D:\Tenders 2021-22\Tenders 2 June 2021.Pmd

Total Page:16

File Type:pdf, Size:1020Kb

D:\Tenders 2021-22\Tenders 2 June 2021.Pmd foKkiu ,si dk mi;ksx jkts xkj fufonk djsa 2 twu Himachal Pradesh Public Service Commission HP PUBLIC WORKS HP PUBLIC WORKS DEPARTMENT ADVERTISEMENT NO. 12/5-2021, 13/5-2021, 14/5-2021 15/5-2021 & 16/5-2021 Dated: 29 -05-2021 DEPARTMENT NOTICE INVITING TENDER Online Recruitment Applications (ORA*) are invited from desirous and eligible candidates for recruitment to the Sealed item rate tenders on form No. 6&8 are invited by the following posts through ORA, which shall be available on the Commission’s website www.hppsc.hp.gov.in/hppsc INVITATION FOR Executive Engineer, Kotkhai Division, HPPWD: Kotkhai for the upto 25.06.2021 till 11:59 P.M., thereafter link will be disabled. (*by using official website www.hppsc.hp.gov.in/ BIDS (IFB) hppsc). following works from the approved and eligible contractors enlisted The Executive Engineer in HP:PWD, so as to reach in his office on or before 22-06-2021 Advt. No. Department Post Pay Scale Category Wise No. of HPPWD Nalagarh, Distt. Solan HP upto 10:30 A.M. and will be opened on the same day at 11:00 A.M. Post(s) on behalf of Governor of HP invites the Item rate bids, in electronic in the presence of the intending contractors or their authorized tendering system from the eligible 12/5-2021 Department of Assistant ₹16650-39100+₹ 02 (Unreserved) representatives. The tender forms can be had from his office against class of contractors registered with cash payment (Non-refundable upto 4:00 P.M. on 21-06-2021). MPP & Power Engineer 5800 (G.P.) (on HP PWD for the works as detailed (H.P. Power (Executive fixed contractual below. The earnest money in the shape of National Saving Certificate / Corporation Trainee- amount = Sr. No 1 Name of Work PR Time deposit account / saving bank account / FDR in any of the Limited Environment) ₹ 31,150/-) under AMP for Palli Gollan Post Office in Himachal Pradesh duly pledged in favour of the (On contract Rammandir Mianpur road km 0/00 to 4/00 (HP1103VR0 06849102, XEN must accompany with each tenders. Conditional tenders or Basis) HP1103VR0 06849104) (SH:- P/L tender received without earnest money will summarily be rejected. 13/5-2021 Department of Assistant ₹16650-39100+ ₹ Unreserved=10, UR B.C. in km 0/500-1/500to 3/0 - 3/ The XEN reserved the right to accept or reject any or all tenders MPP & Power Engineer 5800 (G.P.) (on Ward of Freedom Fighter 500). Estimated Cost (Rs) or to drop the proposal of the tenders without assigning any reasons. 16,50,078.00 Starting Date for (H.P. Power (Executive fixed contractual of H.P. = 01, UR The officer of the tenders shall be kept open for 120 days. All the Corporation Trainee-Civil) amount= ₹ (Hearing Impaired of downloading Bid and end date 31.05.2021 at 3:00 P.M to contractors will have to bring with them the attested copy of Limited (On contract 31,150/-) HP)=01, SC of HP=05, 14.06.2021 up to 11:00 A.M registration / renewal of their enlistment failing which their application Basis) SC Ex.SM of H.P. = 01, Earnest Money (Rs) 32,250.00 shall not be entertained. The contractor must be registered under ST of HP=02, OBC of Deadline for submission of Bid HP=04 & EWS of HP=02 14.06.2021 up to 11:00 A.M Time H.P. General Sales Tax Act 1968 and its proof must be submitted 14/5-2021 Department of Assistant ₹16650- Unreserved= 04, SC of Six Month Eligible class of Contr. with application for tender, failing which tender will not be issued. Class A to D If any date mentioned above happens to be a holiday, the same MPP & Power Engineer 39100+₹5800 H.P. = 01, EWS of Sr. No 2 Name of Work PR (H.P. Power (Executive (G.P.) (on fixed HP=01 under AMP for Shimla Kunihar will be processed on the next day. The Firms / Contractors must Corporation Trainee- contractual Ramshehar Nalagarh road km 60/ quote the rate of each item in words as well as in figures, failing Limited Mechanical) amount= 500 to 103/0 which their tenders are likely to be rejected. (On contract ₹31,150/-) (HP1103MDR07749224) (SH:- P/L Sr. No 1. Name of Work Dismantling of Old Building Case Basis) B.C. in km 83/0 to 84/0) Estimated Cost (Rs) 18,77,744.00 Starting No. 115-IV/2018 Titles as Shri Madan Mohan V/S Sandeep Sood) 15/5-2021 Department of Deputy ₹10300- Unreserved=06 & S.T. of Date for downloading Bid and end Estimated Cost Rs. 1,47,698/- EMD Rs. 3000/- Cost of Tender Sainik Welfare, Director 34800+₹5400 H.P.=01 date 31.05.2021 at 3:00 P.M to Rs. 350/- Time One Month Eligible class of Contractor Class D H.P. (Sainik (G.P.) (on fixed 14.06.2021 up to 11:00 A.M 1089/2021-22 Him Suchna Avam Jan Sampark Welfare), contractual Earnest Money (Rs) 35,700.00 Class-I, amount= Deadline for submission of Bid 14.06.2021 up to 11:00 A.M Time HP Public Works Department (Gazetted) (on ₹15,700/-) Six Month Eligible class of Contr. contract basis) Class A to D e-PROCUREMENT NOTICE 16/5-2021 Department of Assistant ₹10300- UR Ward of Ex-SM i.e. Sr. No 3 Name of Work INVITING FOR BIDS (IFB). Fisheries, H.P. Director of 34800+₹4400 dependent sons/ Construction of double storey Fisheries, (G.P.) (on fixed daughters/wives of Ex- building at GSSS (G) Nalagarh The Executive Engineer, Kullu Division HP. PWD, Kullu on Class-II, contractual serviceman=01& OBC of Distirct Solan HP (SH:- Construction behalf of Governor of Himachal Pradesh invites the online bids on of single storey building) Estimated items rate, in electronic tendering system, in 2 cover System for (Gazetted) (on amount= H.P.=01 (Backlog) Cost (Rs) 42,02,915.00 Starting contract basis) ₹14,700/-) Date for downloading Bid and end the under mentioned work from the eligible and approved Applications received through any other mode will not be accepted and will be rejected straightway. Essential date 31.05.2021 at 3:00 P.M to contractors/Firm registered with HP,PWD, department. Sr. No.1 qualification(s), eligibility conditions and examination fees etc., have been mentioned in the detailed advertisement 14.06.2021 up to 11:00 A.M Name of work Improvement and M/T on Baradha to Shangchan and instructions for filling up online recruitment applications are available on the above referred website. Earnest Money (Rs) 70,000.00 road Km. 0/0 to 5/500 (SH:- M/T, PCC drain, R/wall, B/wall, Deadline for submission of Bid Sd/- (Ashutosh Garg), I.A.S. 14.06.2021 up to 11:00 A.M Time Parapets, Metal Beam and Cross drainage works) under NABARD Secretary Twelve Month Eligible class of RIDF-XXVI. Name of Division Kullu Division HP.PWD Kullu. H.P. Public Service Commission Contr. Class B to C Estimated cost of the Work Rs.4,84,23,261 Bid Security /EMD Tel. No. 0177-2624313 Sr. No 4 Name of Work A/R & Rs.9,68,000/- Cost of Document Rs. 5,000/- Period of M/O to Govt Non Residential HP PUBLIC WORKS DEPARTMENT Building at Nalagarh (SH: Providing Completion One and half year and laying interlocking concrete 2 Starting date of downloading Bid. 01.06.2021 NOTICE INVITING TENDERS block pavement Repair of RCC 3 Deadline for submission of Bid. 08.06.2021 Chhajja and painting etc.) Sealed item rate tenders on form 6&8 are Sr. No. 4 Name of work A/R & M/O to various 3,44,745/- Earnest Money Rs. 6900/- Time Limit Bidders documents can be downloaded from the website http:/ hereby invited by the Executive Engineer, Bhawarna roads of Purba Section under Dheera Sub Division, Three Months Cost of Tender form Rs. 350/- Estimated Cost (Rs) 7,05,350.00 Division HP.PWD. Bhawarna on behalf of the HP.PWD Dheera (Sub work:- P/L patch work) Sr. No. 12 Name of work A/R & M/O HSTM Starting Date for downloading Bid hptenders.gov.in. The documents downloaded from the site should Governor of H.P for the following works from the Estimated Cost Rs. 4,70,300/- Earnest Money Rs. road. (SW:- Providing and Laying Soling wearing in and end date 31.05.2021 at 3:00 not be tempered, and if any such tempering is detected before or approved and eligible contractors enlisted in HP.PWD, 9400/- Time Limit Three Months Cost of Tender form extended portion in Km 54/320 to 55/200). Estimated (B&R) whose registration stood renewed as per Rs. 350/- Cost Rs. 4,90,441/- Earnest Money Rs. 9900/- P.M to 14.06.2021 up to 11:00 A.M after the opening of bids, the bidder shall be penalized and black revised rules and also registered under the H.P Sr. No. 5 Name of work A/R & M/O to various Time Limit Three Months Cost of Tender form Rs. Earnest Money (Rs) 14,100.00 listed. General Sales Tax Act 1968 so as to reach in his roads under Thural Sub Division, HP.PWD Thural 350/- Deadline for submission of Bid office on or before 23/06/2021 up to 11.00 AM. And (Sub work:- P/L patch work ) Estimated Cost Rs. Terms &Conditions:- 14.06.2021 up to 11:00 A.M Time Other terms and condition shall remain same as given in the the same shall be opened on the same day at 11.30 4,75,500/- Earnest Money Rs.
Recommended publications
  • Kangra, Himachal Pradesh
    ` SURVEY DOCUMENT STUDY ON THE DRAINAGE SYSTEM, MINERAL POTENTIAL AND FEASIBILITY OF MINING IN RIVER/ STREAM BEDS OF DISTRICT KANGRA, HIMACHAL PRADESH. Prepared By: Atul Kumar Sharma. Asstt. Geologist. Geological Wing” Directorate of Industries Udyog Bhawan, Bemloe, Shimla. “ STUDY ON THE DRAINAGE SYSTEM, MINERAL POTENTIAL AND FEASIBILITY OF MINING IN RIVER/ STREAM BEDS OF DISTRICT KANGRA, HIMACHAL PRADESH. 1) INTRODUCTION: In pursuance of point 9.2 (Strategy 2) of “River/Stream Bed Mining Policy Guidelines for the State of Himachal Pradesh, 2004” was framed and notiofied vide notification No.- Ind-II (E)2-1/2001 dated 28.2.2004 and subsequently new mineral policy 2013 has been framed. Now the Minstry of Environemnt, Forest and Climate Change, Govt. of India vide notifications dated 15.1.2016, caluse 7(iii) pertains to preparation of Distt Survey report for sand mining or riverbed mining and mining of other minor minerals for regulation and control of mining operation, a survey document of existing River/Stream bed mining in each district is to be undertaken. In the said policy guidelines, it was provided that District level river/stream bed mining action plan shall be based on a survey document of the existing river/stream bed mining in each district and also to assess its direct and indirect benefits and identification of the potential threats to the individual rivers/streams in the State. This survey shall contain:- a) District wise detail of Rivers/Streams/Khallas; and b) District wise details of existing mining leases/ contracts in river/stream/khalla beds Based on this survey, the action plan shall divide the rivers/stream of the State into the following two categories;- a) Rivers/ Streams or the River/Stream sections selected for extraction of minor minerals b) Rivers/ Streams or the River/Stream sections prohibited for extraction of minor minerals.
    [Show full text]
  • Ground Water Information Booklet Mandi District, Himachal Pradesh
    Technical Series: E For official use only Government of India Ministry Of Water Resources GROUND WATER INFORMATION BOOKLET MANDI DISTRICT, HIMACHAL PRADESH CENTRAL GROUND WATER BOARD NORTHERN HIMALAYAN REGION DHARAMSHALA September, 2013 Contributors Anukaran Kujur Assistant Hydrogeologist Prepared under the supervision of Shri J.S. Sharma Head of Office & Shri DALEL SINGH Superintending Hydrologist. Our Vision Water security through sound groundwater management GROUND WATER INFORMATION BOOKLET Mandi District, Himachal Pradesh CONTENTS DISTRICT AT A GLANCE Page no. 1.0 INTRODUCTION 1 2.0 CLIMATE & RAINFALL 1 3.0 GEOMORPHOLOGY & SOIL TYPES 3 4.0 GROUND WATER SCENARIO 5 4.1 Hydrogeology 5 4.2 Ground Water Resources 8 4.3 Ground Water Quality 8 4.4 Status of Ground Water Development 10 5.0 GROUND WATER MANAGEMENT STRATEGY 10 5.1 Ground Water Development 10 5.2 Water Conservation & Artificial Recharge 11 6.0 GROUND WATER RELATED ISSUES & PROBLEMS 11 7.0 AWARENESS & TRAINING ACTIVITY 11 8.0 AREAS NOTIFIED BY CGWA / SGWA 13 9.0 RECOMMENDATIONS 13 MANDI DISTRICT AT A GLANCE Sl. No ITEMS Statistics 1. GENERAL INFORMATION i) Geographical area (sq km) 3,950 ii) Administrative Divisions (2001) • Number of Tehsil & Sub-tehsils 9 & 7 • Number of CD Blocks 10 • Number of Panchayats 473 • Number of Villages 3,338 iii) Population (2011 Census) • Total population 9,99,777 persons • Population Density (pers/sq km) 253 • Rural & Urban Population (in percent) 93.7 & 6.3 • SC & ST Population (in percent) 29.4 & 1.3 • Sex Ratio (females per 1000 males) 1007 iv) Average Annual Rainfall (mm) 1331.50 2.
    [Show full text]
  • Legal Instruments on Rivers in India (Vol – Iii) Agreements on Inter State Rivers Part One
    FOR OFFICIAL USE ONLY LEGAL INSTRUMENTS ON RIVERS IN INDIA (VOL – III) AGREEMENTS ON INTER STATE RIVERS PART ONE CENTRAL WATER COMMISSION INTER STATE MATTERS DIRECTORATE NEW DELHI October, 2015 S. No CONTENTS Page INDUS BASIN 1-114 1 Draft agreement between the British Government and the Bikaner 1-7 State regarding the Northern and Southern Ghaggar canals as adopted at a conference held at Simla on 27th May, 1897 2 Terms of agreement subject to the confirmation of the Secretary of 8-13 State in Council between the British Government and the Government of His Highness the Nawab of Bahawalpur and His Highness the Maharaja of Bikaner regarding the irrigation of the tracts commanded and economically irrigable from the Gharra reach of the Sutlej river and from the Panjnad reach of the Chenab river 3 Agreement between the Secretary of State for India in Council and 14-18 Lieutenant His Highness Raja Joginder Sen Bahadur, Raja of Mandi. 4 First Supplemental Agreement regarding supply of energy in Mandi 19-20 town 5 Agreement between East Punjab Government and the Government 21-30 of Patiala and East Punjab States Union (PEPSU) regarding Sirhind canal and distribution of supplies 6 Agreement on Constitution of the Bhakra Control Board and Bhakra 31-34 Advisory Board 7 Record of the decisions arrived at the inter-state conference on the 35 development and utilisation of the waters of the rivers Ravi and Beas held in room no. 12 North Block, New Delhi on the 29th January, 1955. 8 Record of the decisions taken at the inter-state meeting of the Chief 36-38 Engineers on the development and utilisation of the waters of the rivers Ravi and Beas held in room no.
    [Show full text]
  • Comprehensive Report
    Original Application. No. 673 of 2018 and Original Application No. 673 of 2018 dated 20.09.2018 & 19.12.2018 in the matter of “NEWS ITEM PUBLISHED IN “THE HINDU”AUTHORED BY SHRI. JACOB KOSHY Titled “More river stretches are now critically polluted: CPCB” Comprehensive Report on Prevention and Control of Pollution in Beas River: Action Plan for Rejuvenation of River Beas from Kullu to Dehragopipur at District- Kullu, Mandi, Hamirpur and Kangra of Himachal Pradesh (Submitted in compliance to the Hon’ble National Green Tribunal (NGT) order dated September 20, 2018, 19th December, 2018) HP State Pollution Control Board Him Parivesh, Phase – III, New Shimla - 171009 Contents Sr. Particulars Page No. No. Background 1 1. Action Initiated for ensuring compliance to the Hon’ble NGT, Principal bench 2 Delhi order dated 20.09.2018 and 19.12.2018 vide O.A. No. 673 of 2018. 2. About River Beas and its Tributaries. 3-6 3. Water Quality Goals as per the existing provisions or guidelines/ specifications of 6-7 Center Pollution Control Board (CPCB). 4. District wise report of River Beas. 7 4.1.0 District Kullu A Major Tributaries of River Beas and Towns in Distt Kullu 7 B Sources of Pollution to the River Beas and its tributaries in District Kullu 7-10 B.1 Source of Pollution from Industries and Hotels in Distt. Kullu B.2 Source of Domestic and impact of other activities in Distt. Kullu B.3 Sources of Pollution load to the River Beas from Solid waste in Distt. Kullu C Action initiated at District level along the catchment of River Beas in District 10-11 Kullu D Existing Status in the Catchment of River Beas and its Tributaries 11-12 a.
    [Show full text]
  • State of the Rivers Report Final 2017- Himachal Pradesh
    DRIED & STATE OF THE RIVERS - HIMACHAL PRADESH DUSTED HIMDHARA ENVIRONMENT RESEARCH AND ACTION COLLECTIVE INDIA RIVERS WEEK 2016 0 Dried & Dusted State of the Rivers Report – Himachal Pradesh India Rivers Week 2016 Prepared by Himdhara Environment Action and Research Collective November 2016 Dried & Dusted State of the Rivers Report for Himachal Pradesh Prepared for the India Rivers Week 2016 Author: Himdhara Environment Research and Action Collective Maps: SANDRP, Maps Of India, EJOLT Cover Photo: Nicholas Roerich – ‘Chandra-Bhaga. Path to Trilokinath. Tempera on Canvas. Nicholas Roerich Museum, New York, USA.’ November 2016 Material from this publication can be used, with acknowledgment to the source. Introduction The lifelines of Himalayas A massive collision between two tectonic plates of the Indian and Eurasian land masses about 50 to 70 million years ago led to the formation of the youngest and tallest mountain ranges, the Himalayas. Once the Himalayas started to rise, a southward drainage developed which subsequently controlled the climate of the newly formed continent, and there started the season of monsoon as well. The river systems of the Himalayas thus developed because of rains and melting snow. The newly formed rivers were like sheets of water flowing towards the fore-deep carrying whatever came in their way. Once the rivers reached the plains their gradients became lesser, their hydraulics changed and they started to deposit their sediment (Priyadarshi, 2016). The river is a defining feature of a mountain eco-system. And if that ecosystem is the Himalayas then this makes the rivers originating here special for several reasons. Their origin and source to start with, which includes glaciers and snow bound peaks; their length and size, and the area they cover is larger than most peninsular rivers; their rapid, high velocity, meandering flow which is constantly shaping the young and malleable Himalayan valleys; their propensity to carry silt and form rich plains to facilitate a fertile agriculture downstream is another unique feature.
    [Show full text]
  • Integrated Operation of the Beas-Sutlej System
    Siidhan~, Vol. 8, Part 2, March 1985, pp. 207-221 © Printed in India. Integrated operation of the Beas-Sutlej system P S RAO* and S RAMASESHANt *Indian Institute of Management, Bannerghatta Road, Bangalore 560076, India )'Civil Engineering Department, Indian Institute of Technology, Kanpur 208 016, India Abstract. The study deals with the integrated operation of the Beas and Sutlej link, a complex system. It utilizes the methodology developed in an earlier paper for reservoir operation. The results show the definite advantages of conjunctive use and carry over storage. The results also show that it is advantageous to divert as much water from the Beas to the Sutlej as possible. Keywords. Integrated reservoir operation; conjunctive use. 1. Introduction To study the conventional operation of a reservoir system in a multiobjective framework in order to evaluate the trade-offs between irrigation and power implied by past decisions, a case study of the Bhakra reservoir was undertaken. This study demonstrates the methodology and procedures of multi-objective analysis in an integrated framework. 2. System description 2.1 The Beas-Sutlej system The Beas river originates in the lower ranges of the Shiwaliks. The catchment area of the river upstream of Pong, where a storage dam has just been completed is 12,561 km 2. The average rainfall in the catchment is 1,778 mm. For a mean year the discharge at the Mahdi plain varies from 152cumecs in the dry season to 1,830cumecs during the monsoon, with an annual average run-off of 16,763 m cum. For a dependable year, the run-off is 12,835 mcum.
    [Show full text]
  • Chapter 11 : Power
    www.ranaacademyshimla.com COACHING OF VARIOUS CENTRAL & contact no. 7018596250, 9805332278 STATE LEVEL COMPETITIVE EXAMS CHAPTER 11 : POWER The State carries immense potential for hydropower generation as it is well known as country’s hydro power hub. Hydro power development is the key engine to the economic growth of the State of Himachal Pradesh. The State of Himachal Pradesh has an estimated Hydro Potential of 27,436 MW out of which 24,000 MW has been assessed as harness able while the Government of Himachal Pradesh has decided to forgo balance potential in lieu of safe guarding the environment and to maintain ecological as well as protect various social concerns. Out of the total harness able potential of about 24,000 MW, a potential to the tune of 20,912 MW already stands allotted under various sectors. The State has been accelerating the pace of Hydropower development through the active involvement of both the public and private sectors. A potential of about 10,596.27 MW has already been harnessed so far under various sectors. Though the private sector participation in terms of investments in this sector has been encouraging but the smaller projects has been reserved for investors from Himachal Pradesh only (up to 2 MW) and preference will be given for projects up to 5 MW. Deen Dayal Upadhyaya Gram Jyoti Yojna (DDUGJY) The Ministry of Power, Government of India launched Deendayal Upadhyaya Gram Jyoti Yojna (DDUGJY) on 3rd December, 2014 for the electrification of rural households, separation of agriculture and non-agriculture feeders, strengthening and augmentation of Sub-Transmission and Distribution (ST & D) infrastructure in rural areas, including metering at distribution transformers, feeders and consumers end.
    [Show full text]
  • Ground Water Information Booklet Hamirpur District, Himachal Pradesh
    Technical Series: E For official use only Government of India Ministry of Water Resources CENTRAL GROUND WATER BOARD GROUND WATER INFORMATION BOOKLET HAMIRPUR DISTRICT, HIMACHAL PRADESH NORTHERN HIMALAYAN REGION DHARAMSALA September, 2013 “ संचित जल, सुरषित कल “ जल संरिण व्ष - 2013 Contributors Rachna Bhatti Assistant Hydrogeologist Prepared under the guidance of Sh. J.S.Sharma Head of Office & Sh. Dalel Singh Suptdg. Hydrologist Our Vision Water security through sound groundwater management “ संचित जल, सुरषित कल “ जल संरिण व्ष - 2013 Ground Water Information Booklet Hamirpur District, Himachal Pradesh CONTENTS DISTRICT AT A GLANCE Page No. 1.0 INTRODUCTION 1. 2.0 CLIMATE & RAINFALL 4. 3.0 GEOMORPHOLOGY & SOILS 4. 4.0 GROUND WATER SCENARIO 7. 4.1 Hydrogeology 7. 4.2 Ground Water Resources 11. 4.3 Ground Water Quality 11. 4.4 Status of Ground Water Development 11. 5.0 GROUND WATER MANAGEMENT STRATEGY 12. 5.1 Ground Water Development 12. 5.2 Water Conservation & Artificial Recharge 12. 6.0 GROUND WATER RELATED ISSUES & PROBLEMS 14. 7.0 AWARENESS & TRAINING ACTIVITY 14. 8.0 AREAS NOTIFIED BY CGWA / SGWA 15 9.0 RECOMMENDATIONS 15. “ संचित जल, सुरषित कल “ जल संरिण व्ष - 2013 HAMIRPUR DISTRICT AT A GLANCE Sl. Items Statistics No 1. GENERAL INFORMATION i) Geographical area (sq km) 1,118 ii) Administrative Divisions (2001) Number of Tehsil & sub-tehsils 5 &1 Number of CD Blocks 6 Number of Panchayats 229 Number of Villages 1,672 iii) Population (2011 Census) Total population 4,54,768 Population Density (pers/sq km) 407 Rural & Urban Population 93.1% & 6.9% 24 % & 0.67% SC & ST Population (in percent) 1,095 Sex Ratio iv) Average Annual Rainfall (mm) 1,340.72 2.
    [Show full text]
  • State of Himachal Pradesh Transfer to Regional Office Dehradun
    Telephone No.:(0172) 2638061 FAX No.: (0172) 2638135 \h d -Z /:):-11 "l ilillll~;Fl ,1\11 .( /IJ-/~). ~'tif(:x :11~Q 'lTlx d XlxillTx <;lj~I'11 lfP!. rjU~l)JI~~160030 Lf~rfqxUT~<:j '<:f;1 lrA'r~~PJ NORTHFr~N HEGIONAL OFFICE GOVERNMENT OF INDIA "/i:r ;i ;:/;'>.'/I<,n / DAYS NO, 24·25, SECTOR 31-A MINISTRY OF ENVIRONMENT & FOREST '/I.:r ,)' >:,(;'1/:/,,/1 II DAKSf liN MAr~G, CHANDIGARH·160030 Datcd:!\pril 01,2014 F. No.A-] 00 13j 1j2006NRO To Additional Principal Chief Conservator of Forests (Central) Ministry of Environment and Forests, ClovcrnmenL of India, I.(egional Office, Dehradun, Utlarakhand. Sub.: Transfer of records pertaining to the State of Himachal Pradesh ~reg. Sir, As per telephonic discussion with you and the previous correspondence on this issue, I am sending herewith aJl records, proposals files related to diversion of forests land for non­ forestry purposes, court cases files, working plan files and working plan documents, RTI application files, Environment files and other miscellaneous correspondence (as per lists attached) in respect of the State Government of ]limachal Pradesh, on April 02, 2014. Shri Amarjit, LDC of this office and other two oJficials are accompanying the records and will handover the sarne to Shri Yogesh Gairola, R1. of regional office at Dehradun. The truck carrying the record will start on April 02, 2014 at 9.30 A.M. from Chandigarh and reach Dehradun the same afternoon. This is for your information please. Yours ftSZ1Y, (I~;~ingh) Encls: As above. Additional Principal Chief Conservator of Forests (Central) Copy to: The Additional Director General of Forests (FC) Minlstry of J<:nvironment and Forests, Government of India, Paryavaran Bhawan, CGO Complex, Lodhi I~oad, New Delhi­ 110003.
    [Show full text]
  • Beas-Sutlej Power Complex
    THE ECONOMIC WEEKLY January 7, 1961 Letter from Punjab Beas-Sutlej Power Complex PUNJAB is threatened with acute Feeder during the winter months. is being installed at both Kotla and power shortage once again. The Construction of the dam will be Ganguwal. These units will he ready current flow in the Sutlej is so poor undertaken jointly by Rajasthan by March and June 1961 respectives that it is feared that if the Bhakra and Punjab and its irrigation be­ reservoir is not replenished in time, nefits will accrue mainly to the for­ its water level may soon fall below mer while Punjab will benefit chiefly But the much bigger power gene­ the penstock gates. This will put from the new power generated. A rating units are at Bhakra. The Left the newly-commissioned unit of the detailed project report for this unit Bank Power House, the first unit of Left Bank Power House out of has been prepared and the total which was commissioned in Novem­ action. A cut in power consumption cost is estimated at Rs 87 crores of ber last, will have five generating of 10 per cent has, therefore, been which Rajasthan will meet about units of S3 to 00 mW capacity imposed from mid-December. It is Rs. 70 crores. A sum of Rs 60 lakhs each, depending on the water level against this background of addi­ is expected to be spent during 1060- in the reservoir. All these units are tional power load continually out­ 61 on preliminary work. The third expected to be commissioned dur­ pacing additional power supply that- Plan includes an allocation of Rs ing 1961.
    [Show full text]
  • Hpas Current Affairs 2021
    Dear Aspirant In these times of digital distraction and information overload, it is easier to get lost in the content than find meaningful and relevant information. We at GURUJI’S KIRPA S.N.M. IAS Academy understand the demand of the exam and requirement of the aspirants and to fulfill the two we bring to you “HPAS current Affairs, 2021”. This is a compendium of state relevant information for HPAS Exam and all other competitive exams. The book covers the current affairs and issues from every spheres of State Economy, Ecology, Governance reforms and Welfare initiatives. Look out for LINKING PIN feature in this book which connects the current affairs of the state with that of the National affairs and issues. For the ease of studying, each topic is systematically divided into subtopics and the format is absolutely Prelims oriented. The book includes important topics of interest from March 2020 to February 2021. However, the topics prior to these can be accessed from our website https://www.snmiasacademy.com/ and more content is uploaded on daily basis at https://www.snmiasacademy.com/has-current- affairs/. You may stay updated by connecting to us online. To further ease of your burden and enrich your preparation, the summary for State Economic Survey (2020-2021) and State Economic Budget (2021-2022) will be released in the month of March. 1 CONTENTS I. ECONOMY SECTION 4- 59 1. Fiscal Health & Economic Reforms 2. Horticulture Sector 3. Hydropower Sector 4. Hotel & Tourism Sector 5. Agriculture Sector 6. Industrial Sector 7. Fisheries 8. Physical Infrastructure II.
    [Show full text]
  • Himachal Pradesh
    Chapter 1 INTRODUCTION 1.1 The Context Watershed protection and development have gained tremendous importance and relevance in India over the past few years. This has been due to the increasing realization of the alarming state of India’s natural resources – land, water and forest, which have witnessed rapid degradation as a result of the immense pressures that have been put on them by the country’s growing human and livestock population. Dry lands, for instance, which account for almost two-thirds of India’s total cultivated land, are among the most environmentally fragile lands. These supports a large number of India’s poor and contribute a significant proportion of the country’s agricultural output (Ninan and Lakshmikanthamma, 1994). Owing to the intensification of agriculture, extension of cultivation to marginal lands, perverse incentives that encourage the over-exploitation of natural resources, rapid degradation of forest resources, overgrazing and diminishing common lands, much of these lands are in various stages of degradation. According to an estimate made by the National Commission on Agriculture, 175 million hectares of land in India is under some form of degradation or the other (Planning Commission, 2002). This is easily visible in the form of increased soil erosion, declining groundwater tables, decrease in drinking water viability, desertification, etc. in different parts across the country (Ninan & Lakshmikanthamma, 1994). Furthermore, frequent occurrences of either floods or droughts are evidence of improper land use in the catchments, and of the inadequate conservation of forests (MoA, 2002). Since more than two-third's of India’s one billion-strong population depends heavily on the primary sector – agriculture and forestry – to meet their daily survival needs, this degradation of the natural resource base has thus seriously impacted the well being and development of the majority of the country’s population, especially the poor, who depend on these resources the most.
    [Show full text]