Fort Randall Dam Pickstown, South Dakota Project Profile(2013)

Total Page:16

File Type:pdf, Size:1020Kb

Fort Randall Dam Pickstown, South Dakota Project Profile(2013) Project Profile Fort Randall Dam Pickstown, South Dakota Project Profile(2013) Project Summary Completed in 1952, Fort Randall Dam encloses Lake Francis in south central South Dakota. The Spring of 2011 brought historic flooding to Fort Randall Dam and the entire Missouri River corridor. As a result of this flooding, inspections made it apparent that numerous repairs were needed to rehabilitate the dam. Part of the repairs included extensive hydrodemolition and partial replacement of large portions of the spillway slab. Concrete shrinkage was already a concern given that the replacement concrete would be highly restrained by the underlying remaining concrete and the surrounding concrete. Of additional concern - since more than 8” of concrete was being removed in most areas, reinforcement steel for temperature and shrinkage would need to be installed, requiring 130,000 dowel anchors to be drilled into surrounding concrete. The dowels could put additional strain on the concrete both during installation and during service. In lieu of the 130,000 dowels and temperature and shrinkage steel, the owner opted to use PREVent-C® admixture at a 5% dosage rate along with a macro polypropylene fiber at 5 lbs/yd in addition to other adjustments to their specialty concrete mix design. Owner: United States Army Corps of Engineers Engineer: United States Army Corps of Engineers Concrete Contractor: Red Wilk Construction General Contractor: Morris Inc. Ready-Mix Producer: Wagner Building & Supply Products: PREVent-C®500 Shrinkage-Reducing/Compensating Admixture 300 Barr Harbor Dr. Suite 250, West Conshohocken, PA 19428 www.premiercpg.com | T. 800-227-4287 Premier CPG is a fully-owned division of Premier Magnesia PREVent-C® is a registed trademark of Premier CPG.
Recommended publications
  • Flooding the Missouri Valley the Politics of Dam Site Selection and Design
    University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Great Plains Quarterly Great Plains Studies, Center for Summer 1997 Flooding The Missouri Valley The Politics Of Dam Site Selection And Design Robert Kelley Schneiders Texas Tech University Follow this and additional works at: https://digitalcommons.unl.edu/greatplainsquarterly Part of the Other International and Area Studies Commons Schneiders, Robert Kelley, "Flooding The Missouri Valley The Politics Of Dam Site Selection And Design" (1997). Great Plains Quarterly. 1954. https://digitalcommons.unl.edu/greatplainsquarterly/1954 This Article is brought to you for free and open access by the Great Plains Studies, Center for at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Great Plains Quarterly by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. FLOODING THE MISSOURI VALLEY THE POLITICS OF DAM SITE SELECTION AND DESIGN ROBERT KELLEY SCHNEIDERS In December 1944 the United States Con­ Dakota is 160 feet high and 10,700 feet long. gress passed a Rivers and Harbors Bill that The reservoir behind it stretches 140 miles authorized the construction of the Pick-Sloan north-northwest along the Missouri Valley. plan for Missouri River development. From Oahe Dam, near Pierre, South Dakota, sur­ 1946 to 1966, the United States Army Corps passes even Fort Randall Dam at 242 feet high of Engineers, with the assistance of private and 9300 feet long.! Oahe's reservoir stretches contractors, implemented much of that plan 250 miles upstream. The completion of Gar­ in the Missouri River Valley. In that twenty­ rison Dam in North Dakota, and Oahe, Big year period, five of the world's largest earthen Bend, Fort Randall, and Gavin's Point dams dams were built across the main-stem of the in South Dakota resulted in the innundation Missouri River in North and South Dakota.
    [Show full text]
  • Shallow Water Fish Communities in the Missouri River Downstream of Fort Randall and Gavins Point Dams in 2003 and 2004 with Emphasis on Asian Carps
    Shallow water fish communities in the Missouri River downstream of Fort Randall and Gavins Point dams in 2003 and 2004 with emphasis on Asian carps Prepared for the Aquatic Nuisance Species Coordinator, U.S. Fish and Wildlife Service – Region 6, 134 Union Boulevard, Lakewood, Colorado 80228 By Robert A. Klumb – Fish Biologist U.S. Fish and Wildlife Service Great Plains Fish and Wildlife Management Assistance Office Pierre, South Dakota 57501 November 21, 2007 EXECUTIVE SUMMARY In 2003 and 2004, fish were collected during late-spring through summer with conical minnow traps (two mesh sizes), bag seines, and mini-fyke nets in shallow water habitats in the unchannelized Missouri River downstream of Fort Randall and Gavins Point dams in South Dakota and Nebraska. Presence of three Asian carp species, bighead carp Hypophthalmichthys nobilis, silver carp H. molitrix, and grass carp Ctenopharyngodon idella, have been documented in the Missouri River downstream of Gavins Point Dam but have not been found upstream of this barrier. Whether Asian carps are reproducing in this reach of the Missouri River in South Dakota and Nebraska is also unknown. Adult silver carp were observed downstream of Gavins Point Dam in the mouth of the James River, South Dakota in 2003 and 2004, but no young-of- the-year (YOY) for all three Asian carp species were captured downstream of either dam. Lack of YOY captures potentially resulted from: 1) adult Asian carps migrating in summer to feed but, as of yet, are not reproducing in the South Dakota and Nebraska waters of the Missouri River downstream of Gavins Point Dam, 2) have only recently become established in this part of the Missouri River, 3) gears used in this study were deployed in habitats not inhabited by YOY Asian carps or 4) gears used were ineffective to capture this life stage.
    [Show full text]
  • Today's Missouri River
    DID YOU KNOW? The Missouri River is the longest river in North America. The Missouri is the world’s 15th- TODAY’S longest river. The Missouri has the nickname MISSOURI RIVER “Big Muddy,” because of the large The Missouri River has been an important resource for amount of silt that it carries. people living along or near it for thousands of years. As time went on and the corridor of the Missouri River was developed and populations increased, efforts have been There are approximately 150 fish made to control flows, create storage, and prevent flooding. species in the Missouri River, and As a result, six mainstem dams have been in place for more about 300 species of birds live in the than half a century, with the goal of bringing substantial Missouri River’s region. economic, environmental, and social benefits to the people of North Dakota and nine other states. The Missouri’s aquatic and riparian Since the building of the mainstem dams, it has been habitats also support several species realized that for all of the benefits that were provided, the of mammals, such as mink, river dams have also brought controversy. They have created otter, beaver, muskrat, and raccoon. competition between water users, loss of riparian habitat, impacts to endangered species, stream bank erosion, and delta formation - which are only a few of the complex issues The major dams built on the river related to today’s Missouri River management. were Fort Peck, Garrison, Oahe, Big Bend, Fort Randall, and Gavin’s Point. This educational booklet will outline the many benefits that the Missouri River provides, and also summarize some of the biggest issues that are facing river managers and residents within the basin today.
    [Show full text]
  • The Army Post on the Northern Plains, 1865-1885
    The Army Post on the Northern Plains, 1865-1885 (Article begins on page 2 below.) This article is copyrighted by History Nebraska (formerly the Nebraska State Historical Society). You may download it for your personal use. For permission to re-use materials, or for photo ordering information, see: https://history.nebraska.gov/publications/re-use-nshs-materials Learn more about Nebraska History (and search articles) here: https://history.nebraska.gov/publications/nebraska-history-magazine History Nebraska members receive four issues of Nebraska History annually: https://history.nebraska.gov/get-involved/membership Full Citation: Ray H. Mattison, “The Army Post on the Northern Plains, 1865-1885,” Nebraska History 35 (1954): 17-43 Article Summary: Frontier garrisons played a significant role in the development of the West even though their military effectiveness has been questioned. The author describes daily life on the posts, which provided protection to the emigrants heading west and kept the roads open. Note: A list of military posts in the Northern Plains follows the article. Cataloging Information: Photographs / Images: map of Army posts in the Northern Plains states, 1860-1895; Fort Laramie c. 1884; Fort Totten, Dakota Territory, c. 1867 THE ARMY POST ON THE NORTHERN PLAINS, 1865-1885 BY RAY H. MATTISON HE opening of the Oregon Trail, together with the dis­ covery of gold in California and the cession of the TMexican Territory to the United States in 1848, re­ sulted in a great migration to the trans-Mississippi West. As a result, a new line of military posts was needed to guard the emigrant and supply trains as well as to furnish protection for the Overland Mail and the new settlements.1 The wiping out of Lt.
    [Show full text]
  • 06452500 LAKE FRANCIS CASE at PICKSTOWN, SD Fort Randall Reservoir Basin Fort Randall Reservoir Subbasin
    Water-Data Report 2006 06452500 LAKE FRANCIS CASE AT PICKSTOWN, SD Fort Randall Reservoir Basin Fort Randall Reservoir Subbasin LOCATION.--Lat 43°04′05″, long 98°33′15″ referenced to North American Datum of 1927, in SE ¼ sec.5, T.95 N., R.65 W., Charles Mix County, SD, Hydrologic Unit 10140101, in tower 6 of outlet works at Fort Randall Dam, on Missouri River at Pickstown, 1.0 mi upstream from Randall Creek, and at mile 880.0. DRAINAGE AREA.--263,500 mi². SURFACE-WATER RECORDS PERIOD OF RECORD.--December 1952 to current year (monthend contents only). Prior to October 1964, published as Fort Randall Reservoir at Pickstown. GAGE.--Water-stage recorder. Elevations listed to NGVD of 1929. Prior to Mar. 25, 1953, elevations determined from temporary nonrecording gages. COOPERATION.--Records of elevation and contents provided by U.S. Army Corps of Engineers. REMARKS.--Reservoir is formed by earthfill dam; storage began in December 1952; initial closure made July 1952. Maximum capacity, 5,574,000 acre-ft below elevation 1,375.0 ft (top of spillway gates). Normal maximum, 4,589,000 acre-ft below elevation 1,365.0 ft. Inactive storage, 1,184,000 acre-ft below elevation 1,310.0 ft. No dead storage; elevation of invert of lowest outlet is 1,227.0 ft. Figures given herein represent elevations at outlet works and total contents adjusted for wind effect. The spillway consists of 21 taintor gates, each 40 ft wide by 29 ft high; spillway capacity, 490,000 ft³/s at pool elevation 1,375 ft.
    [Show full text]
  • Fort Peck Draft
    US Army Corps of Engineers Omaha District Draft Fort Peck Dam/Fort Peck Lake Project Montana Surplus Water Report Volume 1 Surplus Water Report Appendix A – Environmental Assessment August 2012 THIS PAGE INTENTIONALLY LEFT BLANK FORT PECK DAM/FORT PECK LAKE PROJECT, MONTANA SURPLUS WATER REPORT Omaha District U.S. Army Corps of Engineers August 2012 THIS PAGE INTENTIONALLY LEFT BLANK Fort Peck Dam / Fort Peck Lake, Montana FORT PECK DAM/FORT PECK LAKE MONTANA SURPLUS WATER REPORT August 2012 Prepared By: The U.S. Army Corps of Engineers, Omaha District Omaha, NE Abstract: The Omaha District is proposing to temporarily make available 6,932 acre-feet/year of surplus water (equivalent to 17,816 acre-feet of storage) from the system-wide irrigation storage available at the Fort Peck Dam/Fort Peck Lake Project, Montana to meet municipal and industrial (M&I) water supply needs. Under Section 6 of the Flood Control Act of 1944 (Public Law 78-534), the Secretary of the Army is authorized to make agreements with states, municipalities, private concerns, or individuals for surplus water that may be available at any reservoir under the control of the Department. Terms of the agreements are normally for five (5) years, with an option for a five (5) year extension, subject to recalculation of reimbursement after the initial five (5) year period. This proposed action will allow the Omaha District to enter into surplus water agreements with interested water purveyors and to issue easements for up to the total amount of surplus water to meet regional water needs.
    [Show full text]
  • Aerial Photography Maps of the Missouri National Recreational River
    Aerial Photography Maps of the Missouri National Recreational River Fort Randall Dam. South Dakota to Santee. Nebraska September 2003 Army Corps of Engineers ® Omaha District Table of Contents Welcome Page • A c"Omprch"n,;',., ex~mi"a t ion of the Missouri Ri,,,. addressil1g topics such as " .. ,irs grograph ica\ char~c~ris{iC.'l . .. .th e origin of ill! nickname, "Big Muddy." .. ,irs appearance during Lewis and Clark's "pk jOlln,C')'. 01 Bald Eagle While many bald Threatened and Endangered Species Page • An iliustrMive guide on the arca's rh",aten"d and endallgercd specie,; ourlinil1g" . area d uring the .. ,the need (or the Endan~",,,,d Species Act of 1973. these rapmrs may ."ways of protecting .pecies fOund along the Missouri Ri,,,r. ", the countless reasons and incentives for "",il1g endange",d species. yea r in the 02 ;Iatec\, means tIl e s 'niubthatha,' or Historical Information Page .A historiC"~1 owrvi~'w of the Lewis and Clark Expedition providing specifies on ... .. the ~... "nt:,; that led up to the f~med Expedition . \ ... the conditions as descril>ed in the journals of William Clark . .. the Missouri Ri",r and the Lev,'is & Clark Bicentennial CommemorMion. 04 Ide turtJicrinsrructi;:jns. General and Safety Information Page oat Ramp Coordinates - An ~ ~t ensiw list of ,,',,nernl information and sa(cty pm:autions offering tips on .. Boat Ramp Name Lat .. respecting the' resomce. .. ....... imming. OOating. and ",mping. Spillway 430031 .. reading and na"ig;oting the' Missomi Riwr. 07 ,--" andalLC ,eek 4r 03 Sheet Index Page • An iliustrMi"e map indexing the following sections of the Recreational Ri",r..
    [Show full text]
  • Sauger Population Ecology in Three Missouri River Mainstem Reservoirs Brian D
    South Dakota State University Open PRAIRIE: Open Public Research Access Institutional Repository and Information Exchange Electronic Theses and Dissertations 2006 Sauger Population Ecology in Three Missouri River Mainstem Reservoirs Brian D. S. Graeb South Dakota State University Follow this and additional works at: https://openprairie.sdstate.edu/etd Part of the Natural Resources and Conservation Commons Recommended Citation Graeb, Brian D. S., "Sauger Population Ecology in Three Missouri River Mainstem Reservoirs" (2006). Electronic Theses and Dissertations. 438. https://openprairie.sdstate.edu/etd/438 This Dissertation - Open Access is brought to you for free and open access by Open PRAIRIE: Open Public Research Access Institutional Repository and Information Exchange. It has been accepted for inclusion in Electronic Theses and Dissertations by an authorized administrator of Open PRAIRIE: Open Public Research Access Institutional Repository and Information Exchange. For more information, please contact [email protected]. Sauger Population Ecology in Three Missouri River Mainstem Reservoirs By Brian D. S. Graeb A dissertation submitted in partial fulfillment of the requirements for the degree Doctor of Philosophy Major in Biological Sciences South Dakota State University 2006 11 Sauger Population Ecology in Three Missouri River Mainstem Reservoirs This dissertation is approved as a credible and independent investigation by a candidate for the Doctor of Philosophy degree and is acceptable for meeting the dissertation requirements for this degree. Acceptance of this dissertation does not imply that the conclusions reached by the candidate are necessarily the conclusions of the major department. David W. Willis Date Dissertation Advisor Charles G. Scalet Date Head, Department of Wildlife and Fisheries Sciences iii Acknowledgements I would like to especially thank my wife, Stephanie for her support and guidance in all aspects of my life during my long tenure as a graduate student, and my advisor, Dr.
    [Show full text]
  • Fort Randall Power Plant Development Plan
    Omaha District Hydropower Master Plan Final Submittal Aug 2016 1 Team Omaha, I am pleased to present the Omaha District Hydropower Master Plan. The Hydropower Master Plan provides a guide for future development decisions. The plan outlines the future requirements that will sustain our hydropower mission capability. Our purpose is to develop a strategic master plan that will guide future programming and funding for all hydropower sustainment, rehabilitation, and modernization requirements in a way that provides predictable funding and maximizes efficiencies to ensure the long-term resilience and reliability of this critical national infrastructure. There are several key tasks essential to our success: Plan for the future with a comprehensive, feasible, and efficient master plan. Program and secure predictable funding to sustain, rehabilitate, and modernize power plant infrastructure according to an established master plan. Prioritize repairs and improvements through risk-informed decisions and communication. Execute funding and complete programmed and funded projects according to contracts and agreements. Our desired end state is to ensure Omaha District hydropower infrastructure is rehabilitated and modernized no later than 2035 to maximize resilience and provide renewable, reliable energy production to the nation for an additional 50 years. I encourage you to become familiar with this plan and to foster greater partnership with every organization whose activities impact the physical development of hydropower in support of the larger U.S. Army Corps of Engineers mission. John W. Henderson, P.E. Colonel, Corps of Engineers District Commander 2 Charter PARTNERING CHARTER We are committed to work together through a positive, effective, and enduring partnership to ensure success of the ______________________________________________ ______________________________________________ goals and objectives as outlined in the Omaha District JOHN W.
    [Show full text]
  • SMITHSONIAN INSTITUTION Bureau of American Ethnology Bulletin 176
    SMITHSONIAN INSTITUTION Bureau of American Ethnology Bulletin 176 River Basin Surveys Papers, No. 15 Historic Sites Archeology on the Upper Missouri By MERRILL J. MATTES CONTENTS PAGE Introduction 5 The Missouri Basin 7 The National Park Service and the Missouri Basin 9 Historic sites investigations 13 Literature cited 20 3 HISTORIC SITES ARCHEOLOGY ON THE UPPER MISSOURI ' By Mekrill J. JVIattes ^ INTKODUCTION The Flood Control Act of 1944 laid the groundwork for a compre- hensive water-control plan for the Missouri River Basin, involving the survey of over 100 potential reservoir sites, and the early creation of several of these reservoirs by the Corps of Engineers and the Bureau of Reclamation. The construction of large dams, inundating extensive river valleys, posed a grave threat to important historical and archeo- logical values quickly recognized by two other Government agencies which have primary responsibilities in these fields—the National Park Service of the United States Department of the Interior, and the Smithsonian Institution. Under the aggressive leadership of chief historian R. F. Lee and assistant chief historian Herbert E. Kahler, of the National Park Service, and Dr. Frank H. H. Roberts, Jr., of the Bureau of American Ethnology, a program was launched for the sur- vey and salvage of archeological sites threatened or doomed by the prospect of inundation (Corbett, 1949; Johnson, 1951; Mattes, 1947; Roberts, 1952). Conceived in 1945, the program was actually implemented in 1946 when a field office of the Smithsonian Institution was set up at the Laboratory of Anthropology of the University of Nebraska at Lincoln, and the positions of historian and liaison archeologist were set up by the National Park Service at its Region Two Office in Omaha (Wedel, 1947) .
    [Show full text]
  • Foundation Document Missouri National Recreational River Nebraska and South Dakota August 2017
    NATIONAL PARK SERVICE • U.S. DEPARTMENT OF THE INTERIOR Foundation Document Missouri National Recreational River Nebraska and South Dakota August 2017 MNRR_FD_PRINT.indd 1 9/22/17 11:20 AM To 90 and Chamberlain To 90 To 90 and Mitchell To 90 To 90 and Sioux Falls Foundation Document 18 18 North 50 0 5 10 Kilometers 281 J a 0 5 10 Miles s m e e d s n A R Lake iv Missouri National Campground Canoe access e r Andes e Recreational River Lake Franc Lak is 37 C a 281 18 50 Unpaved road Primitive campsite Boat launch s e 81 NORTH POINT STATE YANKTON SIOUX RECREATION AREA Lewis and Clark Hiking trail Marina INDIAN RESERVATION National Historic Trail driving route Fort Randall Dam 46 46 50 Visitor Center Fort Pickstown 39-MILE DISTRICTWagner Randall Missouri National Recreational RiverC (Information summer only) Dam h Spillway o te a SOUTH DAKOTA ek Overlook u 59-MILE DISTRICT re Missouri National Recreational River To Winner C C l Fort Randall r 18 l e 29 SOUTH DAKOTA a e Historic Site r d k e NEBRASKA n v a 50 i KARL Avon R R Tyndall k Marty e MUNDT O re 12 ya C NATIONAL te Tr 19 11 ail le WILDLIFE u r x Po REFUGE 37 B u nc Tabor io a Yankton Sioux S C re ek Old Baldy Treaty Monument 281 Gavins Point National Fish 12 Overlook N Hatchery and Aquarium Yankton 11 Sunshine a g Butte tive Missouri National Recreational River Headquarters i Bottom A B me SPRINGFIELD STATE 52 50 Historic Meridian Bridge rica n S RECREATION AREA LEWIS AND CLARK STATE Riverside Park cen 0 ic RECREATION AREA M By Springfield 52 SPIRIT MOUND Spencer ISS wa James River IOWA OU y HISTORIC PRAIRIE Ni R Gavins Island ob I Le Lake ra R w Point 48 ra IV Santee is a ake n R Lynch E nd Clark L Dam 121 St.
    [Show full text]
  • The Military Frontier on the Upper Missouri
    The Military Frontier on the Upper Missouri (Article begins on page 2 below.) This article is copyrighted by History Nebraska (formerly the Nebraska State Historical Society). You may download it for your personal use. For permission to re-use materials, or for photo ordering information, see: https://history.nebraska.gov/publications/re-use-nshs-materials Learn more about Nebraska History (and search articles) here: https://history.nebraska.gov/publications/nebraska-history-magazine History Nebraska members receive four issues of Nebraska History annually: https://history.nebraska.gov/get-involved/membership Full Citation: Ray H Mattison, “The Military Frontier on the Upper Missouri,” Nebraska History 37 (1956): 159- 182 Article Summary: Many military posts were built on the Upper Missouri at the beginning of the nineteenth century as the United States struggled to keep its frontier secure against various Indian tribes. The Army gradually abandoned the posts as the Indian frontier disappeared. Cataloging Information: Names: Manuel Lisa, Henry Atkinson, J L Grattan, William S Harney, G K Warren, John Pope, Henry H Sibley, Alfred H Sully, P H Sheridan, Crazy Horse, Sitting Bull Trading Companies: Missouri Fur Company, Rocky Mountain Fur Company, American Fur Company Army Posts: Camp Missouri (later Cantonment Missouri), Fort Atkinson, Fort Yates, Fort Rice, Fort Benton, Fort Stevenson, Fort Hale, Fort Bennett, Fort Shaw, Fort Lookout, Fort Randall, Fort Sully, Fort Buford, Camp Poplar, Fort Omaha Keywords: Arikara, Sioux, Cheyenne, Treaty of 1868, “Custer Massacre,” Bighorn, Ghost Dance Rebellion Photographs / Images: interior of Fort Rice, Dakota Territory; Fort Abraham Lincoln, near Bismarck, North Dakota; Fort Hale, near Chamberlain, South Dakota; Battalion, Twenty-Fifth US Infantry, Fort Randall THE MILITARY FRONTIER ON THE UPPER MISSOURI BY RAY H.
    [Show full text]