D51 200 Steam Locomotive: STEP by STEP Stage 41 ™ the Backhead 1

Total Page:16

File Type:pdf, Size:1020Kb

D51 200 Steam Locomotive: STEP by STEP Stage 41 ™ the Backhead 1 D51 200 Steam Locomotive: STEP BY STEP Stage 41 ™ The backhead 1 The backhead Your parts 84 Left Right 1 Fitting the fusible plugs Insert a fusible plug into the circled hole on the backhead. Backhead Required tools Fusible plugs × 4 Gauges (side) Instant adhesive Left water gauge Right water gauge Holding the Gauges (top) plug in place, Valve box turn the backhead Regulator lever over and Screws (2 × 4mm) × 5 apply instant Repeat this process to glue the adhesive to remaining three fusible plugs in the back of place at the circled points. the plug. D51 200 Steam Locomotive: STEP BY STEP ™ 2 Fitting the parts 1 3 Fitting the parts 2 Apply instant Apply instant Apply instant adhesive to adhesive to the adhesive to the hole in area marked in the back of the centre blue on the left. the valve box, along of the Apply instant adhesive to the blue line highlighted the highlighted areas of both shown here. area and water gauges. glue the top gauges into place there. Left Right Glue the side gauges into the recess highlighted in the previous Insert the photo. Then projection on locate the water the back of the gauge positions, valve box into the outlined here Glue the left and right water highlighted hole in red. gauges in place, as shown. on the backhead. 85 4 Fitting the regulator lever Insert the Assembled parts rectangular projection at the bottom of the regulator lever (circled) into the rectangular hole in the squared recess at the side of the backhead. Glue the regulator lever into place with instant adhesive on the inside of the backhead. D51 200 Steam Locomotive: STEP BY STEP Stage 42 ™ The backhead 2 The backhead Your parts 86 1 Fitting the valves Apply instant adhesive to the second hole from the left of the six holes along the valve box. Valve (large) Glue the large valve into Required tools the hole. Valves (small) × 5 Main valve Phillips screwdriver Water injector valve Instant adhesive Water injector Glue the five small Main valve Air cylinder valves into the Small valves Firebox door handle remaining holes. Apply instant Glue the main valve into the Firebox opening adhesive to the remaining hole in the valve box. Left firebox door remaining hole in the valve box Right firebox door (circled). Screws (2 × 4mm) × 5 Large valve D51 200 Steam Locomotive: STEP BY STEP ™ 2 Fitting the water injector 3 Fitting the firebox doors Place the firebox opening over the hole in the backhead and screw into place with Place the air cylinder over two 2 x 4mm the two circled projections of the doors. Glue the injector onto the right screws. side of the backhead, then apply some instant adhesive to the hole on the front (circled). Apply instant adhesive to the Place the right back of the water injector. firebox door over Hold the doors the opening and and cylinder position the brass in place and projection into tighten a Glue the water injector valve the circled hole. screw into into the hole on the front of Then position the each hole in the injector, as shown, with left door in the the back of the handle pointing down. the backhead same way. 87 Fitting the door handle and backhead Place the 4 backhead Assembled parts into the Apply instant back of the adhesive to the smokebox, tip of the circled aligning the projection holes of both and place the (circled). firebox door handle onto it. Tighten a 2 x 4mm screw into each of Make sure the the four holes firebox doors are (arrows) around closed and the the smokebox. lever is positioned as shown. D51 200 Steam Locomotive: STEP BY STEP Stage 43 ™ The front left running board The front left running board Your parts 88 1 Assembling the running board 1 Stay B (bottom) Running board (top) Front left running board Required tools Tighten a 2 x 2mm Side plate screw into each of Stay A Phillips screwdriver the three holes. Stay B Pipe cover (small) Side plate Pipe cover (large) (middle) Screws (2 × 2mm) × 7 Align the highlighted holes of the front left Screws (2 × 3mm) × 12 running board, the side plate and stay B, in that order. Make sure the three adjacent holes of stay B are still visible. D51 200 Steam Locomotive: STEP BY STEP ™ 2 Assembling the running board 2 3 Fitting the pipe covers Align the hole of the small pipe cover with the circled Tighten a hole on the 2 x 2mm running board. screw into the three circled Align the holes of the large holes. pipe cover with the two circled holes on the running board. Place stay A behind the running board, aligning the highlighted holes of both. Tighten a 2 x 3mm Screw 2 x 3mm screw into the hole screws into Check your running board from underneath, the two holes against the one shown here securing the small in the running to confirm that the stays are in pipe cover to the board from the correct positions. running board. underneath. 89 4 Fitting the running board Assembled parts Align the holes Tighten a 2 x 3mm of the stays with screw into each of the the two pairs holes in the two stays highlighted, at the (circled). front left of the boiler. Position Loosen the screws the cut-out in the holding the pipe covers in running board place, adjust the position over the sand pipe of the covers so they fit (circled). closely to the boiler, then re-tighten the screws. D51 200 Steam Locomotive: STEP BY STEP Stage 44 ™ The left running board The left running board Your parts 90 1 Assembling the running board 1 Stay B Stay A Align the highlighted holes (bottom) Running board of left running board A, A (top) side plate A and stay A, in that order. Stay A Side plate A Required tools Stay B Side plate B Place stay B behind the Phillips screwdriver running board, aligning Stay C Side plate C the highlighted holes Stay D Screws (2 × 3mm) of both. Left running × 9 Side plate A (middle) Tighten a board A Screws (2 × 2mm) 2 x 2mm Left running × 20 screw into the three board B circled holes. Left running Tighten a 2 x board C 2mm screw into each of the three holes. D51 200 Steam Locomotive: STEP BY STEP ™ 2 Assembling the running board 2 3 Assembling the running board 3 Running board B Place side plate B under running Running board C board B. Tighten a 2 x 2mm screw into the three circled holes. Side plate C Tighten a 2 x 2mm screw into the Side plate B Hold running board C and side plate C circled holes in the board. together and align the holes at the end with those of stay C. Running board B Stay C Stay D Place stay C at the end of plate B, aligning the holes of both. Tighten a Side plate B 2 x 2mm 91 screw into the two Tighten a 2 x 2mm screw into Holding the plate and board together, the two circled holes, then place circled The assembled running board should now align the three holes at the end with the stay D under running board C, holes. appear as shown. holes in stay B. aligning the holes of both. 4 Fitting the running board Assembled parts Place the running board up against the left side of the Continue along boiler, aligning the the running highlighted holes board, tightening and placing the screws into the cut-outs (circled) remaining stays. over the pipes. Tighten three 2 x 2mm screws into the three circled holes, connecting Tighten two 2 x the running board 3mm screws into to the last stay of the the two holes of previous board. the first stay..
Recommended publications
  • Steam Locomotive Firebox Explosion on the Gettysburg Railroad Near Gardners, Pennsylvania
    Steam Locomotive Firebox Explosion on the Gettysburg Railroad near Gardners, Pennsylvania Leadership ViTS Meeting 6 September 2005 Bryan O’Connor, Chief Office of Safety and Mission Assurance Accident Timeline Place: Gettysburg Railroad near Gardners, PA Accident Date: June 16, 1995 Gettysburg 1278 @ Gettysburg Oct 1988 The Accident: • Steam locomotive 1278 with six passenger cars had completed two excursions and was preparing for a third and final excursion for the day. • During slow climb up moderate grade, the boiler exploded, seriously burning the engineer and two firemen. • . (2) Events Associated with Proximate Cause • Operators began climb with too little water in boiler • Water-level continued to drop and by the time the locomotive had crested the grade the crownsheet of boiler was not covered by water and failed due to thermal overstress. • Failure of crownsheet opened boiler to the firebox (atmosphere) and the water in boiler flashed into high pressure steam. • Steam exploded through firebox door into the locomotive cab, seriously burning the engineer (third degree burns over 65% of body) and two firemen. (3) Events Associated with Proximate Cause Approx. 175 psi This figure is exaggerated to show low water conditions, in locomotive 1278 the lowest gage cock was 3.25 inches above the highest point of the crownsheet and the water glass was 3.125 inches above the highest point of the crownsheet (4) Contributing Factors • Prior to operation the feed pump gauge had been removed. • Preparing to ascend grade first fireman shut off the feed pump to the boiler because a leaking check valve between the feed-pump and the boiler could potentially cause slippage on driving wheels.
    [Show full text]
  • Module BESTT MS1
    Module BESTT MS1 Marine Steam Boiler Types, Construction and Maintenance. Aim This unit introduces learners to the wide variety of fuels which may be encountered in steam launches and small steam ships operating on inland waterways or sheltered coastal waters. The range of types of boilers is explained. In each case, the benefits of each fuel type or boiler type are explored. The reasons for caution when conducting external work on old boilers are explained. INTRODUCTION Boiler types considered Horizontal Fire Tube boilers (including locomotive type) Vertical Fire Tube boilers Horizontal Drum Water Tube boilers Vertical Drum Water Tube boilers Single coil (or Flash) boilers Construction, design and general arrangements Heat transfer Cleaning Considerations for boiler choice and design Options for materials and insulations Boiler cladding materials The sheer variety of boiler types used in marine applications is wider than anything we will encounter for railway locomotives or in road steam applications. Although fire tube boilers from earliest days have been the norm for railway locomotives, water tube boilers could also very occasionally be found in locomotives. The well-known Sentinel shunters had water tube boilers a little bigger but otherwise similar to the company’s steam wagon boilers, and Sir Nigel Gresley on the LNER experimented with a ‘Yarrow’ type boiler but dropped the idea and fitted Britain’s only 4-6-4 express engine with a traditional loco boiler. For shipping, various forms of the classic marine multi-furnace fire tube ‘Scotch’ boiler was a norm to the last, and vertical fire tube types were a standard for small steam launches, but alongside these a huge range of highly efficient water tube types was under constant development resulting in many different configurations.
    [Show full text]
  • 88 Series 2 Boiler Manual
    88 Water & steam boilers – Series 2 for use with Gas, Light Oil, & Gas/Light Oil – Fired Burners Boiler Manual • Installation • Maintenance • Startup • Parts For additional information, refer to . Burner specifi cation and data sheets for burners pre-tested with model 88 boilers This manual must only be used by a qualifi ed INSTALLER Consider piping and installation when determining heating installer/service technician. Read all boiler location. instructions before installing. Follow all in- Any claims for damage or shortage in shipment must be structions in proper order. Failure to comply fi led immediately against the transportation company could result in severe personal injury, death by the consignee. or substantial property damage. USER . This manual is for use only by your qualifi ed heating When calling or writing about the boiler— installer/service technician. Boiler and burner must be Please have the boiler model number from the installed by a qualifi ed service technician. We recom- boiler rating label and the CP number from mend regular service by a qualifi ed service technician, the boiler jacket. at least annually. Part No. 550-100-068/1018 Weil-McLain 88 Water and steam boilers — Series 2 — for Gas, Light Oil, & Gas/Light Oil-Fired Burners Read before proceeding Hazard Definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels, or to important information concern- ing the life of the product. Indicates presence of hazards that will cause severe personal injury, death or substantial property damage if ignored. Indicates presence of hazards that can cause severe personal injury, death or substantial property damage if ignored.
    [Show full text]
  • Hurst Boiler & Welding Company, Inc
    Hurst Boiler & Welding Company, Inc. P.O. Drawer 530 - Highway 319 North Coolidge, Georgia 31738 877-99HURST – Toll Free 229-346-3545 – Local 229-346-3874 – Fax www.hurstboiler.com SERIES 45 STEAM BOILER (8.5- 813 HP, STEAM 15 psig) SAMPLE SPECIFICATIONS The following sample specifications are provided by Hurst Boiler & Welding Co., Inc. to assist you in meeting your customer's specific needs and application. The sample specifications are typically utilized as the base template for the complete boiler specification. Contact your local Hurst Boiler & Welding Co., Inc. authorized representative for information on special insurance requirements, special code requirements, optional equipment, or general assistance in completing the specification. 1.0 – General Boiler Specifications 1.1 - The Steam Boiler shall be Hurst Boiler & Welding Co., Inc. Series 45, hp designed for 15 psig. The maximum operating pressure shall be psig and the minimum operating pressure shall be psig. 1.2 - The boiler shall have a maximum output of Btu/hr, or horsepower when fired with oil and/or natural gas, Btu/cu-ft. Electrical power available shall be Volt Phase Cycle. 2.0 – Boiler Design 2.1 - The boiler shall be a three-pass wetback horizontal firebox type boiler with four (4) square feet of fireside heating surface per rated boiler horsepower. Furnace volume shall not be less than cubic feet. It shall be mounted on a heavy steel frame with integral forced draft burner and burner controls. The complete packaged boiler approved as a unit by Underwriters Laboratories and shall bear the UL label. 2.2 - The boiler shall be completely preassembled and tested at the factory.
    [Show full text]
  • Steam Power Plant
    www.getmyuni.com Steam Power Plant A power plant is assembly of systems or subsystems to generate electricity, i.e., power with economy and requirements. The power plant itself must be useful economically and environmental friendly to the society. The present book is oriented to conventional as well as non-conventional energy generation. While the stress is on energy efficient system regards conventional power systems viz., to increase the system conversion efficiency the supreme goal is to develop, design, and manufacturer the non-conventional power generating systems in coming decades preferably after 2050 AD which are conducive to society as well as having feasible energy conversion efficiency and non-friendly to pollution, keeping in view the pollution act. The subject as a whole can be also stated as modern power plants for power viz electricity generation in 21st century. The word modern means pertaining to time. At present due to energy crisis the first goal is to conserve energy for future while the second step is todevelop alternative energy systems including direct energy conversion devices, with the devotion, dedication and determination remembering the phrase, “Delve and Delve Again till wade into”. CLASSIFICATION OF POWER PLANTS Power Plant 1. Conventional - Steam Engines Power Plants - S team Turbine Power Plants - Diesel Power Plants - Gas Turbine Power Plants - Hydro-Electric Power Plants - Nuclear Power Plants Thermoelectric Generator 2. Non-conventional Thermoelectric generator Fuel-cells Power Plants Photovoltaic solar cells Power S ystem MHD Power Plants Fussion Reactor N PP Power S y stem Biogas, Biomass Energy Power sy stem Geothermal Energy Wind Energy Power System Ocean Thermal energy conversion (OTEC) Wave and Tidal Wave Energ y Plantation Scheme A power plant may be defined as a machine or assembly of equipment that generates and delivers a flow of mechanical or electrical energy.
    [Show full text]
  • Steam Locomotive Firebox Explosion on the Gettysburg Railroad Near Gardners, Pennsylvania June 16, 1995
    PB96-917008 NTSB/SIR-96/05 NATIONAL TRANSPORTATION SAFETY BOARD WASHINGTON, DC 20594 SPECIAL INVESTIGATION REPORT STEAM LOCOMOTIVE FIREBOX EXPLOSION ON THE GETTYSBURG RAILROAD NEAR GARDNERS, PENNSYLVANIA JUNE 16, 1995 . Illlr 6768 Abstract: On June 16, 1995, the firebox crownsheet of Gettysburg Passenger Services, Inc., steam locomotive 1278 failed while the locomotive was pulling a six-car excursion train about 15 mph near Gardners, Pennsylvania. The failure resulted in an instantaneous release (explosion) of steam through the firebox door and into the locomotive cab, seriously burning the engineer and the two firemen. This accident illustrates the hazards that are always present in the operation of steam locomotives. The Safety Board is concerned that these hazards may be becoming more significant because Federal regulatory controls are outdated and because expertise in operating and maintaining steam locomotives is diminishing steadily. As a result of its investigation, the National Transportation Safety Board issued safety recommendations to the Federal Railroad Administration, the National Board of Boiler and Pressure Vessel Inspectors, and the Tourist Railway Association, Inc. The National Transportation Safety Board is an independent Federal agency dedicated to promoting aviation, railroad, highway, marine, pipeline, and hazardous materials safety. Established in 1967, the agency is mandated by Congress through the Independent Safety Board Act of 1974 to investigate transportation accidents, determine the probable causes of the accidents, issue safety recommendations, study transportation safety issues, and evaluate the safety effectiveness of government agencies involved in transportation. The Safety Board makes public its actions and decisions through accident reports, safety studies, special investigation reports, safety recommendations, and statistical reviews.
    [Show full text]
  • Firebox Design and Its Relation to Boiler Performance
    ry C5-4 / FIREBOX DESIGN AND ITS RELATION TO BOILER PERFORMANCE BY CHARLES M. CLARK AND JAMES HERRON WESTBAY THESIS FOR THE DEGREE OF BACHELOR OF SCIENCE IN RAILWAY MECHANICAL ENGINEERING COLLEGE OF ENGINEERING UNIVERSITY OF ILLINOIS 1917 UNIVERSITY OF ILLINOIS 7 THIS IS TO CERTIFY THAT THE THESIS PREPARED UNDER MY SUPERVISION BY C HARLES M, . CLARK AND JAMES HERRON JffESTBAY . ENTITLED FIRgBOX DSSICT,,^ IS APPROVED BY ME AS FULFILLING THIS PART OF THE REQUIREMENTS FOR THE DEGREE OF MSHELGR.^ ..SC^EEC^^ Instructor in Charge Approved : HEAD OF DEPARTMENT OF RAILWAY ENGINEERING . 3 FIREBOX DESIGN AND ITS RELATION TO BOILER PERFORMANCE. Contents Page Introduction ------------------- 1 Purpose ------------------ 2 Part I. Theory of Combustion Definition -------------- - 2 The Combustion Process and Heat Distribution 2 Summary ------------------ 11 Part II. Heat Transmission in Locomotive Fireboxes Radiation ------------------ 1 Conduction ----------------- 14 Convection ----------------- 15 Graphical Representation of Heat Transfer - 19 Summary ------------------ 20 Part III. Heat Distribution and Firebox Efficiency Discussion of Articles by Mr. Anthony - - - - 21 Summary -------------------25 Part IV. Test Results and their Analysis The Brick Arch - Coatesville Tests ----- 27 The Brick Arch - P. R. R. Tests -------29 Grate Area - P. R. R. Tests -------- 34 Combustion Chamber - P. R. R. Tests ----- 36 Summary ------------------- Part V. General Conclusion - -- -- - -- -- -- 41 Acknowledgements -------------- 43 Digitized by the Internet Archive in 2013 http://archive.org/details/fireboxdesignitsOOclar . FIREBOX DESIGN AND ITS RELATION TO BOILER PERFORMANCE Introduction . The performance of a locomotive boiler is dependent to a very large extent upon the design of its firebox. A great deal of experimental work has been done in an effort to determine what steps should be taken to improve boiler performance and to increase boiler efficiency.
    [Show full text]
  • API Recommended Practice 538 Industrial Fired Boilers for General Refinery and Petrochemical Service
    API Recommended Practice 538 Industrial Fired Boilers for General Refinery and Petrochemical Service FIRST EDITION | OCTOBER 2015 | 348 PAGES | $305.00 | PRODUCT NO. C53801 This recommended practice (RP) specifies requirements For ordering information: and gives recommendations for design, operation, Online: www.api.org/pubs maintenance, and troubleshooting considerations for industrial fired boilers used in refineries and chemical Phone: 1-800-854-7179 plants. It covers waterside control, combustion control, (Toll-free in the U.S. and Canada) burner management systems (BMSs), feedwater preparation, steam purity, emissions, etc. (+1) 303-397-7056 This RP does not apply to fire tube boilers, gas turbine (Local and International) exhaust boilers, or fluidized bed boilers. Fax: (+1) 303-397-2740 This RP does not cover boiler mechanical construction. Purchaser or owner shall specify codes such as ASME, ISO, etc. API members receive a 30% discount where applicable. This RP does not cover forced circulation boilers. www.api.org Contents Page 1 Scope . 1 2 Normative References . 1 3 Terms, Definitions, Acronyms, and Abbreviations . 3 3.1 Terms and Definitions . 3 3.2 Acronyms and Abbreviations . 18 4 Boilers—Equipment Overview. 20 4.1 General Considerations . 20 4.2 Operations . 23 4.3 Boiler Configurations . 29 4.4 Fuels Fired in Industrial Steam Boilers. 41 4.5 Igniter Management System . 41 4.6 Burner Management Systems . 43 4.7 Boiler Feedwater Preparation . 45 4.8 Boiler Water Quality and Internal Chemical Treatment. 45 4.9 Steam Purity. 45 4.10 Boiler Performance . 46 5 Water Tube Boiler Components. 49 5.1 Pressure Parts—Superheaters/Attemperators .
    [Show full text]
  • LOCOMOTIVE NO. 40 Built by the AMERICAN LOCOMOTIVE COMPANY at Their Dunkirk (N.Y.) Works in August 1920, No. 40 Has Had a Long A
    The Valley Railroad Company 1 Railroad Avenue, PO Box 452, Essex, CT 06426 Phone: 860-767-0103 fax: 860-767-0104 LOCOMOTIVE NO. 40 Built by the AMERICAN LOCOMOTIVE COMPANY at their Dunkirk (N.Y.) works in August 1920, No. 40 has had a long and interesting career. It was one of an order for three identical units constructed for The Portland, Astoria & Pacific Railroad to haul train loads of logs and lumber. Unfortunately, the PA&P was never completed so the locomotives sat idle until they were sold to other railroads. No. 101 (our locomotive) was sold to the Minarets & Western Railway for similar service. When that railroad could not pay it’s debts, the locomotive was given to the Southern Pacific Railroad, which sold it to a used locomotive dealer which in turn sold it to The Aberdeen & Rockfish Railroad in North Carolina as their N0.40. On the A&R it pulled freight and passenger trains until about 1950 when it was retired and stored in their engine house. Here it remained until it was discovered by an employee of the Valley Railroad. It was purchased in 1977 and loaded onto flat cars for it’s trip to Essex and a new career pulling trainloads of tourists for the Essex Steam Train & Riverboat. No.40 is one of less than 200 steam locomotives in the United States which remain in operable condition. It burns about 2 tons of low sulfur coal for fuel each day and evaporates about 6000 gallons of water pulling a 400 ton train a total of 50 miles.
    [Show full text]
  • The Thermo-Mechanical Behavior of the Steam Locomotive Boiler Firebox: an Overall View Ing
    The Thermo-Mechanical Behavior of the Steam Locomotive Boiler Firebox: An Overall View Ing. Livio Dante Porta Edited: Hugh Odom, P.E. & Davidson Ward Foreword: Ing. Shaun T. McMahon About the Coalition for Sustainable Rail The Coalition for Sustainable Rail (CSR) is dedicated to advancement of modern steam technologies, research and development of biofuels, and educational outreach. CSR is a 501c(3) nonprofit working in collaboration with the University of Minnesota to advance the state of the art in these areas. A scientific and educational organization, CSR’s mission is to advance biofuel research and production; to research and develop sustainable railroad locomotives; to promulgate associated sustainable technologies; and to support and conduct non-partisan educational and informational activities to increase awareness of its mission. About CSR’s White Paper Program Working in conjunction with the University of Minnesota (U of M), the Porta Family Foundation, and other not- for-profit rail and biomass research organizations, CSR’s White Paper Program brings works pertinent to biofuel, modern steam locomotive and transportation research into the public discourse. Cover Image - An image of the crown sheet of a mainline, U.S. steam locomotive taken during routine maintenance. ©2015 This paper is covered by the Creative Commons “Attribution-No Derivs-NonCommercial” license (see http://creativecommons.org). It may be reproduced in its entirety as long as the Coalition for Sustainable Rail is credited, a link to CSR’s website is provided and no charge is imposed. The paper may not be reproduced in part or in altered form, or if a fee is charged.
    [Show full text]
  • Patented Nov. 9, 1909. 5 SHEETS-SHEET
    E, FEIGHTNER SUPERHEATER FOR LOCOMOTIVE BOILERS, APPLICATION FILED MAR, 27, 1909. 939,237. Patented Nov. 9, 1909. 5 SHEETS-SHEET , S N N N N N N N S. I, E, FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, 939,237. APPLICATION FILED MAR. 27, 1909, Patented Nov. 9, 1909. 5 SPEEES-SHEET 2, rare - AEREw. 3. GRAHA c. PT-LRApHERS, WASH:NGT8, 9. L. E. FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, APPLICATION FILED MAR, 27, 1909. Patented Nov, 9, 1909. 5 SHEETS-SBEET 3. ife-as OSDEDAPT R RTRea statees Nassetts SSSR'sIIT saaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa. I I I I I I If ES III 72%22a-2.FIUUUUUI o/eveeczz L. E. FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, APPLICATION FILED MAR, 27, 1909, 939,237. Patented NOW, 9, 1909. 5 SHEETS-SHEET 4. S Ya N 7.A7 2-1se 2.Y 5 Ya. - S. 5 2 QS s 3 ()V Wa S. y s Sn , ; c. ( ra - M - ---1 ; S3v. - l S.A O A Lality N All 3 IN I, E, FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, 939,237. APPLICATION FILED MAR, 27, 1909, Patented NOW, 9, 1909. 5 SBEES-SEET 5. o4-2-242. e éezzo G (72%ze, 42. 9 Cov//evacu- a22-22 a1 6-2-2, 42 UNITED STATES FATENT OFFICE. LEWIS E. FEIGHTNER, OF LIVIA, OHIO, ASSIGNOR TO LIVIA LOCOMOTIVE & MACHINE CoMPANY, OF LIMIA, OHIO, A CORPORATION OF OHIO. SUPERHEATER FOR LOCOMOTIVE-BOILERS. 9:39,23. Specification of Letters Patent. Patented Nov. 9, 1909. Application filed March 27, 1909, Serial No. 486,074, To all whom it may concern.
    [Show full text]
  • The Boiler, Frame and Firebox of No. 759 Exposed in the Erecting Hall of Lima Locomotive Works a Month Before Completion
    The boiler, frame and firebox of no. 759 exposed in the erecting hall of Lima Locomotive Works a month before completion. Returning the 765 to service would require the most extensive work since the locomotive’s construction. Allen County Historical Society NICKEL PLATED RESTORATION By Kelly Lynch TRAINS, June 2006 The midnight sky of last October 28th was cold and clear, chilled (and there were others in the family on the Erie, Missouri Pacific, and Pere with an imminent frost and illuminated by faraway stars. In the darkness, Marquette, including preserved 2-8-4 no. 1225, which also sees excursion atop a set of gleaming rails, sat a slumbering giant, Nickel Plate 2-8-4 no. service in Michigan). Her 69-inch drivers were ready to cool after 14 years 765, fresh out of the shop. The towering steam locomotive cut a powerful of excursions. Since her restoration in 1979, the 765 had operated 277 silhouette as it captured an interlude beneath the late night heavens. Steam days, pulled 140 revenue trips, handled more than 100,000 passengers, rose and swirled around its glossy black skin. The headlight cut a steady accumulated 22 million passenger miles and made cameo appearances in stark white path through the air. On its smokebox, inscribed on a diamond two feature films. shaped plate, read the year of her construction: 1944. “I never took any trip for granted,” confided crewmember Jerry For anyone caught in the shadow of the 14-wheeled superpower Feicht. “Each one of them was great. I lived them like they were the last.
    [Show full text]