prime Expat infra Pvt. Ltd. at S.F.No.22/1A, 18, tC,LD,1^E,

LF,2312,3A, 38, 3C, 4A, 48, 5A1, 5A2, 58, 5C, 6, 24fL, 2A, 28, 4A, 4A2, 4A3, 4A4, 4A5, 48, 2512, 26llA, 2A, 28, 2C, Penuncheri Village, Ponneri Taluk, Tiruvallur District - 60L204 - Activity 8(a) & Category "82"- Building & Construction Projects..

6. To consider the proposal for the grant of 62LO Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Limestone along with additionalToR as recommended

over an extent o12.23.5 Ha at S.F. No. 46/2(P) by SEAC in addition to the following:

& 50/1(P), Venkatachalapuram Village, Lalgudi 1. lssue of ToR is considered for the Taluk, Trichy District by M/s. Vel lndustries. mining period 2018-19 onwards

onlY. 2. Excess quantity mined during the

-> MEMBER--))' SECRETARY mining period shall be furnished to assess the ecological and other damages from the Department of

Mining & Geology. 3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

7. To consider the proposal for the grant of 6405 @thoritydecidedto Terms of Reference under violation for the defer the proposal for further discussion. existing project for the mining of Limestone & A Marl over an extent of 4.68.0 Ha at S.F.No. 248 (P) & 253 (P), Varagupadi Village, Alathur

Taluk, Perambalur District by M/s. The Ramco

Cements Limited.

8. To consider the proposal for the grant of 5595 Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Existing Lime along with additionalToR as recommended

stone Quarry over an extent of 4.85.0 Ha at by SEAC in addition to the following: S.F. Nos. 43711, Vickramasingapuram Village, 1. lssue of ToR is considered for the Ambasamudram Taluk, Tirunelveli District by mining period 2018-19 onwards Thiru. B.Sundaram. only. 2. Excess quantity mined during the mining period shall be furnished to assess the ecological and other damages from the Department of

Mining & Geology. 3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

MEMBER SECRETARY T;;nsidertte@ 5237 Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Existing along with additionalToR as recommended

Multi Colour Granite Quarry at S.F. Nos. 139/2 by SEAC in addition to the following: (P) & l40ltB (P), Ulliyakottai Village, 1. lssue of ToR is considered for the Vedasandur Taluk, Dindigul District by Thiru. mining period 2018-19 onwards R. Muthusamy. only. Excess quantity mined during the

mining period shall be furnished to assess the ecological and other damages from the Department of Mining & Geology.

The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

10. To consider the proposal for the grant of Discussed in detail, it was found that the Terms of Reference under violation for the mining plan presented by the proponent

existing project for the mining of Existing Grey during approval is not enclosed. The mining

Granite Quarry over an extent of 2.00.0 Ha at plan given in the proposal has also expired S.F. Nos. 529(Part), Nagamangalam Village, in the year 2OL7-L8. Hence, the Authority Taluk, District by decided to address the applicant to furnish M/s. RaniGranites. the approved mining plan.

11. To consider the proposa! for the grant of 6591 Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Existing Grey along with additionalToR as recommended

Granite Quarry over an extent of 1.95.5 Ha at by SEAC in addition to the following: S.F. Nos. t33lt, L3315, Kondappanayanapalli, Issue of ToR is considered for the & District by M/s. S.M. mining period 2018-19 onwards Exports. only.

Excess quantity mined during the mining period shall be furnished to

MEMBER SECRETARY CHAIRMAN assess the ecological and other damages from the Department of

Mining & Geology. 3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

12. To consider the proposal for the grant of 4793 Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Existing Grey along with additionalToR as recommended

Granite Quarry over an extent of 1.21.0 Ha at by SEAC in addition to the following: S.F.No 438 (Part) Jagadevipalayam Village, 1. lssue of ToR is considered for the Krishnagiri Taluk, , by Tmt. mining period 2018-19 onwards S. Naseera. only. 2. Excess quantity mined during the mining period shall be furnished to assess the ecological and other damages from the Department of Mining & Geology. 3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

13. To consider the proposal for the grant of 5415 Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Existing Grey along with additional ToR as recommended

Granite Quarry over an extent of 4.05.0 Ha at by SEAC in addition to the following: S.F. Nos. 529 (Part), Nagamangalam Village, 1. lssue of ToR is considered for the Denkanikottai Taluk, Krishnagiri District, by mining period 2018-L9 onwards M/s. Indira Granites. only. J 2, Excess quantity mined during the MEMBER SECRETARY mining period shall be furnished to assess the ecological and other damages from the Department of Mining & Geology. 3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period,

L4, To consider the proposal for the grant of 6Lt2 Discussed in detail, the Authority decided to

Terms of Reference under violation for the issue ToR for the preparation of EIA Report

existing project for the mining of Existing along with additionalToR as recommended

Black Granite Quarry over an extent of 2.59.0 by SEAC in addition to the following: Ha at S.F. Nos. 49 & 5Ol3B, Kodiyalam, 1. lssue of ToR is considered for the Denkanikottai Taluk, Krishnagiri District by mining period 2018-19 onwards Thiru. E. C. Senniappan. only.

2. Excess quantity mined during the mining period shall be furnished to assess the ecological and other damages from the Department of

Mining & Geology.

3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

15. To consider the proposal for the grant of 4534 Discussed in detail, the Authority decided to Terms of Reference under violation for the issue ToR for the preparation of EIA Report existing project for the mining of Existing along with additionalToR as recommended

Rough Stone Quarry over an extent of 2.50.0 by SEAC in addition to the following: Ha at S.F. Nos. 346l2lP-lll Nadumandalam 1. lssue of ToR is considered for the Village, Natham Taluk, Dindigul District, by mining period 2018-19 onwards Thiru. S.K.Balasubramanian. only.

. \_ -\-'/ -sY ---, ,l.*/ MEMIfi-rr.*rro*, MEMiE R cxttnnnAru 2. Excess quantity mined during the mining period shall be furnished to assess the ecological and other damages from the Department of Mining & Geology. 3. The EIA study report shall provide details of proposed and actual mined quantity for the entire mining plan period.

-.

MEMBER SECRETARY ffi