OJSC Almazy Rossii Sakha (ALROSA) MD «Aykhal» Mine
Total Page:16
File Type:pdf, Size:1020Kb
Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination OJSC Almazy Rossii Sakha (ALROSA) MD «Aykhal» mine. Temporary backfilling complex. Rockwell Automation 1 ED 12.2005 03.2006 Control system for mill МШР3600х5000 (ControlLogix) CO Village of Aykhal. Ore-dressing & processing Survey enterprise at «Yubileynaya» mine. Ore mill №14. Vacon 6kV (two- 2 SOW 12.2005 12.2006 Installation of the frequency-controlled converter transformer circuit) WD on the circulating water pump, item181-3 Village of Aykhal. Ore-dressing & processing Survey enterprise at «Yubileynaya» mine. Ore mill №14. Vacon 6kV (two- 3 SOW 12.2005 12.2006 Installation of the frequency-controlled converter transformer circuit) WD on the ore hydraulic transportation pump, item 7-1 Village of Aykhal. Ore-dressing & processing enterprise at «Yubileynaya» mine. Ore mill №14. Survey 4 Installation of the frequency-controlled converter SOW Robicon 6кВ 12.2005 on the ore hydraulic transportation pump, item WD 120-5 Village of Aykhal. Ore-dressing & processing Survey enterprise at «Yubileynaya» mine. Ore mill №14. 5 SOW Vacon 0,4кВ 12.2005 Installation of the frequency-controlled converter WD on the jigger, item 145-1 Village of Aykhal. Ore-dressing & processing Survey 6 enterprise at «Yubileynaya» mine. Ore mill №14. SOW Siemens (S7-300) 03.2006 06.2008 Ore bunker loading unit. Control system updating WD REFERENCE-LIST of the completed projects 1 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination ED CO WD «International» mine. ASODU-II (for complete ED development). Complex of equipment for central Rockwell Automation 7 CAO 03.2007 12.2007 dispatch control with in-site network for data (RSView32) CO transmission. Adjustment WD «International» mine. ASODU-II (for complete ISE development). Subsystem «Monitoring of Becker Mining Systems 8 ED 03.2007 12.2007 underground personnel and personnel (CAТS) CAO transportation». Adjustment CO DD «International» mine. ASODU-II (for complete ED Schneider Electric; 9 development). “Power supply” subsystem. 07.2007 12.2007 CO Rockwell Automation Surface part. Adjustment Village of Aykhal. Ore-dressing & processing enterprise at «Yubileynaya» mine. Ore mill №14. 10 DD Siemens (S7-400) 07.2007 12.2008 Stage I sieving and X-ray –luminescent separation. Automated control system OPTION 1. BMS «International» mine. ASODU-II (for complete DD (Betacontrol) 11 development). ISE 12.2008 OPTION 2. Trolex «Power supply» subsystem. Underground part (TX2100) REFERENCE-LIST of the completed projects 2 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination DD «Aykhal» mine. Main industrial site. Modular ED 12 Rockwell Automation 06.2008 03.2009 heat point. Complete delivery CAO CO ED «Aykhal» mine. Main industrial site. Surface 13 CAO Rockwell Automation 10.2010 backfilling complex. Automated control system CO DD «Aykhal» mine. Complex of equipment for ED 14 central dispatch control with in-site network for Rockwell Automation 05.2010 08.2010 CAO data transmission. CO “Aykhal” mine.Automated system of operative SOW dispatch control.. Subsystems automation of DD 15 underground objects “UAPT PS”, “Power ED Becker Mining Systems 05.2010 08.2010 supply”, “extraction”, “stowage”, “water supply”, CAO “air supply”, “mine pumping”. CO Survey SOW Village of Aykhal. Ore-dressing and processing DD 16 enterprise at “Yubileynaya” mine. Ore mill №14. Siemens (S7-300) 12.2008 12.2011 ED Recovery workshop CAO CO “Aykhal” mine. Automated control system of Survey Funke+Huster 17 05.2011 03.2012 loading-unloading complex for skips with SOW Fernsig+ABB+ Rockwell REFERENCE-LIST of the completed projects 3 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination transport gallery and skip hoisting unit. DD Automation Adjustment. ED CAO CO DD «MIR» mine. ASDOU-I (starting complex). ISE Wireless system for emergency warning and 18 ED SUBR-1P 04.2009 07.2009 underground monitoring of the personnel and CAO transport. Adjustment CO “Udachniy” undergroung mine. Deposit opening ED Rockwell 19 at the level of -290/580m. Main colorific CAO 01.2011 09.2011 Automation installation. CO “Udachniy” underground mine. Deposit opening at the level of -290/580m.Surface 20 DD Cisco 06.2011 part. Local area network “Udachniy” underground mine. 21 Deposit opening at the level of -290/580m.Surface DD Cisco 06.2011 part. Local Area Network. “Mir” underground mine. Section conveyance on 22 the delivery strait horizon – 310m. Automated DD Becker Mining Systems 06.2011 control system of the technological process. “Mir” underground mine. Automated system of 23 DD Rockwell Automation 06.2011 operative dispatch control. Subsystem REFERENCE-LIST of the completed projects 4 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination “Ventilation”. GVU, GKU, VKU. «MIR» mine. ASDOU-I (starting complex). DD Complex of equipment for central dispatch ED Rockwell Automation 24 04.2009 08.2009 control with in-site network for data transmission. CAO (RSViewSE) Adjustment CO «MIR» mine. Automated control system of DD Funke+Huster loading-unloading complex for skips with ED 25 Fernsig+ABB+ Rockwell 12.2008 03.2009 transport gallery and skip hoisting unit. CAO Automation Adjustment CO DD «MIR» mine. Gorizont -310m. Main conveyor 26 ED Becker Mining Systems 12.2008 06.2009 line. Automated control system CO «MIR» mine. Surface backfilling complex. MD 27 Automated weighing devices for bulk materials, ED Rockwell Automation 06.2009 12.2009 DVL type CO ABB metronics «MIR» mine. PS 110/6.3/6.6 kV. ASDTU, ASU 28 SPAX XXX 12.2008 03.2009 RZA, AIISKUE. Adjustment REX 5XX Mirninsky GOK. Ore mill №3. Reconstruction. 29 DD АВВ 12.2007 Power supply system. ASDTU, AIISKUE Mirninsky GOK. Ore mill №3. Reconstruction. АВВ; 30 Power supply system 6/0.4kV. Lighting. Control DD 2008-2009 Rockwell Automation stations switchboards REFERENCE-LIST of the completed projects 5 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination Aykhalsky GOK. Ore mill №14. Power supply 31 DD ABB system. ASDTU, AIISKUE «Aykhal» mine. Starting complex for 200 DD thousand ton of ore per year. ASODU (starting OPTION 1 BMS ISE 32 complex). «Pumping» subsystem. Main pumping (Betacontrol) OPTION 2 12.2008 12.2009 ED unit at the horizon +100m. Automated control and Trolex (TX2100) CO monitoring system «Aykhal» mine. Starting complex for 200 thousand ton of ore per year. ASODU (starting 33 CO SUBR-1R 09.2010 complex). Wireless system for emergency warning SUBR-1P WD ISE «International» mine. Main pumping unit at 34 ED Becker Mining Systems 11.2010 12.2010 horizon of -625m. Automated control system. CAO CO «MIR» mine. ASODU-I (starting complex). DD Automation subsystems for underground facilities ED 35 «UAPT&PS», «Power supply», «Mining», Becker Mining Systems 09.2010 12.2010 CAO «Backlilling», «Water supply», «Air supplying», CO «Water-pumping» Aykhalsky GOK. Mining enterprise at 36 «Komsomolskaya» minefield. Ore deposit mining BD 03.2008 12.2008 up to the level of +200m. Feeding VL-6kV. REFERENCE-LIST of the completed projects 6 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No. Facility description Work type design work Note project ning date termination Radial VL-6kV. Electric equipment. Electric lighting of the open cast mine. Diamond production plant « ALROSA-Nyurba ». 37 Open cast mine at «Nyurbinskaya» minefield. BD 11.2007 Power supply system 6kV Diamond production plant « ALROSA-Nyurba ». 38 Open cast mine at «Botuobinskaya» minefield. BD 10.2008 Power supply system 6kV «Udachniy» underground mine. Deposit opening at the level of -290/580m. Surface and 39 underground complex facilities. External power BD 02.2008 supply 110/6.3/6.6kV. VL-110kV. Transformer substation «MIR» underground mine. Opening and mining up to the level of -615m. Surface and underground 40 BD 03.2009 07.2009 complex facilities. The first starting complex. Power supply system 110/6.3/6.6kV Wet self-grinding mill №3. Control system Surway, 41 SOW, WD, ED, Siemens (S7-300) 04.2012 11.2012 modernization. CO ASODU, “Technological and safety video WD 42 SRbEC-Mining 03.2012 observation” subsystem. Pit head complex of VKS mine shaft. Automated 43 SOW, WD Rockwell Automation 05.2012 thermal control of piles field grounds and REFERENCE-LIST of the completed projects 7 Post address: 196603, Russia, Saint-Petersburg, Pushkin, Parkovaya str., 56А tel: +7 - 812 - 331 96 20; fax: +7 - 812 - 331 96 21, [email protected], www.spbec.ru Date of the Basic hardware of the Commissio No.