Appeal Coordinating Office

Total Page:16

File Type:pdf, Size:1020Kb

Appeal Coordinating Office 150 route de Ferney, P.O. Box 2100 1211 Geneva 2, Switzerland Tel: 41 22 791 6033 Fax: 41 22 791 6506 e-mail: [email protected] Appeal Coordinating Office Angola Relief & Rehabilitation – AFAO-01 (Revision 1) Total Appeal Target: US$ 3,802,374 Balance Requested from ACT Network US$ 3,050,965 Geneva, 10 April 2000 Dear Colleagues, Further to the Appeal AFAO-01 issued on 10 March, 2000 for ACT member, Lutheran World Federation/Department of World Service (LWF/DWS), other ACT members in Angola, namely the Evangelical Reformed Church of Angola (IERA) and Church Action in Angola (CAA), have submitted proposals for implementing emergency programs in other parts of the war torn country. While IERA plans to provide assistance to 6,000 families in Uige and Kwanza-Sul Provinces, CAA, through its implementing partner – the Young Men’s Christian Association (YMCA) will assist 3,875 families in Bengo and Kwanza-Sul Provinces. The beneficiaries are from among the large numbers of internally displaced people (IDP) as well as returnees from refugee camps abroad. The major program components include: · Food & non-food items · Health, Water & Sanitation · Agriculture · Education & training · Community infrastructure For the sake of brevity, the Lutheran World Federation/Department of World Service (henceforth referred to as LWS) program and budget details as outlined in the original Appeal document is not repeated in this revision. The total Appeal Target above however is inclusive of LWS’ request. ACT is a worldwide network of churches and related agencies meeting human need through coordinated emergency response. The ACT Coordinating Office is based with the World Council of Churches (WCC) and the Lutheran World Federation (LWF) in Switzerland. Angola – Relief & Rehabilitation 2 Appeal AFAO01 Revision 1 Summary of Appeal Targets, Pledges/Contrib. Recd. and Balance Requested (in US$) CAA CCA/ACM IERA LWS Total Appeal Targets 58,879 210,241 773,237 2,338,514 3,802,375 421,504 Less: Pledges/Contr. Recd Cash 31,000 31,000 Inkind 25,000 695,410 720,410 Balance Requested from ACT 58,879 631,745 748,237 1,612,104 3,050,965 The implementation schedule of the Appeal is as follows: CAA Co-ordination – April 2000 – March 2001 ACM Project implementation – April 2000 – March 2001 IERA Project implementation – April 2000 – October 2000 LWF Project implementation – March 2000 – February 2001 Please kindly send your contributions to the ACT bank account and inform this office of all pledges/contributions and transfers, including funds sent direct to the implementers. Please note the Pledge Form is no longer attached with the Appeal. Account Number - 102539/0.01.061 (USD) Account Name: ACT - Action by Churches Together Banque Edouard Constant Cours de Rive 11 Case postale 3754 1211 Genève 3 SWITZERLAND We would appreciate being informed of any intent to submit applications for EU, USAID and/or other back donor funding and the subsequent results. We thank you in advance for your kind cooperation. For further information, please contact: ACT Co-ordinator, Thor-Arne Prois (phone 41 22 791 6033 or mobile phone ++ 41 79 203 6055) or ACT Appeals Officer, John Nduna (phone +41 22 791 6040 or mobile phone ++41 79 433 0592) ACT Web Site address: http://www.act-intl.org Thor-Arne Prois ACT Coordinator Angola – Relief & Rehabilitation 3 Appeal AFAO01 Revision 1 Angola – Relief & Rehabilitation 4 Appeal AFAO01 Revision 1 CO-ORDINATION - CAA I. REQUESTING ACT MEMBER · Church Action in Angola (CAA), is an ecumenical aid consortium of Angolan churches and NGOs, Northern Christian agencies and international networks which aims to work cooperatively to provide relief, rehabilitation and long-term development programs in Angola. II. IMPLEMENTING ACT MEMBER One of the key reasons for existence of CAA is the provision of support to local partners involved in emergency and rehabilitation work. This covers activities in the entire project cycle from assessment and Participatory Appraisals through proposal drafting, to execution, monitoring and report writing. A dedicated Program Officer who works full time in liaison with partners, carries out this work, with support from the CAA Program Director. Since the establishment of CAA, the office has supported partners in a large number of emergency projects, building up capacity in partners and preparedness in local communities. III. DESCRIPTION of the EMERGENCY SITUATION Fighting all over Angola over the past 18 months has resulted in huge displacements of communities, affecting almost all provinces. Although the government forces’ offensive of September 1999 resulted in the reacquisition of many areas previously outside government control and the establishment of a degree of calm for a period, guerrilla attacks have still been taking place in many areas. The beginning of 2000 has seen renewed attacks all over Angola and this has led to fresh displacements. Families often have to leave their villages very suddenly following attacks and as a result are left with nothing. Immediate problems facing not only displaced families but also residents are lack of food, basic household goods (due to robbery), lack of access to water and sanitation and lack of agricultural inputs to create medium- term food security. Another priority raised by all CAA partners has been education and health. Basic education provision is sorely needed for children but also for adults, in terms of civic education, human rights, reconciliation, etc work to help communities build the culture of peace that Angola so badly needs. IV. PROJECT GOAL AND OBJECTIVES To build the capacity of CAA partners in their responses to emergency situations, encourage greater co- operation and information sharing as well as increase opportunities for Angolan organisations to receive financing from international donors to carry out emergency and rehabilitation work. Objectives · Provide support to partners throughout the project cycle; · Hold at least 6 meetings annually, including all CAA partner project directors, on emergency and rehabilitation work; · Respond to the training needs of partners in emergency and rehabilitation work; · Monitor the implementation of emergency and rehabilitation projects together with partners and encourage learning from mistakes made; · Encourage inter-partner exchanges to facilitate mutual learning. The advantages of working through local organisations in emergency interventions include greater access Angola – Relief & Rehabilitation 5 Appeal AFAO01 Revision 1 to populations in need, local strength in terms of volunteers and church members, existence of structures that are already in place. These factors should improve cost effectiveness in emergency and other interventions. An additional longer-term benefit of working through local structures is the building up, through support provided, of local capacity and ability to get involved in discussions of a wider nature to do with the conflict and how to bring about a lasting peace in Angola. Notwithstanding these advantages, it is still the case that Angolan organisations have a number of serious weaknesses when it comes to project analysis and development. Different organisations, including members of CAA, have very widely varying capacities in this regard and whereas some are currently able to elaborate and implement projects to standards approaching those agreed internationally for humanitarian interventions, others are still some way off this target. The purpose of the CAA E&R officer relates directly to this – to contribute to creating, sustaining and improving the strength and capacity of local organisations in all aspects of emergency and rehabilitation work. This will be achieved through direct support and advice, focussed training initiatives based on identified needs, joint visits to the field and facilitation of experience and information sharing through regular planned meetings and workshops. V. TARGETED BENEFICIARIES The following CAA partners are active in the field of emergency and rehabilitation work: IECA (Congregationalist church), IEBA (Baptist church), IERA (Reformed church), IKA (Kimbanguist Church), ACM (Angolan YMCA), ADRA (Adventist Development and Relief Agency), LWF, CICA (Angolan council of Christian Churches), AEA (the Evangelical Alliance) and FONGA (Forum for Angolan NGOs). The key to CAA’s co-ordination of this work is the bringing of stronger and weaker organisations together to raise the overall quality of the work carried out by Angolan organisations in this field. VI. PROPOSED EMERGENCY ASSISTANCE This project aims to support CAA partners in Angola in their emergency work and is not an emergency intervention in itself. Emergency interventions by Angolan organisations continue, especially in those areas of Angola where international agencies do not have a presence. Current interventions in which the CAA E&R program officer has a significant advisory and/or coordination role include the following: · Three partner intervention in Uige province, implemented by ACM (Angola YMCA), IERA (the Reformed Church) and IKA (the Kimbanguist Church). This project has supported up to 20,000 IDPs from northeastern Uige province with basic needs and shelter. · Three-province/four partner intervention in Zaire, Bengo and Kwanza-Sul provinces with ACM, USODEC (a church-based member of the Forum for Angolan NGOs) and IKA. This project, with a budget of just over $700,000, supports the immediate emergency needs and longer-term food security requirements of 35,000 IDP. VII. PROJECT ADMINISTRATION,
Recommended publications
  • Payment Systems in Angola
    THE PAYMENT SYSTEM IN ANGOLA Table of Contents OVERVIEW OF THE NATIONAL PAYMENT SYSTEM IN ANGOLA ............................... 5 1. INSTITUTIONAL ASPECTS .............................................................................................. 5 1.1 General legal aspects ................................................................................................... 5 1.2 Roles of financial intermediaries that provide payment services ........................... 6 1.3 Roles of the central bank ............................................................................................ 6 1.4 Roles of other private sector and public sector bodies ............................................ 7 2. SUMMARY INFORMATION ON PAYMENT MEDIA USED BY NON-BANKS ....... 7 2.1 Cash payments ............................................................................................................ 7 2.2 Non-cash payments ..................................................................................................... 8 2.2.1 Cheques ............................................................................................................... 8 2.2.2 Credit transfer orders ......................................................................................... 8 2.2.3 Standing/stop order drafts .................................................................................. 8 2.2.4 Other documents to be cleared ........................................................................... 8 2.2.5 Other transfer documents ..................................................................................
    [Show full text]
  • Inventário Florestal Nacional, Guia De Campo Para Recolha De Dados
    Monitorização e Avaliação de Recursos Florestais Nacionais de Angola Inventário Florestal Nacional Guia de campo para recolha de dados . NFMA Working Paper No 41/P– Rome, Luanda 2009 Monitorização e Avaliação de Recursos Florestais Nacionais As florestas são essenciais para o bem-estar da humanidade. Constitui as fundações para a vida sobre a terra através de funções ecológicas, a regulação do clima e recursos hídricos e servem como habitat para plantas e animais. As florestas também fornecem uma vasta gama de bens essenciais, tais como madeira, comida, forragem, medicamentos e também, oportunidades para lazer, renovação espiritual e outros serviços. Hoje em dia, as florestas sofrem pressões devido ao aumento de procura de produtos e serviços com base na terra, o que resulta frequentemente na degradação ou transformação da floresta em formas insustentáveis de utilização da terra. Quando as florestas são perdidas ou severamente degradadas. A sua capacidade de funcionar como reguladores do ambiente também se perde. O resultado é o aumento de perigo de inundações e erosão, a redução na fertilidade do solo e o desaparecimento de plantas e animais. Como resultado, o fornecimento sustentável de bens e serviços das florestas é posto em perigo. Como resposta do aumento de procura de informações fiáveis sobre os recursos de florestas e árvores tanto ao nível nacional como Internacional l, a FAO iniciou uma actividade para dar apoio à monitorização e avaliação de recursos florestais nationais (MANF). O apoio à MANF inclui uma abordagem harmonizada da MANF, a gestão de informação, sistemas de notificação de dados e o apoio à análise do impacto das políticas no processo nacional de tomada de decisão.
    [Show full text]
  • Shipping Agency Lin Lines Agency Forwarding and Clearing Storage, Transporte and Handling Project
    Namibe Lobito Luanda Soyo Cabinda Shipping Agency Lin Lines Agency Forwarding and Clearing Storage, Transporte and Handling Project The coast of Angola is one of the biggest maritime face of West Africa. 5 ports (see chart beside) are today running and New Ports (base) are being open to support the Oil field activity: -Ambriz -Dande -Porto Amboim The Angolan economy is totally depending on the oilfield and mining business and despite the financial crisis the country is still showing a reasonnable growth (about 8%, BNA source). To get more about Angola: https://www.cia.gov/library/publications/the- world-factbook/geos/ao.html Naiber Angola is a 100% foreign share of Capital as follow: ◦ 65% NAIP – Navegação Agencia Internacional Portuguesa (Lin Lines’ General Agents) ◦ 35% VGC – Vasco Gallega de Consignação (Vigo) Naiber has been set up in 2005 in Namibe where Lin Lines and VGC have their core activities. Lobito office has been opened in 2007 Cabinda opened in 2008 Soyo and Luanda opened in 2010 56 Employees - 6 expatriates - 50 locals Namibe Country Manager Alexandre Pinto da Silva Luanda Lobito Cabinda Soyo Aymeric Frisch Pedro Costa Antonio Cameira Pedro Migueis Franz Patane [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] Liners vessels – Lin Lines Incorporation ◦ An operator specialized on the trade between Portugal/Portugal/SpainSpain and Angola ◦ www.linlinesinc.com ◦ Offer 2 sailings per month to all Angolan ports Non-Liners vessels ◦ All kind
    [Show full text]
  • ANGOLA FOOD SECURITY UPDATE July 2003
    ANGOLA FOOD SECURITY UPDATE July 2003 Highlights The food security situation continues to improve in parts of the country, with the overall number of people estimated to need food assistance reduced by four percent in July 2003 relieving pressure on the food aid pipeline. The price of the least-expensive food basket also continues to decline after the main harvest, reflecting an improvement in access to food. According to the United Nations Children’s Fund (UNICEF), the results of both the latest nutritional surveys as well as the trend analysis on admissions and readmissions to nutritional rehabilitation programs indicate a clear improvement in the nutritional situation of people in the provinces considered at risk (Benguela, Bie, Kuando Kubango). However, the situation in Huambo and Huila Provinces still warrants some concern. Household food stocks are beginning to run out just two months after the main harvest in the Planalto area, especially for the displaced and returnee populations. In response to the current food crisis, relief agencies in Angola have intensified their relief efforts in food insecure areas, particularly in the Planalto. More than 37,000 returnees have been registered for food assistance in Huambo, Benguela, Huila and Kuando Kubango. The current food aid pipeline looks good. Cereal availability has improved following recent donor contributions of maize. Cereal and pulse projections indicate that total requirements will be covered until the end of October 2003. Since the planned number of beneficiaries for June and July 2003 decreased by four percent, it is estimated that the overall availability of commodities will cover local food needs until end of November 2003.
    [Show full text]
  • Porto Amboim | Angola PAENAL Fabrication Yard
    Porto Amboim | Angola PAENAL fabrication yard PAENAL, Porto Amboim Estaleiros Navais Limitada, is a joint venture between SONANGOL and SBM. The new construction yard will provide the working area required to build offshore structures and will allow for the transformation of former Very Large Crude Carriers (VLCC) to Floating Production Storage Offloading vessels (FPSOs), to support the country’s rapidly developing offshore oil industry. The PAENAL fabrication yard is located on the Enseada de Benguela Velha beach site located in the Kwanza Sul province, on the Atlantic shoreline of Angola. The site is approximately 3 km south of Porto Amboim, around 220 km south of Luanda. This new yard is being developed in three distinct phases. Each phase will increase the capacity of the yard, which will comprise at the end a 460 m long 8.00 29.50 quay wall and a 630 m breakwater for berthing of Sonangol product tankers Gravel +4.00 in replacement of the offloading CBM +2.00 terminal presently located at the Tie rod - ø 62 mm +1.40 +1.20 (MSL) ±0.00 selected site. It will also add a dry dock Backfill Quarry run for repair and overhaul of construction vessels, supply boats and small coastal Existing soil level tankers up to 150 m in length. The total AZ 20-700 2 -6.00 L = 9.0 m area will be approximately 120.000 m . S 390 GP It will be self-sufficient in terms of power, water and sewerage. The project -10.00 provides a significant stimulus for the -11.00 Quarry stone local economy by tapping into the resources of small and medium-size AZ 50 companies in the region.
    [Show full text]
  • República De Angola Projecto Para a Melhoria
    INSTITUTO MARÍTIMO E PORTUÁRIO DE ANGOLA - IMPA REPÚBLICA DE ANGOLA REPÚBLICA DE ANGOLA PROJECTO PARA A MELHORIA DO PORTO DO NAMIBE RELATÓRIO DA PESQUISA PREPARATÓRIA (REVISÃO) AGOSTO DE 2016 AGÊNCIA DE COOPERAÇÃO INTERNACIONAL DO JAPÃO (JICA) ORIENTAL CONSULTANTS GLOBAL CO., LTD. 基盤 PADECO CO., LTD. CR(1) 16-142 INSTITUTO MARÍTIMO E PORTUÁRIO DE ANGOLA - IMPA REPÚBLICA DE ANGOLA REPÚBLICA DE ANGOLA PROJECTO PARA A MELHORIA DO PORTO DO NAMIBE RELATÓRIO DA PESQUISA PREPARATÓRIA (REVISÃO) AGOSTO DE 2016 AGÊNCIA DE COOPERAÇÃO INTERNACIONAL DO JAPÃO (JICA) ORIENTAL CONSULTANTS GLOBAL CO., LTD. PADECO CO., LTD. Prefácio A Agência de Cooperação Internacional do Japão decidiu realizar um Estudo Preparatório de Cooperação relativo ao Projecto para Melhoria do Porto do Namibe na República de Angola e consignou este trabalho ao consórcio formado pelas empresas Oriental Consultants Global Co., Ltd. e PADECO Co., Ltd. A Equipa de Estudo realizou, no período de Fevereiro a Julho de 2016, discussões com as autoridades do Governo de Angola e o estudo de campo na área-alvo do projecto e, tendo passado pelos trabalhos domésticos após o retorno ao Japão, vem hoje a concluir o presente Relatório. Esperamos que este Relatório venha a dar contributos ao avanço do Projecto e também ao estreitamento ainda maio da amizade entre as duas nações. Por fim, agradecemos profundamente a todas as pessoas que se relacionaram e deram apoio à realização do Estudo. Agosto de 2016 Agência de Cooperação Internacional do Japão Departamento de Infraestruturas e Construção da Paz - JICA Akira Nakamura, Director do Departamento Sumário (1) Perfil da Nação A República de Angola (doravante referida como Angola) localiza-se na porção Sudoeste do Continente Africano e limita-se ao Sul com Namíbia, a Este com Zâmbia e ao Norte com a República Democrática do Congo.
    [Show full text]
  • Creating Markets in Angola : Country Private Sector Diagnostic
    CREATING MARKETS IN ANGOLA MARKETS IN CREATING COUNTRY PRIVATE SECTOR DIAGNOSTIC SECTOR PRIVATE COUNTRY COUNTRY PRIVATE SECTOR DIAGNOSTIC CREATING MARKETS IN ANGOLA Opportunities for Development Through the Private Sector COUNTRY PRIVATE SECTOR DIAGNOSTIC CREATING MARKETS IN ANGOLA Opportunities for Development Through the Private Sector About IFC IFC—a sister organization of the World Bank and member of the World Bank Group—is the largest global development institution focused on the private sector in emerging markets. We work with more than 2,000 businesses worldwide, using our capital, expertise, and influence to create markets and opportunities in the toughest areas of the world. In fiscal year 2018, we delivered more than $23 billion in long-term financing for developing countries, leveraging the power of the private sector to end extreme poverty and boost shared prosperity. For more information, visit www.ifc.org © International Finance Corporation 2019. All rights reserved. 2121 Pennsylvania Avenue, N.W. Washington, D.C. 20433 www.ifc.org The material in this work is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. IFC does not guarantee the accuracy, reliability or completeness of the content included in this work, or for the conclusions or judgments described herein, and accepts no responsibility or liability for any omissions or errors (including, without limitation, typographical errors and technical errors) in the content whatsoever or for reliance thereon. The findings, interpretations, views, and conclusions expressed herein are those of the authors and do not necessarily reflect the views of the Executive Directors of the International Finance Corporation or of the International Bank for Reconstruction and Development (the World Bank) or the governments they represent.
    [Show full text]
  • Memórias De Um Curso De Formação De Professores De Matemática No Instituto Superior De Ciências Da Educação De Cabinda/Angola (1998-2009)
    UNIVERSIDADE FEDERAL DE MINAS GERAIS PPGE – PROGRAMA DE PÓS-GRADUAÇÃO EM EDUCAÇÃO: CONHECIMENTO E INCLUSÃO SOCIAL FACULDADE DE EDUCAÇÃO INÊS FLORINDA LUÍS BUISSA MEMÓRIAS DE UM CURSO DE FORMAÇÃO DE PROFESSORES DE MATEMÁTICA NO INSTITUTO SUPERIOR DE CIÊNCIAS DA EDUCAÇÃO DE CABINDA/ANGOLA (1998-2009) Belo Horizonte – MG 2016 INÊS FLORINDA LUÍS BUISSA MEMÓRIAS DE UM CURSO DE FORMAÇÃO DE PROFESSORES DE MATEMÁTICA NO INSTITUTO SUPERIOR DE CIÊNCIAS DA EDUCAÇÃO DE CABINDA/ANGOLA (1998-2009) Tese apresentada ao Programa de Pós-Graduação em Educação: Conhecimento e Inclusão Social da Faculdade de Educação da Universidade Federal de Minas Gerais, como requisito parcial à obtenção do título de Doutora em Educação. Área de concentração: Educação Linha de pesquisa: Educação Matemática Orientadora: Profa. Dra. Maria Laura Magalhães Gomes Belo Horizonte Faculdade de Educação da UFMG 2016 B932m Buissa, Inês Florinda Luís, 1983- T Memórias de um curso de formação de professores de matemática no Instituto Superior de Ciências da Educação de Cabinda/Angola (1998-2009) / Inês Florinda Luís Buissa. - Belo Horizonte, 2016. 431 f., enc, il. Tese - (Doutorado) - Universidade Federal de Minas Gerais, Faculdade de Educação. Orientadora : Maria Laura Magalhães Gomes. Bibliografia : f. 253-264. Apêndices: f. 265-416. Anexos: f. 417-431. 1. Universidade 11 de Novembro, Instituto Superior de Ciências da Educação -- Teses. 2. Educação -- Teses. 3. Professores -- Formação -- Angola -- Teses. 4. Professores de matematica -- Formação -- Angola -- Teses. 5. Matemática -- Estudo e ensino -- Angola -- Teses. 6. Matemática -- Estudo e ensino -- História -- Angola -- Teses. 7. Ensino superior -- Angola -- Teses. 8. Angola -- Educação -- Teses. I. Título. II. Gomes, Maria Laura Magalhães. III. Universidade Federal de Minas Gerais, Faculdade de Educação.
    [Show full text]
  • Yellow Fever Outbreak in Angola, 29 September 2016
    YELLOW FEVER OUTBREAK WEEKLY SITUATION REPORT, INCIDENT MANAGEMENT TEAM—ANGOLA YELLOW FEVER OUTBREAK IN ANGOLA INCIDENT MANAGEMENT Vol: 9 -05 SITUATION REPORT W39, 29 Sept 2016 Key Highlights The IM System is transitioning during this phase of the response to focus support on vaccination campaign and post-epidemic surveillance system strengthening . Three positive laboratory cases were reported in Porto Amboim district (Cuanza Sul) and Chongoroi (Benguela); cases are being investigated and post-reviewed by the Classification Committee. The population of Porto Amboim district have not been vaccinated to date but included in the next phase of vaccination campaign starting October 10th, 2016. KAP study will be implemented this week in eight provinces including Luanda to identify risks for communication inputs Entomologic risk assessment has been completed in three of five provinces with preliminary results suggesting a high- level infestation of Aedes aegypti in Bengo, medium in Cuanza Norte and no infestation in Cuando Cubango province. II. Epidemiological Situation as of 29 September 2016 Table 1: National Summary of Yellow Fever Outbreak Week 39 statistics (23—29 September 2016): Of 45 suspected cases reported, 16 specimens that were tested in the National Laboratory were negative. Zero(0) deaths were reported among the suspected cases during this period. 11 districts in 4 provinces reported suspected cases of yellow fever. No district reported new confirmed local transmission. Cumulative statistics since 05 December 2015: A total of 884 laboratory confirmed cases have been reported out of 4,188 suspected cases and 3,666 laboratory samples tested Overall, 373 (CFR = 9.2%) deaths were reported among suspected cases and 121 (CFR 13.7%) among confirmed cases Laboratory confirmed cases have been reported for 16 out of 18 provinces in 80 out of 136 districts.
    [Show full text]
  • ANGOLA Reference Map
    ANGOLA Reference Map CONGO L Belize ua ng Buco Zau o CABINDA Landana Lac Nieba u l Lac Vundu i Cabinda w Congo K DEMOCRATIC REPUBLIC OF THE CONGO o z Maquela do Zombo o p Noqui e Kuimba C Soyo M Mbanza UÍGE Kimbele u -Kongo a n ZAIRE e Damba g g o id Tomboco br Buengas M Milunga I n Songo k a Bembe i C p Mucaba s Sanza Pombo a i a u L Nzeto c u a i L l Chitato b Uige Bungo e h o e d C m Ambuila g e Puri Massango b Negage o MALANGE L Ambriz Kangola o u Nambuangongo b a n Kambulo Kitexe C Ambaca m Marimba g a Kuilo Lukapa h u Kuango i Kalandula C Dande Bolongongo Kaungula e u Sambizanga Dembos Kiculungo Kunda- m Maianga Rangel b Cacuaco Bula-Atumba Banga Kahombo ia-Baze LUNDA NORTE e Kilamba Kiaxi o o Cazenga eng Samba d Ingombota B Ngonguembo Kiuaba n Pango- -Caju a Saurimo Barra Do Cuanza LuanCda u u Golungo-Alto -Nzoji Viana a Kela L Samba Aluquem Lukala Lul o LUANDA nz o Lubalo a Kazengo Kakuso m i Kambambe Malanje h Icolo e Bengo Mukari c a KWANZA-NORTE Xa-Muteba u Kissama Kangandala L Kapenda- L Libolo u BENGO Mussende Kamulemba e L m onga Kambundi- ando b KWANZA-SUL Lu Katembo LUNDA SUL e Kilenda Lukembo Porto Amboim C Kakolo u Amboim Kibala t Mukonda Cu a Dala Luau v t o o Ebo Kirima Konda Ca s Z ATLANTIC OCEAN Waco Kungo Andulo ai Nharea Kamanongue C a Seles hif m um b Sumbe Bailundo Mungo ag e Leua a z Kassongue Kuemba Kameia i C u HUAMBO Kunhinga Luena vo Luakano Lobito Bocoio Londuimbali Katabola Alto Zambeze Moxico Balombo Kachiungo Lun bela gue-B Catum Ekunha Chinguar Kuito Kamakupa ungo a Benguela Chinjenje z Huambo n MOXICO
    [Show full text]
  • Angola Livelihood Zone Report
    ANGOLA Livelihood Zones and Descriptions November 2013 ANGOLA Livelihood Zones and Descriptions November 2013 TABLE OF CONTENTS Acknowledgements…………………………………………………………………………................……….…........……...3 Acronyms and Abbreviations……….………………………………………………………………......…………………....4 Introduction………….…………………………………………………………………………………………......………..5 Livelihood Zoning and Description Methodology……..……………………....………………………......…….…………..5 Livelihoods in Rural Angola….………........………………………………………………………….......……....…………..7 Recent Events Affecting Food Security and Livelihoods………………………...………………………..…….....………..9 Coastal Fishing Horticulture and Non-Farm Income Zone (Livelihood Zone 01)…………….………..…....…………...10 Transitional Banana and Pineapple Farming Zone (Livelihood Zone 02)……….……………………….….....…………..14 Southern Livestock Millet and Sorghum Zone (Livelihood Zone 03)………….………………………….....……..……..17 Sub Humid Livestock and Maize (Livelihood Zone 04)…………………………………...………………………..……..20 Mid-Eastern Cassava and Forest (Livelihood Zone 05)………………..……………………………………….……..…..23 Central Highlands Potato and Vegetable (Livelihood Zone 06)..……………………………………………….………..26 Central Hihghlands Maize and Beans (Livelihood Zone 07)..………..…………………………………………….……..29 Transitional Lowland Maize Cassava and Beans (Livelihood Zone 08)......……………………...………………………..32 Tropical Forest Cassava Banana and Coffee (Livelihood Zone 09)……......……………………………………………..35 Savannah Forest and Market Orientated Cassava (Livelihood Zone 10)…….....………………………………………..38 Savannah Forest and Subsistence Cassava
    [Show full text]
  • Technip Heerema Alliance Wins Major Kaombo Subsea Contract Offshore Angola
    Technip Heerema Alliance wins major Kaombo subsea contract offshore Angola April 16, 2014 The consortium, comprising Technip and Heerema Marine Contractors (Heerema), was awarded a major lump-sum contract by Total E&P Angola for the engineering, procurement, construction, installation (EPCI) and pre-commissioning for the SURF (subsea umbilicals, risers and flowlines) part of the Kaombo project, located in Block 32 offshore Angola in water depths up to 2,000 meters. The contract is valued at approximately USD 3.5 billion with a Technip share of around 55% and a Heerema share of around 45%. This project falls within the Technip Heerema strategic alliance formed 15 months ago that offers comprehensive subsea solutions through a unique combination of complementary assets, technologies and capabilities. It provides the industry with a strong and experienced contractor to address the ultra-deepwater market. The project’s scope of work consists of the engineering, procurement, fabrication, transport and installation of: 18 rigid risers, of the Single Top Tension Riser (STTR) type, including large buoyancy tanks (~40m high, ~6m diameter), flexible top riser jumpers and riser base spools, approximately 300 kilometers (km) of rigid pipe-in-pipe production and single pipe injection pipelines, a large number of subsea structures, piles and steel jumpers. Besides, it covers the transport and installation of approximately 115km of client-supplied umbilicals, manifolds, well jumpers and flying leads. The partners will leverage the complementarity of
    [Show full text]