2017 Labour Day Long Weekend Agricultural Travel Restrictions Roads with a Classification of Freeway

Total Page:16

File Type:pdf, Size:1020Kb

2017 Labour Day Long Weekend Agricultural Travel Restrictions Roads with a Classification of Freeway 2017 Labour Day Long Weekend Travel Restrictions – Agricultural Vehicles These restrictions only apply to oversize agricultural vehicles such as tractors, headers and have been in place for many years. They are stipulated in the NSW Class 1 Agricultural Vehicles (Notice) 2015 (No. 1) - click here for a copy Permit Notices. A truck carrying an agricultural machine is regarded as a load carrying vehicle not an agricultural vehicle. Night Travel Zones Night travel for an oversize agricultural machine or combination that is wider than 2.5 metres or longer than 22 metres is not allowed anywhere in NSW. Daytime Travel - All Zones If you are operating under the NSW Class 1 Agricultural Vehicles (Notice) 2015 (No.1) and travelling wider than 2.5 metres or longer than 22 metres, from sunrise Saturday 30 September 2017 to sunset Monday 2 October 2017, travel is only permitted on the following roads if accompanied by at least one pilot vehicle: • Any highway, freeway or motorway east of but NOT including the Newell Highway, and • Burley Griffin Way between the Hume Hwy and Irrigation Way at Yoogali, and • The Lachlan Valley Way between the Mid Western Hwy at Cowra and the Hume Hwy near Yass, and • Kings Highway (MR51) from Braidwood to Batemans Bay, and • Kidman Way (MR321 + MR80) between the Newell Hwy near Jerilderie and the Mid Western Hwy at Goolgowi, and • John Renshaw Drive between the F3 Sydney-Newcastle Freeway and New England Hwy. Specific Permit If you are travelling under a specific permit for dimensions wider or longer than allowed under the NSW Class 1 Agricultural Vehicles (Notice) 2015 (No.1), then you cannot travel from sunrise Saturday 30 September 2017 to sunset Monday 2 October 2017 on the following roads: • All highways and freeways east of but NOT including the Newell Highway, and • Olympic Way between Albury and Cowra, and • Kings Highway between Braidwood and Batemans Bay, and • Lachlan Valley way between Yass and Cowra, and • Burley Griffin Way between the Hume Hwy and Griffith. These restrictions only apply to over size travel. Permits to exempt you from any of the above listed restrictions are NOT available except under emergency provisions relating to fire, explosion or natural disaster. 2017 Labour Day Long Weekend Agricultural Travel Restrictions Roads with a classification of freeway . M1 Warringah Freeway – Sydney Harbour Bridge to Willoughby Rd Naremburn. M2 Hills Motorway – Lane Cove Tunnel at North Ryde to Abbot Rd Seven Hills. M1 Motorway – Pacific Hwy Wahroonga to John Renshaw Dve Beresfield and Princes Hwy Waterfall to Princes Hwy Yallah. M4 Western Motorway – Concord Rd Strathfield to Great Western Hwy Lapstone. M5 South Western Motorway – General Holmes Dve Kyeemagh to Hume Hwy Prestons. M7 Westlink – M2 at Baulkham Hills to Prestons. Gore Hill Freeway – Willoughby Rd Naremburn to Longueville Rd Lane Cove. Hunter Expressway – M1 Pacific Motorway near Seahampton to the New England Highway near Branxton Roads east of the Newell Highway with a classification of Highway . Princes Highway (HW1) . Hume Highway (HW2) . Federal Highway (HW3) . Barton Highway (HW15) . Snowy Mountains Highway (HW4) . Monaro Highway (HW19) . Sturt Highway (HW14) . Riverina Highway (HW20) . New England Highway (HW9) . Oxley Highway (HW11) . Golden Highway (HW27) . Pacific Highway (HW10) . Gwydir Highway (HW12) . Bruxner Highway (HW16) . Kamilaroi Highway (HW29) . Castlereagh Highway (HW18) . Great Western Highway (HW5) . Mitchell Highway (HW7) . Central Coast Highway (HW30) . Mid Western Highway (HW6) . Illawarra Highway (HW25) . Newcastle Bypass (HW23) . Cumberland Highway (HW13) . Gold Coast Highway (HW31) 2017 Labour Day Long Weekend Agricultural Travel Restrictions .
Recommended publications
  • Moving in the Right Direction
    MOVING IN THE RIGHT DIRECTION STOCKYARD PLACE Grieve Close extended south to Corumbene N Road, passing under Central Coast Highway and Debenham Road South GRIEVE CLOSE ROAD SOUTH DEBENHAM Stockyard Place Two way link road and Manns Road Off-ramp from Central Coast Highway GRIEVE CLOSEintersection upgraded to Grieve Close. Left turn only Corumbene Road, Jusfrute Central Coast Drive and Grieve Close Highway and No right turn intersections modified MANNS ROAD Dyer Crescent DYER CRESCENT from Dyer JUSFRUTE DRIVE intersection closed GRIEVE CLOSE Crescent to Manns Road Signalised CORUMBENE ROAD intersection will be provided at the intersection of SHOPPING Grieve Close and CENTRE Manns Road Service Road HENRY KENDALL STREET Brisbane Water Drive and Manns Road realigned to form new intersection with Central Coast Highway with traffic light control DOMAYNE BEL-HILTON FERGUSON CLOSE PARADE Brisbane Water Drive CENTRAL COAST HIGHWAY KULARA AVENUE and Bel-Hilton Parade intersection closed Two way link road BRISBANE WATER DRIVE Shared pedestrian/ cycle path connecting to Fagans Bay cycle path New road pavement Concrete median Shared pedestrian/cycle path Area to be landscaped (indicative only) Indented bus bay Bus stop on road Date of aerial photography: 2010 DEVELOPER : NSW Roads and Maritime Services MAIN CONSTRUCTION COMPANY : Seymour Whyte Constructions Pty Ltd ENGINEER : Aurecon Australia Pty Ltd PROJECT VALUE : $170 million 33KV, 11KV and LV Ausgrid power lines. Telecommunications working together as one.” Not only creating a safer and more The $170M Central Coast Highway upgrade has realigned the existing intersection into a single signalised networks servicing Telstra, Optus and Nextgen customers also efficient infrastructure solution for one of the Central Coast’s busiest intersection easing congestion.
    [Show full text]
  • New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
    New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements ..........................................................................................................................
    [Show full text]
  • Gosford City Centre Masterplan the Gosford Challenge Gosford City Centre Masterplan
    City, Our destiny Gosford City Centre Masterplan The Gosford ChallenGe Gosford City Centre Masterplan r City, u O destiny a World Class reGional Waterfront City r City, iii u O destiny The Gosford ChallenGe Gosford City Centre Masterplan acknowledgments JOINT PROJeCt SPONSORS DESIGn TEAM Gosford City Council land and property Gosford Challenge team Clr Chris Holstein Management authority Colleen Worthy-Jennings Mayor Hon Tony Kelly MHR Stephen Fairnham Clr Craig Doyle Warwick Watkins Duncan Clarke Deputy Mayor Graham Harding Helen Polkinghorne Clr Chris Burke Brett Phillips John Tilston Clr Peter Freewater Stewart Veitch Barbara Cruise Clr Amy Houston Robert Eyre Clr Terri Latella Scott Burton Clr Jim Macfadyen Steve Green Clr Laurie Maher Sue Verhoek Clr Vicki Scott Kerr Partnering Clr Jeff Strickson Cox Architects and Planners Peter Wilson Patrick Condon Stephen Glen Rob Lane Gary Chestnut Aurecon Rod Williams Arup Nic Pasternatsky Oculus Terry Thirlwell teaming with ideas r City, u O destiny Contents 1 GROWING A REGIONAL CITY 2 4 MAKING IT HAPPEN 92 1.1 gosford as a regional city 3 4.1 implementation plan 93 1.2 greater metropolitan context 4 4.2 the beginning - two priority areas 96 1.3 regional context 5 APPENDICES 1.4 local context 6 appendix 1 sustainability 102 1.5 attributes of a regional city 8 appendix 2 regional benchmarks 110 1.6 purpose of a masterplan 10 appendix 3 retail and commercial market 114 1.7 the journey 12 appendix 4 participants 116 1.8 planning context 14 1.9 key strategic opportunities 15 2 SPATIAL FRAMEWORK 16 2.1 the city framework 16 2.2 the masterplan 18 2.3 five precincts of activity 20 3 MASTERPLAN ELEMENTS 48 3.1 connecting places 50 3.2 activate the city 56 3.3 responsive built form 60 3.4 generate jobs and new enterprises 64 3.5 living in the city 72 3.6 access and movement 76 3.7 sustaining the city (enhancing the natural environment) 86 note: diagrams of future development are concept only.
    [Show full text]
  • Dissertation an Evaluation of Traffic Calming Devices for Major Highways Passing Through Rural Australian Communities
    Dissertation An evaluation of traffic calming devices for major highways passing through rural Australian communities University of Southern Queensland Faculty of Engineering and Surveying A dissertation submitted by Mr Gregory Paul In fulfilment of the requirements of Bachelor of Engineering (Civil) October 2015 i ABSTRACT Rural communities are overrepresented in the Australian crash statistics with 66% of the Australian road fatalities occurring on rural roads despite only 33% of the road fleet using rural roads frequently. Australian literature on traffic calming is dated and provides information predominantly for the urban road environment and does not direct road designers to modern engineering means. In the past decade a number of traffic calming devices have been implemented into the urban road network and this has been represented by a significant reduction in the number of fatalities. However, these have not been incorporated into rural communities due to a perceived unbeneficial cost by use ratio. The report aims to analyse 14 sites and compare before and after traffic calming installation crash data to determine if traffic calming provides significant improvements to the safety of the road network. The report will also analyse the speed of drivers using these traffic‐ calming devices to quantify how driver behaviour in moderated at each site. To achieve this each site will be investigated and the speed of drivers recorded over a given distance before and after the traffic‐calming device. This will provide a map of driver behaviour and interactions through the rural community. This behavioural analysis will be instrumental in viewing the operational efficiency of traffic calming devices and recommending where the optimum positioning of a device would be for maximum benefit.
    [Show full text]
  • Statement of Environmental Effects Development Application for the Kooba PS2 Storage Dam
    Statement of Environmental Effects Development Application for the Kooba PS2 Storage Dam February 2020 Progressive Rural Solutions 0408 577 248 Table of Contents Document Information Record Project Details Client name: Webster Southern Ag Project: Kooba (PS2) Storage Project No: 115-0 Document Control Document Title Statement of Environmental Effects for the Kooba PS2 irrigation storage dam File Name: J115 – SEE – V1R4 Revision: V1R4 Author Clare Fitzpatrick Position: Director Signature: Date: 17/02/2020 Reviewed by: Clare Fitzpatrick Position: Director Signature: Date: 17/02/2020 Approved by: Clare Fitzpatrick Position: Director Signature: Date: 17/02/2020 Revision history Version Issue date Reason for issue Author Reviewed by Approved by V1R1 01/10/2019 Initial Document Clare Fitzpatrick NA NA V1V2 06/02/2020 Draft Clare Fitzpatrick M Fitzpatrick Clare Fitzpatrick V1V3 10/02/2020 Draft for client review Clare Fitzpatrick Client Clare Fitzpatrick V1R4 17/02/2020 FINAL Clare Fitzpatrick Clare Fitzpatrick Client Distribution Version Recipient Lodgement Copies V1R3 Client for review Electronic 1 V1R4 Client Electronic & Hard 1 V1R4 Leeton Shire Council Electronic & Hard 1 V1R4 WaterNSW Electronic 1 Disclaimer The report has been prepared for the benefit of the client and no other party. Progressive Rural Solutions assumes no responsibility and will not be liable to any other person or organisation for or in relation to any matter dealt with or conclusions expressed in the report, or for any loss or damage suffered by any other person or organisation arising from matters dealt with or conclusions expressed in the report (including without limitation matters arising from any negligent act or omission of Progressive Rural Solutions or for any loss or damage suffered by any other party relying upon the matters dealt with or conclusions expressed in the report).
    [Show full text]
  • Leeton Shire Council Local Strategic Planning Statement 2020
    LOCAL STRATEGIC PLANNING STATEMENT JUNE 2020 1 | P a g e DOCUMENT AUTHORISATION RESPONSIBLE OFFICER Manager Planning, Building and Health REVIEWED BY Senior Management Team DATE ADOPTED: 24 June 2020 ADOPTED BY: Council RESOLUTION NO: (IF RELEVANT): 20/088 REVIEW DUE DATE: 30 June 2027 REVISION NUMBER: 1 REVIEW/ MINUTE PREVIOUS AUTHOR/ DATE DESCRIPTION OF AMENDMENTS SIGN NO VERSIONS: EDITOR (IF OFF RELEVANT) REVIEW OF THIS POLICY This Policy will be reviewed every 7 years or as required in the event of legislative changes. The Policy may also be changed as a result of other amendments that are to the advantage of Council and in the spirit of this Policy. Any amendment to the Policy must be by way of a Council Resolution or, for administrative reasons, the approval of the General Manager. 1 | P a g e Foreword The Leeton Local Strategic Planning Statement (LSPS) is a community driven document that identifies, shapes and acknowledges the short, medium and long- term strategic town and environmental planning objectives for the Leeton Shire community. The Leeton LSPS is shaped by how the Leeton Shire and its communities have developed, the special characteristics that makes us unique and our values and expectations that we wish to achieve, protect and enhance over the next 20 years. The statement brings together important information about our unique environment, the character of our communities, our cultural identity and our economy to set priorities for building a prosperous and liveable Shire. The Leeton LSPS will establish a consistent framework for the Leeton Shire that will: 1. Explain development standards important to the Leeton community.
    [Show full text]
  • $23 Million Road Resealing Season Starts in South West Nsw
    Daryl Maguire MP Member for Wagga Wagga PRESS RELEASE 22 September 2017 $23 MILLION ROAD RESEALING SEASON STARTS IN SOUTH WEST NSW As the weather improves, so too do the optimal conditions for road resealing – triggering the start of a $23 million program to be rolled out in the next seven months through south western NSW. Daryl Maguire MP, Member for Wagga Wagga said the NSW Government funded work will deliver 4.3 million square metres of much-needed resealing work from Yass to Wentworth, Hillston to Albury and everywhere in between from September to May next year. “More than 4.5 million litres of bitumen and 25,000 cubic metres of aggregate will be rolled out by Roads and Maritime Services in the next seven months,” Mr Maguire said. “The resealing process involves the resurfacing of roads to protect the underlying structure and provide a safe, textured surface for motorists to travel on.” More than 370 kilometres of resealing work will be carried out at various locations on the Sturt Highway, Silver City Highway, Olympic Highway, Irrigation Way, Cobb Highway, Snowy Mountains Highway, Barton Highway, Hume Highway, Riverina Highway, Kidman Way, Burley Griffin Way, Newell Highway, Mid Western Highway and Lachlan Valley Way. “Work will be delivered in mostly rural areas, some semi-rural areas and some urban areas, with some of this work will be delivered by local councils and industry partners on behalf of Roads and Maritime,” Mr Maguire said. “The South West sealing crew, consisting of 17 workers based at Narrandera, is one of three Roads and Maritime crews delivering this high-value, high-volume work across NSW.
    [Show full text]
  • Government Gazette of 2 November 2012
    4517 Government Gazette OF THE STATE OF NEW SOUTH WALES Number 116 Friday, 2 November 2012 Published under authority by the Department of Premier and Cabinet LEGISLATION Online notification of the making of statutory instruments Week beginning 22 October 2012 THE following instruments were officially notified on the NSW legislation website (www.legislation.nsw.gov.au) on the dates indicated: Proclamations commencing Acts Courts and Other Legislation Amendment Act 2012 No 60 (2012-531) — published LW 26 October 2012 Regulations and other statutory instruments Law Enforcement and National Security (Assumed Identities) General Amendment (Miscellaneous) Regulation 2012 (2012-532) — published LW 26 October 2012 Road Amendment (Miscellaneous) Rules 2012 (2012-533) — published LW 26 October 2012 Road Transport (Driver Licensing) Amendment (Miscellaneous) Regulation 2012 (2012-534) — published LW 26 October 2012 Road Transport (General) Amendment (Miscellaneous) Regulation 2012 (2012-535) — published LW 26 October 2012 Security Industry Amendment Regulation 2012 (2012-536) — published LW 26 October 2012 Environmental Planning Instruments Environmental Planning and Assessment Amendment (State Significant Infrastructure—Northern Beaches Hospital Precinct) Order 2012 (2012-537) — published LW 26 October 2012 Murray Local Environmental Plan 2011 (Amendment No 1) (2012-539) — published LW 26 October 2012 State Environmental Planning Policy (Western Sydney Parklands) Amendment 2012 (2012-538) — published LW 26 October 2012 Waverley Local Environmental Plan 2012 (2012-540) — published LW 26 October 2012 4518 OFFICIAL NOTICES 2 November 2012 Assents to Acts ACTS OF PARLIAMENT ASSENTED TO Legislative Assembly Office, Sydney 22 October 2012 IT is hereby notified, for general information, that Her Excellency the Governor has, in the name and on behalf of Her Majesty, this day assented to the undermentioned Acts passed by the Legislative Assembly and Legislative Council of New South Wales in Parliament assembled, viz.: Act No.
    [Show full text]
  • Gold Coast Highway Multi-Modal Corridor Study
    Department of Transport and Main Roads Study finding's Buses Traffic analysis Buses currently play an important role in the movement of people A detailed traffic analysis process was undertaken to determine along and beyond the Gold Coast Highway corridor to a wide the number of traffic lanes, intersection configuration and Gold Coast Highway (Burleigh Heads to Tugun) range of destinations. Consistent with the approach adopted performance of the Gold Coast Highway now and into the future. in the previous stages of the light rail, some bus routes would The analysis confirmed that the nearby Mi (Varsity Lakes to Tugun) be shortened or replaced (such as the current route 700 and upgrade will perform a critical transport function on the southern 777 buses along the Gold Coast Highway), while other services Gold Coast providing the opportunity to: Multi-modal Corridor Study would be maintained and potentially enhanced to offer better • accommodate a significant increase in vehicle demands connectivity overall. including both local demands on service roads and regional demands on the motorway itself. This study has identified the need for buses to continue to connect March 2020 communities to the west of the Gold Coast Highway to key centres • improve local connections to the Mi and service roads including and interchanges with light rail. Connections between bus and a new connection between the Mi and 19th Avenue. light rail will be designed to be safe, convenient and accessible. Planning for the future This significant increase in capacity will provide through traffic Further work between TMR. TransLink and City of Gold Coast will with a viable alternative, reducing demand on the Gold Coast The Department of Transport and Main Roads (TMR) has confirm the design of transport interchanges and the network of Highway.
    [Show full text]
  • 2018 Australia Day Long Weekend Travel Requirements Agricultural Vehicles Roads and Maritime Services | January 2018
    2018 Australia Day Long Weekend Travel Requirements Agricultural Vehicles Roads and Maritime Services | January 2018 Travel restrictions apply for oversize agricultural is exempted) from sunrise 26 January 2018 to vehicles, such as tractors and headers, during the sunset 28 January 2018 must be accompanied by Australia Day long weekend. These requirements at least one pilot vehicle during this period: are outlined in Appendix 2 of the NSW Class 1 Agricultural Vehicles Notice 2015 and additional Road Start Point End Point requirements for vehicles operating under an access permit in the Additional Access Conditions Princes Highway* Broadway Victorian Border for oversize and overmass heavy vehicles and Parramatta Hume Highway* Victorian Border loads. This document provides an overview of the Road Australia day long weekend travel requirements. F1 Warringah Tugun Pacific Highway* Freeway, North interchange Night time requirements Sydney New England Hexham Bridge Wallangarra There is no change to night travel requirements for Highway oversize agricultural vehicles during the Australia M1 Pacific Day long weekend. Central Coast Pacific Highway, Motorway, Highway Doyalson Oversize agricultural vehicles are unable to travel Kariong at night if they are wider than 2.5 metres or longer John Renshaw M1 Pacific New England than 22 metres under the NSW Class 1 Drive Motorway Highway Agricultural Vehicles Notice 2015. Hume Cumberland Pacific Highway, Night travel access permits are available for Highway, Highway Wahroonga oversize hay balers and grape
    [Show full text]
  • Central Coast the Adams
    The Adams Ultimate guide to business Map of the Central Coast .......................................................... 50 Demographics and other data .................................................... 51 Population ........................................................................... 51 Age profile ........................................................................... 52 Individual & Household income ........................................... 53 Educational attainments ....................................................... 54 Employed persons by Occupation ......................................... 54 Employed persons by Industry .............................................. 54 Distance table for Central Coast roads ................................. 56 Traffic Volume Data .............................................................. 56 Businesses operating on the Central Coast (number, size & turnover) ..................................................... 57 Climate data .............................................................................. 58 Contacts .................................................................................... 59 Local Government – Councillors and Senior Executives ......... 59 State Government – Representatives and Electorates ........... 60 Federal Government – Representatives and Electorates ........ 61 Other Government contacts ................................................. 62 Business Associations ................................................................. 63 Central Coast
    [Show full text]
  • Minutes of the Tourist Attraction Signposting Assessment Committee South West Region Meeting
    TASAC Minutes 15 July 2015 Minutes of the Tourist Attraction Signposting Assessment Committee South West Region meeting Wednesday 15 July 2015 at Narrandera Shire Council Chambers 1st floor, 141 East Street, Narrandera Members David Douglas Regional Coordinator TASAC and Drive, Destination NSW Phil Oliver Guidance and Delineation Manager, Roads & Maritime Services (RMS) Maria Zannetides TASAC Secretariat Also present Ashleigh Harrison Events and Visitor Services Officer, Narrandera Shire Council Jenny Ryan Administration Officer (Tourism) Narrandera Shire Council Michael Buckley RMS South West Region Nicola James Manager, Economic Development Tourism and Events, Leeton Shire Council Brent Lawrence Visitor Services Coordinator, Leeton Shire Council Greg Lawrence Manager Tourist and Economic Development, Griffith City Council & Chair, Riverina Regional Tourism Apologies Andrew Brown Economic Development and Tourism Manager, Narrandera Shire Council Candace Torres Zone Manager Inland NSW, Destination NSW AGENDA ITEMS 1. DELEGATIONS / PRESENTATIONS & REGIONAL SIGNPOSTING ISSUES 1.1 Narrandera signposting issues Ashleigh referred to a sign on the Sturt Highway approximately 4.2 km east of Narrandera that welcomes visitors to “Riverina M.I.A.” and lists the distances to the Narrandera, Leeton and Griffith visitor information centres next to a Roman “i” symbol. The sign, which is understood to have been in place for some 25 years, is outdated and affected by graffiti. Ashleigh asked about the possibility of changing the sign so that it refers to the “Murrumbidgee Irrigation Area” instead of “M.I.A.” and features an italicised “i” symbol. Phil explained that the design of the sign is outdated and no longer available under the NSW Tourist Signposting Manual. David added that there are several signs near the boundaries of the Riverina Tourism area that welcome visitors to the area and give distances to visitor information centres.
    [Show full text]