Samuel House, 1st Floor, 5 Fox Valley Way, Stocksbridge, Sheffield, S36 2AA Tel: 0114 321 5151 www.enzygo.com Our Ref: SHF.1615.003.HY.L.001.A Date: 13th February 2020 Your Reference: 3/2020/0010 FAO: Carole Woosey Email:
[email protected] Ribble Valley Borough Council Development Control Council Offices Church Walk Clitheroe Lancashire BB7 2RA Dear Carole, RE: HENTHORN ROAD, CLITHEROE, BB7 2QF [REFERENCE 3/2020/0010] - RESPONSE TO ENVIRONMENT AGENCY OBJECTION Enzygo Ltd have been commissioned to provide a response to an Environment Agency objection to a reserved matters planning application for 21 units on the above Site. A copy of the Environment Agency objection letter (Reference: NO/2020/112396/01-L01) is included as Attachment 1. This letter relates specifically to addressing Comments 1, 2 and 3 of the Environment Agency response. Please find below our response to the Environment Agency comments. ‘The proposed development would restrict essential maintenance and emergency access to Pendleton Brook, Main River. The permanent retention of a continuous unobstructed area is an essential requirement for future maintenance and/or improvement work’ To overcome our objection, the applicant should; 1) Submit cross sections extending from the water’s edge, including the top of the riverbank to the development areas closest to the watercourse, specifically plots 8 and 13 (Sabden), plot 7 (Eagley) and between the top of the riverbank and the attenuation pond. Drawing HR-BTP-00-S-DR-A-3537_160A (Attachment 2) includes cross sections at Plots 8, 7, 13 and the attenuation basin location as requested. The cross sections demonstrate that the built development will be a minimum of 13.2m (Plot 8) from the surveyed Pendleton Brook right bank top (A).