FORM 1A for PROPOSED HIGH RISE RESIDENTIAL DEVELOPMENT

FORM 1A for PROPOSED HIGH RISE RESIDENTIAL DEVELOPMENT

FORM 1A For PROPOSED HIGH RISE RESIDENTIAL DEVELOPMENT AT KAVESAR, GHODBUNDER ROAD, THANE At Plot bearing on S.No. 163/5, to 8B/1, 163/5 to 8B/2, 163/9A/1, 163/9A/2, 165/1A, 165/2A, 166/6A, 166/7A, 166/8A, 166/9A, 166/9B, 166/10A/1, 166/10A/2, 166/11A, 166/12A, 166/13A, 166/14A/1, 166/14A/2, 166/15A/1, 166/15A/2, 166/16A, 166/22A/1, 166/22A/2, 166/22A/3, 166/24A/1, 166/24A/2, 166/24A/3, 166/30A/1, 166/30A/2, 167/1, 167/2, 167/3 at Village Kavesar, Thane Submitted to STATE LEVEL ENVIRONMENTAL APPRAISAL COMMITTEE -2 (SEAC-2), MAHARASHTRA Proposed By M/s. Aniline Constructions Company Pvt. Ltd. Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane APPENDIX - II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing land use No the existing land use will not get significantly altered get significantly altered from the project, it is a residential project and the Land from the project that is not use is conforming to the approved Master Plan. All the consistent with the plans are attached as Annexure II of Form 1. surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority be submitted). Attach Maps of: (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. (i) Site Location DP is attached in Annexure I of Form 1A. (ii) Surrounding features 500 m radius and surrounding feature is given in of the proposed site Annexure II of Form 1A. (within 500 meters) (iii) The site (indicating - levels & contours) to appropriate scales. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane 1.2 List out all the major Description m2 project requirements in Total construction area 99,186.15 terms of the land area, Total plot area 9,300 built up area, water Proposed FSI 44,777.98 consumption, power requirement, connectivity, Total Built –Up Area 83,387.64 community facilities, parking needs, etc. Detailed area statement is given in Annexure I of Form 1. Dry season (Water requirement) Use Source m3/d Domestic 325 TMC Flushing 165 STP Treated Gardening 8 Sewage Detailed water calculation and its balance is given in Annexure VI of Form 1. Energy Consumption: Connected Load: 13,834 kWh Parking Provided: Parking 4 wheelers No. Total Parking 790 Permissible (D5 and D6) Total parking proposed 790 2 wheeler 62 Detailed parking statement is given in Annexure III of Form 1A. Connectivity: Proposed site is accessible by- 1) Thane railway station- 9.5 Km 10.3 What are the likely Project site will be developed into mixed use impacts of the proposed development. Hence, there shall have some impacts on activity on the existing water, air environment, power requirement but it shall be facilities adjacent to the mitigated by providing proper pollution control facilities proposed site? (Such as like STP. Also for water conservation, rain water open spaces, community harvesting shall be done. Power consumption shall be facilities, details of the reduced by using energy saving practices. Impact on air existing landuse, quality shall be reduced by plantation of trees. This disturbance to the local project will generate employment during construction as ecology). well as in operational phase and there by shall have positive impact on socio economy. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane 1.4. Will there be any As per the Seismic Zoning Map of India Thane region significant land falls under Zone- III. Stability Certificate, as per disturbance resulting in prevalent IS Code is obtained for these buildings from erosion, subsidence & registered Consulting Structural Engineer considering the instability? (Details of soil seismic forces and wind forces etc. type, slope analysis, vulnerability to subsidence, seismicity etc may be given). 1.5 Will the proposal involve No, the proposal will not involve alteration of natural alteration of natural drainage systems. drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of Maximum Debris and excavated material will be reused earthwork involved in the on site and the rest shall be disposed to authorized site construction activity- through authorized contractors with permission from cutting, filling, reclamation T.M.C. as per the "Construction Demolition Waste etc. (Give details of the (Management &. Disposal) Rules 2016" quantities of earthwork involved, transport of fill materials from outside the site, etc.) 1.7 Give details regarding i. For construction: 40 – 50 m³/day. (Depending on water supply, waste construction activity) handling etc during the Note: Treated sewage from temporary STP of the construction period. occupied buildings shall be used for construction activity of proposed development. This will help to reduce the fresh water demand for construction activity. For operation: i. Quantity of Sewage generated: 441.30 m³/day ii. Treatment/ Disposal: 264 m3/day (Disposal into existing municipal sewer line) Detailed water calculation and its balance is given in Annexure VI of Form 1. 1.8 Will the low lying areas & No, low lying areas & wetlands will not get altered. wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane 1.9 Whether construction Solid Waste Generation during Construction Phase: debris & waste during Debris, excavated material and construction waste shall construction cause health be disposed to authorized site with permission from hazard? (Give quantities of T.M.C. various types of wastes generated during Solid waste construction including the Use TPD construction labour and the Solid Waste 2.15 means of disposal) Biodegradable 1.18 IVC Non-Biodegradable 0.64 Recycling Inert 0.32 Handover TMC Hazardous wastes: There will be separate storage for Hazardous wastes and its disposal shall be done to authorized common hazardous waste disposal site respectively for further treatment and disposal as per the “Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.” E waste : E-waste generated during construction phase shall be stored at distinct location within project site and subsequently E-waste shall be handed over to authorized recyclers as per the “E-Waste management Rules, 2016”. Detailed solid waste management plan is given in Annexure VIII of Form 1. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 5 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane 2. WATER ENVIRONMENT 2.1 Give the total quantity of Dry season (Water requirement) water requirement for the Use residential Source proposed project with the m3/d breakup of requirements for Domestic 325 TMC various uses. How will the water requirement met? State Flushing 165 STP the sources & quantities and Treated Gardening 8 furnish a water balance Sewage statement. The Domestic water requirement will be met by TMC. The flushing and Gardening water requirement will be met through water which is recycled by STP. Wet season (Water requirement) Use Source m3/d Domestic 325 TMC Flushing 165 STP Treated Gardening Nil Sewage Detailed water calculation and its balance is given in Annexure VI of Form 1. 2.2 What is the capacity Domestic Water Supply from TMC. The permission (dependable flow or yield) of for the same has already being taken by project the proposed source of water? proponent. 2.3 What is the quality of water Drinking water quality of Class A as per Indian required, in case, the supply is Standard: 10500, 2004 from TMC. not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can be met from Use Source the recycling of treated m3/d wastewater? (Give the details STP Treated of quantities, sources and Flushing 165 usage) Sewage This water requirement will be met through the recycling of sewage. Detailed water calculation and its balance is given in Annexure VI of Form 1. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 6 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 Application form for Environmental Clearance Project Name: Proposed Residential project at Ghodbunder road, Thane 2.5 Will there be diversion of No diversion is anticipated, TMC has common water water from other users? supply. (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental The wastewater generated from project will be around pollution load from 441.30 m³/day.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    37 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us