Download 58.69 KB ASIAN DEVELOPMENT BANK PPA:PHI 22187 PROJECT PERFORMANCE AUDIT REPORT ON THE INFRASTRUCTURE RESTORATION PROJECT (Loan No. 946-PHI[SF]) IN THE PHILIPPINES November 1996 CURRENCY EQUIVALENTS Currency Unit – Philippine Peso At Appraisal At Project Completion At Postevaluation P1.00 = $0.0467 $ 0.0362 $ 0.0400 $ 1.00 = P21.393 P 27.650 P 25.000 ABBREVIATIONS BOM - Bureau of Maintenance DBM - Department of Budget and Management DILG - Department of Interior and Local Government DOF - Department of Finance DPWH - Department of Public Works and Highways EIRR - Economic Internal rate of Return LGU - Local Government Unit O&M - Operation and Maintenance PCR - Project Completion Report PI - Project Inspectorate PPAR - Project Performance Audit Report RRP - Report and Recommendation of the President SDR - Special Drawing Rights VOC - Vehicle Operating Cost WEIGHTS AND MEASURES hectare - ha kilometer - km meter - m square meter - sq m NOTES (i) The fiscal year (FY) of the Government ends on 30 June. (ii) In this Report, “$” refers to US dollars. I. HIGHLIGHTS 1. Objectives and Scope. In 1988 the Bank introduced a new policy of lending for rehabilitation after disasters. The Infrastructure Restoration Project was the Bank's first under the new policy and was intended to help the Philippines cope with the aftereffects of a series of unusually severe typhoons. The aim was to promptly restore damaged schools, flood control structures, ports and roads which were essential to local communities or economies. The loan funded the selection, design, and implementation of a range of small-scale rehabilitation civil works under an emergency sector loan approach. 2. Cost, Financing, and Schedule. The Bank provided a loan from its Special Fund resources of SDR14.72 million ($20 million equivalent) towards a total Project cost of $25 million, including a $5 million component in Government funds. The actual Project cost amounted to $27.08 million equivalent with Bank financing of $20.23 million. The slight increment of the Bank loan was due to the depreciation of the US dollar against the Special Drawing Rights (SDR). Implementation of the Project took 34 months longer than expected because of delay in completing detailed design and the expansion of the scope of the Project. 3. Implementation. The Project was implemented to a Department of Public Works and Highways (DPWH) technical standard which was accepted by the Bank. The Project included more subprojects than had originally been expected. As the Loan Agreement did not bind the Government's fiscal agencies responsible for budgetary allocations to adhere to the emergency schedule, their procedures for fund release had to be followed by DPWH and this slowed construction. The quality of work completed was generally satisfactory but reflected the larger number of subprojects and a shortage of engineering skills among implementing staff. Completed structures generally just met DPWH minimum service-life standard. The Bank's objective of restoring structures to conditions which would minimize the risk of future typhoon damage was not fully achieved. 4. Institutional Aspects. The organizational and coordination arrangements adopted were adhered to and generally benefited the Project. The creation of a project inspectorate (Pl) of consultants was useful and justified its funding from the loan amount. The lack of an interagency steering body to oversee implementation as an emergency project, however, exposed the Project to major delays. 5. Environmental Aspects. Lack of post-construction maintenance and casual use of some flood control structures as garbage dumps poses a public health hazard; no other significant environmental impacts were observed. However, the Project experience illustrated that the growing threat of floods and landslides to coastal communities in central Philippines continues because of deforestation of nearby uplands. The Government should have a long-term plan to promote afforestation and watershed protection. 6. Cost/Benefit Assessment. A survey of selected subprojects confirmed that the Project was socially and economically beneficial. The 53 surveyed subproject clusters showed economic rates of return (EIRR) ranging from negative to 75 percent. The (Project cost) weighted average of the rates of all surveyed subprojects approximates 23 percent. Although no rates of return were calculated at appraisal or completion, this bears out the Project justification at appraisal. The Project is economically viable. 7. Overall Performance and Sustainability. The Project helped to restore essential physical facilities damaged by typhoons, thereby enabling the affected communities to maintain normal levels of economic and social activities in the aftermath of the calamities. Most subprojects performed well at postevaluation, generating a relatively high level of socioeconomic benefits. The Project is rated generally successful However, there is an urgent need to improve the maintenance of the restored structures to ensure the sustainability of the Project. 8. Feedback. Speed of implementation is essential to the success of rehabilitation projects after disasters. The Project experience illustrates the disruptive potential of interagency coordination lags in the Philippines. While not all problems can be foreseen at appraisal, such emergency projects require the agreement of all lead agencies involved to the emergency implementation schedule and, as the case may be, an interagency steering body to ensure adherence to this commitment. Further, even where the Bank (in the interest of an effective crisis response) delegates its normal operational control functions to the executing agency and its advisors (consultants), the Bank must retain final controls. The Project indicates that it is essential for the Bank to remain actively involved in the determination of requisite skills, the selection process of advisors and, on a random basis, the supervision of subproject design. The monitoring and intervention rights of the Bank during implementation should be stressed in the Loan Aqreement. II. BACKGROUND A. Rationale 9. In late 1980, many of the Bank's developing member countries experienced natural disasters that often caused great hardship and economic disruption, with governments being ill-prepared to deal with such events. To supplement existing forms of emergency assistance which aim at relief and are grant-funded, the Bank introduced in 1988 a loan facility for rehabilitation projects after disasters. 10. The Philippines is situated in an active geotectonic zone and a major tropical cyclone belt, hence it is prone to natural calamities. Because of the country's geography, settlement patterns and a lack of infrastructure, such events have disruptive effects on livelihood activities of mostly rural communities. 11. In 1987 and 1988, severe typhoons occurred in the Philippines requiring disaster relief and rehabilitation measures in Southern Luzon, Eastern Visayas, and Mindoro. Damage to infrastructure in coastal zones was especially heavy, prompting emergency assistance from bilateral donors. The Bank could not respond promptly to a Government request for assistance in 1987 as a bankable project had to be prepared, based on approved policy. This was done in late 1988 when a further similar calamity occurred. The Bank therefore addressed the aftereffects of several storms1 with a single loan and project proposal, the Infrastructure Restoration Project. 1 The storms were named Sisanq, Unsanq, and Urinq. B. Formulation 12. The Project was an emergency sector loan with specific subprojects to be chosen and designed during implementation. To assist DPWH, the Executing Agency, a special Pl staffed with 15 consultants was established; this was funded from the loan. There was no project preparatory technical assistance as this would have delayed the Project. C. Objectives and Scope at Appraisal 13. The Project had twin objectives: (i) to support an economy then emerging from a prolonged political crisis and economic stagnation, and (ii) to help rural communities concerned to quickly overcome the threat to their livelihood from the destruction of local infrastructure. 14. The Project was part of a larger Government rehabilitation program. At inception, a Government field survey had identified 250 eligible core subprojects representing school buildings, and civil works for roads, bridges, ports, wharves, and flood control structures in need of rehabilitation or strengthening, as well as associated consulting services. These were to be augmented by additional subprojects during Project implementation. D. Financing Arrangements 15. The Bank loan of $20 million was from the Bank's Special Funds resources with a service charge of 1 percent per annum, 10 years' grace period, and 35 years maturity. The loan was to finance the entire foreign exchange component of the Project amounting to $11.6 million, and $8.4 million equivalent in local expenditures. Total Project cost as appraised was $25 million equivalent including $5 million equivalent in Philippine Government funds. The Borrower was the Republic of the Philippines. E. Completion 16. The Loan Agreement between the Bank and the Borrower was signed in February 1989 and became effective in April 1989. At appraisal, the Project was expected to be completed within a period of 18 months by 30 September 1990. However, after three extensions, the Project was completed in June 1993 and the loan account closed in August 1993. A Project Completion Report (PCR) prepared
Recommended publications
  • The Dialects of Marinduque Tagalog
    PACIFIC LINGUISTICS - Se�ie� B No. 69 THE DIALECTS OF MARINDUQUE TAGALOG by Rosa Soberano Department of Linguistics Research School of Pacific Studies THE AUSTRALIAN NATIONAL UNIVERSITY Soberano, R. The dialects of Marinduque Tagalog. B-69, xii + 244 pages. Pacific Linguistics, The Australian National University, 1980. DOI:10.15144/PL-B69.cover ©1980 Pacific Linguistics and/or the author(s). Online edition licensed 2015 CC BY-SA 4.0, with permission of PL. A sealang.net/CRCL initiative. PAC IFIC LINGUISTICS is issued through the Ling ui6zic Ci�cle 06 Canbe��a and consists of four series: SERIES A - OCCASIONA L PAPERS SER IES B - MONOGRAPHS SER IES C - BOOKS SERIES V - SPECIAL PUBLICATIONS EDITOR: S.A. Wurm. ASSOCIATE EDITORS: D.C. Laycock, C.L. Voorhoeve, D.T. Tryon, T.E. Dutton. EDITORIAL ADVISERS: B. Bender, University of Hawaii J. Lynch, University of Papua New Guinea D. Bradley, University of Melbourne K.A. McElhanon, University of Texas A. Capell, University of Sydney H. McKaughan, University of Hawaii S. Elbert, University of Hawaii P. Muhlhausler, Linacre College, Oxfor d K. Franklin, Summer Institute of G.N. O'Grady, University of Victoria, B.C. Linguistics A.K. Pawley, University of Hawaii W.W. Glover, Summer Institute of K. Pike, University of Michigan; Summer Linguistics Institute of Linguistics E.C. Polom , University of Texas G. Grace, University of Hawaii e G. Sankoff, Universit de Montr al M.A.K. Halliday, University of e e Sydney W.A.L. Stokhof, National Centre for A. Healey, Summer Institute of Language Development, Jakarta; Linguistics University of Leiden L.
    [Show full text]
  • Directory of Participants 11Th CBMS National Conference
    Directory of Participants 11th CBMS National Conference "Transforming Communities through More Responsive National and Local Budgets" 2-4 February 2015 Crowne Plaza Manila Galleria Academe Dr. Tereso Tullao, Jr. Director-DLSU-AKI Dr. Marideth Bravo De La Salle University-AKI Associate Professor University of the Philippines-SURP Tel No: (632) 920-6854 Fax: (632) 920-1637 Ms. Nelca Leila Villarin E-Mail: [email protected] Social Action Minister for Adult Formation and Advocacy De La Salle Zobel School Mr. Gladstone Cuarteros Tel No: (02) 771-3579 LJPC National Coordinator E-Mail: [email protected] De La Salle Philippines Tel No: 7212000 local 608 Fax: 7248411 E-Mail: [email protected] Batangas Ms. Reanrose Dragon Mr. Warren Joseph Dollente CIO National Programs Coordinator De La Salle- Lipa De La Salle Philippines Tel No: 756-5555 loc 317 Fax: 757-3083 Tel No: 7212000 loc. 611 Fax: 7260946 E-Mail: [email protected] E-Mail: [email protected] Camarines Sur Brother Jose Mari Jimenez President and Sector Leader Mr. Albino Morino De La Salle Philippines DEPED DISTRICT SUPERVISOR DEPED-Caramoan, Camarines Sur E-Mail: [email protected] Dr. Dina Magnaye Assistant Professor University of the Philippines-SURP Cavite Tel No: (632) 920-6854 Fax: (632) 920-1637 E-Mail: [email protected] Page 1 of 78 Directory of Participants 11th CBMS National Conference "Transforming Communities through More Responsive National and Local Budgets" 2-4 February 2015 Crowne Plaza Manila Galleria Ms. Rosario Pareja Mr. Edward Balinario Faculty De La Salle University-Dasmarinas Tel No: 046-481-1900 Fax: 046-481-1939 E-Mail: [email protected] Mr.
    [Show full text]
  • The Acceptability of Using Bioremediation in Mogpog, Marinduque, a Mined-Out Community in the Philippines
    Journal of Nature Studies 19(1): 81-104 Online ISSN: 2244-5226 THE ACCEPTABILITY OF USING BIOREMEDIATION IN MOGPOG, MARINDUQUE, A MINED-OUT COMMUNITY IN THE PHILIPPINES 1 2 3 Gloria Luz M. Nelson *, Girlie Nora A. Abrigo , and Asuncion K. Raymundo 1 Institute of Governance and Rural Development (IGRD), College of Public Affairs, University of the Philippines Los Baños, College, Laguna, Philippines 2Department of Social Sciences, College of Arts and Sciences, University of the Philippines Los Baños, College, Laguna, Philippines 3Institute of Biological Sciences, College of Arts and Sciences, University of the Philippines Los Baños, College, Laguna, Philippines; National Academy of Science and Technology, Philippines *Corresponding author: [email protected] ABSTRACT – Heavy metal contamination of soil and water were found in Barangay Capayang in Mogpog, Marinduque, Philippines after mining operations closed in 1982. Bioremediation activities to remove or neutralize hazardous substances were undertaken by UPLB scientists and the local officials since 2006. The survey of 259 households showed that bioremediation is acceptable as a solution to remove the toxic waste in water for domestic use (Z test =0.00 to 0.10). The study has also shown that the attendance to bioremediation lecture has positively changed the attitude of the attendees. The attitude scores for the 19 out of the 21 statements was significantly higher for the attendees as compared to the non-attendees. Moreover, the median acceptability scores on half of the 18 acceptability statements was also significantly higher among the lecture attendees. The focus group participants reiterate that bioremediation can lead to good health and can restore their agricultural livelihood.
    [Show full text]
  • Physico-Chemical Properties and Heavy Metal Contents of Ino-Capayang Mine-Made Lake in Marinduque, Philippines
    International Journal of Engineering Research and Technology. ISSN 0974-3154, Volume 13, Number 6 (2020), pp. 1493-1496 © International Research Publication House. http://www.irphouse.com Physico-chemical Properties and Heavy Metal Contents of Ino-Capayang Mine-made Lake in Marinduque, Philippines Jellian L. Lanot1, Jhoy Ann L. Lawig1, Jayson A. Lecaros1, Paul John L. Malagotnot1, Panchito M. Labay1 and Jessie O. Samaniego2 1School of Engineering, Marinduque State College, Tanza, Boac, Marinduque, 4900, Philippines. 2Department of Science and Technology – Philippine Nuclear Research Institute, Commonwealth Ave., Quezon City, 1101, Philippines 2ORCID ID: 0000-0003-1020-6224 Abstract Capayang is located between villages of Ino and Capayang, which is located around 3.72 km from the town proper of Ino-Capayang mine-made lake is a monolith remains of mining Mogpog, in the island of Marinduque (Fig. 2). in Marinduque, opened in 1968 and closed and abandoned in 1980. The lake is surrounded by barren lands and few Currently, the mined-out area excluding the lake is barely vegetation scattered with metallic ores forming acid mine covered with vegetation [2] and it has been a site for outdoor drainage continuously draining into the lake. To evaluate the activities for people who do biking, walking and shooting. It water quality in the lake, water samples were collected from the was reported that the local government of Mogpog, lake and analyzed for physico-chemical parameters and heavy Marinduque is planning to convert the lake and surrounding metal concentrations. Physico-chemical parameters were pH, area into an eco-tourism park, where people can do activities temperature, electrical conductivity (EC), total dissolved solids such as walk around the lake, boating or fishing and other (TDS) and oxidation-reduction potential (ORP) were measured outdoor activities.
    [Show full text]
  • Blessed Vicente M. Soler, Missionary in the Philippines, 1889-1906
    BLESSED VICENTE M. SOLER, MISSIONARY IN THE PHILIPPINES, 1889-1906 Emmanuel Luis A. ROMANILLOS Abstract Resumen The study narrates the missionary years of Este estudio describe la actividad misio- Blessed Vicente Soler in Antipolo, Mind- nera del beato Vicente Soler en Antipo- oro and Batangas. At the outbreak of the lo, Mindoro y Batangas. Al estallar la Philippine Revolution, Father Soler and his Revolución filipina el padre Soler y sus confreres travelled to Lucena in June 1898 compañeros viajaron a Lucena en junio to escape from the revolutionists’ clutch- de 1898 para escapar de los revoluciona- es and took a steamer to Borneo which rios y allí embarcaron en un vapor con berthed at Looc in Tablas Island where they destino a Borneo. Pero al pasar por Looc opted to stay. With eleven confreres, Father (Tablas) optaron por permanecer en Fi- Soler was soon imprisoned there. They lipinas. Muy pronto volvió a caer, junto were later taken by boat to Romblon, then con sus once compañeros, en manos de to Marinduque for incarceration at Boac los revolucionarios, que los trasladaron a and later moved to Mogpog where kind Romblón y, luego, a Marinduque. Duran- parishioners and secular priest treated them te algún tiempo fueron encarcelados en well. After various sea travels, the prisoners Boac y Mogpog, donde fueron bien tra- were taken to Tayabas and hiked from one tados por el párroco y sus feligreses. Tras town to another. After months of captivity, varias idas y venidas fueron trasladados a evasion from American forces, transfers, Batangas, donde caminaron de pueblo en exhaustion from long hikes, hunger, un- pueblo.
    [Show full text]
  • Competitive Selection Process (CSP) by Marinduque Electric Cooperative, Inc. (MARELCO) for Its New Power Provider (NPP)
    Competitive Selection Process (CSP) by Marinduque Electric Cooperative, Inc. (MARELCO) for its New Power Provider (NPP) BID BULLETIN NO. 2019-002 A. This Bid Bulletin is issued in response to the comments and clarifications of respective bidders raised during and after the Pre-Bid Conference conducted on August 28, 2019. Issues and concerns were summarized, classified and categorized according to the provisions under the Terms of Reference and Instruction to Bidders. Taking cognizance on the significance and relevance of some recommendations and comments, and likewise the fundamental objectives and guiding principles in which a Competitive Selection Process must be conducted, the committee, after due deliberation thereby decided to cause some revisions and/or rephrase some provisions of the TOR and Instruction to Bidders to comply with the objectives of the competitive selection process on fairness, transparency and competitiveness. OLD PROVISION REVISED PROVISION TERMS OF REFERENCE TERMS OF REFERENCE I. INTRODUCTION I. INTRODUCTION (SCOPE OF BID) 1. The Marinduque Electric Cooperative, Inc. 1. The Marinduque Electric Cooperative, Inc. (MARELCO), through its Third Party Bids and (MARELCO), through its Third Party Bids and Awards Committee (TPBAC), invites Generation Awards Committee (TPBAC), invites Generation Companies to join the Competitive Selection Companies to join the Competitive Selection Process (CSP) for the procurement of a Power Process (CSP) for the procurement of a Power Supply Agreement (PSA) with a New Power Supply Agreement (PSA) with a New Power Provider (NPP) for the provision of 16 MW for Provider (NPP) for the provision of 16 MW Marinduque Grid. Available Guaranteed Capacity for Marinduque Grid which will include base, peaking and intermediate load requirements of the province.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population
    2010 Census of Population and Housing Marinduque Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population MARINDUQUE 227,828 BOAC (Capital) 52,892 Agot 502 Agumaymayan 525 Amoingon 1,346 Apitong 405 Balagasan 801 Balaring 501 Balimbing 1,489 Balogo 1,397 Bangbangalon 1,157 Bamban 443 Bantad 1,405 Bantay 1,389 Bayuti 220 Binunga 691 Boi 609 Boton 279 Buliasnin 1,281 Bunganay 1,811 Maligaya 707 Caganhao 978 Canat 621 Catubugan 649 Cawit 2,298 Daig 520 Daypay 329 Duyay 1,595 Ihatub 1,102 Isok II Pob. (Kalamias) 677 Hinapulan 672 Laylay 2,467 Lupac 1,608 Mahinhin 560 Mainit 854 National Statistics Office 1 2010 Census of Population and Housing Marinduque Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Malbog 479 Malusak (Pob.) 297 Mansiwat 390 Mataas Na Bayan (Pob.) 564 Maybo 961 Mercado (Pob.) 1,454 Murallon (Pob.) 488 Ogbac 433 Pawa 732 Pili 419 Poctoy 324 Poras 1,079 Puting Buhangin 477 Puyog 876 Sabong 176 San Miguel (Pob.) 217 Santol 1,580 Sawi 1,023 Tabi 1,388 Tabigue 895 Tagwak 361 Tambunan 577 Tampus (Pob.) 1,145 Tanza 1,521 Tugos 1,413 Tumagabok 370 Tumapon 129 Isok I (Pob.) 1,236 BUENAVISTA 23,111 Bagacay 1,150 Bagtingon 1,576 Bicas-bicas 759 Caigangan 2,341 Daykitin 2,770 Libas 2,148 National Statistics Office 2 2010 Census of Population and Housing Marinduque Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City,
    [Show full text]
  • Soil and Vegetation Analysis of Rehabilitated and Unrehabilitated Area in an Inactive Copper Mined out Site in Mogpog, Marinduque, Philippines
    J. ISSAAS Vol. 25, No. 2: 118-129 (2019) SOIL AND VEGETATION ANALYSIS OF REHABILITATED AND UNREHABILITATED AREA IN AN INACTIVE COPPER MINED OUT SITE IN MOGPOG, MARINDUQUE, PHILIPPINES Katrine Mae B. Mante1, Nina M. Cadiz2,*, Virginia C. Cuevas2 and Carmelita C. Rebancos3 1Bohol Island State University Calape, Bohol, Philippines, 2Institute of Biological Sciences, University of the Philippines Los Baῆos, 3School of Environmental Science and Management, University of the Philippines Los Baῆos *Corresponding author: [email protected] (Received: May 4, 2018; Accepted: October 23, 2019) ABSTRACT After 10 years of establishing rehabilitation strategies, the present study analyzed the soil (i.e. pH, organic matter, N, P, K, Cu, bulk density and water holding capacity) and plant diversity to evaluate the 10 year rehabilitation efforts carried out in an inactive copper mined out site of Consolidated Mines Incorporated (CMI) in Mogpog, Marinduque, Philippines by the then University of the Philippines Los Baños Bioremediation Team. During the revisit of the area in 2016-2017, the experimental site was divided into rehabilitated and unrehabilitated areas by establishing six (6) 20m x 20m quadrats. Comparison of soil samples was done through Student’s t test, while vegetation analysis was done by measuring the plant diversity using the species richness and Species Importance Value (SIV). After 10 years of rehabilitation, there was a minimal difference in soil characteristics between rehabilitated and unrehabilitated area except for pH. Vegetation analysis showed significantly higher mean species richness under rehabilitated area as compared with the unrehabilitated area. The rehabilitated area was dominated by vines and trees and had greater number of seedlings and saplings, while grasses dominated the unrehabilitated area.
    [Show full text]
  • Under the Sagip Ilog Program
    EXECUTIVE SUMMARY Under the Sagip Ilog Program, two (2) In the pursuit to sustain and strengthen rivers were included under this program, the implementation of environmental namely: Calapan River located at laws and partnership with various Calapan City in the Province Oriental stakeholders, EMB MIMAROPA Mindoro and Mogpog River located at continually developed the annual targets the Province of Marinduque. Activities that are of high importance during CY in this program include data gathering 2011 and implement strategies to through monthly water quality enhance the programmed activities in monitoring, pollution sources inventory line with the mandate and procedure. and providing assistance to local These accomplishments were made government unit(s) concerned in possible through the hard work and formulating water quality management dedication of the regional and field framework. In line with the designation personnel, the continuous support of the of the Water Quality Management Area PENROs and CENROs resulting to a (WQMA) in Calapan City, a public significant contribution in the hearing was conducted last December accomplishment of the region’s target. 13, 2011. Completion of the remaining Significant of which is the activities required for the proposal of accomplishment of EIAM Division designation of a WQMA such as data having accomplished the targets for the collection and evaluation that will be most number of activities as planned for needed in the final proposal document CY 2011. The implementation of EIS will be given priority in CY 2012. system has declined in number of issued ECCs to 162 from the planned target of Laboratory records also showed that the 224.
    [Show full text]
  • Gov. Carmencita O. Reyes Marinduque
    MEETING THE CHALLENGE OF MILLENIUM DEVELOPMENT GOALS ON HEALTH by: Gov. Carmencita O. Reyes Marinduque . The heart ofthf the Philippines Political Subdivision and Classification • Lone Congressional District • Six (6) municipalities namely: Boac, the capital town, Buenavista, Gasan, Mogpog, Sta. cruz and Torrijos • 218 Barangays Land Area in Hectares by Municipality, Income Class and Rural/Urban Category Municipality Land Area No. of Income Rural / Urban (has.) Barangay Class Marinduque 95,925 218 4th Class Partially Urban Boac 21,270 61 1st Class Partially Urban Buenavista 7,860 15 4th class Partially Urban Gasan 11, 930 25 3rd Class Partially Urban Mogpog 8,770 37 3rd Class Partially Urban Sta. Cruz 24,665 55 1st class Partially Urban Torrijos 21,430 25 4th Class Partially Urban Land Area in Hectares, 2007 Population and Average Growth Rate (2000-2007) Per Province, MIMAROPA MIMAROPA Land Area in Has. 2007 Population Average PROVINCES Growth Rate (2000-2007) Occidental 587,985 421,952 1.44 Mindoro Oriental 436,472 735,769 1.06 Mindoro Marinduque 95,925 229,636 0.76 Romblon 135, 593 279, 774 0780.78 Palawan 1,489,626 682,152 1.94 MIMAROPA 2,745,601 2,5598,791 1.49 Philippines 30,000,000 88,574,614 2.04 Annual IRA Share, 2007 to 2011 Calendar Year Annual IRA Share 2011 Php 347,776,304.00 2010 Php 326,921,778.00 2009 Php 276,485,390.00 2008 Php 247,671,336.00 2007 Php 215,322,507.00 Technical grant assistance from the WB-ASEM in 2004 entitled, “Strengthening the Government Capacity for Poverty Assessment , Plan Formulation and Monitoring”, which led to the implementation of CBMS in 2005.
    [Show full text]
  • List of Test Passers - Secondary Level (M - N)
    DEPARTMENT OF EDUCATION 2015 ALTERNATIVE LEARNING SYSTEM ACCREDITATION AND EQUIVALENCY (ALS A&E) TEST LIST OF TEST PASSERS - SECONDARY LEVEL (M - N) Last Name First Name Middle Name Division Testing Center MA REYMAR LILAM Sultan Kudarat Salaman Central Elementary School MA EDRICK JAMES MAYCACAYAN Oriental Mindoro Porferia G. Comia Memorial School MA GENER JR. ACOSTA Rizal Binangonan Elementary School MA RICHARD JR. ESPINOSA Rizal Cainta Elementary School MAAC MYRA SAN ANTONIO Cavite Trece Martires City National High School MAAC RENZ ANDUYO Occidental Mindoro Abra De Ilog National High School MAADIL ISRAFILA ABUBAKAR Basilan Maluso National High School MAAGAD SIMON CLARABAL Bukidnon Malaybalay City Central School MAAGAD RALPH LUBANG Bayugan City Bayugan National Comprehensive High School MAAGAD CHERAME SACAY Misamis Oriental Misamis Oriental Gen. Comprehensive High School MAAGAD WILBERT JR. LASCUÑA Davao Del Sur Sta. Cruz National High School MAAGMA CHRIS PATRICK Aklan Kalibo Pilot Elementary School MAALA MARK ARCHIE PILLODAR Batangas Province Malvar National High School MAALA JAYSON CARPIO Quezon City Gen. Roxas Elementary School MAALA JENNYBEL MACABENTA Leyte Palo I Central School MAALA RAY JOSEPH DELOS REYES Lipa City Lipa City National High School MAALA RAYMARK DELOS REYES Lipa City Lipa City National High School MAALA ANALYN OPINIANO San Fernando City Sindalan Elementary School MAALAT RICKY ONGCAY Agusan del Sur Trento National High School MAALOUF JENALYN SEVILLA Quirino Quirino General High School MAAMBONG MARIZ DELA CRUZ Davao Oriental
    [Show full text]
  • Preparedness Measures and Effects for Typhoon “QUINTA” (I.N
    SITREP NO. 08 TAB A Preparedness Measures and Effects for Typhoon “QUINTA” (I.N. MOLAVE) AFFECTED POPULATION As of 03 November 2020, 6:00 AM TOTAL SERVED - CURRENT Region/Province/ AFFECTED No. of Evac Inside Evacuation Centers Outside Evacuation Centers (Inside + Outside) Mun/City Centers Brgys Families Persons Families Persons Families Persons Families Persons GRAND TOTAL 2,777 198,064 848,082 35 840 3,197 1,199 5,315 2,039 8,512 REGION III (CENTRAL LUZON) 138 62,351 280,279 8 288 1,044 694 3,115 982 4,159 AURORA 5 61 218 0 0 0 2 9 2 9 DINGALAN 4 51 182 - - - 2 9 2 9 SAN LUIS 1 10 36 - - - - - 0 0 BULACAN 51 25,989 117,287 5 141 450 0 0 141 450 CALUMPIT 28 19,005 76,019 5 141 450 - - 141 450 SAN MIGUEL 23 6,984 41,268 0 0 0 - - 0 0 NUEVA ECIJA 5 1,300 5,660 1 126 509 110 525 236 1,034 CABANATUAN 2 496 2,295 1 126 509 110 525 236 1,034 GAPAN 1 186 843 - - - 0 0 0 0 JAEN 1 422 1,488 - - - - - 0 0 SAN ANTONIO 1 196 1,034 - - - - - 0 0 PAMPANGA 75 34,402 154,463 1 4 15 0 0 4 15 ARAYAT 2 252 1,175 - - - - - 0 0 CANDABA 12 5,411 21,441 1 4 15 - - 4 15 MACABEBE 23 11,935 50,572 - - - - - 0 0 MASANTOL 26 13,337 67,378 - - - - - 0 0 SAN LUIS 8 2,007 9,330 - - - - - 0 0 SAN SIMON 4 1,460 4,567 - - - - - 0 0 TARLAC 2 599 2,651 1 17 70 582 2,581 599 2,651 LA PAZ 2 599 2,651 1 17 70 582 2,581 599 2,651 REGION IV-A (CALABARZON) 964 25,801 105,441 7 124 459 0 0 124 459 BATANGAS 304 7,324 30,319 1 8 22 0 0 8 22 AGONCILLO 2 29 125 - - - - - 0 0 ALITAGTAG 1 5 18 - - - - - 0 0 BALAYAN 33 268 1,125 - 0 0 - - 0 0 BALETE 2 10 37 0 0 0 - - 0 0 BATANGAS CITY
    [Show full text]