As part of the South District Council Local Plan review Apt Group are representing clients promoting ‘Land to the North of Pool House Road’ Wombourne. The site presents an excellent opportunity to grow the village in a sustainable and balanced manner whilst addressing both a large brownfield site which is available for development and building on the potential of land already safeguarded in that area. This document builds on the original site submission as part of the ‘Call for Sites’ which was undertaken in late 2018. The masterplan for the site clearly demonstrates that the site works much better as a whole rather than its constituent parts and represents a once in a lifetime opportunity to strategically plan for sustainable development. Planning strategically for housing growth will help meet the future needs of . The site can be broken down into 3 distinct phases two of which are brownfield parcels of land and the other ‘greenfield’ site consists of a former landfill site. Linking the 3 sites together provides for a greater critical mass helping to secure a range of onsite and offsite infrastructure benefits that meet the objective of the Council’s Local Plan Review without overloading the area with an unsustainable level of development. To support the demonstration of the deliverability of the site, in advance of the ‘Strategic Spatial Strategy & Infrastructure’ consultation in Autumn 2019, investigations into key areas including highways, drainage, geotechnical (ground conditions) and ecology related to the site have been undertaken and inform the content of this document. There are no overriding physical, environmental or technical constraints affecting site delivery. The site is suitable, available and achievable for development during the lifetime of the new plan period. As the site progresses through the allocations process further work will be undertaken to support the adoption of this site in the final iteration of the Local Plan review. This document establishes a vision for sustainable growth in Wombourne and sets out the suitability, availability and achievability of development at this location which is summarised as: Suitable – the site would contribute to overall housing needs by providing a mix of housing types, tenures and sizes at a scale proportionate with the role and function of Wombourne. Together with bringing forward the adjacent safeguarded land, the proposal would rebalance the distribution of development across Wombourne; a comprehensive masterplan-led development would bring forward housing, infrastructure and open space. Available – the landowner(s) are willing sellers and have indicated support for release of the whole site from the West Midland Green Belt; there are no known legal or ownership issues that preclude the whole site’s development during the Local Plan period; neither are there any significant overriding physical or technical constraints preventing future delivery. Achievable – the whole site could be comprehensively developed with a quantum of development that would deliver benefits by retaining and enhancing green infrastructure, together with site remediation and socio-economic benefits in terms of housing provision and infrastructure contributions.

2

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

Contents 1. Introduction 2. Site Location 3. Site Constraints 4. Site Description 5. Proximity to Local Services 6. Housing Requirement and Site Yield 7. Vision and Masterplan 8. Site Phasing 9. Onsite Infrastructure 10. Highways 11. Drainage 12. Geotechnical 13. Ecology 14. Alternative Sites 15. Performance Against Green Belt Objectives 16. Conclusions 17. Emerging Spatial Housing Strategy & Infrastructure Delivery Consultation 18. Annexes  Annex A. Drainage Note  Annex B. Geotechnical Note  Annex C. Ecology Note  Annex D. Site Masterplan  Annex E. Performance Against Green Belt Objectives

3

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

1. Introduction

1.1. South Staffordshire Council is reviewing its local plan. The review will consider the strategy and policies in both the core strategy and site allocations documents, updating evidence where necessary and setting out how much development is required in the district up until 2037. As part of this review new and/or amended policies will be proposed along with new residential and employment site allocations.

1.2. The Council’s Local Development Scheme (April 2019) sets out a broad timetable for key stages in preparing the local plan. The stages and dates are summarised in the following table. Table 1. Timetable for Local Plan Review Stage Dates Issues and options consultation October – November 2018. Complete Strategic spatial strategy & infrastructure delivery Autumn 2019 consultation Preferred spatial strategy and sites Spring 2020 Publication plan Winter 2020-21 Submission of local plan Autumn 2021 Local plan examination Winter 2021-22 Local plan adoption Summer 2022

1.3. The Council consulted on issues and options for the local plan review in October 2018. This was the first stage of the local plan review and identified planning issues facing South Staffordshire. The document also set out a range of options for future development. Five housing growth options were proposed and they ranged from 5,130 dwellings (270 per annum) to 25,130 dwellings (1,323 per annum) for the plan period 2018-37.

1.4. South Staffordshire Council consider that a minimum 9,130 dwellings (481 per annum) would be a proportionate contribution towards its own housing needs and also providing an element of unmet need from the wider Greater Housing Market Area. This option is one of many and a decision has not been made on a preferred level of growth. Should the Greater Birmingham housing shortfall be reduced, the contribution from South Staffordshire to the housing market area shortfall would also be proportionally reduced.

1.5. Six spatial options for distributing housing growth are presented in the issues and options consultation. They comprise various combinations of housing growth including urban extensions, village growth, intensification of development within existing village boundaries and new settlements. The options are not mutually exclusive and a combination of options could be the most sustainable solution.

4

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

1.6. Consultation responses from the issues and options stage are available on the Council’s website. A summary of responses will be published later in the year. The Council has not made any decisions on which growth option, or combination of options, to take forward in the local plan review.

1.7. The next stage in the local plan review is to consult on the overall strategy and broad locations for future development, including infrastructure delivery requirements. Consultation on the strategic spatial strategy and infrastructure delivery is scheduled for autumn 2019. Consultation on the preferred strategy for development will follow in spring 2020.

1.8. Given the identified need for housing growth, the Council launched a call for sites exercise to identify land which could be developed for housing and economic uses. Portions of the land north of Pool House Road were submitted for consideration in 2018 (site references 310, 311 and 458). A Strategic Housing and Economic Land Availability Assessment (SHELAA) was published later in 2018 and sets out a broad assessment of each site’s suitability, availability and achievability, in accordance with the National Planning Policy Framework (NPPF). The submitted portions of the Pool House Road site were considered potentially suitable but subject to policy constraints at present, namely the Green Belt designation.

1.9. This document expands on the previous call for sites submission and summarises the land north of Pool House Road’s suitability, availability and achievability for future development.

1.10. A summary of the emerging Spatial Housing Strategy & Infrastructure Delivery consultation is included in section 17 of this document. The proposed consultation documents have been made available on the Council’s website prior to review by Scrutiny Committee on the 10 October 2019.

2. Site Location

2.1. The site is located to the west of the village of Wombourne in South Staffordshire which itself is to the west of the Black , separated from the conurbation area by Green Belt land.

2.2. Wombourne has a population of around 14,000 (2011 Census) with the village being evenly split by the former railway line, now the South Staffordshire Railway Walk, which runs north to south. To the west of the line the majority of existing development is to the south west of the village. Further development in this area is likely to create an imbalance in the urban form of the village with additional residential areas being further from services and facilities.

5

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

PLAN 1 - LOCATION PLAN OF SITE 2.3. The proposed development site is made up of 3x parcels of land. These are:

 Copart  Land North of Pool House Road  Industrial Estate

6

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

2.4. The Copart and Smestow Brook portions of the site are accessed off the B4176 Road and the Land North of Pool House Road is accessed from a point midway along Pool House Road. The site is within the Green Belt, this includes the brownfield parcels of the site.

2.5. There are three existing safeguarded development sites which adjoin Pool House Road, these are located to the south of the proposed site allocation. The three sites were safeguarded in the Council’s Site Allocations Document (site references 285, 459 and 415) and removed from the . Future access to the Land North of Pool House Road is through the larger of the three development plots and land has been retained within the control of the site promoter for this purpose.

3. Site Constraints

3.1. The site has a number of constraints which are discussed in more detail in the technical reports annexed to this document. These include topographical, geotechnical, ecological, drainage and highway constraints; however, the technical reports conclude there are no overriding constraints affecting overall site delivery.

3.2. In summary the site is has some historical constraints associated with former uses including ground conditions and use as a landfill. Physical access to the 3x parcels of land for residential development is also a constraint that is addressed in more detail below. Landscape sensitivity has been raised as an issue in relation to local conservation areas and views towards Wombourne. There are no constraints that would prevent the allocation of the site for residential purposes as it is possible to design and engineer out existing issues.

3.3. The plan below highlights the areas of previous landfill.

7

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

PLAN 2 – FORMER LANDFILL SITES 3.4. Consideration of site constraints and opportunities include:

 A strong relationship with safeguarded land to the east. This provides opportunities to connect with the built form along Pool House Road  Drainage solutions – there are some changes in levels across the three sites. There is an opportunity for SuDS to be designed into future development  Public rights of way and overhead pylons crossing through parts of the site – diversion and/or integration of these routes into the scheme design will be required  Smestow Brook – this water feature divides the site areas. There is scope to open up the small river and integrate it as a physical feature into the scheme design  The site includes parcels of previously developed land – development of the whole site brings the potential to reuse large areas of this land but remediation works may also be required  Integrating Smestow Brook, hedgerows, trees and other natural features into a comprehensive green network, together with public open space provision  Site accessibility – utilising existing junction access from the B4716 Bridgnorth Road and providing connectivity for pedestrians and cyclists between the site, safeguarded land and services and facilities in Wombourne.

4. Site Description

4.1. Land north of Pool House Road comprises a substantial area of previously developed land plus a remaining portion of greenfield land. These two areas are separated by Smestow Brook which runs north to south through the site. The site comprises of 3x parcels of land which are described below:

8

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

PLAN 3 - LAND PARCELS 4.2. Copart

 Position and current usage - this portion of the site is located to the far west of the overall site and consists of previously developed land that is currently occupied by a car storage yard. The current occupiers have secured an alternative site with which to relocate the business. The alternative site is at Meaford in Staffordshire and the Copart Business is in the process of submitting a planning application to enable relocation. The site is cleared and is ready to be developed so there are no issues of relocating existing users in this case.  Previous usage – the site was previously used as a cement pipe works; however, this has not operated for several years and most buildings that were associated with this use have now been cleared.  Current access - access to the site is via a single junction off Bridgnorth Road which is shared with the Smestow Brook Business Park.  Adjoining land - the site is bounded by agricultural land to the west and north, by the Smestow brook and Industrial Estate to the east and by Bridgnorth Road to the south.  Topography – the site consists of relatively flat platforms of land associated with the previous uses and sits above Smestow Brook Industrial Estate.

9

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

4.3. Land North of Pool House Road

 Position and current usage – The parcel sits to the north west of 2x brownfield parcels of the overall site and comprises green fields used as grazing land.  Previous usage – the site is a former landfill and the Environment Agency have confirmed that the fill is inert material which predominantly consists of construction waste.  Current access – the land is accessed off Pool House Road via an access road which has been retained by the site promoter for the purposes of developing this site.  Adjoining land – the site is bounded to the south and west by Smestow Brook, the north by an existing farm and to the east by grazing land. This portion of the site sits directly above 3 x plots of safeguarded land which have been identified in the current South Staffordshire Site Allocations Document.  Topography – access to the site is relatively flat and rises up to the north with main body of the site before slopping down again mid-point. The western side of the site falls away towards the Smestow Brook.

4.4. Smestow Brook Industrial Estate

 Position and current usage – the parcel of land represents the middle portion of the overall site and is currently occupied by an Industrial Estate which consists of small business units, a children’s play barn, storage yards, vehicle repair centres and haulage yards. The site promoter is working to facilitate the relocation of these businesses.

 Previous usage – the previous use of the site would have been associated with the adjoining cement works and as such it remains brownfield land.

 Current access – the site shares the same access point as the Copart site from Bridgnorth Road which then splits to provide separate access points for both Copart and the business park.

 Adjoining land – the site is bounded to the west by Copart and to the north, east and south by Smestow Brook.

 Topography – this parcel of land sits at a lower level than the Copart site and consists of relatively flat platforms of land, this is evidenced by existing industrial / commercial buildings onsite. The land falls from south to north towards the Smestow Brook.

5. Proximity to Local Services

5.1. Wombourne is a large village and has a wide range of community facilities and services to serve residents’ daily needs. The village also has a strategic role serving smaller outlying villages and hamlets. The site is close to employment and retail along the B4176 Bridgnorth Road, including the main local Sainsbury’s supermarket.

10

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

5.2. The location of the site presents the opportunity for off-road access into the village centre via the . Local education and leisure facilities are located further along Pool House Road, this includes both primary and secondary provision as well as Wombourne Leisure Centre. The site benefits from relatively good pedestrian and vehicle access to together with shops and services along Planks Lane.

5.3. In summary the site is well connected to services, facilities and retail opportunities that Wombourne has to offer and most provisions can be reached on pavement or offroad with Wombourne’s network of foot paths.

PLAN 4 - LOCAL SERVICES

Table 2. Distances to Local Services Facility / Service Approximate Distance (as the crow fly’s) Primary School 1.6km Secondary School 1.3km Village Centre 2.1km Supermarket 1km Leisure Centre 1.4km Employment Park 0.9km

11

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

6. Housing Requirement and Site Yield

6.1. The Local Plan Review issues and options consultation identifies a minimum housing need of 5,130 dwellings over the plan period 2018-37 (270 per annum). This figure is based on the national standard method of assessing housing need as set out in the NPPF and guidance. The Council’s preferred level of future growth at this stage is 9,130 dwellings (481 per annum) which meets the districts objectively assessed housing need and includes an additional 4,000 dwellings towards the shortfall from the Greater Birmingham Housing Market Area.

6.2. South Staffordshire Council have undertaken a Strategic Housing and Economic Land Availability Assessment (SHELAA) which is an assessment of housing and employment land availability. Several sites including land at Wombourne have been submitted to the ‘call for sites’ and they have been assessed by the Council. The process does not allocate housing and employment sites – this is still to be determined by the Council. It does however make realistic assumptions about the availability, suitability and likely economic viability of sites.

6.3. The assessment applied developable area and density assumptions for housing sites that were submitted to the Council. For sites greater than 2 hectares a 60% ratio is applied to calculate the net developable area, given that allowances need to be made for open spaces, access roads and infrastructure. Site specific features could impact net developable areas.

6.4. The density assumptions used in the assessment are based on an analysis of average densities across historic schemes in the district. Table 3. Sites Densities Density assumptions (dwellings per net developable hectare) Village edge/isolated greenfield sites 32 dph Sites within existing village envelope/brownfield sites 38 dph Sites on the edge of an adjacent urban area (e.g. the Black 35 dph Country)

6.5. The Local Plan review issues and options consultation also proposes an option of adopting a 35 dph minimum density standard for new housing sites.

6.6. Land to the North of Pool House Road comprises 3x parcels of which fall into different density types. For the purposes of this assessment they have been grouped into three broad areas – the Copart site, Smestow Bridge Industrial Estate (both brownfield sites on the edge of a settlement) and the greenfield land to the north of Pool House Road. Using the Council’s SHELAA site assessment methodology, various dwelling yields have been calculated with a preferred combination based on the land types.

12

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

Table 4. Site Yield – Land North of Pool House Road Site Site Area Net Density Assumption Density Yield (hectares) Developable (adapted from the (dwellings) Area Strategic Housing and (hectares) Economic Land Availability Assessment) Copart 23.34 14 32 dph - village edge site 448 dwellings Greenfield 14.66 8.8 32 dph - village edge site 282 dwellings land Smestow 6.64 4 32 dph - village edge site 128 dwellings Bridge Industrial Estate Total 858 dwellings

6.7. While the Copart and Smestow Bridge Industrial Estate are brownfield sites, they are located on the edge of Wombourne and would require a comprehensive landscape design solution. Development could be phased throughout the parcels with variation in densities as a response to its edge of village context. A lower density could be applied along the outer site edges, for example, as a response to the boundary edges. The proposals for land north of Pool House Road have therefore applied a 32 dwellings per hectare density assumption for the whole site. While the estimated yields are slightly lower on the brownfield parcels than the SHELAA findings, these calculations are considered to be reasonable having been based on the SHELAA assumption of 60% gross to net developable area, the 32 dph density calculation, and initial findings from the site assessment work.

6.8. The Council acknowledges these assumptions can only be considered starting points for estimating site capacity; however, they give a broad indication of likely yield which can be taken forward for consideration and subject to further technical assessments.

6.9. The Local Plan issues and options consultation proposes that Wombourne is a Tier 2 settlement, below the Tier 1 level of settlements but still with a range of services and facilities. Several of the growth options include Wombourne as a potential settlement to accommodate a proportionate level of growth, but no figures have been suggested. Both the preferred level of housing growth and distribution strategy are yet to be agreed by the Council. Further information will be provided on settlement capacity in the autumn 2019 consultation on strategic spatial strategy and infrastructure delivery.

7. Vision and Masterplan

7.1. This site offers a generational opportunity for the Council and community of Wombourne to achieve a sustainable level of growth within the local area that meets the needs of future generations for quality affordable housing. The site also provides a real opportunity to capture the infrastructure benefits that development at an appropriate scale can provide for the existing community of Wombourne as well as new residents. A positive approach from the Council, community and stakeholders

13

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

will help regenerate this area brownfield land and open up the north west of Wombourne for everyone’s benefit.

7.2. The vision for the delivery of the site would be as one whole development opportunity this is supported by the following rationale:

 The site delivers a yield of approximately 858 dwellings based on 32 dwellings per hectare, a level of development that is consistent with the emerging Local Plan review and the Council’s preferred strategy for future development.

 The site has the potential to deliver local infrastructure benefits such as a safer highways network, onsite allotment provision and improved access to the Smestow Brook Local Nature Reserve.

 The site, as a whole, supports the wider delivery of development opportunity to the west of Wombourne and re-balances the urban form of the village which is currently heavily weighted to the east. It also support a more comprehensive ‘master planned’ approach to development when considered alongside the development potential of the existing safeguarded sites along Pool House Road.

 This development opportunity to the west of the village will also help protect the West Midlands Green Belt and provide the Council with a more robust position in resisting development between the conurbation and Wombourne to the east.

 The site is a major opportunity to regenerate and integrate a brownfield site on the edge of the village, an allocation that would provide certainty to the Council and the community around the long term use of the site. Without an allocation the relocation of Copart is still likely to go ahead with the prospect of a derelict, vacant site on the edge of the village.

 The site as a whole is well connected to the local area and provides the opportunity to open up access to the countryside to the north of Wombourne. The access to green space could be managed either by the Council or directly by future development partners.

14

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

PLAN 5 – SITE MASTERPLAN 8. Site Phasing

8.1. The following assessments analyse how the sites work sequentially starting with the Copart site, followed by the Copart + Greenfield land and finally the overall site which includes all 3x parcels of land. It looks at the relative benefits and challenges provided by each scenario. The phasing strategy is based on initial highways assessments which indicate approximately 300 dwellings can be served off a single access point. The Copart site capacity could therefore be delivered in the first phase, with development of the Greenfield land coming forward next and utilising access from the safeguarded Green Belt sites off Pool House Road. Smestow

15

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

Bridge Industrial Estate would form the third and final phase for overall site delivery, with the internal link road connecting through from the Greenfield land.

Table 5. Copart Site Site Summary Opportunities Housing  448 homes including affordable provision Regeneration  Regeneration of large brownfield site on the edge of the village Infrastructure  Highway improvements on Bridgnorth Road and Pool House Road junction and need for connection to Pool House Road to deliver all 448 homes.

PLAN 6 - COPART LAND 8.2. As an allocation on its own, the Copart site delivers a yield of 448 dwellings at a rate of 32 dwellings per hectare.

8.3. Delivery of the Copart site on its own would enable the regeneration of a significant area of brownfield land which currently sits outside the Wombourne settlement boundary. The site is likely to have limited future potential as a ‘quality employment site’ due to the nature of the previous and current uses which would have an impact on viability. Developing the site for residential uses is likely to increase the deliverability of the site through increased land values to offset any remediation costs.

16

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

8.4. At 448 dwellings the site cannot be developed in its entirety off a single point of access. Staffordshire County Council highways use a measure of 300 dwellings off a single point of access and the Copart site could be developed up to this threshold with a single access point. To deliver the remaining 148 dwellings a second access would be required off Pool House Road which connects the remaining phases of the Copart site with the Greenfield area of land. A second access of Pool House Road would also enable the release of Smeastow Brook Industrial Estate site and the delivery of a further 128 dwellings.

8.5. The delivery of a viable residential scheme onsite will limit the delivery of green open space provision and prevent the delivery of additional community benefits such as allotments that could be delivered on the overall wider site. This could potentially be offset by providing improved access to the Smestow Brook Local Nature Reserve, ensuring there are play facilities on site and managing development areas to maximise the usable open space. Good links into Wombourne for walking and cycling would need to be considered so that residents can access a typology of parks.

8.6. A serious draw back to the delivery of the Copart site, in isolation, is the resulting disconnect with Wombourne. The site would sit clearly outside the built form of the village and it would be far more difficult to achieve sustainable links into the village with missed opportunities for access via Land to the North of Pool House Road. The site would also sit next to a commercial / industrial park with potential issues associated with the proximity of those uses such as noise, dust, vehicle movements all impacting on the lives of incoming residents.

8.7. Pedestrian, cyclist and vehicle traffic will all access Wombourne from the existing Bridgnorth Road access. This is problematic when the Bridgnorth Road sweeps down towards Wombourne and will make access for pedestrians and cyclists (especially elderly and younger residents) more difficult, thereby increasing the likelihood of residents travelling by car for even short journeys.

8.8. Allocation of the Copart site in isolation will be a significant missed opportunity for the Council and community. It will result in piecemeal development of sites within the area including; the increased likelihood of the Smestow Bridge Industrial Estate being redeveloped for residential uses, at a later date, as well as the delivery of the safeguarded land on Pool House Road. This approach will reduce the Council’s ability to secure a ‘future proofed’ area that has been master planned to deliver a range of infrastructure improvements at scale such as highway improvements, sustainable transport links and community uses. Where sites come forward without a clear overall infrastructure led strategy the Council are likely to have to ‘gap fund’ infrastructure provision as sites are far less likely to relate to each other.

17

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

Table 6. Copart + Land North of Pool House Road Site Site Summary Opportunities Housing  730 homes including affordable provision Regeneration  Regeneration of a large brownfield site on the edge of the village  Scope for a more ‘finished’ urban form when linked to safeguarded sites. Infrastructure  Opportunity for a site link road providing an alternative route through to Bridgnorth Road in the event of accidents  Provision of onsite allotments to meet community needs  Strategic opportunity to secure wider infrastructure benefits from site + safeguarded land

PLAN 7 - COPART + LAND NORTH OF POOL HOUSE ROAD 8.9. An allocation covering Copart and land north of Pool House Road could deliver a total of approximately 730 dwellings.

8.10. This approach would bring in land north of Pool House Road as a second phase of site development. Access to this second phase would be provided off Pool House Road via the safeguarded sites that have been removed from the Green Belt. An internal link road would connect land north of Pool House Road with the Copart site.

8.11. Although the delivery of 730 dwellings should be feasible it is not the most optimum solution because it removes the opportunity to bring forward additional brownfield

18

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

land within the overall scheme as part of an overall masterplan. The result instead will be piecemeal (Industrial Estate remaining in the centre of a residential area) development which misses the opportunity to deliver a comprehensive scheme through the internal link road.

8.12. The development of Copart and Smestow Bridge Industrial Estate would exceed the Staffordshire County Highways guidance thresholds off a single access point. This would place a greater strain on the junction of Bridgnorth Road and Pool House Road which becomes an even greater potential single point of failure on the local highway network in the event of an accident or need for maintenance works. Instead, it is proposed to bring forward development of the greenfield land north of Pool House Road which could provide a link to the Copart site as a means of delivering a comprehensive approach to improvements in the area.

8.13. The inclusion of the greenfield parcel will provide extensive areas of green open space which can be made publicly accessible. This space provides a green buffer between proposed areas of development and existing Green Belt to the north of the village. The space can be used to plant appropriate levels of screening to protect sensitive view looking towards Wombourne, landscape mitigation can also be provided by setting development on the greenfield parcel down by re-profiling the landscape. Open space also provides the opportunity for community input into the planning process to determine what benefits they would wish to see such as the provision of allotments which could be managed for benefit of the whole village.

8.14. A greater scale of development which combines both sites will have some additional benefits. These are mainly generated by the potential for more open space across the site, a more finished urban form (including the safeguarded sites) and a more favourable position in terms of securing offsite infrastructure improvements.

8.15. The challenge presented by allocating the two parcels of the overall site is that the Copart site could still be seen as isolated from Wombourne by the Smestow Bridge Industrial Estate. The potential issues of noise, dust and vehicle movements from the industrial estate could still arise in this scenario, impacting on both residents and businesses.

Table 7. Copart Site + Land North of Pool House Road + Smestow Brook Industrial Estate Site Site Summary Opportunities Housing  858 homes including affordable provision Regeneration  Regeneration of 2x large brownfield sites on the edge of the village  Open up access to the former (inert) landfill site to the north as green open space  Better sustainable travel links between brownfield sites and services and facilities in Wombourne Infrastructure  Maximised highway improvements on Bridgnorth Road and Pool House Road junction

19

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

 Opportunity for a site link road providing an alternative route through to Bridgnorth Road in the event of accidents  Provision of onsite allotments to meet community needs  Strategic opportunity to secure wider infrastructure benefits of safeguarded land such as education contributions  Opportunity to design a comprehensive ‘green infrastructure’ solution which minimises the visual impact of proposals and maximises opportunities for public benefit.  Improved public access to Smestow Brook

PLAN 8 - COPART + SMESTOW BROOK INDUSTRAIL ESTATE + LNPHR 8.16. The overall site can deliver approximately 858 dwellings as an allocation and this would meet emerging local housing requirements. Allocation of the 3x parcels of land will have significant additional benefits which cannot be achieved with a piecemeal allocation of only the brownfield sites.

8.17. In terms of highways benefits the overall site could deliver a link road from the Bridgnorth access via a bridge across the Smestow Brook and connecting in with Pool House Road. This would enable the delivery of a greater number of units across the site as well as providing a suitable alternative route for traffic from Wombourne out to towards Bridgnorth should it be required. The Copart site could be released in part with the delivery of the remaining brownfield land being enabled via the construction of a link road between the Copart site and the Land North of Pool House Road.

20

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

8.18. The 3x parcels of land allocated as a whole will provide a greater critical mass from which to secure developer contributions for offsite infrastructure such as highways, education and sustainable travel improvements. This is a generational opportunity to secure a safe, robust and future proofed highway network and address public perception of highway safety in this area of the village. The inclusion of the green field land parcel will help facilitate better access by sustainable modes of travel into Wombourne from the Copart and Smestow Bridge sites via the green field land and through appropriate infrastructure to enable residents to cross Pool House Road safely.

8.19. A more strategic approach to allocating land within Wombourne will help rebalance the urban form of the village towards the west whilst maintaining good access to services, facilities and recreation opportunities. This should be done alongside the formal allocation of the safeguarded land along Pool House Road to provide the community with a clear indication of where development will go and what improvements will come with it.

9. Onsite Infrastructure

9.1. At 858 dwellings the site offers an opportunity for small scale retail focussed at the core of the site or closer to the main access off the Bridgnorth Road to address passing trade.

9.2. An overall green infrastructure offer could include:

 Meeting the village need for allotment spaces and associated parking spaces  Access to green open space for the whole community – with a variety of management options available from a dedicated management company, community led approach to Council adoptions  Potential for improvements to the Smestow Brook Local Nature Reserve  Onsite play and parks facilities to meet local needs  Appropriate screening for development to address issues of landscape sensitivity especially to the north of green field land.  Potential for offsite contributions towards education provision

9.3. Allotments - South Staffordshire Council published a draft Allotment Strategy in 2011, although it has never been formally adopted. The most recent open space audit, in the Open Space Strategy 2014-28 identified one allotment site in the Wombourne North & ward. There were no allotments in the Wombourne South East and South West wards.

9.4. The Council’s open space policies do not include an allotment standard; the need for allotments within a village will be led by locally identified demand. On site provision or contributions to improve existing facilities will be sought if a local need for such facilities has been identified. Consultation with the relevant Parish Council and local community will be the starting point for identifying such needs. It is clear that the

21

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

potential areas of open space on this site could provide an excellent opportunity to meet local need.

9.5. Education – An estimate has been calculated of pupil demand generated by the proposed development and safeguarded land along Pool House Road. This estimate is based on the dwelling mix assumptions in the Council’s Long Term Balancing Market Housing Report (2017). Following these assumptions it is unlikely that the generated demand would require on-site primary school provision. Any surplus provision in the local catchment area would need to be considered and it is therefore likely that developer contributions would be required towards either existing or new education facilities.

10. Transport

10.1. The highways infrastructure plan for the area is provided in Plan 9.

PLAN 9 – HIGHWAYS INFRASTRUCTURE PLAN

10.2. With a development of this size first principles would suggest that significant junction upgrades would be required for both the site access locations and other key locations on the local highway network. At this stage it is difficult to draw any firm conclusions on what would specifically be required and where. Therefore a transport model such as PTV Vissim would be required to comprehensively map the existing

22

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

transport movements and forecast the development impact on the village and surrounding area including those routes into the West Midlands conurbations.

10.3. Delivering a sustainable development is also key and therefore it is acknowledged that walking and cycle connectivity requires a detailed appraisal and new infrastructure, including the upgrade and enhancement of existing facilities would be necessary. Discussions will also be held with the local public transport operators regarding the improvement of local bus links and associated bus infrastructure with a view to hopefully providing a bus service through the development site itself. Any future planning application on the site would be supported by a comprehensive sustainable transport and travel plan strategy.

11. Drainage

11.1. A summary of the Drainage note is provided below.

11.2. The report is a desk study that has been produced to identify any key development constraints and opportunities in relation to drainage for the site and its 3x parcels of land. The report is high level as there are no detailed development layouts are available at the time of writing the report.

11.3. Smestow Brook

11.3.1. The Smestow Brook is an important feature within the site and is also a Biological Alert site; the development should maintain and enhance the watercourse valley as a blue/green corridor as public open space. If possible, a wider watercourse corridor should be provided along the site’s southern boundary. This can easily be accommodated within the current proposals.

11.4. Flood Risk

11.4.1. The mapped flood risk to the site from rivers and reservoirs is shown to be contained to the Smestow Brook watercourse valley. Reservoir flooding may affect a small area along the southern boundary of Smestow Brook Business Park, however the majority of the overall site is not within river or reservoir flood zones. Some localised surface water flooding and flow routes are mapped affecting the site, however this can be accommodated by considering the flow routes within a site design.

11.5. Drainage

11.5.1. Given the historic and current site usages and the Principal Aquifer underlying the site, infiltration drainage is extremely unlikely to be suitable and the Smestow Brook should be seen as the best point of outfall in accordance with the Drainage Hierarchy. Surface water discharge from the site should be restricted as close to greenfield runoff rates as possible. Preliminary estimations of discharge rates and corresponding attenuation volumes for each development phase have been calculated to provide an indication of what volume of surface water attenuation will be required.

23

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

11.5.2. Any development of the site should utilise SuDS for surface water drainage, providing multiple benefits e.g. water quality treatment for any development highway. Any SuDS serving should not be located in Flood Zones 2 or 3a. The Masterplan does not identify any space for SuDS within the development and space for drainage infrastructure will need to be identified when developing the site design further. Any SuDS features would likely need to be lined because of ground conditions.

11.5.3. There are no existing public sewers within the development site, although it is expected that there are existing private foul and surface water drainage systems within the existing industrial estate. The industrial estate is served by mains water and a main is located under the B4167.

11.6. Connecting the 3x parcels of land

11.6.1. The development proposals include a highway over the Smestow Brook linking the brownfield and greenfield areas of the overall site. This will need to be designed with consideration of existing flow routes and levels, the site’s Biological Alert Site status and the modelled flood zones. Any feature crossing the watercourse will require a permit from the Environment Agency and will likely require flood modelling to demonstrate that proposals do not affect flood flows down the watercourse.

11.7. Former Landfill

11.7.1. The former landfill site and any SuDS and drainage will likely require excavation into this landfill material. How this can be achieved will need to be carefully considered. Any SuDS features would need to be designed to account for loading and settlement from storage of large volumes of water. Engineering costs associated with this parcel are therefore expected to be abnormal.

11.7.2. In conclusion, no major drainage constraints have been identified in brownfield parcels of land although a number of features and conditions will need to be considered within the site design as this develops.

12. Geotechnical

12.1. A summary of the geotechnical note is included below.

12.2. Draft master plan

12.2.1. Substantial demolition and clearance of Copart and Smestow Bridge Industrial Estate, which include buildings, hard standings and services within these areas will be necessary. Based on the modern industrial use of this land, contamination is more likely to be an issue in this part of the site. Furthermore, the north-western parts of Phase 1 area have been extensively quarried and subsequently infilled with landfill. As such, more extensive remediation and more extensive foundation measures may be necessary. Also, the surface water flood risk map indicates that the northern part of Phase 1 will be prone to flooding and specific measures may be necessary to address this issue. Phase 2 is located at the southern end of the north-eastern part of the site. Although this part of the site currently appears as open green fields, the entire area

24

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

appears to have been subjected to extensive quarrying and subsequent infilling with landfill. As such, more extensive remediation and more extensive foundation measures are likely to be required.

12.3. Ground contamination issues

12.3.1. Many of the current operators on the industrial estate could give rise to significant contamination issues. Given the extent of the various automotive works (scrap yards), it is anticipated that the greatest concern will be from various hydrocarbons ‘leaking’ into the surface soils. Similarly, the various areas of extensive landfill within the site represent significant risks and are likely to require further studies in advance of a planning application.

12.4. Topography

12.4.1. Generally speaking, the south-western part of the site falls easterly towards Smestow Brook, whilst the north-eastern part of the site falls westerly towards Smestow Brook. Given the relatively gentle topography, modest earthworks should be possible to create the proposed development platforms.

12.5. Geology

12.5.1. Based on the preliminary information available, it would appear that the prevailing ground conditions are likely to comprise varying amounts of Made Ground materials (backfilled quarries and landfills) overlying predominantly granular natural superficial deposits (sands and gravels), which in turn overly sandstone bedrocks. Locally, immediately adjacent to the route of the Smestow Brook, the natural superficial deposits are likely to be me more cohesive clays (Alluvium).

12.6. Further studies

12.6.1. Further studies will inevitably be required to bring the development forward to detailed design. These studies will need to include detailed topographical surveys, comprehensive geotechnical desk study and site specific ground investigations to determine the prevailing ground conditions and geotechnical parameters for design. The specific requirements for each development site should be determined as part of detailed geotechnical desk study works.

13. Ecology

13.1. A summary of the ecology note has been included below.

13.2. The following features have been identified 2km or more from the site:

 No Special Areas of Protection (SPA), Special Areas of Conservation (SAC) or Ramsar sites within 5km of the site.  No SSSI within 2km of the site: o ‘’ SSSI is located approximately 2.5km to the south west of the site, and o ‘ Road Cutting’ SSSI is located approximately 5km to the east of the site.

25

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

 No National Nature Reserves within 2km of the site.  ‘Wom Brook Walk’ and ‘South Staffordshire Railway Walk’ Local Nature Reserves are located within 2km of the site. Neither site is located within, or immediately adjacent to, the site.

13.3. The following has been identified within 2km of the site:

• Four Local Wildlife Sites and one ‘Biodiversity Alert Site’ are located within 2km at: o Staffordshire and Canal:: Penn Substation o The Grotto, o Heath Mill and Smestow Mill Smestow Brook, and o Planation

13.4. The following has been identified adjacent to or partially within the proposed site (Phases 1 – 3):

 One Local Wildlife Site is immediately adjacent to the site, ‘Feiashill’. This site was declared as a Local Wildlife Site in 1996.  A single Biodiversity Alert Site ‘Woodford Grange and Smestow Barn’ is presently partially within, and immediately adjacent to, the site

14. Alternative Sites

14.1. An analysis of alternative sites included within the SHELAA in the table below.

Table 8. Summary of Alternative Sites SHELAA Comment reference / site name 280 - Land Although the site is within the development boundary of Wombourne it has at the existing constraints that make sustainable development difficult not least its location in relation to Bratch Locks and the listed pumping station onsite. The site would lend itself well to more tourism related development that could open up the site which sits between two of Wombourne’s most valuable assets being the canal and the South Staffordshire Railway Walk. Highways access to the site is potentially difficult with access onto any of the surrounding roads leading to disruption for existing residents from either through traffic or changes to the network. 283 - Land The site is in Green Belt land and outside of the development boundary. off Development at this location will start to signal a coalescence of the village Bridgnorth with the conurbation area. The site is also adjacent to the Sytch Lane Road Cemetery and once the proposed site had been completed the cemetery will be surrounded by residential development on 3 sides and a Livery / Agricultural Yard. Although the site is adjacent to the urban area it remains relatively isolated from Wombourne with access likely to be achieved via the Bridgnorth Road. 416 – Land Development of this site would start to see a finger of development off Orton extending to the north of Wombourne. This appears to be a relatively Lane remote proposal that does not contribute to the logical form of the village.

26

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

Part of the site is safeguard land with approximately a quarter of the site being made up of additional land in the Green Belt. 463 (a, b, c The site would benefit from access onto the Road, however it and d), 284 signals a willingness for further development in the gap between the village – Billy Buns and the conurbation. Development at this point is highly likely to lead to Lane further pressures in the future. 554 – Land The site is within close proximity of Bratch Locks conservation area. It off Trysull represents an expansion into the Green Belt that is on a wholly greenfield Road site and does not provide a logical form to the village with further pressure for infill development in the area in future years. A potentially piecemeal approach to development in the area will water down the Council’s ability to secure an infrastructure led strategy and negate the benefits of a master planned approach. 626, 627, The proposed sites collectively represent a major extension to the south 628, 629 – west of Wombourne. The sites are greenfield open land within the West Land off Midlands Green Belt that if delivered would bring Wombourne much closer Bridgnorth to the village of Swindon to the south. It would then be difficult for the Road Council to resist further pressure in the future to bring the two settlements (Parcels a, together, as part of future Local Plan work. This site does not provide any b, c and d) benefits arising from the delivery of a brownfield site such as the Land North of Pool House Road.

15. Performance against Green Belt objectives

15.1. The sites identified above have been included along the Land North of Pool House Road to assess them against the 5 Green Belt objectives in the NPPF. A table summarising the results is included in Annex F to this document. The table demonstrates that of all the major sites around Wombourne the Land to the North of Pool House Road performs the best against the 5 objectives of the Green Belt as summarised below:

1. Check the unrestricted sprawl of large built-up areas – The site represents an extension to the north west of Wombourne - opposite side of village to the West Midlands conurbation 2. Prevent neighbouring towns merging into one another – There are no implications for merging the gap between Wombourne and the West Midlands 3. Assist in safeguarding the countryside from encroachment – There is limited scope for further development beyond proposals due to the presence of natural barriers 4. Preserve the setting and special character of historic towns – A major developable part of site is brownfield and there is scope to enhance the setting of the area 5. Assist in urban regeneration, by encouraging the recycling of derelict and other urban land – The site provides a major opportunity to deliver regeneration of brownfield land on the edge of the village

27

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

16. Conclusions

16.1. It is clear from the analysis provided that Land North of Pool House Road (including Copart, Smestow Brook Industrial Estate and safeguarded land) works best as a whole and not as individual parcels of development. The overall site delivers an opportunity to take a strategic approach to development in Wombourne, in an area that has already been identified as suitable for development with the designation of safeguarded land. The site is also suitable as it helps meet the Council’s desire to protect the Green Belt buffer between the West Midlands and Wombourne as well as regenerating a brownfield site.

16.2. The analysis provided in the attached notes highlight areas for development and further investigation. They demonstrate that the site does not have any overriding physical or environmental constraints that prevent a future allocation and there are technical solutions to any issues raised that can be dealt with through outline and reserved matters planning applications.

16.3. The site also performs better on many counts to other proposals in the Wombourne area which rely on the development of solely green field sites of which a number of these sites suggest a development strategy that would see Wombourne at risk of merging with surrounding settlements on the West Midlands conurbation fringe.

16.4. The content of this document establishes that the site is:

 Suitable – the site would contribute to overall housing needs by providing a mix of housing types, tenures and sizes at a scale proportionate with the role and function of Wombourne; the site’s proximity to services and facilities in Wombourne and nearby West Midlands conurbations, accessibility by public transport; the Council’s SHELAA identifies the site overall as ‘potentially suitable’, with general policy compliance, the main outstanding issue being the Green Belt designation; No issues were identified in the Council’s Infrastructure Delivery Plan (2018) that could impact on development of this scale in this location. Together with bringing forward the nearby safeguarded land, proposals would rebalance the distribution of development across Wombourne; a comprehensive masterplan-led development would bring forward housing, infrastructure and open space.

 Available – the landowner(s) are willing sellers and have indicated support for release of the whole site from the West Midland Green Belt; there are no known legal or ownership issues that preclude the whole site’s development during the Local Plan review plan period; neither are there any significant overriding physical or technical constraints preventing delivery during the future plan period.

 Achievable – the whole site could be comprehensively developed with a quantum of development that would deliver benefits both in retaining and enhancing green infrastructure, together with site remediation and socio-economic benefits in terms of housing provision and necessary infrastructure contributions.

16.5. The benefits of developing the whole site can be summarised as:

28

Masterplan and Phasing Report

Land at Pool House Road, Wombourne

 Proportionate growth for Wombourne which accords with its role as a large village serving its residents and also those of nearby villages;  Well-located in close proximity to existing employment opportunities, services and facilities; with strategic links to nearby conurbations in the West Midlands via public transport;  Delivery of approximately 858 dwellings – a range of dwelling sizes, types and tenures to help meet housing demand in South Staffordshire;  Provision of new green infrastructure – a network of public open space and green corridors including enhancement along Smestow Brook; contributing to the health and wellbeing of residents;  Utilising existing access points and providing accessibility for pedestrians and cyclists into Wombourne;  Landscape treatment and design solutions particularly along the softer site boundaries into open countryside further north.

17. Spatial Housing Strategy & Infrastructure Delivery Plan

17.1. Building on the evidence presented in this document the emerging Spatial Housing Strategy & Infrastructure Delivery Plan sets a range of strategy options for the distribution of growth in the Borough. The document sets relative benefits and dis- benefits of seven options for the distribution of growth. The majority of options identified that they “may facilitate delivery of previously developed land in the Green Belt at Wombourne”. It is assumed, without further detail on specific sites, this is in reference to the Copart / Smestow Brook Industrial Park land. The document also references the South Staffordshire Green Belt Study (2019) with a plan showing the Green Belt ratings around Wombourne. The Copart and Smestow Brook Industrial Park sites is rated as ‘low – moderate’ and the Greenfield land to the north of Pool House Road is rated as ‘moderate’.

17.2. It is clear that:

 The emerging development plan strategy supports further growth at Wombourne  There is support for the delivery of PDL which includes the Copart and Smestow Brook Industrial Park  The impact of growth on the Green Belt in this area is ‘low to moderate’  To maximise the benefits from an infrastructure led strategy a focusing growth on a strategic site is the best way to maximise off site contributions, address existing infrastructure issues and comprehensively plan for infrastructure needs of a new community. Annexes

A. Drainage Note B. Geotechnical Note C. Ecology Note D. Site Masterplan E. Performance Against Green Belt Objectives

29

apT I Wellington Civic Offices I I PO Box 457 I TF2 2FH I 01952 384555 [email protected]