Plot bearing on S.No. 163/5, to 8B/1, 163/5 to 8B/2, 163/9A/1, 163/9A/2, 165/1A, 165/2A, 166/6A, 166/7A, 166/8A, 166/9A, 166/9B, 166/10A/1, 166/10A/2, 166/11A, 166/12A, 166/13A, 166/14A/1, 166/14A/2, 166/15A/1, 166/15A/2, 166/16A, 166/22A/1, 166/22A/2, 166/22A/3, 166/24A/1, 166/24A/2, 166/24A/3, 166/30A/1, 166/30A/2, 167/1, 167/2, 167/3 at Village Kavesar, Thane

Submitted to

STATE LEVEL ENVIRONMENTAL APPRAISAL COMMITTEE -2 (SEAC-2),

Proposed By

M/s. Aniline Constructions Company Pvt. Ltd. Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

APPENDIX - II (See paragraph 6)

FORM-1 A (only for construction projects listed under item 8 of the Schedule)

CHECK LIST OF ENVIRONMENTAL IMPACTS

(Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)

1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing land use No the existing land use will not get significantly altered get significantly altered from the project, it is a residential project and the Land from the project that is not use is conforming to the approved Master Plan. All the consistent with the plans are attached as Annexure II of Form 1. surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority be submitted). Attach Maps of: (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. (i) Site Location DP is attached in Annexure I of Form 1A. (ii) Surrounding features 500 m radius and surrounding feature is given in of the proposed site Annexure II of Form 1A. (within 500 meters) (iii) The site (indicating - levels & contours) to appropriate scales.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

1.2 List out all the major Description m2 project requirements in Total construction area 99,186.15 terms of the land area, Total plot area 9,300 built up area, water Proposed FSI 44,777.98 consumption, power requirement, connectivity, Total Built –Up Area 83,387.64 community facilities, parking needs, etc. Detailed area statement is given in Annexure I of Form 1. Dry season (Water requirement) Use Source m3/d Domestic 325 TMC Flushing 165 STP Treated Gardening 8 Sewage

Detailed water calculation and its balance is given in Annexure VI of Form 1. Energy Consumption: Connected Load: 13,834 kWh Parking Provided: Parking 4 wheelers No. Total Parking 790 Permissible (D5 and D6) Total parking proposed 790 2 wheeler 62

Detailed parking statement is given in Annexure III of Form 1A. Connectivity: Proposed site is accessible by- 1) Thane railway station- 9.5 Km 10.3 What are the likely Project site will be developed into mixed use impacts of the proposed development. Hence, there shall have some impacts on activity on the existing water, air environment, power requirement but it shall be facilities adjacent to the mitigated by providing proper pollution control facilities proposed site? (Such as like STP. Also for water conservation, rain water open spaces, community harvesting shall be done. Power consumption shall be facilities, details of the reduced by using energy saving practices. Impact on air existing landuse, quality shall be reduced by plantation of trees. This disturbance to the local project will generate employment during construction as ecology). well as in operational phase and there by shall have positive impact on socio economy.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

1.4. Will there be any As per the Seismic Zoning Map of Thane region significant land falls under Zone- III. Stability Certificate, as per disturbance resulting in prevalent IS Code is obtained for these buildings from erosion, subsidence & registered Consulting Structural Engineer considering the instability? (Details of soil seismic forces and wind forces etc. type, slope analysis, vulnerability to subsidence, seismicity etc may be given). 1.5 Will the proposal involve No, the proposal will not involve alteration of natural alteration of natural drainage systems. drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of Maximum Debris and excavated material will be reused earthwork involved in the on site and the rest shall be disposed to authorized site construction activity- through authorized contractors with permission from cutting, filling, reclamation T.M.C. as per the "Construction Demolition Waste etc. (Give details of the (Management &. Disposal) Rules 2016" quantities of earthwork involved, transport of fill materials from outside the site, etc.) 1.7 Give details regarding i. For construction: 40 – 50 m³/day. (Depending on water supply, waste construction activity) handling etc during the Note: Treated sewage from temporary STP of the construction period. occupied buildings shall be used for construction activity of proposed development. This will help to reduce the fresh water demand for construction activity. For operation: i. Quantity of Sewage generated: 441.30 m³/day ii. Treatment/ Disposal: 264 m3/day (Disposal into existing municipal sewer line)

Detailed water calculation and its balance is given in Annexure VI of Form 1. 1.8 Will the low lying areas & No, low lying areas & wetlands will not get altered. wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

1.9 Whether construction Solid Waste Generation during Construction Phase: debris & waste during Debris, excavated material and construction waste shall construction cause health be disposed to authorized site with permission from hazard? (Give quantities of T.M.C. various types of wastes generated during Solid waste construction including the Use TPD construction labour and the Solid Waste 2.15 means of disposal) Biodegradable 1.18 IVC Non-Biodegradable 0.64 Recycling Inert 0.32 Handover TMC

Hazardous wastes: There will be separate storage for Hazardous wastes and its disposal shall be done to authorized common hazardous waste disposal site respectively for further treatment and disposal as per the “Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.” E waste : E-waste generated during construction phase shall be stored at distinct location within project site and subsequently E-waste shall be handed over to authorized recyclers as per the “E-Waste management Rules, 2016”.

Detailed solid waste management plan is given in Annexure VIII of Form 1.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 5 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

2. WATER ENVIRONMENT 2.1 Give the total quantity of Dry season (Water requirement) water requirement for the Use residential Source proposed project with the m3/d breakup of requirements for Domestic 325 TMC various uses. How will the water requirement met? State Flushing 165 STP the sources & quantities and Treated Gardening 8 furnish a water balance Sewage statement. The Domestic water requirement will be met by TMC. The flushing and Gardening water requirement will be met through water which is recycled by STP.

Wet season (Water requirement) Use Source m3/d Domestic 325 TMC Flushing 165 STP Treated Gardening Nil Sewage Detailed water calculation and its balance is given in Annexure VI of Form 1.

2.2 What is the capacity Domestic Water Supply from TMC. The permission (dependable flow or yield) of for the same has already being taken by project the proposed source of water? proponent. 2.3 What is the quality of water Drinking water quality of Class A as per Indian required, in case, the supply is Standard: 10500, 2004 from TMC. not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can be met from Use Source the recycling of treated m3/d wastewater? (Give the details STP Treated of quantities, sources and Flushing 165 usage) Sewage This water requirement will be met through the recycling of sewage.

Detailed water calculation and its balance is given in Annexure VI of Form 1.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 6 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

2.5 Will there be diversion of No diversion is anticipated, TMC has common water water from other users? supply. (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental The wastewater generated from project will be around pollution load from 441.30 m³/day. wastewater generated from the This Waste water will be treated by the STP. proposed activity? (Give details of the quantities and composition of wastewater Detailed water calculation and its balance is given in generated from the proposed Annexure VI of Form 1. activity) 2.7 Give details of the water The scheme is to collect rain water from the terrace requirements met from water into rain water collection tanks of total capacity: harvesting? Furnish details of RWH Tank Capacity Provided: the facilities created. RWH Tank 1 : 20 m3/day (D5) RWH tank 2: 20 m3/day(D6)

Detail of Rain Water Harvesting is given in Annexure IV of Form 1A 2.8. What would be the impact of Storm water drain shall be cleaned at regular interval. the land use changes occurring Mapping the areas within or leading in or out of the due to the proposed project on building that will be water logged, flooded or isolated the runoff characteristics due to the flood. (quantitative as well as The areas will be marked after completion of the qualitative) of the area in the project (as final ground levels etc. will be available post construction phase on a after completion). long term basis? Would it The vulnerability of the basement should be mapped. aggravate the problems of Dewatering pumps shall be installed at vulnerable flooding or water logging in locations. any way? 2.9 What are the impacts of the The scheme is to collect rain water from the terrace proposal on the ground water? into rain water collection tanks of total capacity: (Will there be tapping of RWH Tank Capacity Provided: ground water; give the details RWH Tank 1 : 20 m3/day (D5) of ground water table, RWH tank 2: 20 m3/day(D6) recharging capacity, and approvals obtained from Detail of Rain Water Harvesting is given in Annexure competent authority, if any) IV of Form 1A

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 7 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

2.10 What precautions/measures The runoff from the site during construction phase are taken to prevent the run- would be very negligible. This will be prevented as off from construction activities under : polluting land & aquifers? (Give details of quantities and i) Use of wet jute cloth covering the walls and soaking the measures taken to avoid the same with minimum quantity of water to avoid the adverse impacts) dripping. This will also help in conserving water. ii) By collecting the running water in an impervious pit and using the same again for curing purpose.

2.11 How is the storm water from There will be proper storm water drains which will be within the site managed?(State provided all around the project site, to effectively the provisions made to avoid manage the storm water run-off. flooding of the area, details of the drainage facilities provided along with a site layout Detailed storm water calculation and layout is given in indication contour levels) Annexure V of Form 1A.

2.12 Will the deployment of No As the following measures which have been listed construction labourers below will be adopted: particularly in the peak period  Disposal of sewage to sewer line. lead to unsanitary conditions  Disposal of segregated waste to TMC. around the project site (Justify Biodegradable waste would be treated in house. with proper explanation)  First aid and medical facilities.  Proper housekeeping.  Regular pest control. 2.13 What on-site facilities are provided for the collection, Sr. No. Parameters Raw Treated treatment & safe disposal of Sewag Sewage sewage? (Give details of the e (mg/l) quantities of wastewater (mg/l) generation, treatment capacities with technology & 1 pH 7-8 7-8 facilities for recycling and 2 Suspended 100- Up to 10 disposal) Solids 200 mg/l 3 BOD (3 250- < 10 mg/l days 270C) 300 4 COD 450- Up to 40 600 mg/l 5 Oil & 10-20 Nil Grease

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 8 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

2.14 Give details of dual plumbing  Recycling of treated sewage for flushing, system if treated waste used is gardening and construction activity. used for flushing of toilets or  Colour coding for dual plumbing system shall any other use. be done as per standard practices.

3. VEGETATION 3.1 Is there any threat of the project to No there is no threat of the project to the the biodiversity? (Give a biodiversity. description of the local ecosystem with it’s unique features, if any) 3.2 Will the construction involve In the said plot there are only 4 trees, which is extensive clearing or modification obstacle to vehicle movement/construction of of vegetation? (Provide a detailed project. Therefore 4 trees on plot, transplant NIL account of the trees & vegetation trees and 109 trees are to be planted. affected by the project) The detail of the same is as per tree NOC is attached as Annexure X of Form 1. 3.3 What are the measures proposed In the said plot there are only 4 trees, which is to be taken to minimize the likely obstacle to vehicle movement/construction of impacts on important site features project. Therefore 4 trees are on plot, transplant (Give details of proposal for tree NIL trees and 109 trees are to be planted. . plantation, landscaping, creation The detail of the same is as per tree NOC is of water bodies etc along with a attached as Annexure X of Form 1. layout plan to an appropriate scale)

4. FAUNA 4.1 Is there likely to be any No, there is no possibility of any displacement of displacement of fauna- both fauna- both terrestrial and aquatic or creation of terrestrial and aquatic or creation barriers for their movement due to the residential of barriers for their movement? cum commercial project. Provide the details. 4.2 Any direct or indirect impacts on No, direct or indirect impacts on the avifauna of the avifauna of the area? Provide the area due to the proposed project. details. 4.3 Prescribe measures such as NA. corridors, fish ladders etc to mitigate adverse impacts on fauna

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 9 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

5. AIR ENVIRONMENT 5.1 Will the project increase The following locations were selected for the ambient atmospheric concentration air quality monitoring in the study area: of gases & result in heat The following table shows the CO, NOx and PM islands? (Give details of concentration during the pre-construction & post- background air quality construction scenario for Grid. levels with predicted values Future Scenari based on dispersion models Prese o taking into account the nt Concen Differen Scena tration increased traffic generation ce in the Concent rio at Baseline concentr ration at as a result of the proposed Parameters Conce Project Concent ation site = A constructions) ntrati Site ration B (µg/m3) + B on at (µg/m3) A Projec t Site (µg/m 3) 0.72 0.80 0.8 0.59 1 hr CO mg/m mg/m3 1.39 avg. 3 annual 11.3 12.5 1.2 9.95 Nox 11.15 avg. µg/m3 µg/m3 PM1 annual 39.2 40.9 1.7 36.06 37.76 0 avg. µg/m3 µg/m3

The Following Table shows NAAQ standards: Parameters NAAQ standards (µg/m3) CO 4000 (1 hr) CO 2000 (8 hrs) PM10 100 (24 hrs) NOx 80 (24 hrs)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 10 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

5.2 What are the impacts on During construction phase, Dust, Particulate Matter is generation of dust, smoke, the main pollutant, which may be generated during odorous fumes or other construction activities. Other emission sources are hazardous gases? Give intermittent and include emissions of SO2 NOx and details in relation to all the CO from materials transport of heavy vehicles on site meteorological parameters. etc. Proper upkeep and maintenance of vehicles, sprinkling of water on roads and construction site are some of the measures that would reduce the impact during construction phase. Sources of Air pollution During Operational phase : • The gaseous emissions from vehicles. • Emissions from DG set while in operation only during power failure. Mitigation Measures: • The traffic congestion will be avoided by proper parking arrangement and maintaining smooth Traffic flow. • Regular PUC checkup for vehicles. • CPCB approved DG sets will be used and its stack height will be maintained as per CPCB norms. • Proper maintenance of DG sets shall be done and Low sulphur fuel shall be used. 5.3 Will the proposal create The Proposed project would have 3 entry/ exit. shortage of parking space Parking No.s for vehicles? Furnish details Total Permissible 790 of the present level of parking transport infrastructure and Total Parking measures proposed for 790 improvement including the provided traffic management at the 2-wheeler 62 entry & exit to the project site. Detailed parking statement is given in Annexure III of Form 1A.

5.4 Provide details of the Dedicated CFO access 9 m width and 6 m wide movement patterns with internal roads for 4 wheelers & 13 m wide roads for internal roads, bicycle HMV & LCV are provided. tracks, pedestrian pathways, footpaths etc., with areas under each category. 5.5 Will there be significant The proposed project being residential development, increase in traffic noise & the source of noise is mainly vehicular noise. The vibrations? Give details of project proponents have proposed to provide well the sources and the organized parking arrangement and maintaining measures proposed for smooth traffic flow which would help in reducing mitigation of the above. traffic congestion and noise levels. Trees would act as noise barrier and will reduce the noise level.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 11 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

5.6 What will be the impact of D.G. Sets will be operated only in case of power DG sets & other equipment failures during operational phase. The Pollutants like on noise levels & vibration RSPM, SO2 that may arise from emissions from D.G. in & ambient air quality Sets will be discharged through vent of proper height. around the project site? D.G. sets are with inbuilt acoustic enclosures to reduce Provide details. the noise of D.G. sets while in operation. Plantation of trees would act as noise barrier and will reduce the noise level.

6. AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or No landscapes? Are these considerations taken into account by the proponents? 6.2 Will there be any adverse impacts All precautions will be taken to mitigate the from new constructions on the impact due to water, air and noise pollution during existing structures? What are the construction and operation phase. Environmental considerations taken into Management Plan is prepared and shall be account? implemented along with Environmental Monitoring Programme. 6.3 Whether there are any local No. considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. 6.4 Are there any anthropological or Ghodbunder : Approx.12.8 km archaeological sites or artefacts : Approx. 25.4 km nearby? State if any other Sanjay Gandhi National Park : Approx. 19.1 km significant features in the vicinity of the proposed site have been considered.

7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any There will be influx of 3590 people. This influx changes to the demographic will have a positive impact on the economy of the structure of local population? surrounding areas. Provide the details. 7.2 Give details of the existing social It is a well-developed Mega City of India, having infrastructure around the all modern amenities. Civil structures, School, proposed project. Colleges, Hospitals, Recreation facilities, Markets, etc. are available in the area to a reasonable degree. 7.3 Will the project cause adverse As this project is a residential development, it will effects on local communities, not cause adverse effects on local communities,

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 12 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

disturbance to sacred sites or disturbance to sacred sites or other cultural values. other cultural values? What are the safeguards proposed?

8. BUILDING MATERIALS 8.1 May involve the use of building The Conservation Material and resource strategy materials with high-embodied will be achieved through the following: energy. Are the construction  Use of materials with recycled content materials produced with energy  Use of rapidly renewable materials efficient processes? (Give  Use of local materials details of energy conservation  Reuse of salvaged materials measures in the selection of  Use of certified wood based materials and building materials and their furniture energy efficiency) Use of Fly ash in Construction :  RMC with fly ash (25 -35 %) shall be used  Concrete and AAC blocks (65 %)  Portland cement (20 -22%) 8.2 Transport and handling of The material required for construction activities shall materials during construction be procured from company’s authorized / approved may result in pollution, noise & vendors only. The vendor’s performance is public nuisance. What measures monitored periodically. In case of urgency or non- are taken to minimize the availability of materials from authorized/approved impacts? vendors, it will be procured from the open market to maintain the pace of the work. The mode of transport for above materials will be by trucks and / or by trailers.

 All the vehicles having PUC certificates.  Transport of construction material in properly covered vehicles.  Storage of construction material  Internal roads are maintained in good conditions with regular sprinkling of water (WBM) to curb the dust nuisance to the surrounding.  5-meter high tin sheets are barricaded the periphery of the plot. 8.3 Are recycled materials used in Yes. Recycled materials shall be used like Cement, roads and structures? State the AAC blocks, vitrified tiles, Reinforcement steel, extent of savings achieved? Structural steel, Aluminium, Wood, Glass etc.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 13 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

8.4 Give details of the methods of Segregation of non-biodegradable and biodegradable collection, segregation & garbage on site. disposal of the garbage  Treatment of biodegradable waste: By OWC generated during the operation and IVC method phases of the project.  Segregation, storages facilities for all solid waste streams  Non- biodegradable garbage: Will be segregated into recyclable and non- recyclable waste. Recyclable waste shall be handed over to recyclers and non-recyclable waste shall be handed over to TMC.  E waste generated during operation phase shall be stored separately and disposed of to the recyclers authorized by MPCB.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 14 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

9. ENERGY CONSERVATION 9.1 Give details of the power Power Requirement: requirements, source of supply, Connected Load: 13,828 kWh backup source etc. What is the Source: MSEDCL energy consumption assumed per square foot of built-up area? How DG set Power back up:- 1 have you tried to minimize energy (D6) : 1 x 630 KVA

A Variety of measures have been proposed to reduce energy requirements given below:  Solar photovoltaic’s system.  Energy efficient building envelope and elevator system.  Installation of micro wind turbines in wind tunnels to harness wind power. Wind power system of 40 kwp.  High efficiency pumps, level controllers, BEE rated interior & exterior lighting fixtures having lighting power densities 20% lower than the green building base lines, Installation of CFC free equipment.  The proposed building will be provided with auto sensor taps, occupancy sensor lights, energy efficient fitting etc.  Entire HVAC systems are monitored and controlled by comprehensive Building Management System to achieve energy saving of nearly 7%.  Intelligent Building Management system to monitor & control of all A/c & Major Electrical equipment, along with water pumps.  In commercial building all Fluorescent lights with Electronic ballast in place of Copper chokes & Tube - T5 type, in place of T8 type, to reduce the power consumption by 12watts per lamp & increase in lumens by 14% to 16%.  Electrical distribution system will be monitored regularly and energy consumption will have check meter, so that any energy loss will be detected and will be rectified immediately.  Insulated Roof to reduce heat gain. Solar reflective paint or roof insulation with 80 mm expanded polystyrene is considered.  Use of Variable Refrigerant Volume Flow (VRF) system  Use of Energy-Efficient Elevator Systems, Integrated Building Management System

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 15 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

9.2 What type of, and capacity DG set Power back up:- 1 of, power back-up to you plan to (D6) : 1 x 630 KVA provide? 9.3 What are the characteristics Glass will be used for windows only. of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? 9.4 What passive solar Maximize the use of natural lighting though design. architectural features are being The roof shall be insulated so that there will not be used in the building? Illustrate the direct heat gain due to sunlight. applications made in the proposed project. 9.5 Does the layout of streets & Solar energy will be used specially for street & buildings maximise the potential for garden lighting. solar energy devices? Have you Solar energy will be used for water heating purpose. considered the use of street lighting, Proposed Buildings will be provided with, emergency lighting and solar hot occupancy sensor lights. water systems for use in the In commercial building all Fluorescent lights with building complex? Substantiate Electronic ballast in place of Copper chokes & Tube with details. - T5 type, in place of T8 type, to reduce the power consumption by 12watts per lamp & increase in lumens by 14% to 16%. 9.6 Is shading effectively used to It is proposed to insulate the roofs of these buildings reduce cooling/heating loads? What to minimize the heat gain and intern saving the principles have been used to electricity. maximize the shading of Walls on Insulated Roof to reduce heat gain. Solar reflective the East and the West and the paint or roof insulation with 80 mm expanded Roof? How much energy saving has polystyrene is considered. been effected? 9.7 Do the structures use Energy efficient building envelope and elevator energy-efficient space conditioning, system. lighting and mechanical systems? Provide technical details. Provide High efficiency pumps, level controllers, BEE rated details of the transformers and interior & exterior lighting fixtures having lighting motor efficiencies, lighting intensity power densities 20% lower than the green building and air-conditioning load base lines assumptions? Are you using CFC Installation of CFC free equipment. and HCFC free chillers? Provide specifications. Entire HVAC systems are monitored and controlled by comprehensive Building Management System to achieve energy saving of nearly 7%.

Intelligent Building Management system to monitor & control of all A/c & Major Electrical equipment, along with water pumps.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 16 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

9.8. What are the likely effects of It will not alter the microclimate. The construction the building activity in altering the will not cause inversion. micro-climates? Provide a self- assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? 9.9. What are the thermal U value in Watts/hr/m2/C characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components.

Roof 0.409 Watts/hr/m2/C

Wall 0.352 Watts/hr/m2/C

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 17 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

9.10 What precautions & safety Fire Fighting Measures: measures are proposed against  As per the regulations of CFO and as per NBC fire hazards? Furnish details of CODE 2016. CFO NOC is attached as Annexure emergency plans. XI of Form 1.  Fire Protection System will be based on CFO guidelines.  Relevant BIS codes: Specifically IS: 5290 and IS: 5312, IS: 908 and IS: 2190, IS: 3844, IS: 15105.  Fire detection system  Wet risers, Fire hydrants, Fire pumps, and sprinkler pumps: Electric, supply independent circuit & Fire hydrant line will be provided.  Automatic sprinkler system.  Portable fire extinguishers of IS specification.  Refuge areas as per CFO Norms with proper provision of signage's.  Emergency Escape routes.  One fire escape lift per wing.  Alternate source of power supply / D.G sets.  Adequate underground water storage tanks and overhead tanks. Following functional system shall be provided:- a. Piping System One fire escape lift per wing b. Fire water static One fire escape lift per wing storage c. Fire Pumping Pumping system comprising of system independent pumps for hydrant, sprinkler & jockey application has been provided. d. Hydrant System External & internal hydrant complete with hose reel. e. Sprinkler Sprinkler rating and type shall be System provided in Corridors for buildings upto 45 m height and in Corridors and Roofs for buildings higher than 45 m. f. Hand held fire Strategically placed at designated Extinguishers areas.

9.11 If you are using glass as wall Glass will be used only for windows. This is a material provides details and residential development glass will be of clear and specifications including single glazed type only. emissivity and thermal characteristics. 9.12 What is the rate of air Proper natural ventilation will be providing in infiltration into the building? rooms. Provide details of how you are mitigating the effects of infiltration.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 18 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

9.13 To what extent the non- 30 KW Solar On grid Systems to be installed. conventional energy technologies are utilised in the overall energy consumption? Provide details of the renewable energy technologies used. 10. Environment Management The Environment Management Plan would consist Plan of all mitigation measures for each activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. Environmental Impact and Management Plan for the project. The detailed Environment Management Plan for construction & operation phase of project is attached as Annexure VI of Form 1A.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 19 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Annexure 1: DP Plan

DP 1991

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 20 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Annexure 2: Details of 500m radius from project site

Proposed Site

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 21 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Annexure 3: Parking Statement

Parking Statement – D5 and D6 Description Nos of Flat Unit Parking Reqd. 35 to 50 Sq.m. Flats Nil 1 Park/ 2 Flat Nil 50 to 75 Sq.m. Flats 718 Nos 1 Park/ 1 Flat 718 Nos Above 75 Sq.m Nil 2 Park/ 1 Flat Nil Total 718 Nos 718 Nos 10 % Visitors 72 Nos Total 4 Wheeler Parking Required for Residential Bldg. 790 Nos Total 4 Wheeler Parking Provided 790 Nos

Number of Big Cars 133 Cars Number of Small Cars 0 Cars Total cars on Ground Floor 133 Cars (Stilt Lvl) Total cars on Ground Floor 133 Cars Total cars on Basement 1 120 Cars Total cars on Basement 2 122 Cars Total cars on Basement 3 129 Cars Total cars on Basement 4 286 Cars Total Cars 790 Cars

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 22 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Annexure 4: Rain Water Harvesting (RWH) Detail

The total roof top area for buildings – D5 and D6 has roof top area of 1623 m2. Amount of rain water collected is given in following Table. Table: Area details for RWH at the proposed site 3 Terrace Rain Fall Run off SR. NO. Building 2 RWH Potential (m ) Area (m ) (mm/day) Coefficient 2 day storage Building – D5 and D6 1 Towers 1623 25 0.8 65 Total 65

Two RWH tank will be provided having capacity of 20 m3 for proposed project

Location of RWH Tank:

RIDGE LINE RIDGE LINE

80Ø SUMP PUMP OUTLET T/A 80Ø SUMP PUMP OUTLET T/A

450 MM STORM WATER TANK SLOPE 1:300 D6 D5

Location of RWH tanks

Figure 4.1: Location of RWH Tank at Basement 1

(Capacity: 2 x 20 m3 – D5 and D6)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 23 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Ground Lvl

RWH Tank 20 m3

1st Basement

Section of RWH tank

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 24 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Annexure 5: Storm water drainage network

STRUC LVL -1.000 M

STRUC LVL -1.000 M

E LECT. E LECT. RAMP S HAFT S HAFT E LV S HAFT

AVG.FINISHED LVL. +1.075 M AVG.FINISHED LVL. +1.075 M

FF & FF & P L. P L.

E LV E LV S HAFT S HAFT

2500MM

T O PODIUM

STRUC LVL -1.000 M STRUC LVL -1.000 M

VOID STRUC LVL -1.000 M TO BASEMENT

+0.20 M

E

450 mm storm water drain channel slope 1:300 To external storm water drain

Municipal Water supply line

Calculation of Storm Water

1) Unpaved area (a) 904 m2

Maximum rainfall (b) 150 mm/hr

Total volume of rainfall (a x b x 0.4) 55 m3/hr

2) Paved area (a) 7144 m2

Maximum rainfall (b) 150 mm/hr

Total volume of rainfall (a x b x 0.8) 857 m3/hr

Total storm water drainage 912 m3/hr

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 25 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Annexure 6: Environment Management Plan

Some of the major environment and social impacts can be minimized or eliminated by proper scientific environment management plan. The proposed site has been examined based on secondary information and site visits with regard to environment and social impacts. The environmental impact matrix as presented in the Table 17.1 delineates major impact areas due to the proposed project.

Table 17.1: Matrix of Environmental Impacts due to the proposed development Construction phase Operation phase Physical resources

Geology/Soil × ×

Land Use × ×

Climate × ×

Environmental Attributes

Noise / Air quality ● ×

Water quality × ×

Ground/ Surface water × ×

Solid waste management ● ×

Ecology × ×

Economic development

Population × ×

Job opportunities Θ Θ

Infrastructure × Θ

Transportation * ×

Socio economic × Θ

Quality values of life

Public health ● ×

Cultural values × Θ

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 26 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Key: ●: Short term negative impact; * Moderate negative impact; Θ: Positive impact; ×: Insignificant impact

It is evident from the above table that the proposed project would lead to immense positive impacts. Adequate planning would aid in mitigating some of the negative impacts and also lead towards betterment of human health and environment. Short term negative impact of the proposed project would be during the construction phase. The positive impact of the project would be job opportunities during construction phase and operational phase. Also developer would be providing parking slots for commercial vehicles in the proposed site. Major benefits would be in terms of employment, economic progress of the region, increased in property value and other social benefit. This EMP is planned towards strategizing in reduction of impacts on following factors, both in construction and operational phase:

 Air environment  Noise environment  Surface and Ground Water  Ecological aspects  Transportation  Human Health  Land use  Socio Economics Minor impacts anticipated are on transportation, socio-economic and cultural aspects. The proposed project would have environmental impact in two distinct phases:

 The construction phase would have short-term negative impacts mainly at the construction site from construction activities  The operation phase would have long-term positive impacts on surrounding environment and socio economic values

Depending upon the environment attributes, the impacts can vary widely. They are discussed in the consequence section.

Air Environment

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 27 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Construction phase

Impact on air environment is likely to occur from general construction activities like land clearing, earthmoving, construction of foundations and superstructures, excavation, handling and transportation of construction and demolition materials, and from wind erosion of open sites and stock pile areas etc. Following table delineates impacts on air environment and possible mitigation measures during construction phase.

Impacts on air environment and possible mitigation measures during construction phase

Impact sources Mitigation measures Remarks Increased vehicular  Vehicles should have “Pollution Developer would traffic and vehicular Under Control Certificate” (PUC) follow the norms as pollution due to  Proper maintenance of vehicles per CPCB and MPCB transportation of  Efficient movement of vehicles construction material  All the vehicles which are used for construction activities should be operated during non-peak hours Increase dust and Construction materials would be Developer and site particulate matter: transported by vehicles that would supervisor  Due to vehicles be covered to prevent dust nuisance carrying construction materials  Due to construction activities Respiratory illness on  Regular health checkup for all Developer and site workers and staff from workers and staff supervisor construction activities  In case of emergency, contact details of hospital would be displayed at the site Awareness towards better Developer and site construction practices and to prevent supervisor health hazard

Operational phase

Transportation vehicles and road traffic would contribute to vehicular emissions, such as nitrogen oxides (NOx), particulate matter (PM), carbon monoxide (CO), hydrocarbons

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 28 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

(HC) etc. Even if the full potential of technical and operational measures is achieved to reduce emissions, still the overall level of emissions might increase from different sources. The number of people potentially affected by these emissions would depend on their proximity to the pollution sources and the local conditions affecting dispersion of the pollutants. The proposed project is a residential high rise building and hence, there would be temporary influx of vehicles. The sources of emissions would be from vehicles. Following table presents the impacts on air environment and possible mitigation measures during operational phase.

Impacts on air environment and possible mitigation measures during operational phase Impact sources Mitigation measures Remarks Increased vehicle density Roads to be design for efficient Developer has carried out and movement in and movement of vehicles the Vehicular Congestion around the proposed site (VC) analysis of the roads near the proposed site. They would share this information with local authority for appropriate measures to be taken in near future Workers and staffs would be advised to use public transport Monitor periodically ambient Developer in consultation air quality at selected sites with MPCB Development of 1555 m2 of Developer and Society land area into green space members

Noise Environment

Construction phase

During the construction phase noise environment would get altered due to noise from construction equipment and machineries at the construction site. Though noise impacts during construction phase are temporary, their impact could be significant on workers, staff and also on environment. The impact would also be dependent on the intensity of the noise. Following project presents the sources of impacts and possible mitigation measures on noise environment during construction phase.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 29 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Impacts on noise environment and possible mitigation measures during construction phase Impact sources Mitigation measures Remark Construction  Noise proofing material or Developer, contractor and activities acoustics would be installed to site supervisor the construction machineries and equipment at the construction site  Construction activities should be carried out at normal working hours Vehicles carrying Proper maintenance of vehicle and Developer, contractor and construction vehicular traffic in and around the site supervisor materials proposed site Ill effect of noise Noise protective equipment like Developer and site pollution on workers ear muffs, ear plugs, etc would be supervisor provided Awareness towards better Developer and site construction practices to reduce supervisor impact on noise on human health and environment

Operational phase

As the proposed project is a residential high rise, it would not create any noise nuisance. Excessive noise can cause significant health problems, such as hearing loss, hypertension, cardiovascular disease, gastrointestinal problems, and other disorders. In addition, noise may cause interference with communication, sleep deprivation, poor performance at work and in school due to of lack of concentration, and general annoyance. Below Table present the sources of impacts and possible mitigation measures on noise environment during operation phase.

Impacts on noise environment and possible mitigation measures during operation phase Impact sources Mitigation measures Remark Noise from vehicles in and Monitor periodically ambient Developer in consultation around the proposed site noise level at selected sites with MPCB

Tree plantation as sound Developer barrier

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 30 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Transportation

The transportation infrastructure currently is adequate. The existing status of traffic indicates problem associated with congestion and limited public transport.

Construction phase

During the construction phase, there would be congestion due to transport of construction materials to the site. Road safety measure would be taken to prevent any accident taking place due to transportation of construction materials. Below Table present the sources of impacts and possible mitigation measures of transportation during construction phase.

Impacts on transportation and possible mitigation measures during construction phase Impact sources Mitigation measures Remarks Traffic congestion Construction materials would be Developer transported during non-peak hours Road safety measures would be Developer would create followed awareness among drivers towards road safety tips

Operational phase

During the operational phase, there would be traffic congestion due to movement of vehicles in and around the proposed site. Developer has carried out the congestion analysis of the roads near the proposed site. They would share this information with local authority for appropriate measures to be taken in near future. Below Table present the sources of impacts and possible mitigation measures of transportation during operation phase.

Impacts on transportation and possible mitigation measures during operation phase Impact sources Mitigation measures Remarks Vehicular traffic Roads to be design for efficient Developer has carried out the congestion movement of vehicles VC analysis of the roads near the proposed site. They would share this information with local authority for appropriate measures to be taken in near future

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 31 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Encouragement of public transport Workers and staff members would be advised to use public transport Implementation of carpooling and share auto rickshaws ideas, if possible

Solid Waste Management (SWM)

Construction Phase

Construction activities would generate waste like debris, waste construction materials, excavation materials, municipal solid waste, etc. These waste needs to be handled and managed in proper scientific manner before disposal. Below Table present the sources of impacts and possible mitigation measures of SWM during construction phase.

Impacts on Solid Waste Management (SMW) and possible mitigation measures during construction phase Impact sources Mitigation measures Remarks Construction Proper scientific handling and Developer and site supervisor activities management of waste before in consultation with TMC disposal Scientific disposal to avoid long Developer and site supervisor term negative environment in consultation with TMC impacts Operation Phase

Type of waste generated from residential unit includes food waste, plastic waste, paper, glass, metals and tin etc. Food, kitchen and garden waste would easily biodegradable while others would be non-biodegradable waste. Organic waste composter and In-vessel composter would be installed for management of biodegradable waste. The recyclable waste would be handled over to recyclers while other inert waste would be handled over to TMC for their scientific disposal. Following Table present the sources of impacts and possible mitigation measures of SWM during operation phase.

Impacts on Solid Waste Management (SMW) and possible mitigation measures during operation phase Impact sources Mitigation measures Remarks Biodegradable Installation of organic waste Developer and the waste convertor and In-vessel composter maintenance would be borne by society members

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 32 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

Recyclable waste Handled over to recyclers and Society members treatment using briquetting Inert waste Handled over to TMC for disposal Society members in consultation with TMC Organic manure Used as fertilizer for gardening Society members Water Environment

Construction phase

Workers would be appointed for construction activity. Among these workers, site engineers, supervisors, labours, security personnel, etc. are included. Developers would provide staying arrangement at the proposed site during construction phase. Drinking water and sanitary facility would be provided by developer. Similarly, mobile toilets and STP would be installed at the construction phase. Below Table presents the sources of impacts and possible mitigation measure on water issues during construction phase.

Water issues and possible mitigation measures during construction phase Impact sources Mitigation measures Remarks Waste water from Waste water should be disposed Developer would install STP construction activities off properly after treatment to for treatment and avoid ground and surface water management of wastewater contamination. Contamination of After treatment most of the Developer would install a surface and ground recycled water would be used for STP whose treatment water due to drainage construction activity and efficiency would meet the runoff remaining would be disposed off CPCB norms into a open sewer Operation phase

About 441.3 m3/day of sewage would be generated during operational phase for Sale - D5 and D6. It would be treated with MBBR Technology. Following Table presents the water issues and possible mitigation measures during operation phase. Water issues and possible mitigation measures during operation phase

Impact sources Mitigation measures Remarks Wastewater generated from Two STP of total 500 KLD would Developer would operation phase be installed for treatment for D5 install a STP and D6 (Sale buildings) Reuse of recycle water for gardening and flushing purposes Contamination of ground Drainage facilities would be Developer and and surface water due to properly maintained concerned authority

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 33 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

improper maintenance of drainage and sewerage system Ecological Aspects

Construction phase

Currently, the proposed site is an already constructed area. It would be demolished reconstructed with this high rise tower. Below Table present the sources of impacts and possible mitigation measures on ecological aspects during construction phase.

Impacts on ecological aspects and possible mitigation measures during construction phase

Impact sources Mitigation measures Remarks Land Clearing Currently, few trees are present Permission of tree cutting & in the proposed location replanting has been taken for proposed project. Dust generated from Water would be sprinkled Recycled water would be the construction used for this activity activity Operational phase

The developer would develop 1555 m2 of area into green space on Ground and on Podium. Wastewater would be used as fertilizers and society members would appoint a gardener for their maintenance.

Socio economic aspect

 The socio economic impacts in the region would be primarily positive due to the employment opportunities generated both during construction and operational phase

 The proposed project consists of; 2 sale buildings (High rise – D5 and D6) of height 150.70 m. They are not affecting the sunlight rating of neighbourhood structures in and around the proposed site. The details of the same have been provided in shadow analysis chapter.  The AC outlet locations would be placed as per environment friendly locations  Treated wastewater would be used as fertilizer for gardening and flushing  Design features would maintain the IAQ as per ASHARE standard and NBC codes.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 34 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

 Eco friendly materials as per TMC eco housing criteria would be used for construction.  Developer would allow setup of mobile signal booster systems for different mobile service provider. A feasibility for the same would be carried out in near future  Awareness would be created for use of public transport, energy conservation strategies, and tips for betterment of IAQ.  Manual would be prepared for maintaining IAQ, types of material used along with their rating  Evacuation plan, routes for fire stations and important telephone numbers of hospitals and fire stations would be shared with society members, managers and concerned authority

Formation of Environment Management Cell

The Environment Cell shall comprise of environment background personnel either environment engineer or environment science background person with knowledge of building safety measures. During construction phase the environment cell shall comply with safety standards and measures as prescribe din the environment clearance norms. The following measures shall be adopted during construction phase:

 Covering all the materials stored at construction site with plastic or tarpaulin sheet  3 m height screens would be provided all around the building (or plot boundary) during construction phase to obstruct the flow of dust and wind to surrounding locations  All workers shall be provided with dust masks  1 wash basin per 20 workers shall be maintained  Bio-toilets would be installed for workers  Installation of STP, RWH, SWM units and water efficient units as per proposed in the project During operation phase; environment cell shall report to chairman of the society and it must comprise of in house and empanelled experts. The role of the environment cell during operation phase will be:

 Maintaining STPs, SWM units, RWH, carrying out environmental audits, safety audits, etc.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 35 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

 Maintaining landscape and safety of the society  Maintaining compliance monitoring as per direction of MoEF or HRC The detail formulation of environment cell is given below;

Figure: Environment and Monitoring Cell EMP Budget

The developer would be installing STP, SWM, RWH and landscaping. The breakup of the cost is given below;

Capital and operation & maintenance cost of EMP

No. Component Description Capital Cost in Lakhs Rs O/M Cost in Lakhs Rs. Per yr 1 STP (MBBR) Waste Water 48 12 Treatment 2 MSW OWC and IVC 36 2.5 (Including man power) 3 RWH 10 1 4 Landscape 9 0.7 (Including gardeners) 5 DMP 185 37 6 Solar Energy System 60 5 7 Basement Air 77.5 6.24 Cleaning System Total 425.5 64.44 240.5 (Without DMP) 27.44 (Without DMP) These are approximate figures and may change with GDP

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 36 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane

EMP costing for Construction phase No. Component Description Capital Cost in Lakhs Rs 1 Dust Suppressant and barricading Air pollution and erosion control 6 2 PPE for workers (gloves, specs, boots, etc.) Site Safety and Health Safety 1.5 3 Bio Toilets and Basin Site Sanitation 3 4 Health Checkup 3 5 Air, water, soil, noise monitoring 1.5 Total 15

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 37 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006