S-Line Richmond Staples Mill Main Street Fredericksburg Alexandria

Total Page:16

File Type:pdf, Size:1020Kb

S-Line Richmond Staples Mill Main Street Fredericksburg Alexandria Package R2 Washington,CFP 111.5 (LE) to CFP 110.1 (RO) DCMP 134.0 to CFP 112.2 (CP VA) R2A - Long Bridge A1A - New York Ave Midday ¤£50 Capacity ImprovementsL’Enfant Fourth Track and Storage Facility ST7 A1B - Washington Union ST7 Station Improvements LE Station Sub Basement Washington ¤£50 New Long Bridge for CPWashington, VA DC Passenger Rail Union Station Package M3 Program Highlights Package M1 RO MP 22.3 to MP 30.2 66 CFP 104.3495 (AF) to MP 12.1 L’Enfant ¦¨§ ¦¨§ Crystal City L’EnfantPackage R1 Railroad Right-of-Way RF&P Corridor CrystalC.R. Tower City CFP 112.2 (CP VA) to CFP 111.5 (LE) (ROW) and Track Acquisition Alexandria Fourth Track Package M5 Improvements R1A - L'Enfant 4th Track ¦¨§66 and Station Improvements Purchase of 350 Miles of Railroad MP 32.7 to MP 36.0 ConstructAlexandria 37 Miles of 495 ¤£17 ¦¨§ ROW and 225 Miles of Track M5A - Broad Run Expansion New Track Alexandria Franconia- M5B - South Manassas Third Track and Signal Franconia- ¤£1 Package R3 SpringfieldSpringfield RF&P Corridor Base Infrastructure AF CFP 110.1 (RO) to CFP 104.3 (AF) Franconia-Springfield Bypass RW R3A - Alexandria 4th Track Half CSXT ROW between Washington, DC and (Complete 2024) 123 Package M2ST Richmond, VA (102 miles) and 39 miles of track 4 miles of new track Package R4 R3B - Crystal City Station LortonLorton Improvements MP 12.1 to MP 22.3 CFP 104.3 Franconia (AF) to CFP 98.0to Lorton Third Track R3C - Alexandria Station Package M4 M2A - Rolling Road Station Improvements Improvements Phase 1 M2B - Backlick Road Station Improvements Buckingham Branch Line MP 30.2 to MP 32.7 Lorton All CSXT ROW between Doswell, VA and Clifton M4A - (CompleteManassas Station Improvements 2026) Woodbridge Woodbridge Package R5 M4B - Manassas Park Parking Improvements Forge, VA (173 miles) and 186 miles of track 19 miles of new track CFP 98.0 to CFP 90.8 (Lorton) Featherstone NeabscoR5A - CreekFranconia to toWoodbridge Lorton Third Mainline Package R6 RipponRippon R5BThird - Franconia-Springfield Track (Siding D) Bypass (Phase 1) CFP 90.8 (Lorton) to CFP 88.7 ST234 S-Line Phase 2 R5C - Railroad Bridge Over Newington Road - Occoquan River Third Track All CSXT ROW (abandoned rail line) between (CompleteR6A 2030) (Phase 3, Tie-In H) R5D - Franconia-Springfield Station Improvements R6B - Railroad Bridge Over Route 1 NPP Petersburg, VA and Ridgeway, NC (75 miles) 14 miles of new track 95 R5E - Lorton Station Second Platform R6C - Woodbridge Station Improvements ¦¨§ Quantico QuanticoQuantico Package R7 Package R8 PP S-Line/A-Line CFP 88.7 to CFP 84.8 CFP 84.8 to CFP 72.1 (Arkendale) R7A - Neabsco Creek to Woodbridge Third Track (Phase 2, Siding D) Passenger train rights on CSXT track between R8A - Powell's Creek to Neabsco Creek Third Track (Phase 3, Tie-In G) Richmond, VA and Petersburg, VA (~30 miles) R7B - Rippon Station Improvements R8B - Arkendale to Powell's Creek Third Track - Pkg. 6 (Phase 3, Tie-In G) R8C - Arkendale to Powells Creek Third Track - Pkg 4 (Phase 3, Tie-In G) Arkendale Package R9 ¤ R8D - Arkendale to Powells Creek Third Track - Pkgs 1-3, 5 R8E - Potomac Shores Station CFP 72.1 (Arkendale) to CFP 68.1 R8F -Quantico Station Improvements R9A - Aquia Creek Third Track - Phase 1 (Phase 2, Siding E) ¤£301 ST234 - Aquia Creek Third Track - Phase 2 ¤£17 R9BAquiaR9A -Aquia Creek Creek Third Third Track Track - (Phase 4, Tie-In I) Package R10 Phase(Siding 1 (Siding E) E) CFP 68.1 to CFP 61.3 Brooke Package R11 Leeland Road R10A - Brooke Station Improvements CFP 61.3 to CFP 58.9 (FB) - Potomac Creek Third Track - Phase 1 R10B R11A - Rappahannock River Third Track (Phase 4, Tie-In K) Network Map (Phase 1, Siding A) DJ PotomacR11B - Fredericksburg Creek Third Station Track Improvements R10C - Potomac Creek Washington,Third Track - Phase DC 2 (Phase 4, Tie-In J) R11C - Fredericksburg(Siding A) Station Rehabilitation Potomac Fredericksburg¦¨§66 Fredericksburg River R10D - Leeland Road StationAlexandria Improvements FB 95 ¦¨§ Package R13 Package R12 HA CFP 53.2 (XR) to CFP 4.8 (GN) ¨§81 CFP 58.9 (FB) to CFP 53.2 (XR) ¦ R13A - Caroline County Universal Crossovers R12A - Crossroads Maintenance¦¨§95 & Storage Facility Spotsylvania ¤£17 R13B - Crossroads Third Track (Phase 2, Siding F) R12B - Life-Cycle Overhaul and Upgrade Facility XR R13C - Woodford to Milford Third Track (Phase 1, Siding B) ¤£29 VAWV Fredericksburg Crossroads Third Track 3 R13D - Ashland(Siding Mill Third F) Track (Phase 2, Siding C) ST Staunton Charlottesville ¤£301 ¦¨§64 Doswell ¤£301 Clifton Forge Ashland Woodford to Milford Third Track (Siding B) Richmond ¤£460 ¤£17 Petersburg ¤£17 ¤£29 Charlottesville ¤£360 95 ¦¨§95 VA ¦¨§ NC 360 Ridgeway ¤£ ¦¨§85 Hanover Third Track RF&P Corridor ¦¨§85 (Siding C) Durham ¦¨§40 Buckingham Branch Line Raleigh ¦¨§85 S-Line (Abandoned) Ashland HERE, Esri | Federal Railroad Administration (FRA), Esri S-Line/A-Line ¦¨§95 ¤£33 Legend Richmond to Raleigh: S-Line ¦¨§95 Stations 64 ¦¨§87 ¦¨§ StaplesStaples Mill Mill Staples Mill RF&P Railroad Tracks Existing ST288 Richmond Base Infrastructure ¦¨§295 ST76 Phase 1 0 5 10 15 20 MainMain Street StreetPhase 2 RichmondMiles Richmond.
Recommended publications
  • Virginia Railway Express Strategic Plan 2004-2025
    VRE STRATEGIC PLAN Contents EXECUTIVE SUMMARY .......................................................................................................................V Current State of the Railroad ..............................................................................................................v The Strategic Planning Process..........................................................................................................vi The VRE Ridership Market................................................................................................................vii Strategic Plan Scenarios and Recommendations .............................................................................viii Core Network Needs...........................................................................................................................ix Potential Network Expansion ..............................................................................................................x Phased Service Improvement and Capital Investment Plan ..............................................................xii Financial, Institutional and Organizational Issues ..........................................................................xiii VRE Moving Forward ......................................................................................................................xiv 1. CURRENT STATE OF THE RAILROAD..........................................................................................1 VRE SYSTEM OVERVIEW .........................................................................................................................1
    [Show full text]
  • Appendix O: Hazardous Materials Site Information
    HAZARDOUS MATERIALS SITE O INFORMATION D.C. TO RICHMOND SOUTHEAST HIGH SPEED RAIL FALLS CHURCH CITY BEGIN ALTERNATIVE AREA 1 ! CFP 110 (!(! (!(! (! BEGIN ALTERNATIVE AREA 2 (!I3(! CRYSTAL CITY STATION (! (! (((!!! ARLINGTON COUNTY (! (! ¨¦§395 ¨¦§295 [ ALEXANDRIACITY OF Washington, D.C. (!(! ¨¦§66 (!(! ALEXANDRIA (! ! ( ¨¦§395 STATION (!! (!( ¨¦§95 (! (!(! (! (! (!(!(! (! !! I3(!(!(! (!(! (!(((! (!! (!I (!(! (!(!(! (!(! CFP 105 (!(! ¨¦§95 (! ! O-1(! (!(!(! (!( (!(!(!(!(! (! (! (!(!(!(!( \\cltsmain\gis_data\GIS\Projects\011545_VADeptofRails-PublicTransportation\0239056_RAPS-4AltDev-ConceptEng\map_docs\mxd\DEIS\Tech Reports\Hazardous Materials\DC2RVA_AppO_FigO-1_Hazmat_8.5x11_DEIS_BW.mxd | Last Updated: 06.16.2017 CFP 100 ! 495 ¨¦§ ¨¦§195 ¨¦§295 Richmond 0 Richmond ¨¦§95 FAIRFAX Colonial Heights 0.5 COUNTY ¨¦§64 Mile State Projection:Plane Virginia@ Lambert8.5 1North inch x Conformal 11FIPS = inches4501 1 mile FeetConic Basemap: 2015 USGS Topographic Map Data Source:North VDOT American CEDAR; Datum ERIS, of 2016. 1983 Legend 1 (! Potential HAZMAT or [ Petroleum Contamination (! SUPERFUND/ CERCLA/ (! NPL Known HAZMAT Release (! Hazmat Facility I3(! (! Potential Petroleum IFRANCONIA-SPRINGFIELD Contamination (! I3 Petroleum Facility (! STATION I3 Amtrak Station II3 VRE Station II3 Amtrak/VRE Station ! VRE/WMATA Station CSXT Mileposts DC2RVA Project Corridor Alternative Area Limits Virginia Rail Lines 1,000-foot Study Area County/City Boundaries Hazardous Materials (! Figure O-1 ((!! Sites Sheet 1 of 15 !( !(!( !( ! !(( ¨¦§495 !( !!((!(!( !(( !!(!(!(!( !( !(!(!(!((( ! ¨¦§395 !( !( I3!( IFRANCONIA-SPRINGFIELD !(!( STATION [ Washington, D.C. ¨¦§66 ¨¦§395 !( ¨¦§95 !!(( !( CFP 095 !( ! ! ¨¦§95 ( !( !( !( I3 ¨¦§295 LORTON STATION ¨¦§195 Richmond !( LORTON AUTO 0 ¨¦§64 I3 ¨¦§95 TRAIN STATION Colonial Heights !( 0.5 !( Mile !( 1 inch = 1 mile 1 !( Projection:@ 8.5Lambert x 11 Conformal inches Conic !( State Plane Virginia North FIPS 4501 Feet Basemap:North 2015 American USGS Datum Topographic of 1983 Map !( Data Source: VDOT CEDAR; ERIS, 2016.
    [Show full text]
  • Ceo Report February 2021
    CEO REPORT FEBRUARY 2021 FEBRUARY 2021 The Virginia Railway Express, a joint project of the Northern Virginia Transportation Commission and the Potomac Rappahannock Transportation Commission, will provide safe, cost‐effective, accessible, reliable, convenient, and customer responsive commuter‐oriented rail passenger service. VRE contributes to the economic vitality of its member jurisdictions as an integral part of a balanced, intermodal regional transportation system. FEBRUARY 2021 TABLE OF CONTENTS CEO REPORT I FEBRUARY 2021 TABLE OF CONTENTS SUCCESS AT A GLANCE ....................................................................................................................................... 3 ON‐TIME PERFORMANCE ................................................................................................................................... 4 AVERAGE DAILY RIDERSHIP ................................................................................................................................ 6 SUMMONSES ISSUED ......................................................................................................................................... 7 TRAIN UTILIZATION ............................................................................................................................................ 8 PARKING UTILIZATION ....................................................................................................................................... 9 FINANCIAL REPORT FOR DECEMBER 2020 .........................................................................................................
    [Show full text]
  • VRE Summer 2018 Intern Presentation Reinaldo
    MULTIMODAL ACCESSIBILITY TO VRE STATIONS REINALDO GERMANO PLANNING INTERN VIRGINIA RAILWAY EXPRESS 1 MULTIMODAL ACCESSIBILITY TO VRE STATIONS 1. BACKGROUND a. Why should multimodal accessibility to VRE stations be improved? b. What are the benefits of multimodal accessibility? c. How can we encourage multimodal accessibility? 2. CASE STUDY a. How and from where users access VRE? b. How different stations compare? c. How to boost active and public transportation as a way to access VRE stations? 3. FUTURE STUDIES AND LESSONS LEARNED VIRGINIA RAILWAY EXPRESS 2 THE EASIER IT IS TO ACCESS THE SYSTEM, THE MORE LIKELY PEOPLE ARE TO USE IT TRIP FIRST MILE VRE LAST MILE 4% 4% 7% 5% 4% 6% 20% 62% 87% VIRGINIA RAILWAY EXPRESS 2017 VRE Master Agreement Survey 3 WHY SHOULD MULTIMODAL ACCESSIBILITY TO VRE STATIONS BE IMPROVED? • Although the streets and infrastructure that comprise the first and last mile fall outside the boundaries of VRE jurisdiction and control, they remain critical components of an effective service. • It is possible to increase ridership without increasing the need to provide more parking if fewer people drive alone to stations and more people carpool, take the bus, bike, or walk to stations. • Federal, state, regional, and local policies support increased use of public transportation as a means to ease roadway congestion, reduce greenhouse gas emissions, and support economic and physical health in communities. VIRGINIA RAILWAY EXPRESS 4 BENEFITS OF MULTIMODAL ACCESSIBILITY VRE + Multimodal accessibility = User Economic Ridership
    [Show full text]
  • Doug Allen Virginia Railway Express Paul Ballard Trinity Metro/Texrail
    Doug Allen Virginia Railway Express Nicola Liquori SunRail Paul Ballard Trinity Metro/TEXRail Mass Transportation That’s Good for the Masses Location: Central Florida P DeLand Corridor: Central Florida Rail Corridor 61 miles, 4 counties DeLand SunRail Operating Route: 49 miles, 4 counties Future Northern Orange City Opening: May 2014 - Phase 1 (12 stations) Expansion SunRail Stations Federal Funding Grant Agreement $357m P SunRail Parking Provided Deltona Southern Expansion (4 stations) open July 2018 Future Northern Expansion Federal Funding Grant Agreement $187m I-4 Ultimate Construction Project Lake St Johns River P Monroe Ridership: 6,546 - Average Daily Ridership June 2019 DeBary VOLUSIA CO. SEMINOLE CO. Increased 80% between FY18 − FY19 with P Sanford opening of Southern Expansion LAKE CO. LAKE LAKE CO. CO. SEMINOLE ORANGE CO. Sanford SunRail is a Central Florida Pipeline P Lake Mary • Connects individuals with industries and opportunities Longwood Lake Jesup • Delivers solutions-oriented transportation by connecting to and P Longwood Winter Springs promoting other public and private transportation Altamonte ORANGE CO. ORANGE SEMINOLE CO. Springs P Altamonte Springs • Explores partnerships and technologies to meet evolving Maitland Oviedo P Maitland workforce and community needs Winter Park SEMINOLE CO. ORANGE CO. Winter Park/Amtrak Why it Works AdventHealth • The goal is not movement, but the connection of people LYNX Central Station Church Street and the betterment of a region Orlando Health/Amtrak • Every station is an opportunity to create micro-hubs of Orlando local commerce P Sand Lake Road Orlando • Benefits go far beyond delivering people: ntl irport • Increase in property value and taxes P Meadow Woods • New transit-oriented development • Increased local commerce ORANGE CO.
    [Show full text]
  • Rappahannock Regional Jail 34
    Part I: Setting the Stage Setting the Stage In 2007, the City Council adopted a Vision Statement to guide Fredericksburg toward its 300th anniversary in 2028. This Comprehensive Plan provides the framework for the community to attain that vision – addressing current conditions, defining goals for the future, and providing strategies that reconcile the existing conditions and the City’s desired outcomes. This Part I of the Comprehensive Plan sets the stage with a clear statement of vision, a brief overview of what a comprehensive is supposed to be, and a presentation of facts that provide a community profile. Preface Chapter 1: Vision and Comprehensive Plan Overview Chapter 2: Fredericksburg: A Community Profile 1 Preface Fredericksburg, Virginia, December 2014 This Comprehensive Plan has been prepared to guide decision making. It is to be used to help the City of Fredericksburg move forward in a manner that embraces local values and achieves the City’s vision for itself. The Fredericksburg City Council adopted its last comprehensive plan in 2007. A year later, the nation experienced a severe economic downturn that had a tremendous impact on the available revenues that are used to cover local government costs. The local real estate market dropped, although not as significantly as it did in some parts of the country, due to the City’s favorable location as a part of the Northern Virginia/Washington D.C. metropolitan area. Still, some area housing lost value and many local businesses are still trying to recover. At this time, the City is beginning to see renewed investment in the community and this revised Plan renews the City’s policies to guide the anticipated growth.
    [Show full text]
  • Ceo Report October 2020
    CEO REPORT OCTOBER 2020 OCTOBER 2020 The Virginia Railway Express, a joint project of the Northern Virginia Transportation Commission and the Potomac Rappahannock Transportation Commission, will provide safe, cost‐effective, accessible, reliable, convenient, and customer responsive commuter‐oriented rail passenger service. VRE contributes to the economic vitality of its member jurisdictions as an integral part of a balanced, intermodal regional transportation system. OCTOBER 2020 TABLE OF CONTENTS CEO REPORT I OCTOBER 2020 TABLE OF CONTENTS SUCCESS AT A GLANCE ....................................................................................................................................... 3 ON‐TIME PERFORMANCE ................................................................................................................................... 4 AVERAGE DAILY RIDERSHIP ................................................................................................................................ 6 SUMMONSES ISSUED ......................................................................................................................................... 7 TRAIN UTILIZATION ............................................................................................................................................ 8 PARKING UTILIZATION ....................................................................................................................................... 9 FINANCIAL REPORT FOR MARCH 2020 ..............................................................................................................
    [Show full text]
  • VRE OPERATIONS BOARD MEETING April 16, 2021 – 9:00 A.M
    VRE OPERATIONS BOARD MEETING April 16, 2021 – 9:00 A.M. Finance Committee Meeting – Follows Adjournment of Operations Board Meeting VIA WebEx 1. Roll Call 2. Consent Agenda A. Resolution Finding Need to Conduct April 16, 2021 Meeting Electronically B. Approval of Agenda C. Authorization to Issue an Invitation for Bids for Repair and Overhaul of Air Brake Equipment D. Authorization to Issue an Invitation for Bids for Rehabilitation of Wheelsets and Traction Motor Assemblies 3. Approval of Minutes from the March 19, 2021 VRE Operations Board Meeting 4. Chair’s Comments 5. Chief Executive Officer’s Report 6. Virginia Railway Express Riders’ and Public Comment 7. Action Items: A. Authorization to Exercise a Contract Option and Amend a Task Order for Maintenance Services for VRE Facilities B. Authorization to Exercise a Contract Option for Custodial and Seasonal Services for VRE Facilities C. Authorization to Execute a Right of Entry Agreement for MCBQ Construction Activities Adjacent to the VRE Quantico Station Parking Lot D. Recommend Authorization to Execute the Amended and Restated Operating Access and Amended Master Lease Agreements with CSX Transportation 8. Information Items: A. Spending Authority Report B. Construction Manager/General Contractor (CM/GC) Alternative Delivery Method C. Use of Federal Relief Funds in the FY 2022 Operating Budget 9. Closed Session 10. Operations Board Member’s Time The Next VRE Operations Board Meeting will be on May 21, 2021- 9:00 A.M. 2 Virginia Railway Express Operations Board Resolution 2A-04-2021 Resolution Finding Need to Conduct April 16, 2021 Meeting Electronically WHEREAS, on March 12, 2020, the Governor of Virginia declared a state of emergency in Virginia in response to the spread of novel coronavirus, or COVID-19, a communicable disease of public health threat as so declared by the State Health Commissioner on March 7, 2020 (“COVID-19”); and, WHEREAS, in subsequent Executive Orders, particularly Executive Order Nos.
    [Show full text]
  • PRESS RELEASE Office of Public Affairs
    PRESS RELEASE Office of Public Affairs For Immediate Release Contact: Karen Finucan Clarkson 571-255-0931 (mobile) 703-838-5433 (office) [email protected] VRE Is Perfect Commuting Alternative During Metrorail Station Closures Commuter Rail Connects Franconia-Springfield and Alexandria with Stations in NOVA & DC Alexandria, Va. – When the six Metrorail stations south of National Airport shut down this summer, the Virginia Railway Express (VRE) will be a convenient alternative for many commuters. VRE offers service at two stations, Franconia-Springfield and Alexandria, that are a short walk from the soon-to-be closed Franconia-Springfield and King St-Old Town Metrorail stations. VRE trains run northbound in the morning and southbound in the evening with stops at Crystal City in Virginia, and L’Enfant and Union Station in Washington, D.C. “VRE makes commuting easy,” said Doug Allen, the railroad’s chief executive officer. “Our 32 daily trains provide nearly 20,000 passenger trips and connect to all six Metrorail lines. VRE is a great commuting alternative for many Metrorail riders affected by this summer’s station shutdown.” VRE trains arrive at Union Station each weekday between 6:24 and 9:17 a.m. and depart Union Station between 12:55 and 7:05 p.m. While all trains stop at the Alexandria station, only trains on the Fredericksburg line stop at Franconia-Springfield, where parking at the Metro garage will be free during the station closure. Passengers can see which trains have the most available seating by visiting VRE’s train utilization trends page at www.vre.org.
    [Show full text]
  • Background and Purpose
    VIRGINIA RAILWAY EXPRESS INVITATION FOR BID (IFB) No. 020-019 CONSTRUCTION OF QUANTICO STATION IMPROVEMENTS IFB Issued: June 18, 2020 Contact: Ramon Paez, Contract Administrator Virginia Railway Express, 1500 King Street, Suite 202, Alexandria, VA 22314 Main Office: (703) 684-1001 Direct/Fax: (703) 838-5447 Email: [email protected] Contact: Kristin Nutter, Manager of Purchasing and Contract Administration Virginia Railway Express, 1500 King Street, Suite 202, Alexandria, VA 22314 Main Office: (703) 684-1001 Direct/Fax: (703) 838-5441 Email: [email protected] IFB No. 020-019 1 IFB Title: Construction of Quantico Station Improvements Virginia Railway Express TABLE OF CONTENTS I. INTRODUCTION TO IFB ............................................................................................... 3 II. PROCUREMENT SCHEDULE ...................................................................................... 5 III. INSTRUCTION TO BIDDERS ....................................................................................... 6 IV. SPECIAL PROVISIONS ................................................................................................ 31 V. GENERAL PROVISIONS ............................................................................................. 41 VI. GENERAL CONDITIONS FOR CONSTRUCTION .................................................. 68 VII. INSURANCE REQUIREMENTS ................................................................................. 85 VIII. SMALL BUSINESS AND VETERAN BUSINESS CONCERNS ..............................
    [Show full text]
  • Ceo Report December 2020
    CEO REPORT DECEMBER 2020 DECEMBER 2020 The Virginia Railway Express, a joint project of the Northern Virginia Transportation Commission and the Potomac Rappahannock Transportation Commission, will provide safe, cost‐effective, accessible, reliable, convenient, and customer responsive commuter‐oriented rail passenger service. VRE contributes to the economic vitality of its member jurisdictions as an integral part of a balanced, intermodal regional transportation system. DECEMBER 2020 TABLE OF CONTENTS CEO REPORT I DECEMBER 2020 TABLE OF CONTENTS SUCCESS AT A GLANCE ....................................................................................................................................... 3 ON‐TIME PERFORMANCE ................................................................................................................................... 4 AVERAGE DAILY RIDERSHIP ................................................................................................................................ 6 SUMMONSES ISSUED ......................................................................................................................................... 7 TRAIN UTILIZATION ............................................................................................................................................ 8 PARKING UTILIZATION ....................................................................................................................................... 9 FACILITIES UPDATE ...........................................................................................................................................
    [Show full text]
  • RIDE Magazine | August 2014 1 No Matter How You Picture the Perfect Resort-Style Retreat, You’Ll Find It Just 30 Miles from DC at Potomac Shores
    RIDE Magazine | August 2014 1 No matter how you picture the perfect resort-style retreat, you’ll find it just 30 miles from DC at Potomac Shores. Escape to 2,000 rolling acres overlooking a Jack Nicklaus Signature Golf Course. Two miles of shoreline. Ten miles of trails. DESTINATION for a LIFETIME A planned town center. A future Virginia Railway Express station. And the relaxed traditions of Tidewater living. Then make a lifetime of wishes come true. Visit The Greeting House Luxury homes now selling from the low $500s 2175 Potomac River Blvd., Potomac Shores, VA 22026 | Toll-free 855.808.6051 | PotomacShores.com GPS address: 17700 Dominican Drive, Dumfries, VA 22026 Features and products vary by community. Price, offers, financing and availability are subject to change without notice. See a Sales and Marketing Representative for details. RIDE Magazine | August 2014 3 COMING IN 2017...NEW VRE STATION AT POTOMAC SHORES. FROM THE CEO DOUG ALLEN Chief Executive Officer am so pleased to announce some great news about two VRE projects that have been in the works for a long time. VRE’s original system plan has always included a train station at Potomac IShores (then called Cherry Hill). VRE has partnered with SunCal, the devel- oper of the Potomac Shores community, to build a new station at no cost to VRE. Potomac Shores station is planned to open for service in 2017 (see article on page 8 8), although the opening date is predicated on VRE making other improvements on the Fredericksburg Line. I am also happy to announce that Spotsylvania County has the property access it needs for VRE to start construction of the station and for the County to build a 1,500 space parking lot.
    [Show full text]