Survey Results

Total Page:16

File Type:pdf, Size:1020Kb

Survey Results Connect 400 Alternatives Q1 Please rate the alignment of Alternative 1A on a scale of 1 to 3, with 1 being the “least appropriate” and 3 “most appropriate” within the corridor. Answered: 130 Skipped: 6 3- Most Appropriate 2- Moderately Appropriate (alternati... 1- Least Appropriate Not Applicable within the... 0% 20% 40% 60% 80% 100% Answer Choices Responses 3- Most Appropriate 82.31% 107 2- Moderately Appropriate (alternative should be refined) 10% 13 1- Least Appropriate 6.92% 9 Not Applicable within the Corridor 0.77% 1 Total 130 1 / 38 Connect 400 Alternatives Q2 Which transit technology is most appropriate for Alternative 1A? Answered: 129 Skipped: 7 3- Heavy Rail Transit (HRT) 2- Light Rail Transit (LRT) 1- Bus Rapid Transit (BRT) None of the above 0% 20% 40% 60% 80% 100% Answer Choices Responses 3- Heavy Rail Transit (HRT) 84.50% 109 2- Light Rail Transit (LRT) 7.75% 10 1- Bus Rapid Transit (BRT) 5.43% 7 None of the above 2.33% 3 Total 129 2 / 38 Connect 400 Alternatives Q3 Are there any potential access points that should be eliminated? Answered: 29 Skipped: 107 # Responses Date 1 Pitts Pitts 1/15/2013 3:03 PM 2 This would need to be modelled to determine the balance between patronage at each stop, and on the other 1/15/2013 9:22 AM hand overall trip time from outer stations to downtown or other destinations. Unless of course MARTA were to introduce fast trains not stopping everywhere. 3 None No. 1/14/2013 11:52 AM 4 Pitts Pitts 1/11/2013 10:55 PM 5 Old Milton Windward Old Milton and Windward 1/11/2013 7:16 AM 6 Pitts Mansell Old Milton Eliminate Pitts, Mansell and Old Milton. Unneccessary. Save our money! 1/11/2013 6:52 AM 7 Pitts Maybe Pitts? 1/11/2013 5:45 AM 8 Mansell North Point Northpoint Mall or Mansell. I would think the most logical location is the park and ride 1/10/2013 7:28 PM at Mansell from a cost standpoint. 9 Holcomb Bridge Holcomb Bridge cuz it is already too congested. 1/10/2013 7:57 AM 10 Mansell Mansell due to its proximity to North Point 1/10/2013 7:52 AM 11 Pitts Pitts? 1/10/2013 7:24 AM 12 North Point Old Milton The access points between Mansell Road and Windward Parkway seem 1/10/2013 6:24 AM excessive. All of these locations are easy to get to and within minutes of each other. I think the Mansell Road location could be eliminated with the location of Northpoint Mall. Old Milton Parkway, and Windward parkway. I would have suggest Old Milton as well but understand that Gwinnett College is building a campus on the south side of Milton and significant retail on the north. 13 None No 1/6/2013 1:19 PM 14 None None 1/3/2013 12:05 PM 15 Pitts Pitts 12/26/2012 1:37 PM 16 None No 12/25/2012 12:48 AM 17 Pitts Pitts 12/24/2012 6:53 PM 18 None While not all seem immediately useful, I am sure they will be very useful in the future; might as well 12/20/2012 1:25 PM plan for it now and be proactive rather than reactive. 19 Holcomb Bridge Roswell is diligently trying to clean up the area. The proposed stop at Holcomb Bridge 12/18/2012 6:35 AM would be right in the middle of a failing shopping area. The only thing this access point would facilitate is selling of that land at extremely reduced rates in order for the current land owner to step away. The lower prices for the land and need for improvement will most likely allow for the development of low housing and more apartments. We do not need this in Roswell. 20 None no 12/18/2012 6:09 AM 21 Mansell Drop Mansell, go from Holcomb Bridge to Encore Parkway 12/18/2012 4:45 AM 22 Pitts Pitts Station 12/17/2012 6:51 AM 23 Pitts Pitts should be dropped 12/12/2012 9:57 PM 24 Pitts Instead of Pitts consider Northridge 12/12/2012 7:06 PM 25 Pitts Pitts 12/12/2012 4:26 PM 26 Pitts Pitts. Can just head right down to North Springs on Peachtree-Dunwoody. Skip Pitts & leave some 12/12/2012 3:59 PM future access points & leave to be able to add that station in the future should demand warrant. 27 None none 12/12/2012 3:34 PM 28 None No 12/12/2012 1:29 PM 3 / 38 Connect 400 Alternatives # Responses Date 29 None None 12/11/2012 5:35 PM 4 / 38 Connect 400 Alternatives Q4 Are there any potential access points that should be included? Answered: 35 Skipped: 101 # Responses Date 1 None Nope 1/15/2013 3:03 PM 2 None No 1/15/2013 9:22 AM 3 Northridge Northridge Road. 1/14/2013 11:52 AM 4 Northridge Northridge 1/11/2013 10:55 PM 5 None No 1/11/2013 7:16 AM 6 Northridge Northridge instead of Pitts. 1/11/2013 5:45 AM 7 None None. Main purpose should be to alleviate congestion along 400 corridor into the Perimeter area, 1/10/2013 7:28 PM Buckhead, Midtown, Downtown and the Airport. I don't see the need for the light rail and other bus options. Don't move enough people and side streets must be updated first. 8 North Point Mall 1/10/2013 7:57 AM 9 Northridge Northridge Road 1/10/2013 7:24 AM 10 None No. The point of the rail is to provide consistent service that out performs trip times for the 1/10/2013 6:24 AM automobile. I work downtown and the more stops means more delays. The only way I would consider riding this is if trip times are consistent, reliable, and improve my commute. 11 None No 1/6/2013 1:19 PM 12 Northridge Northridge station 1/6/2013 12:58 PM 13 Northridge Northridge 1/4/2013 8:42 AM 14 Outside of Area Continue the line north to Cumming. 1/3/2013 8:31 PM 15 None None 1/3/2013 12:05 PM 16 Northridge Northridge Road 12/26/2012 1:37 PM 17 Yes 12/25/2012 12:48 AM 18 Northridge Closer to Northridge Rd 12/24/2012 6:53 PM 19 Northridge I think personally that the Pitts access point should be replaced with an access point at 12/23/2012 12:05 PM Northridge Road as there is more current development and opportunity for development in the Northridge/400 area. 20 Outside of Area Extend HRT to Exit 12, if not the heavy rail, at least a bus that shuttles from 12 to the 12/20/2012 1:25 PM station at 11 at the bare minimum. 21 Outside of Area An access point in Johns Creek will be beneficial. 12/19/2012 4:16 PM 22 Northridge Northridge 12/19/2012 5:38 AM 23 None no 12/18/2012 6:09 AM 24 Northridge Northridge Station 12/17/2012 6:51 AM 25 McGinnis Ferry I would love to see the line extended to the County Line at McGinnis Ferry or McFarland 12/13/2012 3:18 PM Parkway 26 Northridge Northridge road would help to increase transit access to other areas and decrease burden of 12/13/2012 10:30 AM traffic usage at Holcomb Bridge/Pitts station. 27 Northridge Consider a Northridge + Highway 9 access point OR a Morgan Falls access point instead of a 12/12/2012 9:57 PM Pitts station— Pitts road is out of the way. In Alpharetta, a downtown alpharetta station is possible because there are abandoned industrial lots— please pass this map along: http://goo.gl/maps/MwSyE 28 Holcomb Bridge Station should be designed to link with Riverwalk Trail 12/12/2012 6:13 PM 29 Northridge Northridge Road 12/12/2012 4:26 PM 5 / 38 Connect 400 Alternatives # Responses Date 30 Northridge Northridge. Will pick up a large population south of the Chattahoochee from the Roswell Rd / 12/12/2012 3:59 PM Hwy 9 Corridor. The river is a significant chokepoint for surface transportation on Hwy 9. Providing a station on both sides will greatly ease this. 31 Outside of Area An access point in Johns Creek will be beneficial. 12/12/2012 3:34 PM 32 Northridge Northridge Road 12/12/2012 1:56 PM 33 None No 12/12/2012 1:29 PM 34 Haynes Bridge Haynes Bridge Road 12/12/2012 12:12 PM 35 None None 12/11/2012 5:35 PM 6 / 38 Connect 400 Alternatives Q5 Other suggestons? Answered: 37 Skipped: 99 # Responses Date 1 HRT-yes Please consider HRT. this would reduce lots of traffic on GA 400. Any other alternative is like 1/15/2013 3:03 PM wasting money as it cannot help to reduce the traffic. 2 TOD/Development Maximise station trading to reduce tax support. Maximise Park and ride to get people 1/15/2013 9:22 AM to use the train for commutting. 3 HRT-yes BRT is not going to bring the ridership that rail will. Please consider using rail to extend the line. 1/14/2013 11:41 AM 4 Question #2 makes no reference to timeframe. My answer is applicable if the inference is "for the next ten 1/11/2013 7:06 AM yrs" 5 Marta has a serious identity crisis and is routinely used out of need than convenience.
Recommended publications
  • Bus Rapid Transit (BRT) Review Route 72/73 Stakeholder Report Back: What We Heard June 2018
    Bus Rapid Transit (BRT) Review Route 72/73 Stakeholder Report Back: What we Heard June 2018 Verbatim Comments The comments below are as they were submitted by participants attending the events and at the online portal pages. No edits have been made but personal information or offensive language is removed with an indication that this has happened. Route-specific comments are divided by route and into three categories for each route, answering the three engagement questions: 1. What do you like about the proposed route? (positive feedback) 2. What would you change or think could be improved about the proposed route? (negative feedback) 3. Is there anything else you think we should know? (general feedback) General, non-route-specific comments and Evaluation comments follow the route-specific verbatims. Route 72/73 What do you like about the proposed route? • (9) I used 72/73 to • It goes all over Calgary. Russcarrock/Westbrook area so this • It goes all way to Calgary. works for me • It is good that it connects to the C-train. • 9 will be same frequency It will multiply the options so it is good. • Chinook to Ogden Our shift goes to 11pm so this covers • I didn't realize my route was deleted our staff. (72/73) but it looks like the 9 replaces it • Like that you can go from Dover Reach exactly where I use it so all good with Drive to McMann St Hospital and church me! at 44th and 16th • I go to Chinook jump on the train and • Now takes the 72/73.
    [Show full text]
  • Time and Motion
    Time and motion © 1997−2009, Millennium Mathematics Project, University of Cambridge. Permission is granted to print and copy this page on paper for non−commercial use. For other uses, including electronic redistribution, please contact us. January 1999 Features Time and motion by Robert Hunt Since the dawn of time mankind has searched for ever quicker ways to travel from A to B. First it was the wheel; then horses and other animals were drafted in to help, and in the last century steam engines started to power locomotives. Aeroplanes took off in this century, and in 1976 Concorde was the first passenger transport to break the sound barrier. The fastest method of transport in modern times is the spacecraft, such as NASA's Space Shuttle. Time and motion 1 Time and motion Figure 1: The blue route? But speed isn't the only consideration in travel: it's also important to make sure that the route chosen is the shortest. Imagine you were piloting Concorde from London to San Francisco, and you had to choose a route on the map. Would you choose the straight line, marked in blue, or the long curved line marked in yellow? Well the curved line is the shortest one! Figure 2: Or the yellow? Why's that? It's because the Earth isn't flat, but maps are, so maps are always distorted. The shortest route between two points on a globe is along part of a great circle, which is a large circle going all the way round the globe with the centre of the Earth at the centre of the circle.
    [Show full text]
  • Perth's Urban Rail Renaissance
    University of Wollongong Research Online Faculty of Engineering and Information Faculty of Engineering and Information Sciences - Papers: Part B Sciences 2016 Perth's urban rail renaissance Philip G. Laird University of Wollongong, [email protected] Follow this and additional works at: https://ro.uow.edu.au/eispapers1 Part of the Engineering Commons, and the Science and Technology Studies Commons Recommended Citation Laird, Philip G., "Perth's urban rail renaissance" (2016). Faculty of Engineering and Information Sciences - Papers: Part B. 277. https://ro.uow.edu.au/eispapers1/277 Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: [email protected] Perth's urban rail renaissance Abstract Over the past thirty five years, instead of being discontinued from use, Perth's urban rail network has been tripled in route length and electrified at 25,000 oltsv AC. The extensions include the Northern Suburbs Railway (with stage 1 opened in 1993 and this line reaching Butler in 2014), and, the 72 kilometre Perth Mandurah line opening in 2007. Integrated with a well run bus system, along with fast and frequent train services, there has been a near ten fold growth in rail patronage since 1981 when some 6.5 million passengers used the trains to 64.2 million in 2014-15. Bus patronage has also increased. These increases are even more remarkable given Perth's relatively low population density and high car dependence. The overall improvements in Perth's urban rail network, with many unusual initiatives, have attracted international attention.
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • Everett's Inbound Bus Lane on Broadway
    EVERETT Fast, reliable, and accessible transportation was lacking in Everett, Transforming a Parking Lane and city officials knew something had to change. A city just north of Boston, Everett saw that it’s lack of quality transportation into a Shared Bus/Bike Lane options for residents and those passing through were insufficient. Originally the Mayor wanted to explore extending the Orange Line for the Morning commute or the commuter rail, both of which would be costly and lengthy projects. However, after MassDOT completed the Everett Transit Action Plan in November 2016, it was clear that bus improvements would be a faster, and cheaper, way to prioritize transit in the City. Morning Peak Time Dedicated Bus Lane Everett’s Mayor was a strong believer in the Transit Action Plan Pilot: December 2016 to September 2017 and provided the political will for changes to be made. Mode share data showing that 50% of people on the corridor were on the bus Permanent: September 2017 was the single biggest thing that convinced the Mayor and his administration that bus riders were not a minority and should be prioritized for street space. The Everett Transit Action Plan, which included extensive public process, helped set the stage for the City to begin a pilot for bus improvements shortly after the conclusion of the study. Most new planning projects go through a lengthy and typical process of holding nighttime meetings with residents, gathering feedback, and then spending months working with consultants to reach a final design, but this project was different. With the foundation of the Transit Action Plan, the City of Everett made a decision to try a new project implementation process.
    [Show full text]
  • Methodologyforterritor
    MODAL SPLIT INDICATORS METHODOLOGY FOR TERRITORIALISATION OF AIR TRANSPORT APRIL 2020 MODAL SPLIT INDICATORS METHODOLOGY FOR TERRITORIALISATION OF AIR TRANSPORT SUMMARY The methodology for ‘territorialisation’ of air transport data in the European Union, presented below, has been developed by Eurostat. ‘Territorialisation principle’ means that only freight and passenger transport performed within the territory of a country is considered. In terms of air transport, 'territorialisation' means that the transport performed in the air space is allocated to the countries overflown on each air transport route. The aim of territorialisation is to compare shares of each transport mode into the total transport performance in the European Union and also at national level. This is called the ‘modal split’ between the different transport modes. ‘Territorialisation’ is straight-forward for transport by road, railway and inland waterways, as it takes place on the territory of a country. The calculation is more complex for maritime and air transport, which only uses airport or port infrastructure in the country where the transport starts (origin) and where it ends (destination), and merely passes through the national waters or airspace of other countries on the route. ‘Transport performance’ is measured in tonnes-kilometres (tkm) for freight and passenger-kilometres for passengers (pkm). A tonne-kilometre is defined as one tonne of freight flying for one kilometre; a passenger-kilometre is defined as one passenger flying for one kilometre. The total tkm or pkm on an air route are, first, calculated based on passengers/freight transported between pair of airports and a distance matrix; and, then, the calculated tkm/pkm are ‘territorialised’ by allocating them proportionally to the countries overflown, according to the distance flown over each country.
    [Show full text]
  • Medstar Georgetown University Hospital Transportation Demand Management (TDM) Plan
    ` MedStar Georgetown University Hospital Transportation Demand Management (TDM) Plan October 2016 ZONING COMMISSION District of Columbia Case No. 16-18A ZONING COMMISSION 1 District of Columbia CASE NO.16-18A DeletedEXHIBIT NO.7C Table of Contents Section 1 ................................................................................................................................. 4 1.1 Background Information ....................................................................................................... 4 1.2 Anticipated Hospital Growth ................................................................................................ 4 1.3 Trip Generation ..................................................................................................................... 5 Section 2 ................................................................................................................................. 7 Market Research ..................................................................................................................... 7 2.1 Stakeholder Involvement ...................................................................................................... 7 2.2 Commute Survey ................................................................................................................... 8 2.3 Peer Review ........................................................................................................................ 10 Section 3 ..............................................................................................................................
    [Show full text]
  • Bike Sharing in the United States: State of the Practice and Guide to Implementation Bike Sharing in the United States
    DOWNTOWN BOISE Parking Strategic Plan APPENDIX A2 Bike Sharing in the United States: State of the Practice and Guide to Implementation Bike Sharing in the United States: State of the Practice and Guide to Implementation September 2012 Prepared by Toole Design Group and the Pedestrian and Bicycle Information Center for USDOT Federal Highway Administration Pedestrian and Bicycle Information Center CREDIT: CAPITAL BIKESHARE (WASHINGTON, DC) CREDIT: BOULDER B-CYCLE (BOULDER, CO) CREDIT: DECO BIKE (MIAMI BEACH, FL) NOTICE This document is disseminated under the sponsorship of the Federal Highway Administration in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. This report does not constitute a standard, specification, or regulation. The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objective of the document. The opinions, findings and conclusions expressed in this publication are those of the authors and not necessarily those of the Federal Highway Administration. This document can be downloaded from the following website: www.bicyclinginfo.org/bikeshare September 2012. ACKNOWLEDGEMENTS This Guide was prepared by Toole Design Group and the Pedestrian and Bicycle Information Center through a cooperative agreement (DTFH61-11H-00024) with the Federal Highway Administration. This report would not have been possible without the support and assistance of the Advisory Committee, who were willing to share data, background information, and advice for future bike share programs. Also, special thanks to the League of American Bicyclists which distributed a bike share questionnaire to Bicycle Friendly Communities (results are reported in this report).
    [Show full text]
  • Dc Circulator Customer Satisfaction Survey 2019 Topline Report
    DC CIRCULATOR CUSTOMER SATISFACTION SURVEY 2019 TOPLINE REPORT Prepared for: Prepared by: Date: February 14, 2020 TOPLINE REPORT Background and Purpose The District Department of Transportation (DDOT) commissioned WBA Research to conduct the DC Circulator Customer Satisfaction Study in the Fall of 2019. From October 16th to November 11th, 2019, WBA Research (WBA) distributed surveys onboard buses throughout DDOT’s DC Circulator bus system. The purpose of this survey was to gauge satisfaction with the service offered by DC Circulator, as well as to identify areas of strength and areas where there are opportunities for improvement. Distribution and Completion. WBA’s trained survey distributors handed out surveys aboard DC Circulator buses on all six routes across the DC Circulator system. In total, WBA received 1,143 completed surveys across weekdays and weekends on all six routes. Weighting. WBA built daily weights by the route and day of the week on which a given respondent was surveyed. In order to build the weights, DDOT provided ridership counts for each route for the month of October 2019. By using the total ridership during the month of October 2019 for each route, WBA was able to build weights that allowed the results to be representative of each route’s ridership on a weekday or weekend. Key Findings Satisfaction. DC Circulator experiences high ratings from its riders, with riders giving an average overall satisfaction rating of 8.7 on a 0 to 10 scale. While this is still high, it is a decline from overall satisfaction observed in 2018 (9.0). Nearly all riders (99 percent) would recommend DC Circulator to others.
    [Show full text]
  • Service Evaluation Report
    System and Service Evaluation January 2017 Prepared by: Table of Contents Introduction ................................................................................................................................6 Service Overview ........................................................................................................................9 Historical Context .......................................................................................................... 9 System Changes ...................................................................................................................... 11 Service Span and Frequencies ........................................................................................... 12 Access to Service ........................................................................................................ 13 Network Structure ............................................................................................................ 15 Other Mobility Services ..................................................................................................... 15 DecoBike ................................................................................................................................. 16 ZipCar ...................................................................................................................................... 17 Taxis, Jitneys, and Transportation Network Companies (TNCs) ............................................... 17 UC San Diego Campus Shuttles .............................................................................................
    [Show full text]
  • Public Transport for Perth in 2031
    DRAFT FOR CONSULTATION MAPPING OUT THE FUTURE FOR PERTH’S PUBLIC TRANSPORT NETWORK. © State of Western Australia Published by the Department of Transport 140 William Street Perth Western Australia 6000 Published July 2011 Internet: www.transport.wa.gov.au Phone: (08) 6551 6000 Fax: (08) 6551 6001 CHairMan’S FOREWORD We have much to be proud of in the next 21 years and to propose has reached a stage in its development Perth’s public transport system. projects that will see construction of where another tier of service is needed infrastructure such as new railways, – an on-road Rapid Transit System. Over the past 25 years successive transit ways and bus lanes to better Without priority for public transport on Western Australian Governments support public transport and improve the roads, the quality and level of service have made bold and strategic quality of services. cannot be achieved and the network will not be able to meet demand. This decisions to modernise and We have worked closely with will lead to pressure for wider roads the Western Australian Planning significantly extend the passenger and increasing congestion on roads in Commission. The Directions 2031 and rail network and maintain a fully constrained environments. Beyond spatial framework for Perth integrated system that allows people and Peel has informed our planning. A strategic alignment of objectives to move around the city with ease. We recognise that an increasing between state transport agencies and concentration of housing, employment local government is needed to find a Our public transport system is regarded as and major services in the central and balance between travel demands and one of the best, newest and most efficient inner parts of the city will shape the community amenity.
    [Show full text]
  • Draft Maine State Rail Plan
    Draft Maine State Rail Plan TABLE OF CONTENTSview Chapter 1 Framework of the Maine State Rail Plan 1.1 Purpose of the State Rail Plan 1.1 1.2 Visions, Goals, Objectives of the Maine State Rail Plan 1.3 1.3 Transportation and Rail Planning in Maine 1.6 . Figure 1-1: MaineDOT Organizational Chart 1.7 . Figure 1-2: Maine’s MPO Areas 1.10 . Figure 1-3: Regional Planning and Development Councils 1.11 1.4 Public and Stakeholder Involvement 1.12 1.5 Review of Freight and Passenger Rail Planning Studies 1.17 1.6 Evaluation Criteria 1.18 Chapter 2 Freight Rail System 2.1 Overview 2.1 . Figure 2-1: North American Class I Rail Connections 2.2 . Figure 2-2: Map of MM&A Abandonment 2.6 . Figure 2-3: State of Maine Owned Rail Status 2.10 2.2 Freight Rail Industry Development 2.10 2.3 Maine’s Freight Railroad Facilities 2.12 2.4 International, National and Regional Context 2.21 . Figure 2-4: Canadian Class I Connections to Maine System 2.21 . Figure 2-5: Northeast U.S. Rail Freight System 2.22 . Figure 2-6: NS, CP, PAS and PAR Corridors 2.23 . Figure 2-7: Railroad Return on Investment and Cost of Capital 2.24 2.5 Freight Rail Issues and System Constraints 2.24 . Figure 2-8: Estimated National Highway System Peak-Period Congestion 2.25 . Figure 2-9: Estimated Rail Freight Service Levels, 2035 2.25 . Figure 2-10: Rail Clearance and Weight Constraints 2.28 .
    [Show full text]