Introduction 1

1.0 Review of Scheme of Mining 3

PART-I

2.0 Proposal under scheme of mining for the next 9 five years

3.0 Geology and Exploration 10

4.0 Conceptual Mining Plan 20

5.0 Mining 21

6.0 Mine Drainage 26

7.0 Stacking of Granite Reject and Disposal of 26 Waste

8.0 Employment potential and Welfare Measures 28

9.0 Uses of Granite 29

10.0 Any Other Infonnation 30

PART-II

11.0 Environment Management Plan 31

12.0 Any other Relevent Infonnation 38 PART-III

13.0 Progressive and Final Mine closured Plan 40

14.0 Economic repercussions of closure of mine and 44 manpower retrenchments

15.0 Time Scheduling abandonlnent 45

16.0 Proposed financial Estinlatel Budget for (EMP) 45 Environment Management

17.0 Abandonment Cost 46 (a)

LIST OF ANNEXURES s. No. Description Page No.

I G.O.Copy 48

II Lease Deed Copy 56

III Copy ofFMB 82

IV Copy of Combined Sketch 84

IV Copy of Patta and Chitta Adangal 86

V Copy ofRQP certificate 88 (b)

LIST OF PLATES s. No. Description Page No.

01. Location Plan I

02. Lease Plan II

03. Geological Plan III

04. Geological Sections IV

05. Surface Plan V

06. Production and Development Plan VI

07. Section of Production and Development VII

08. Conceptual Mining Plan! Mine Closure Plan VIII

09. Section of Ultimate Pit Limit IX

10. Progressive Mine Closure Plan Showing Land X Use and Afforestation

11. Key Map XI (i)

CONSENT LETTER FROM APPLICANT

The Scheme of Mining in respect of Multi Colour Granite (Red Multi) quarry over an extent of 1.00.0 Hectare in S.F.NO. 1105/2(P) & 1105/3(P),

Erudhukottai Village, Denkanikottai Taluk, Krishnagiri District, Tamil Nadu

State has been prepared by Shri.S.Suriyakumar Recognised Qualified

Person, Reg.No. RQP\MAS\013\87\A.

I request the Dept. of Geology and Mining, Chennai to make further correspondence regarding modifications of the scheme of mining with the said Recognised Person on this following Address,

S.SURIYAKUMAR, M.Phil.(Geology),F.C.C.(Mining), PGDBA, PGDIPC (Industrial Pollution Control) RQP & NABET /QCI Accredited EIA Consultant, No.3/216,K.S.V.Nagar,Narasothipatti, Alagapuram Post, Salem - 636 004. Phone (0427) 2444297, Cell: 98427 29655

I hereby under take that all modifications so made in the Scheme of

Mining by the Recognized Qualified Person may be deemed to have been made with my knowledge and consent and shall be acceptable to me and binding on me in all respects.

Place: Krishnagiri, Tamil Nadu Date: 10.07.2015 r0' Signature of the Applicant (ii)

THIRU R.MAHENDHAR S/O. Ramegowdu, Kundumaranapalli Village & Post, Denkanikottain Taluk, Krishnagiri District. Tamil Nadu. Pincode -635107 PH =99422-42131. ------~

DECLARATION OF MINE OWNER

The Scheme of Mining in respect of Multi Colour Granite (Red Multi) quarry over an extent of 1.00.0 Hectare in S.F.NO. 1105J2(P) & 1105J3(P), Erudhukottai

Village, Denkanikottai Taluk, Krishnagiri District, Tamil Nadu has been prepared with my consultation and I have understood the contents and agree to implement the same in accordance with the Mining Laws.

Place: Krishnagiri, Tamil Nadu Date: 10.07.2015 16, Signature of the Applicant (iii)

S.SURIYAKUMAR, M.Sc.,M.Phil. (Geo),F.C.C.(Min),PGDBA,DIPC. RQP & NABET /QCI Accredited EIA Consultant, No.3/216, K.S.V.Nagar, Narasothipatti, Salem - 636 004. Email: [email protected]@gmail.com . Phone (0427) 2440 446, 2444 297,Cell : 98427 - 29655.

( CERTIFICATE

This is to certify that the provisions of Granite Conservation and

Development Rules, 1999 (GCDR) have been observed in the Scheme of ( Mining for Erudhukottai quarry in S.F.No. 110SJ2(P) & 110SJ3(P) ( ( Denkanikottai Taluk, Krishnagiri District over an extent of 1.00.0 Hectare,

Tamil Nadu State applied by Thiru. R.Mahendhar S/ 0 Ramegowdu, ( Kundumaranapalli Village & Post, Denkanikottai Taluk, Krishnagiri District ( for the existing mining lease. (

\. Wherever specific permissions/exemptions/relaxations or approvals

( are required, the applicant will approach the concerned authorities of State

and Central Governments for granting such permissions etc.

Certified Place: Salem, Tamil Nadu Date: 10.07.2015 <9, ~~~ Signature of Recognized ~ d Person s. SURJYJ\KUMAR Recognised Qualified Pe'rson Reg. NQ.RQP/MAS/013/87/J1.

I. I (iv)

S.SURIYAKUMAR, M.Sc.,M.Phil. (Geo),F.C.C.(Min),PGDBA,DIPC. RQP & NABET /QCI Accredited EIA Consultant, No.3/216, K.S.V.Nagar, Narasothipatti, Salem - 636 004. Email: [email protected]@gmail.com . Phone (0427) 2440 446, 2444 297,Cell : 98427 - 29655.

( CERTIFICATE

Certified that in preparation of Scheme of Mining for Multi Colour Granite

( (Red Multi) quarry over an extent of 1.00.0Hectare in S.F.No.ll0S/2(P) &

( 110S/3(P) Erudhukottai Village, Denkanikottai Taluk, Krishnagiri District, c Tamil Nadu for Thiru. R.Mahendhar S/o Ramegowdu, Kundumaranapalli

Village & Post, Denkanikottai Taluk, Krishnagiri District covers all the

provisions of Mines Act, Rules, and Regulations etc. made there under and

( whenever specific permissions are required the applicant will approach the

Director of Mines safety, Chennai. The standards prescribed by DGMS in

respect of Miners Health will be strictly implemented.

Certified Place: Salem, Tamil Nadu Date: 10.07.2015 (~), 9~ G~- Signature of ReCOgnize:Giialifi ~d Person s. SURIYJ.\KUMAR, Recognised Qualified Person Reg. NQ.RQP/MAS/013/87/A

I .

\ J FOR MULTICOLOUR GRANITE (RED MUL TIl QUARRY IN S.F. NO. 1105/2(P) & 1105/3(P),OVERAN EXTENT OF: 1.00.0HECTARE, ERUDHUKOTTAI VILLAGE, DENKANIKOTTAI TALUK, KRISHNAGIRI DISTRICT,TAMIL NADU. (Period of Scheme of Mining: 2014-2015 to 2018-2019)

( G.O 3(D) No.16 Industries (MME-2) Dept. dated 22.06.2009 (Prepared under Rule 18(2) (1) of GCDR, 1999 for Existing Mining Lease)

INTRODUCTION: The mining Scheme is prepared under the Rule 18 (2) (1) of GCDR, 1999 for

( the existing mining lease once in five years for systematic and scientific development of quarries. Now the scheme of mining is prepared due to period from ( 2014-2015 to 2018-2019 for implementation. The applicant, Thiru R.Mahendhar Slo Ramegowdu, an individual residing at, Kundumaranapalli Village and Post, Denkanikottai taluk, Krishnagiri district. He has vast experience and skill on quarrying of granite blocks in Tamil Nadu for the last 6 years. They have been granted mining Lease from the State Government over an extent of 1.00.OHectare in S.F.No. 1105/2(P) & 1105/3(P),Erudhukottai village of Denkanikottai Taluk, c Krishnagiri district to quarry Multi colour Granite under G.O 3(D) No. 16 Industries ( (MME-2) Dept. dated 22.06.2009 to quarry granite blocks and lease was executed ( on 27.07.2009 for a period of 20 years till 26.07.2029. The Multicolour Granite deposits in this area are rich in orthoclase feldspar with excellent wave pattern similar to Indian Jubrana. It is commercially called as Red Multi. It mainly composed of mineral constituents such as biotite, quartz, orthoclase feldspar and less plagioclase feldspar. It is a type of Light Pink Granite with biotite. The biotite is fine grained and other minerals like alkaline and soda feldspar are medium grained. The graphic texture and intergrowth of quartz and feldspar indicates that younger intrusive was invaded into the pre-existing country rock, which preferably would have been a biotite gneisses(Peninsular Gneisses) which was converted into a type of a Migmatite with rich orthoclase feldspar. Dimensional cutting and polishing of these type of hard and compact rocks exhibits an attractive alternative bands of gray and pink minerals with wave patterns

1 The multi colour obtained after polishing is almost white and find a suitable market in flooring tiles and slabs. Granites finds its application in such industries owing to the fact of its high compressive and tensile strength, high hardness ranging from 6.5 - 7.5 (Moh's scale) specific gravity 2.70 and attain high polishing which create an excellent aesthetic value.

Lease particulars details are given as under, G.O. NO Date of Date of Date of ( Grant Execution expiry G.O No.16 Industries 1.00.0 22.06.2009 27.07.2009 26.07.2029 (MME-2)

\ Production particulars for the previews 2010-2015 years are given as under, ( Years Production(cu.m) ( 2009-2010 Nil ( 2010-2011------242.124 2011-2012------84.913 2012-2013------324.106 2013-2014------751.394 2014-2015------2453.020 ( Total = 3855.557 M3

The applicant has produced 1402.537M3 as against planned target production

( of 450m3 for the last five years. Increase of production is due high rate of recovery ( from 10% to 20% and more production target and demand. Production was

increased during the year 2014-15. The mining plan was approved by the Dept. of

Geology and Mining Guindy, Chennai during the year 2008 vide letter No.

17906/MM5/2008 dated 08.06.2009 and Mining Plan expires in 31.3.2014. The

scheme of mining is now prepared for the next five years plan period from 2014-

2015 to 2018-2019. The scheme of period 2014-15 is lapsed and therefore scheme

is made for the period 2015-2019. Geological, Surface plans and sections are

prepared in a suitable scale in 1: 1000 and 1: 500 respectively and given in Plate

No.III -IV so as to illustrate the existing pit dimensions and geology of granite

2 deposit and its disposition. Conceptual Mining Plan is prepared to show final pit

configuration of the mine and systematic method of working.

1.0 REVIEW OF SCHEME OF MINING:

1.1.a) Name of Mine Thiru. R. Mahendhar ~ b) Address 5/0 Ramegowdu, ( Kundumaranapalli Village & Post, ( Denkanikottai Taluk, Krishnagiri District.,TamiINadu. Pin Code: 635 107. Contact No. :99432-42131. (

( c) Status Individual,

( 1.2. Particulars of Approval of Letter No . 17906/MM5/2008 dt ( 08.06.2009

( 1.3 Date of commencement of 01.09.2009 Mining operation 1.4 Location: ( The area is accessible to a distance of 3kms away from Erudhukottai Village. ( SH-road is situated about 1km away on the eastern side connecting Denkanikottai - ( Aiyur Road. Approach road is available to the quarry site for transport of materials. ( The Location of the area is given in Plate 1. It is represented by Survey of ( Topo sheet No. 57 H/15 with center of reading 12°26'02.88549"N and 77°50'07.92843"E with elevation 939m above MSL.

Route: Krishnagiri 56Kms 28Km~ Denkanikottai 13Km~ Erudhukottai 3Kms!

3 (

All boundary Pillar corner reading co-ordinates are given below, Mr R. Mahender Phone: 9942242131 Erudhukottai Fax: Denkanikottai Krishnagiri District,TN Project information Coordinate System Name: Red Multi Granite Name: UTM Size: Datum: WGS 1984 ( Modified: Zone: 43 North (75E) Reference Geoid: EGM96 (Global) number: Description: Scheme of Mining Vertical datum: Point List ( ID Latitude Longitude Elevation Feature Code ( (Meter) 1 N 12°26'02.43814" E77° 50'05.68070" 924.155 Pillar 2 N 12°26'04.95309" E77°50'06.13107" 937.782 Pillar 3 N12°26'03.75121 " E77° 50'09.09588" 943.773 Pillar 4 N 12°26'03.41736" E77°50'09.91944" 944.791 Pillar 5 N 12°26'00.88572" E77°50'09.46183" 940.448 Pillar 6 N 12°26'0 1.25487" E77°50'08.37396" 940.850 7/11/201505:54:18 PM Trimble Business Center (

( Details of Infrastructure is given as under, ( S.No. Description Place Distance (Kms) I Railway Denkanikottai 14 1 , - .J 2 Road SH-Road 1 Denkanikottai- - Aiyur Post office Erudhukottai 3 3 - t 4 Airport Bangalore 120 5 Police station Denkanikottai 14 ] 6 Fire service Denkanikottai 14 7 Primary Erudhukottai 3 Health centre J Union Erudhukottai 3 8 1- School Erudhukottai 3 9 !- J 10 DSP Office Denkanikottai 14 !- Villages 11 !- .I i) North Erudhukottai 3 , ---~. ii) ,- South Vanniyapuram 1 East Nemileri 3 iii) ---- ivl West Belalam 3 1

4 (

(

[ -' " "> Jammu$."" KashmIr f

~ ...... tv" H.rMcb

  • RAjasthan (

    (

    .Mumb~n • ( Bombay)

    (

    (

    (

    Girinalli ( Girrllilllil'\030

    ( Noganoor

    (

    ( ( MANIYAMBADI

    (

    (

    HanumanthapUfilm

    \. ErUdvkotta Kolatt!

    Fig.1 Showing Location and route map of applied area for Quarry lease

    5 (

    (

    ( 1.5 REVIEW OF COMPLIANCE POSITION OF SALIENT FEATURES OF MINING PLAN! SCHEME OF MINING ( Special conditions imposed by State Government while approving the mining ( plan are, i) The applicant should leave a safety distance of 7.5 meters to the adjacent patta lands. ( ii) General conditions are given Annexure-l(As per G.O.Copy) (

    ( No other special condition was imposed during the last six years by the Dept. of Geology and Mining by the district office at Krishnagiri and commissioner at in ( Chennai. Now the mining scheme is prepared for the lease area over an extent of ( 1.00.0Hec. as per the G.O. (3D) No . 16 /lndustries (MME-2)/ Dept. dated ( 22.06.2009. As the five years period of mining Plan is expired on 26.07.2014, now ( the scheme of mining is prepared for the period from 2014-15 to 2018-19,approval from the Dept of Geology and Mining, Chennai for systematic operation.

    ( 1.5.0. REVIEW OF IMPORTANT CHAPTERS OF MINING PLAN 1.5.1. EXPLORATION The RQP and his survey team along with applicant had carried out the survey ( to map of the geological and surface details also mentioned in the earlier mining ( plan except a study carried out by GSl and state Govt. Agencies. 1.5.2. MINE DEVELOPMENT The mine development proposed in the approved mining plan and the actual ( development done by the applicant are summarized as under, ( PROPOSAL GIVEN IN THE MINING PLAN:

    (

    ( 0 Rejects 90 /0 450 500 50 1: 336.5 ( 900 1000 100 1: 9.0 ( 900 1000 100 1: 9.0 900 1000 100 1: 9.0 ( 900 1000 100 1: 9.0 ( 4050 4500 450 1: 45.39

    (

    (

    (

    ( 6 (

    ( (

    Planned Actual ( Over all Granite: Reject ratio= 1: 45.39 1: 6.44 (

    ( REVIEW OF MINE DEVELOPMENT: ( The applicant had developed the mine as per the Mining Plan with more ( production and dumping of waste was done on his own patta land on the western side. It is said to be a temporary dump and it will be shifted into the lease area for back filling in future. ( 1.5.3 AFFORESTATION PROGRAMME: ( It was mentioned to plant 20 trees per annum over the dumps and lease ( boundary but few trees were planted along the approach road and near office and planting trees around ML area (Green belt) will be carried out by the applicant during the next five years (2014-2019) systematically.

    1.5.4 LAND RECLAMATION AND REHABILITATION: ( No much disturbance was observed in area a respect of fauna, flora and human settlement of the villages. The applicant has to rehabilitate the old dumps and stabilize it with local inhabitants. Similarly the workings should be safe guarded from the inadvertent entry by proper fencing (51 type). After completion of mining the land will be used as storage of rain water for percolation that the ground water will be charged to increase ground water level. And fishy culture will be developed l with aesthetic planting around mines like park. Top Soil, a precious product of ( mother earth will be made use9 for this rehabilitation and land reforming.

    7 ( r 1.5.5 CONTROL OF DUST, NOISE AND VIBRATION: Conditions caused to disturb the eco-system and environment of the mining area is negligible except the necessity of controlled blasting to prevent fly of rocks{ noise and vibration. The Granite is lifted from the pit bottom to the surface by crane \Hydraulic excavators very slowly and therefore raising of dust is negligible in quarry and tipper movement also very slow due to carrying huge blocks of granite from quarry to dressing yard and therefore raising of dust from haul road also extremely low or nil. No deep hole blasting was practiced and therefore not much vibration nuisance. Sometimes noise will be more than 90 dB due to blasting of shot holes with low explosives used for shattering. In such case, the persons working near such areas will be given Mask with ear plugs\muffles in addition to Helmet and goggles.

    1.5.6 SIGNIFICANT FEATURES: No significant feature observed in this area.

    8 (

    I' \. PART I

    2.0 PROPOSAL UNDER SCHEME OF MINING FOR THE NEXT FIVE YEARS:

    ( 2.1.(i) Name and Address of the Thiru. R. Mahendhar, Address 5/0 Ramegowdu

    ( Kundumaranapalli Village and Post,

    ( Denkanikottai Taluk, Krishnagiri District. Pin Code: 635 107 ( Contact No. +9199422-42131

    ( (ii) Name and Address, Register No. : S.Suriya kumar. Validity date of RQP/Person M.Sc., M.Phil., F.C.C.(Min) PGDBA,DIPC. ( employed under Rule 42(1)(d) No.3/216, K.S.V.Nagar, who prepared the mining scheme Narasothipatti, Salem-4. ( Phone: (0427)2444297 Cell : 98427 - 29655 Registration No . Reg.No.RQP/MAS/013/87/A Validity up to 08.11.2021.

    2.3 Granites to be mined Multicolour Granite (Red Multi) ( 2.4 Area and date of expiry of 1.00.0Hec, 26.07.2029 ( Mining Lease Details of lease particulars are given below, (

    (

    1.00.0 22.06.2009 27.07.2009 20 Years 26.07.2029

    Toposheet No . with latitude 57 HIlS and longitude. l Location Latitude Longitude Elevation Topography ( 1 N12°26'02.43814" E77°50'05.68070" 924.155 2 N 12°26'04.95309" E77°50'06.13107" 937.782 3 N12°26'03.75121" E77°50'09.09588" 943.773 \. 4 N 12°26'03.41736" E77°50'09.91944" 944.791 ( 5 N 12°26'00.88572" E77°50'09.46183" 94G.448 6

    9 Krishnagiri Denkanikottai Erudhukottai 1105/2(P) 0.71.0 Patta Land ----~~~------Tamil Nadu 1105/3(P) 0.29.0 of applicant TOTAL 1.00.0 Ha

    2.5 Date of expiry of approval of mining Plan: 31.03.2014 3.0 GEOLOGY AND EXPLORATION ( a) Physiography: The lease area is almost flat terrain to a height of 939m above MSL and quarry has to be reached a depth of 22m above MSL. No major Pond or H.T. electric line is found nearby except water log in the old mined out areas. Water table is located at a depth of 45m from the surface in a tube well. ( Being a hard formation yield of water in the pit is very poor. Area around quarry lease is dry agricultural lands with acacia bushes, dry crops. Temperature of the region is reported to be 300 C to a max. of 41 0 C during summer and drop to 22°C during winter. The area receives rainfall mostly during NE monsoon and average c rainfall is about 500mm per annum. Rain fall of this area is about 600 mm during monsoons in a year. Regional crops are ragi, ground nuts, maize. Mango trees are common in this region . There is no monument or area of public interest is found in ( the vicinity.

    ( b) REGIONAL GEOLOGY The area forms part of the peninsular gneiss, the most wide spread group of ( rocks in many parts of the southern India. They consist of a very heterogeneous c mixture of different types of granites intrusive into the schistose rock after the latter were folded, crumpled and metamorphosed. They include granite granodiorites, gneissic granites and banded or composite gneisses. The banded gneiss consists of white bands of quartz-Feldapar alternating with dark bands containing hornblend, biotite and minor accessories. The peninsular gneissic varity rose in colour with less grey colour with interclatiopns of quartz-feldspathic material along gneissosity. Migmatisation of varing kinds of rocks such as basic granulates; Charnockite and sillimanite gneiss has given rise to grey biotite gneiss. Subsequent inversion of rose pegmatite into biotite gneiss has rendered the grey gneiss to few vestiges within migmatite complex. The rose feldspar pegmatite permeation is mostly parallel to the gneissosity along with the garnet, thereby giving a design to the rock. The rose

    10 feldspar dominate over grey feldspar giving yellowish white appearance to the rock type. The granite gneiss occurs as monad nocks and hillocks. The order of superposition of geological sequence are given as under,

    Description AGE

    A Top soil - Morum(lm Thick) Recent Age Pegmatite and Quartz Veins Archaean Age Dolerites dyke " Migmatites(Paradiso & Red Multi) " (Kolar Group) Biotite gneiss Archaean Complex

    The regional rocks mostly composed of quartz, plagioclase feldspar, orthoclase feldspar and accessories minerals like mica.

    C) GEOLOGY OF THE PRECISE AREA The area of mining lease comprised of Migmatite, with rich orthoclase feldspar Light pink colour and wave patterns. The mineral constituents are biotite, quartz, orthoclase feldspar and plagioclase feldspar. The biotite is fine grained and other minerals are medium grained. The graphic texture and intergrowth of quartz and feldspar indicates that younger intrusive were invaded into the pre-existing country rock, which preferably would have been a biotite gneisses(Peninsular Gneisses).Flowage structure and texture of rock indicates deep seated metamorphism at high temperature and pressure. Xenoliths of schistose rock are also found in the adjacent peninsular gneisses which indicate assimilation of older rocks by the younger intrusive. Therefore, it is clear from the regional flow structure and texture of xenoliths, the rock would be a type of Migmatite. Since the fine grained biotite is rich in assemblages shows a grey shade to the Granite. The pinkish colour of the rock is due to rich fresh orthoclase feldspar. Dimensional cutting and polishing of these types of hard and compact rocks exhibits an attractive pinkish and grey shades of background with attractive wave patterns. It is a part of peninsular gneisses migmatised by younger intrusive. It is commercially called as "Red-Multi" by the buyers in view of its assemblages of light pink feldspar. It is Multi colour granite covered partly by Morum soil at the top. The rock is hard, compact and sheet in nature so as to cut required sizes of blocks.

    11 ( 1

    f \ E Q Q ( Ln "C c: ( ::l 0 I. n:s U') CU I. ...,::l n:s CU "- CUu n:s "-I. ::l U) .c..., "i

    ...... N

    "- 0 C 0 ~ fa U 0

    U) ~ 0 .c U) CU (

    \. J

    ( ,--.... ~ ...... , ~ "\ r"\ r' I' (;('0('" t) r; ') ---

    12°26'04.95309" N 77°50'06.13107" E

    ,® 120 26'00.88572"N 770 50'09.46183"E

    @iJ

    Fig.3 : Google image shows Lease boundary of the proposed quarry with DGPS readings

    13 (

    The mineral constituents of the rock mass shall be about orthoclase feldspar 450/0 ,

    0 % quartz roughly 20 /o r Plagioclase feldspar 15 r mica 15% and others 5%. The order of superposition of geological sequence are given as under,

    Description AGE ( t Top soil - Morum(lm Thick) Recent Age Red Multi -Migmatite Archaean age

    ( Biotite gneiss Archaean Complex

    The strike of the granite body is trending in N-S direction and dips vertically. The regional trend is shown in the geological plan . (

    (

    (

    (

    (

    (

    (

    (

    (

    \.

    ( c

    ( Fig. 4 General view of the lease area

    \.

    (

    14

    / (

    (

    (

    (

    (

    (

    (

    (

    (

    ( Fig.5: Photo Showing Base unit of DGPS at Pillar "1"

    (

    (

    (

    (

    (

    (

    (.

    (

    Fig.6: Photo Showing ROVER Unit of DGPS at point "2"

    15

    ( \.

    (

    (

    (

    (

    (

    (

    (

    (

    (

    (

    Fig.7: Photo Showing ROVER Unit of DGPS at point "3" (

    (

    (

    (

    (

    (

    ( c

    ( Fig.8 : Photo Showing ROVER Unit of DGPS at point "4"

    16

    I <­

    (

    (

    (

    (

    (

    (

    (

    (

    ( Fig.9: Photo Showing ROVER Unit of DGPS at point "5" (

    (

    (

    (

    (

    {,

    (

    Fig.l0 Texture and colour of Red Multi Granite

    17 ( d) Drainage Pattern of the Area: There is no Major river or lake located nearby. It is a dry land with rock exposure. EXPLORATION AND RESERVES: 3.1 Category wise reserves estimated in the earlier mining Plan 3.1.1Geological reserves (As per the previous mining Plan) 3 Category of reserves Quantity (m ) Type of Granite i) Proved 6,228 Multi colour Granite ii) Probable

    Total = 6,228 "

    3.1.2 Mineable reserves ( As per the previous mining plan) Quantity of Mineable reserves = 4,720 m3 Type of Granite = Multi colour Granite Life of the Mine = 20 years

    3.2. DEPLETION OF RESERVES: Reported production (Till date) = 3855.557 m3 Balance mineable reserves = 864.443 m 3 The mineable reserves is re-estimated as =9973 m 3 (Up to a 34m depth) 3.3 ADDITIONAL RESERVES ESTABLISHED

    The geological plan was properly prepared by remapping the entire deposit showing the real disposition of the band. The Multi colour Granite band is trending N-S direction. Additional reserves are computed further 34m depth from the present level, based on field observation, exposure of granite body in the working pit reached up to 22m depth. Thereby 49864 M3 of additional reserves is estimated for working up to 34m above MSL. In the previous Mining Plan the reserve was estimated up to 15m only. 3.4 CATEGORY WISE UPDATED RESERVES: i) Geological reserves: Proved (0-34m) = 17487 m 3 Probable = --- (Not estimated in absence of drilling)

    17487 m3 (Refer Table-I)

    Possible = Not Estimated

    18 Table-I

    SECTION L W(m) Oem) Volume Rate of Recovery Reject 3 3 (m) recovery @200/o (m ) @80% (m )

    31 15 11 5115 20% 1023 4092 AB-X1Y1 49 65 12 38220 20% 7644 30576 ( 32 6 5 960 20% 192 768 ( 45 6 11 2970 20% 594 2376 AB-X2Y2 13 65 6 5070 20% 1014 4056 (

    ( 45 65 12 35100 20% 7020 28080 ( TOTAL 87435 17487 69948

    ( ii)Mineable reserves :

    3 Estimated revised mineable reserves = 9973 m • Details of length, width of Granite body and depth of estimation are given in Table II and Plate IV. Table-II

    SECTION BENCH L W D Volume Rate of Recovery Reject @80% (m3) 3 (m) (m) (m) recovery @20% (m ) ( ~ II 31 - 9 -~ 5- 1395 20% -- 279 · 1116 III 26 3 6 468 20% 94 374 AB-XIVI IV 49 49 6 14406 20% 2881 11525 c V 44 44 6 11616 20% 2323 9293 II 7 65 5 2275 20% 455 1820 III 7 59 6 2478 20% 496 1982 I- - - - ( AB-X2V2 IV 15 53 6 4770 20% 954 3816 V 37 36 6 7992 20% 1598 6394 ( -i------VI 31 24 6 4464 20% 893 3571 I TOTAL 49864 9973 39891 -- ( WASTE I I II 10 65 5 3250 - - 3250

    ,-- -- co-- --1--- AB-X2V2 III 4 59 6 1416 -- 1416

    TOTAL 4666 - - 4666 - GRAND TOTAL 54530 9973 44557

    19 Dimensions of the working pits are given as under, Ultimate Pit Dimension

    Bench L(m) W(m) Oem) I 115m 71m 5m II 111m 65m 5m III 105m 61m 6m IV 99m 54m 6m ( V 87m 43m 6m VI 75m 31m 6m I- TOTAL 34m

    As the mine has already reached a depth of 22m, the economic depth of ( mining is taken as 34m and. However the Granite band is continuing at depth with ( better recovery and quality for mining ( OTHER EXPLORATORY DETAILS : c The granite Band length on the south western side is opened for winning the deposit and therefore no further trenching and pitting are required for this area except two core drilling to prove the depth continuity, red colour, texture and recovery factor. The length and width of the deposit is well established in the working pit but the depth should be proved by drilling for proper planning of the mines. The proposed one core drilling shall be vertical and 30M depth with Nx and Bx standard size, should be drilled at the centre along Section A-B to probe the ( depth and quality of the deposit at deeper levels. Bore hole drilling have to be carried out with in a period of one year. ( Sampling: ( In case of core drilling, the lithology, colour, texture, cracks, jOints mineral grains alignment have to be observed and manual polishing and engineering properties can also studied for decorative purposes. 4.0 CONCEPTUAL MINING PLAN: (Final Mine Closure Plan) An updated conceptual mining plan and sections are prepared in 1: 1000 scales to illustrate the final pit configuration. The ultimate pit configuration and dump dimensions are shown as under, ( ULTIMATE PIT DIMENSIONS eM)

    Ultimate Pit Dimension

    Bench L(m) W(m) Oem) I-- I 115m 71m 5m

    20 II 111m 65m 5m III 105m 61m 6m IV 99m 54m 6m V 87m 43m 6m VI 75m 31m 6m TOTAL 34m ( ULTIMATE DUMP DIMENSION Waste Backfilling (75mx31mx2.007m) = 4666 m 3 Reject Backfilling (81mx37mx13.3103m) = 39891 m3

    Total = 44557 m 3 ( Details of pit dimensions are given in Plate VIII. Ultimate pit slope shall be ( 60° and each bench height shall be 6M with 60°. After completion of mining, the pit c will be used for fishy culture\recharge of rain water for neibouring wells. 5.0. MINING

    5.1 Salient Description of present Mining methods: Open cast method of mining by Semi-mechanized method is adopted to raise the production in this area using Line drilling, smooth blasting, block lifting using cranes and waste and rejects removal using Hydraulic excavators and tippers ( combination. The Wire saw cutting is adopted below second bench to recover more granite blocks to increase the rate of recovery. Granite is exposed in the existing pit

    and the recovery factor is taken as 20 0/0 and it may increase further at deeper levels. Black patches, side burden and granite rejects are the main development ( work to raise production from this area. ( The economical depth of mining is taken as 34m safely having considered several field phenomenon. each granite bench is designed as 6m and six granite benches are formed to win the blocks. As semi-permanent road was designed such that it will not be affected for a long period from the southern side to the main pit. The applicant had developed the pit with the following dimensions as on date. Ultimate Pit Dimension Bench L(m) W(m) D(m) I 115m 71m 5m II 111m 65m 5m III 105m 61m 6m IV 99m S4m 6m

    21 V 87m 43m 6m VI 75m 31m 6m TOTAL 34m

    Being a mechanized mining, the applicant had developed a long pit over the granite band from N to S with six benches. Road shall be formed to connect all pits ( for proper mining. Pit will be widened properly to reach depth to win better quality ( granites with high recovery. Details of Pit design parameters for production and development work for the next four years are given in Plate VI. Height of benches shall be maintained as 6m with vertical face for dimensional cutting during the next four years. 5.2 a)Year Wise Production and Development for the five Years: ( The development involves only removal of rejects amounts of 80% . The ( average annual production is proposed as 1594 m 3 for the next four years and generation of production schedule is given in the Table-III and production planning is given in Plates VI. Table-III

    Recovery Rate of Reject @ YEAR L(m) W(m) D(m) Volume @20010 3 recovery 3 80°10 (m ) (m )

    ( LAPSED MINING SCHEME PERIOD 2014-2015 31 9 5 1395

    26 3 6 468 1506 6021 4 47 6 1128 2015-2016 20% 21 36 6 4536

    2016-2017 30 43 6 7740 20% 1548 6192

    24 43 6 6192 20% 1612 6452 2017-2018 13 24 6 1872

    2018-2019 46 31 6 8556 20% 1711 6845

    \. TOTAL 31887 6377 25510

    Total Production for the four years 6377 m3 Granite to Waste Ratio 25510 /6377 = 1: 4.0

    22

    ( \ Safe benches with proper height were formed and pit will be widened ( properly to reach depth to win better quality granites with high recovery. Details of bench dimensions are given in Plate VI. Details of Pit design parameters for production and development work for the next four years are given in Plate VII. Height of benches shall be maintained as 6m

    ( with vertical face for dimensional cutting. b) Drilling ( Drilling of small dia holes is carried out using compressor and Jack Hammers Combination for regular production of sizeable blocks. Large dia drill shall be used to r make hole for connecting the diamond saw wire for cutting a large size blocks for ( pre-splitting arrangements. Depth of each small dia is 2. Sm for 3m bench height and ( large dia holes shall be 6-Sm depends on bench height and extent of cutting on advance direction. The spacing of small dia holes shall be 30 - 40 cms and burden ( from the preface depends upon the size of block. However it is preferred to have < [ 1m burden from the preface for effective pulling of blocks. In case of burden in excess of 1.Sm the spacing should be adjusted smaller, less than 30 cms. To achieve a correct blasting geometry certain amount of trial blast is often prerequisite to effect a perfect pre-determined to release the block from the parent rock. In case of wire saw cutting joints and fracture have to be studied below connecting the diamond wire for smooth cutting and to avoid damage of wire. r Type Nos. Dia. Of Size/Capacity Motive H.P. Hole Make Power Jack 4 32mm Hand held Atlas Diesel 60 Hammer Copco Compressor 1 ELGI 7.5 Kgs/cm2 \\ 450 (

    c) Loading Equipment: Loading of waste and granite rejects shall be done by Hydraulic Excavators into 10 tonner's tippers for clearing of waste and rejects from the working place ~( \ periodically. The applicant is engaging one Hydraulic excavator with 1.2m3 capacity ( \ and two tippers of 10 tonnes capacity for internal transport of rejects from the { working face to the dumps. Block lifting also done by the same excavator. Details of Loading equipments are tabulated below, Type Nos. Size/Capacity Make Motive Power I H.P ~ - Hydraulic 1 1.20M3 Tata Hitachi Diesel 180 excavator "-- I

    23 (

    (

    d) Haulage and Transport Equipment: Transport of Rejects and waste are removed by Tippers of 10 tonne capacity

    (

    (

    (

    (

    (

    (

    ( Fig.ll a) Hydraulic Excavator - b): Tipping Truck ( LC 370

    Type Size/Capacity Make IMotive Power H.P Tipper 2 10 M.T Ashok Leyland Diesel 110

    e) Miscellaneous Operations: iJ Extent of Manual Mining Manpower will be engaged for drilling shot-holes, line drilling, smooth blasting, Jet burner operation, dressing of granite blocks, cutting and removal of small amount waste or rejects and support service labours for operation of

    ( machineries. The materials required for manual workings are listed as under, ( 1. Drill rods - 450mm, 800mm, 1650mm, 3900mm and up to 7200mm. 2. Steel alloy chains of sufficient lengths with dia. of 12 - 18mm with "D' ( shackles. 3. Rubber hose and clamps

    ( 4. Feather and wedges of 15 cm and 30 cm sizes utilized for splitting of blocks. 5. Crow bars of 1500 - 1800mm lengths. ( 6. Spades, Sludge hammers, Iron Pans and chisels. iiJ Pumping: Dewatering arrangements shall be made to pump out the rain and percolation of ground water during rainy seasons. A stand by pump with 10 H.P. capacities is essential to meet the emergency.

    24 ( r 5.3. BLASTING: A controlled Blasting technique is adopted to open a pre-determined crack of the block from the parent body. Shot-hole with 32-40mm dia. which are drilled by line drilling and Jack hammers at a close spaced interval of 30 cms will be initiated suitably with anyone or more of the following methods, i. Pre-splitting ii. Cushing blasting with low strength and very low dia. Cartridges axial priming or standard dia. cartridge with intermittent stemming materials. iii. Water impulsion with Detonating cords of sufficient power, Preferably 10gms per meter to develop cracks along the line of drilling, a) BROAD BLASTING PARAMETER Dia. of the hole = 32 - 36 mm Spacing = 30 cms Depth = 2.5 m Burden = Min =lm; Max = 2m Charge per Hole = D.cord with water or 70 gms of gun powder or slurry. In watery holes, the detonating fuse is directly used and water act as a cushion to move the blocks and form a line of crack. In other cases, small vibrations created by low explosives open the artificial shear plane \ tensional crack formed by a line of drilling. Sometimes wedges are used to cut the major blocks into smaller sizes after drilling of holes to a depth of 30-40 cms. Then the blocks are dressed to desire sizes. b)TVPE OF EXPLOSIVES: Common explosives used to develop a line of crack along the line of drilling are, i. Detonating Fuse or Cord with 5-10gms of Expl. per metre, ii. Low explosives like Gun powder or 70 gms of slurry cartridges, iii. Ordinary Detonator, c1ass- 6 iv. Safety fuse, class -6. c) Powder factor: The Powder factor for waste rock development shall be 2m3 or 7 tonnes per Kg. of explosives.

    25 (

    (

    d) STORAGE OF EXPLOSIVES The applicant is directly purchasing explosives from the authorized dealer and they are blasting with help of blaster certificate holders as there is no space for ( storing explosives in nearby area. It is advised to store the explosives as per the ( Indian Explosives Act, 1958. The explosives to be used in mines being a small ( quantity the District collector may be approached to keep the stocks not exceeding 5 ( kgs at time or any other quantity permitted by the concerned authorities in a

    ( portable magazine of S & B types. 6.0 MINE DRAINAGE ( c a)Surface Water control: No major river or drainage or pond is situated around 1kms radius. b)Water Table: The ground water table is observed at a depth of 45m in the adjacent Tube well. The mining is proposed to a depth of 34m only. The ground water may not percolate into the quarry much in view of massive formation without much fractures and jOints c) Quantity and Quality of Ground water: The recuperation of ground water is very poor in hard formation. The rain water percolation and collection shall be less than 300 Ipm and it shall be pumped about periodically by a stand by diesel powered centrifugal pumps motivated with 10H.P. Motor. The quality of water is potable without any contamination and it shall be pumped into the adjacent agricultural fields and plantation area.

    7.0 STACKING OF GRANITE REJECTS AND DISPOSAL OF WASTE

    Granite rejects which amounts to 800/0 of the total excavation, about 25510 M3 will be generated for mining up to 34m depth. It is revealed in the Final mine closure plan showing the ultimate depth of mining and ultimate pit configuration. ( Details of waste generation for the next four years are given as under, Year Topsoil Overburden/Waste Granite Total 3 3 3 : (M ) (M ) Rejects (M ) ( 2014-15 Lapsed Mining Scheme Period 2015-16 6021 6021 2016-17 ------6192 6192 2017-18 ------6452 6452 2018-19 ------6845 6845 Total ------25510 25510 (

    ( 26

    ( All waste and reject materials are dumped out of the lease area over the existing external dump, maintained by applicant in his own patta land, which wi" be shifted to back fill the pit after closure of Mine. DUMP DIMENSION (M) Year wise Dump Dimensions (m) Reject (External Dump) = 25510 M3 TOTAL = 25510M3 Being a working mine the approach road is already available and the exiting road within the mines shall be used for proper transport of materials by tippers\dumpers. For convenience of operation and increase of production together with safety and environment, it is designed parallel to the strike length over the good quality portion for the next four years. Granite rejects and side burden are major waste work which has to be transported to the respective places as per the plan. The overall Granite to waste ratio for the next four years as 1: 4.0. 7.1 ANY CHANGE IN PROPOSED METHOD OF MINING AND DEVELOPMENT: MACHINERIES: No change is envisaged for future development of Mines. 7.2 HANDLING OF WASTE I SUB GRADE MATERIALS: The waste rocks to be generated from the mine will be fragmented gneisses and rejects of Granite with patches, cracks and small size blocks. The site selected for dumping waste and Granite rejects are dumped on external area to be maintained by the applicant. Total generation of Granite rejects and waste for the next four years wi" be 25510M3 and for the whole life of mine will be 44557M3 . No space or Virgin ground available for the lessee to dump waste within the lease hold area. 7.3 OTHER PERMANENT STRUCTURES 7.3.1 Habilitation: The following villages are found in the buffer zone with population as per 2011 census. The Erudhukottai Population is 5563 peoples of both male and female.

    Name of Village Direction Distance from Population Mines (Approx) Erudhukottai North 3 5563 Vanniyapuram South 1 1090 Nemileri East 3 1104 Belalam West 3 1272

    27 7.3.2 Power lines: There no HT or LT line is found nearby. 7.3.3 Water bodies: There is no major river found around 1km radius. Water table is reported as 4Sm depth. 7.3.4 Archaeological\Historical monuments: No infrastructures and places of interest like Temples, Sanctuaries, bridges etc are found within SOOm radius. 7.3.5 Road: The area is accessible to a distance of 3kms away from Erudhukottai Village. SH­ road is situated about 1km away on the eastern side connecting Denkanikottai - Aiyur Road. Approach road is available to the quarry site for transport of materials. 7.3.6 Place of worship: There is no place of worship like Temple, School, archeological importance are found around SOOm radius. 7.3.7 Reserves Forest \ Forest \ social forest\ wild life sanctuaries etc Aiyur reserve forest is found 3.Skms away on the east side and Kolatti reserve forest is found 3kms away on the southern side. No wild life sanctuaries are found around lSkms. 7.3.8 Any other structures: Nil 8. EMPLOYMENT POTENTIAL & WELFARE MEASURES 8.1 Employment Potential: Management and supervisory personal. For the purpose of Mines safety under the provisions of MMR, 1961 under the Mines Act, 19S2.The Mining Engineer so appointed should have First\ Second class Mine Manager certificate to act as a Manager of the Mine as per the Mining laws. To supervise daily, of all workings and the persons employed therein the First\second class Manager so appointed must be assisted by a Foreman certificate holder. Wherever the workers are employed more than 10, it is preferred to have a qualified Mining Mate to keep all the production workers directly under his control and supervision. A mines clerk shall also be appointed to keep the registers and record of the mine and make necessary entries for the persons employed in the mines. a) Manager Cum Mining Engineer 1 No. (exempted under rule 42(6)(d) of GCDR,1999)

    28 b) Mining Mate 1 person c) Blaster INo. ( d) Clerk cum record keeper 1 person ( e) Site supervisors 1 Persons . LABOUR SKILLED - SEMI SKILLED AND UNSKILLED

    ( Skilled = 1 No. Semi-skilled = 2 " ( Unskilled = 20" ( .

    ( Total = 23"

    ERK CUM RECORD KEEP

    <@Ice Asslsta~

    ( 9.0. USES OF GRANITE: The Granite raised out of the mine shall be exported to overseas buyers as well as for domestic clients. Polished Multicolour Granite are widely used for

    <.. decorative purposes in building, monument, Institutional, commercial and residential (. buildings in the form of slabs, tiles, cut to size, markers etc.

    <.. 9.1.GRANITE PROCESSING UNITS: The applicant do not have cutting and polishing unit now.

    c 29 (

    ( 9.2 ENVIRONMENTAL MANAGEMENT PLAN:

    Proposal as per Position at the Proposal for Salient Items Approved end of five the next five Mining years years

    1. Topsoil belt Top soil was Spread over the No top soil storage and proposed to use external dump available in the for dump maintained by the preservation afforestation applicant quarry

    No land 2. Reclamation reclamation and and Does not arise No proposal rehabilitation Rehabilitation proposed Waste shall be dumped over the external of the Waste shall be lease area dump Separate dumps dumped over the maintained by the 3. Waste dump proposed for top external of the applicant and it Management: soil, rejects and lease area dump will be backfilled waste. maintained by the over the closed applicant portion of the quarry in due course. 20 trees per Tota"y 40 trees 20 trees will be 4. Afforestation annum proposed were planted planted per year Programme for plantation ~~~~g the mine as per Plate X No proposal is 5. Quality of Air Small mine given

    Drinking water is 6. Quality and provided through No effect for As per the Make up of public source only. surface or ground previous Mining water No major seasonal water sources. Plan drainages.

    7. Noise Level No machineries No Impact No proposal 8, Vibration Does not arise No impact No proposal 9. Treatment of Does not arise No impact No proposal Mine Water 10. ANY OTHER INFORMATION:

    The length of band in the quarry area is measured as 95m x 82m running N- S direction. The geological and mineable reserves are estimated as 17487 M3 and 9973 M3 up to a depth of 34m. The rate of recovery of granite is assessed as 20% based on geological setting and production data of the quarry.

    30 < PART - II

    11.0 ENVIRONMENT MANAGEMENT PLAN

    ,r A) BASE LINE INFORMATION i) Existing Land use Pattern: The quarry has reached a depth of 22m above MSL. Water table of the area is ( said to be fluctuated between 40-45m during a year in the adjacent open wells of the area. The existing land use pattern is given as under,

    ( Working Pit Mine Roads 0.04.50 Safety and Area 0.28.55 under plantation Labour shed and 0.05.00 office Waste Dump Unutilized 0.04.15 ~ .. Total 1.00.0Ha 100

    The land use pattern at the end of fifth year given below,

    Mining Area 0.57.94 Mine Roads 0.04.50 Safety a nd Area 0.28.55 under plantation Waste dump Labour shed and 0.05.00 office Unutilized 0.04.01 Total 1.00.0Ha 100

    ii) Air quality: Air sampling was not done. It is proposed to carry out monitoring of Dust raise by periodical air sampling for every season as per norms of MoEF and

    ~ ,t DGMS . iii) Water quality: A water sample has to be tested once in a Year for a minimum of 23 elements in a NABL \MoEF Lab to assess hardness, salinity, colour, specific gravity, pH , turbidity, COD, BOD, fluorine etc

    31

    ( (

    ( iv)Noise levels: Threshold sound level is reported as 58dB. Which is within the limit as prescribed by DGMS. v)Vibration levels: No deep hole blasting at present. In case of deep hole blasting c or any large dia explosive usages. Vibration and air blast noise have to be tested. ( vi) Water Regime: There is no major river found around 1km radius.

    ( vii) Public building, Places and Historical monuments: c No infrastructures like residential building, places of special interest like temples, archeological monument, Sanctuaries etc., are found around radius of 500m.

    c viii) Flora and Fauna: ( The entire area is covered by working pit. No flora or fauna available in his c lease hold area.

    On regional ground, the Flora is represented by herbs and shrubs of local species. Fauna is represented by rabbits, rat, scorpion, millipedes etc

    ix) Climatic Conditions:

    The average actual rain fall of Krishnagiri is reported as 1000.8mm per annum.

    Pictorial representation and annual statistics for the last 10 years of rain fall data of

    Krishnagiri district is given as under,

    RainfaU 2.010-2011

    RAINFALL 2010- 11

    ( 3 00 ~------~------_ 250 - (

    0 Normal Rainfall 'I ( 1_ Act ual Rainfall 1 1 00

    J rL ( I '" " . r ~ ~ ~ c=. t:) S? e=­ §'"5 §' ~t; ~ ~ ~ -:> -:) «; (J) 0 :z 0 -:> l MOl'.JTH

    (

    (

    (

    ( 32 (

    ( (

    (

    r

    ( Period Nor...... a l Raiin:fall Aicltual Raiin:faU ( 1 ) ( 2) 3 ) ( ... . S lOuth WeSI:MO lnSlOon , Perio d Total 403. . 6 3187 ..9 Jlu ne2:0 0 9t 4 .8.4 5 1 ..2 .J1 u J:y20D9 a. ... . 3 129 JB ( A u g u s ll. 2 0 0 19 1 08 9 9785 Septentlbe r2.009 1 65_0 1 7 9 _4- ( 2. North EaS 1:l!1'IoInIS D on ( T ·otal 2901. 9 ·4i(j)52 Oc!l:o b er2009 1 6 9 _4- 1 "' 9 .9 Nove rnbe r2009 8.3 .8 2 7 4 _7 Dece rnbe (2009 37. 7 10 6. 3 .'Wi nte r - Pe ... i od

    Tot a m 1 107 37.1 Jlanu a ("'1..,-2 0 1 '0 4 _9 '0 .0 F eb r u ary2 0 l ' 0 5 _8 3 7 _1 4 __Hot - W'eajthe,r Peri o d

    Tot::a. • 151.6 190...6 t'J!larc h 2 0 1 0 12. 3 3 ..8 A pril 20 1 0 39.9 8 9 _3 Il'Jtla y.20 1 0 99.4 9 7_5 ,\\Vhole :yea r 8 5 6 ,_8 1 0 00.8

    b) Temperature: Throughout the month of May daytime temperatures will generally reach highs of around 33°C that's about 91°F. At night the average minimum temperature drops ( down to around 22°C, that's 71 °F.In recent times the highest recorded temperature in May has been 38°C that's 101°F, with the lowest recorded temperature 15°C, about 60°F.

    c) Relative Humidity:

    (. The average daily relative humidity for May is around 64%. <­ d) Heat Index: ( The Heat Index is a measure of how hot it feels when relative humidity is added to actual air temperature. From this a comfort level is calculated providing

    ( categories on how heat conditions might adversely affect someone.

    33 ( e) Comfort Levels:

    Given average maximum temperatures and humidity levels you can expect dangerous heat conditions. Sunstroke, muscle cramps and heat exhaustion are likely. Heatstroke is possible with prolonged exposure and/or physical activity (see heat index for more information). f) Precipitation: The average monthly amount of precipitation has been recorded at around 122 mm, that's 5 inches. Throughout the month you can expect to see rain or drizzle falling on 10 days of the month. g) Wind: The average daily wind speed in May has been around 6 km/h, that's the equivalent to about 4 mph, or 3 knots. In recent years the maximum sustained wind speed has reached 63 km/h, that's the equivalent of around 39 mph, or 34 knots. h) YEARLY TRENDS: WEATHER AVERAGES & EXTREMES:

    The following charts show yearly weather trends with information on monthly weather averages and extremes. x) Human Settlement:

    The following villages are found in the buffer zone with population as per 2011 census. The Erudhukottai Population is 5563 peoples of both male and female.

    Name of Village Direction Distance from Population Mines (Approx) Erudhukottai North 3 5563 Vanniyapuram South 1 1090 Nemileri East 3 1104 Belalam West 3 1272 xi) Public Building Places of worship and Monuments: No infrastructures like residential building, places of special interest like temples, archeology, Sanctuaries etc., are found in the radius of 500m. Erudhukottai Village is situated about 3kms on the north side.

    34 B) ENVIRONMENT MANAGEMENT PLAN

    i) Dust: Dust expected to be generated from drilling, hauling roads, place of excavation etc will be suppressed by periodical wetting of land by spraying using MgCb solutions. Wet drilling and dust extractor arrangements will be provided to drilling units so as to control raise of dust from the site of drilling. Operators, those exposed directly to such conditions will be provide such protective equipments like mask, ear plug, helmet, gloze etc as per the Mines Act. ii) Temporary storage and Utilization of Top Soil: Small quantity of Top soil shall be dumped separately for dump afforestation in future. iii) Proposal for reclamation land affected by mining activities during and at the end mining lease period:

    The depth of granite deposit is not known. However for economical planning, the depth is taken as 34m from the surface. Immediate reclamation of land does not rise for this deposit. However it pit will be used for miscellaneous purposes like fish bond etc., after completion of mining. All waste and reject materials will be dumped shown on the plate VI-X. iv) Programme of Afforestation:

    Regional trees like Mango, Tamarind, , acacia etc will be planted along the Lease boundary and avenues as well as over Non-active dumps at a rate of 20 trees per annum with interval Sm in between. The rate of survival expected to be

    800/0 in this area. Land use and afforestation Plan is given Plate X. v) Stabilisation and Vegetation of Dumps: The materials to be dumped shall be very hard in nature and it does not require any grading separately. The materials like granite rejects shall be graded automatically during dumping by Excavator and tipper combinations. Part of top soil will be spread over the Non-active dumps along the slope and edges to plant tree sapling to form vegetal cover over the dumps. Such vegetal cover will prevent erosion of dumps during rainy seasons. The program of tree planting is given as under,

    35 Year Place Type of Trees Number .L Rate of survival I Lapsed Mining Scheme Period ... II Lease Boundary Teak, Mango, Tamarind and 20 80% other Regional Trees ill Lease Boundary Teak, Mango, Tamarind and 20 80% other Regional Trees :-- - ~ IV Lease Boundary Teak, Mango, Tamarind and 20 80% - ( other Regional Trees ( V Lease Boundary Teak, Mango, Tamarind and 20 80% other Regional Trees I L ( vi)Treatment and Disposal of water from mines: Measures to Control Erosion / Sedimentation of Water Course:

    The water to be pumped from the quarry shall be treated in sump containing Sand filters before discharging into natural drainage. Granite sheet extraction will not produce any waste which pollutes the ground water. Drinking water to mine labour will be supplied from public source or bore well to be drilled by the applicant. The rain should be collected by garland drainage around the Lease boundary or pit and to allow settling in a small pit for settling suspended particles before passing to natural drainage system.

    vii) Measures for minimizing adverse affect on water regime:

    Sampling of water shall be done at discharge point to check the quality of water as per TNPCB standards.

    l viii) Protective measure for ground vibration: Only shot hole blasting shall be adopted for breaking the boulders and hard rocks. No deep hole blasting or machineries is used in this quarry. Vibration from blasting or heavy machineries will be negligible. In case of any report of vibration from the public Vibration test shall be conducted. ( ix) Measures for protection of historical monuments and rehabilitation of human settlements likely to be distributed due to mining activity: No historical monuments or area of special interest or any other sanctuaries are found around SOOm radius from this area. Village also located about lkms away and no dwellings around SOOm. Therefore rehabilitation of human settlement or protection of historical places or monuments does not arise.

    36 x) Others like legal factors like tribal issues, national park etc: There is no much heavy industry in this area. A few granite quarries is found around 500m radius. The villager will get some income due to growth of mining industry. There are no legal issues or tribal problems associated with this mine. It is patta land in a village and no tribal issues here. National park, monuments etc totally absent around 5 kms radius. (xi) Monitoring schedule: Top soil conservation and dust control, surface water contamination during rainy season, ground water protection, trees plantation are the ( main area of EMP attention is required for this "B" category mine. ( xii) Socio-economic benefits arising out of Mining:

    ( 23 persons are directly employed and 500 persons are getting indirect employment by shops, hotels, service etc, of which 80% will be from local people (Son of Soil). Gradual development of quarry from this area, not only provide employment opportunities but also the industrial culture and civilization to the village people. Beneficiary villages are Nemileri, Belalam and Vanniyapuram its hamlets

    xiii) Waste management: The waste to be generated shall be debris of portable size hard rock without any clay soil and connate water and therefore collapse of dumps is not possible for this mine. The waste\Rejects shall be dumped out of the lease area temporarily for future use of his quarry. Dimensions of Dump at the end of 5th year and at the end of Life of Mine are given as under,

    Description End of 5th Year End of Life of Mine

    ( Topsoil Nil Nil

    Reject 25510M3 44557M3 c. All rejects/waste dumped external area maintained by the applicant. Small size of granite shall be used for tile and monument industries. Huge gang saw size blocks shall be used for making slabs etc as well as for exports. ( xiv)Tailing dam management: No ground water discharge or slurry from the mine and thereby no tailing or settling tank required for this mine except a small pit for decanting the slurry water.

    37

    ( 12.0 ANY OTHER RELEVENT INFORMATION

    The Multicolour Granite deposits in this area are rich in orthoclase feldspar with excellent wave pattern similar to Indian Jubrana. It is commercially called as Red Multi. It mainly composed of mineral constituents such as biotite, quartz, orthoclase feldspar and less plagioclase feldspar. It is a type of Light Pink Granite with biotite. The biotite is fine granined and other minerals like alkaline and soda feldspar are medium grained. The geological reserves and mineable reserves are estimated as 17487M3 and 9973M3 respectively for the lease area up to a depth of 34m. Systematic mining with proper orientation of working faces and blasting techniques will improve the recovery, by which the mining cost will be so low from the present status of mining; also the valuable rock will be conserved. Engaging Diamond wire saw cutting machine will improve the rate of recovery to more than 38%. a) Geotechnical studies: Chance of slope failure in such hard rock mining is normally negligible. Overall pit shall be maintained at 60° for working pits. The mine is absolutely free from geotechnical problems and therefore no geotechnical studies on engineering properties of rocks and rock dynamic studies had been done for this area. b) Hydrological studies (Surface and ground water) by geophysical methods: There is no major river is situated around 1km radius. The ground water fluctuates between 40-45m in a year. Highly hard rock area. During rainy season they work on top of the benches and during summer they work on bottom of the benches so as to avoid unnecessary pumping of ground water. No major ground water or slurry pumping involved which affect the mining and environment. ECONOMIC EVALUATION Protect Cost Investment on Machineries (Rs in Lakhs) a) Tata P & H Crane = Hire b) Hydraulic Excavator (1. 7M3) One Nos. = 60 c) Tippers 10Tonners (2 Nos.) = 20 d) Screw Compressors (One) XA140 = 10 e) Line drilling and Jack Hammers = 30 f) Genset\Pumps etc = 20 g) Workshop facilities = 10 h) Diamond wire saw cutting Machine = 40

    Total = 190Lakhs or 1.90Crores

    38 Tentative cost of Production per cu.m of Siable granite Blocks: Production cost for rough granite 3 The average production cost is given as Rs 16460 per M " Details are given as under, Cost per S.No. Description MT (Rs) 1 Exploration and Development 200 2 Salary and wages 1700 3 Depreciation 1650 4 Interest on Investment @18% 1800 5 Fuels and Lubricants 1600 6 Spares @ 30°10 of (5) 450 Depreciation of Infrastructures@ 5°1o 7 500 of capital 9 Royalty 2500 10 Over heads, pumping etc 500 11 Transport from Mine to Port 3500 12 Sale Tax (14.5°/0) (iteml-9) 2060 Total 16460

    i) Sale value = Rs 25000 per M3 ii) Production cost = Rs 16260 " iii) Profit = Rs 8540 per M3 or 330/0

    39 PART-lIt 13.0 PROGRESSIVE AND FINAL MINE CLOSURED PLAN

    ~ 13.0 Introduction: i) Name and Address: Name and Thiru R.Mahendhar ( Address 5/0 Ramegowdu, Kundumaranapalli Village & Post,

    ( Denkanikottai, Krishnagiri District, Tamil Nadu. Contact No . +91 9942242131 ( ii) Location Extent of lease area: ( Extent 1.00.0Hectares S.F.Nos. 1105/2 (P) & 1105/3 (P) Village Erudhukottai Taluk Denkanikotta, District Krishnagiri, State Tamil Nadu Type of lease area Non - Forest land / Patta land. Present land use pattern Existing Mining lease area. Method of Mining Opencast Mining - Semi mechanised. ( 13.1 Mined - out land: ( Depth of mining is estimated as 34m. The quarry has reached a depth of 22m above MSL. The existing land use pattern is given as under, (

    Working Pit Mine Roads 0.04.50 Safety and Area 0.28.55 ( under plantation Labour shed and 0.05.00 ,( office Waste Dump Unutilized 0.04.15 J • • Total 1.00.OHa 100

    40 The land use pattern at the end of fifth year given below,

    (

    Mining Area 0.57.94 Mine Roads 0.04.50 Safety and Area 0.28.55 ( under plantation Waste dump ( Labour shed and 0.05.00 ( office Unutilized 0.04.01 Total 1.00.0Ha 100 (

    ( 13.2 Water Quality Management: There is surface body of water available within the ML area. Ground water table is located at a depth of 45m and fluctuating between 40-45m in a year where as mining is planned up to a maximum depth of 34m only. Therefore pumping of ground water or surface water does not arise in this mine. The turbid rain water during rainy season is proposed to settle in a pit before discharging in to the natural stream for settling the suspended particles. No other EMP required for water quality management. 13.3 Air Quality Management There is no gaseous matter to be generated in this mine. Dust generation during ( drilling of shot holes, haul road, smoke from vehicles shall be controlled as given below, i) Dust extractor or wet drilling to be followed to control dust at source of emission c during drilling, ii) Emission level in all machineries and transport vehicles to be tested once in a year to keep them in control with proper maintenance and service as per TNPCB Standards, iii) Water sprinklers along the sides of haul road shall be fixed to control fly of dust while transporting minerals and waste, iv) Avenue trees along roads and green belt around ML boundary shall be planted with ( density of 1500 trees per Hectare as per the norms of MoEF to control fly of dust, noise etc,

    ( v) In above all, labours engaged in such dust prone areas should be provided with safety devices like ear muff, mask, goggles etc as per the MMR,1961 amendments and circulars of DGMS under the provisions of occupational diseases. vi) Labours may be permitted officially to undergo medical checkup to test silicosis and other respiratory check up once in 5 years

    41 And other guidance required under these laws should be strictly adopted. 13.4 Waste Management ( The waste to be generated shall be debris of portable size hard rock with some fines. No c1ayee matter shall present in the waste. The solid waste shall be

    ( dumped systematically with proper repose angle and stabilization as given beiowl

    (

    ( ~ 1l'".~ ~~ :!: >&»~o~ (

    (

    ( /~ ~ ~ ~A 5 ~ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~~ l/ \11 ~ Topsoil Spreading Retention Parapet Wa ll (O-Sm thick) (1m height)

    All waste and reject materials are dumped out of the lease area over the existing external dumpi maintained by applicant in his own patta land, which will be shifted to back fill the pit after closure of Mine. Dump shall be maintained as given below, i) Gradation of dump shall be done automatically as coarser materials go to the bottom and finer at the top and therefore drain of rain water flow freely to the C bottom without endangering the stability of dump, ( ii) Stabilization of dump with top soil and tree plantation shall make the dump more stable on long, iii) 1m height parapet shall be constructed for dumps more than 6m height along the toe to prevent and control wash out from dumps entering into natural system through rain water, ( iv) Garland drainage around dump shall prevent under wash of dump by hydrostatic pressure to be developed by surface water and control wash outs and collapse/ (. v) Dump should be terraced for every Sm height and stabilized as above, ( vi) As practically as possible the dump should be made as per the plate VIII on barren grounds so as to avoid re-handling so that the dump shall be seasoned and stabilized.

    (

    42 Waste generation at the end of 5th year and at the end of Life of Mine are given as under, ( Description End of 5th Year End of Life of Mine

    Topsoil Nil Nil

    3 3 ( Reject 25510M 44557M . ( 13.5 Top SoIl Management: Top soil is a precious product of the earth which normally forms from the ( rocks by weathering by millions of years of exposures to the atmosphere with aid of ( oxygen and water. These top soil causes for development of amino acids and ( genesis of plant kingdom. Therefore, the top soil should be removed separately ( before developing the face for granite and waste benches. The top soil should be dumped along the Lease boundary for dump afforestation and use of agricultural purposes. Top soil should not be mixed with other waste or reject materials. It should be conserved by judicious utilization in the mine premises. 13.6 Tailing Dam Management: No water shall be used for quarrying or any other processing except drinking water to be drawn from public sources. Some stagnation of rain water in the pit shall be used for wire saw cutting and recycled using slurry pumps. Therefore need for tailing dam does not arise. But tailing control of rain water flow during rainy season has to be done by decanting the SPM in a pit before passing the water into natural system. 13.7 Infrastructure: . Approach road is available from the village road up to the applied area. Basic ( amenities for workers and field office shed such as First Aid Station, canteen, Rest ( Shed, Toilet etc as per Mines Rules, 1955 shall be made available at the entrance of mine. 13.8 Disposal of Mining Machinery: No proposal for disposal of machineries during the first five years of mining plan period.

    ( J 13.9 Safety and Security: No immediate abandoned plan, being a shallow operation. 51-type of stone fencing will be constructed around the open pit mines and watch and ward shall be to safeguard the mine from access to surface openings. 13.10 Disaster Management and Risk Assessment: Name and Address of Contact Person coordinating in case of Eventuality is, Name and Thiru R.Mahendhar

    43 Address 5/0 Ramegowdu,

    Kundumaranapalli Village & Post,

    Denkanikottai,

    Krishnagiri District, Tamil Nadu.

    Contact No. +91 9942242131

    Manager will be appointed and he will be provided suitable communication facilities. Primary Health centre is available in Denkanikolttai for medical emergencies, about 14 kms away from the mine.

    13.11 Care and Maintenance during temporary discontinuance:

    Watch and ward are provided permanently in the Mine premises to monitor the Mine openings to prevent inadvertent entry. Top soil bund is made partly and Stone fencing is proposed all around lease boundary to safe guard the mine and the adjacent livings. Temporary discontinuance will be minimum as there is enough demand for these materials in tiles industries. 14.0 Economic repercussions of closure of mine and manpower retrenchments 14.1 Number of local residents employed in the mine, status of continuation of family occupation and scope of joining occupation back. 23 Persons get employment. Most of labours are Agriculturist. In case of closure of mine, they may continue their own work or no other neighbor mines as should not observed around this area within SOOm radius. Being a proposed quarry immediate retrenchment may not arise. 14.2 Compensation given or to be given to the employees connecting with sustenance of himself and their family members. In case of any closure of mine the compensation under Industrial Dispute Act will be paid as per law. All workers shall get retrenchment benefits as per labour laws under enforcement. 14.3 Satellite occupations connected to the mining industry - number of persons engaged therein - continuance of such business after mine closes. The quarrying activity shall lead to development of several ancillary units and business, which are explained below: i) Other than mine employment, workshops, spare parts, tyres and tubes and related several self-employment opportunities.

    44 ii) Several shops and service providers shall grow in the public adjacent to mines, iii) Schools and city development shall also be possible owing to the fact of economic growth in the village. 14.4 Continued engagement of employees in the rehabilitate status of mining lease area and any other remnant activities. In the event of closure of mine, the mine worker shall get alternate work or business like agriculture etc. No serious repercussions envisaged in the event of cessation of mining activity, as they will be provided employment in other mines belong to the company. 14.5 Envisaged repercussions on the expectation of the society around due to closure of mine. Persons on Roll at the time of closure will get benefit as per State Govt. guidelines as applicable at the time of retrenchment 15.0 Time Scheduling for abandonment: The following works are scheduled before abandoning the mine, i) Parapet wall of 2m height will be constructed around the pit, ii) Planting and monitoring of Afforestation programme. As there is no proposal for closure of mine for the next 5-10 years. The abandonment of quarry does not arise. The parapet and plantations will be done during the year 2016-17. In case of any abandonment the following time is required, Activities Days for schedule Time schedule for fencing 6 months Time schedule for reclamation 1 year of mined out area 16.0 Proposed financial Estimate / Budget for (EMP) Environment Management a) Project cost I investment i) Land Cost Rs 13,00,000 ii) Machinery to be used Rs 1,90,00,000* iii) Refilling / Fencing Rs 75,000 iv) Labourers Shed Rs 75,000 v) Sanitary facility Rs 50,000 vi) Other items Rs 75,000 Total Rs 205.751akhs

    45 b)EMPCost

    i) Drinking water facility for the labourers = Rs 75,000 ii) Sanitary arrangement = Rs 70,000 ii i) Safety Kits, = Rs 75,000 iv) Water sprinkling for dust control = Rs 75,000 ( v) Afforestation etc. = Rs 3,80,000

    ( Total Rs 6.75lakhs 17. Abandonment Cost: ( Being a deep dipping deposit and depth persistence is yet to be established by ( proposed exploration and therefore program of back filling or reclamation of Land ( will be considered after completion of exploration to ascertain the cut-off limit of Mining. However budgetary provisions for Afforestation program and rehabilitation of the Area shall be carried out with cost as given below, i) Budgetary Provisions under abandonment At the end of At the End of Life 5 th year of Mine i) Afforestation Rs.20,000 Rs.1,00 ,000 (Planting and Securing) I ii) Backfilling Rs.3,00,000 iii) Rehabilitation of Area Rs1,50,000 (Dump Grading) iv) Construction of Parapet Rs.50,000 ( Rs.20,000 Rs.6,00,000

    <... ii) Year wise break up details are given as under,

    (

    ( \.

    (

    ( Total budget for afforestation for 5 years = Rs 150,000 (

    46 iii) Budget provision for Environmental monitoring (under EIA & EMP) Air sampling Water Analysis Noise (Rs) Ground SPM & gaseous (for 23 elements) vibration (Rs) matter (Rs) (Rs) 4000 per station 7000 x 2 = Rs 3000 x 2 = Not required ( x4= Rs 16000 x 2 14000\year Rs 6000\year season = (Core zone only) (Core zone) ( Rs 32000\year c (Core zone only) ( Totally Rs.46,OOO per year shall be allotted for monitoring of EMP. No abandonment during first five years and therefore no budget are allotted for the first

    ( five years. Total budget for Afforestation and EMP shall be, Expenditure = Rs 30000+ 46000 = Rs76,000 per year Period = 5 years Budget Amount = Rs 380,000 for five years