Ebbsfleet Public Realm Landscape Character Overview Use This Landscape Character Overview to Guide the Characterisation of Your Public Realm Design Concept

Total Page:16

File Type:pdf, Size:1020Kb

Ebbsfleet Public Realm Landscape Character Overview Use This Landscape Character Overview to Guide the Characterisation of Your Public Realm Design Concept Ebbsfleet Public Realm Landscape Character Overview Use this landscape character overview to guide the characterisation of your public realm design concept. This analysis of Ebbsfleet’s distinctive landscapes identifies four unifying landscape themes; Water, Chalk, Agriculture, and Industry. These themes should be used to inspire a distinctive and characterful landscape design in all future public 2 realm future projects. Introduction Landscape character mapping Landscape narratives Landscape character areas Ebbsfleet’s iconic landscapes provide a rich source of inspiration for developing dinstinctive and characterful public realm This best-practice guidance document has been developed to define Integrated design the preferred approach for designing and delivering the public realm in a 21st Century Garden City. This chapter summarises the high level landscape character assessment carried out as part of the development of the public realm strategy. This This chapter summarises the high level landscape This chapter has been used to inform the assessment builds on previous landscape character character assessment carried out as part of development of the evaluation framework assessments carried out as part of the Ebbsfleet the development of the public realm strategy. indicator 3: Identity & Sense of Place (chapter Implementation Framework and further defines the This assessment builds on previous landscape 3), and the development of the detailed design key characteristics and themes that create Ebbsfleet’s distinctive sense of place today. character assessments carried out as part of the guidance within the hard materials strategy Ebbsfleet Implementation Framework and further (chapter 5) and planting strategy (chapter 6). defines the key characteristics and themes that The study identifies four unifying narratives ; create Ebbsfleet’s distinctive sense of place water, today. chalk, agriculture, and The study identifies four unifying narratives industry. water, and outlines the variations of each narrative within chalk, the landscape character areas. agriculture, and industry. This chapter has been used to inform the development of the evaluation framework and outlines the variations of each narrative indicator 3: Identity & Sense of Place (chapter within the landscape character areas. 3), and the development of the detailed design guidance within the hard materials strategy (chapter 5) and planting strategy (chapter 6). 28 Ebbsfle et Public Realm Strategy Landscape Character Overview Developing the design narrative Overview of landscape Using the assessment in your character areas process The following pages were developed to form Step 3: Multiple site visits were performed to Ebbsfleet Garden City is taking shape in a network The content of this chapter should form critical the foundation for the ensuing design guidance catalogue and record the experiential qualities of of chalk quarries dug out of former fertile background information for the site appraisal in step within this document and has been carried out the landscape character areas through notes and farmland on the banks 1 of the design process (chapter 1) as well as the on a high level. The study builds on previous photographs. of the River Thames. The landscape is a vivid development of the design narratives and principles in landscape analysis and utilised a tried and tested record of the interactions between natural forces step 2 of the design process (chapter 1). Additionally, approach that has been previously used to Step 4: The existing landscape features were and the people who have lived and worked here the 4 unifying narratives and their distinct variations form the basis for the hard landscape strategy develop narratives to inspire the public realm and mapped and analysed to define the key themes over the long history of human settlement. This (chapter 5) and the planting strategy (chapter 6) landscape of Eastern Quarry and Ebbsfleet Valley. and characteristics within the existing landscape. unique post agricultural and post-industrial contained within this document. Each public realm The study was carried out using the following six landscape provides a dramatic setting for the design proposal should, therefore, be developed to steps: Step 5: From the analysis a high level series of new Garden City, and should be used to form reference the outlined hard materials and planting Step 1: The existing landscape character studies narratives for the design of the public realm was the inspiration for an equally distinctive public strategies in step 3 of the design process (chapter 1). and landscape analysis carried out as a part of developed to communicate the four unifying realm that meets the ambitions laid out within this the Ebbsfleet Implementation Framework were themes across Ebbsfleet Garden City. document. Any variations from the narratives and design reviewed. principles outlined in this chapter should be justified Step 6: A list of overarching, high level design The four landscape character areas in Ebbsfleet by further developing the landscape character Step 2: The available historic landscape principles were developed for each of the four Garden City are: assessment and establishing a unique design narrative information, historic maps, and national character defined landscape character areas. These Chalk Quarries, grown from the specific sense of place of the site areas were reviewed to uncover evidence of the design principles built upon both the site specific Ebbsfleet Valley, under consideration. The development of the public historic landscape features. variations and the four unifying narratives Swanscombe Marshes, and realm’s design narrative is critical as this chapter will that were revealed in the landscape analysis Northfleet Riverside. be used as a tool to evaluate if public realm proposals meet the vision laid out in the evaluation framework undertaken in steps 1 through 4. These four character areas are identified in a map on (chapter 3) - specifically the evaluation checklist of page 32 and the characteristics of each character area Indicator 3: Identity and Sense of Place. are described on pages 33 - 37. The four unifying narratives are identified on pages 28 - 31. These are present across Ebbsfleet Garden City, and have been analysed across the four landscape character areas, and the distinctive variations outlined. For example, the unifying narrative of water is defined by lakes within the Chalk Quarries, the Ebbsfleet River within Ebbsfleet Valley, the River Thames embankments of Northfleet Riverside, and the mudflats and salt marshes of Swanscombe Marshes. 29 Ebbsfle et Public Realm Strategy Landscape Character Overview 0 Landscape character MAPPING Geology & Topography 0 0 10 10 0 20 0 20 10 30 0 10 0 River Thames 20 Greater Thames Estuary 10 40 30 River Thames 0 0 20 10 10 10 20 0 10 0 30 20 40 10 0 20 10 40 0 30 10 40 0 0 10 10 20 10 30 30 10 10 40 0 1040 10 20 30 30 40 10 0 10 10 30 20 40 30 30 50 10 0 0 20 50 60 10 20 30 20 50 50 30 10 20 20 0 20 10 40 30 10 40 0 30 20 0 0 20 60 40 10 20 10 20 10 60 North Kent Plains 0 50 20 20 20 50 20 30 10 60 40 50 10 80 10 20 70 80 30 70 0 80 50 40 0 90 40 20 80 10 40 0 90 10 60 40 30 30 10 20 10 10 10 Water 50m 0 Superficial Topography 20 Geology40 Ebbsfleet Garden City’s topography is characterised by the 50 Alluvium - clay, silt, sand, peat 20 60m 0 Ebbsfleet Garden City is located within two distinct 100m Ebbsfleet River Valley, the low lying areas along the Thames 10 40 Boyne Hill Gravel - sand, gravel 20 0 60 geological50 zones: the Greater Thames Estuary alluvial 10 0 30 50 River bank, and the area’s history of quarry activities. These 30 20 70m 0 70 clay and the North80 Kent Plains chalk. Over time the land 10m 10 0 0 20 10 40 Bedrock distinctive topographic features have shaped the Garden30 has been formed by water (e.g. process of erosion and 20 80m 0 80 20 City’s30 hydrology and need to be studied in relationship to 10 20 10 20 60 deposition) and human interaction (e.g. the chalk10 quarries). Chalk 20 20m 40 70 proposed sustainable20 urban drainage systems and planting 10 50 30 80 50 30 10 40 50 In a number of places, the chalk bedrock has been exposed Thanet Formation - sand 90m 30 30 20 10 20 strategies. Additionally the site’s topography provides 90 30m 10 80 and forms a distinctive characteristic of the existing Lambeth Group - sand, silt, clay opportunities for distinctive viewing points (e.g. from the 40 landscape. Additionally, the soil properties and underlying 0 30 50 Ebbsfleet 20 former landfill in Ebbsfleet Central) and it will need to be 0 90 40m 20 0 geology are known to effect the infiltration levels of 60 Garden 10 City 20 20 20 Ebbsfleet Garden City used to identify appropriate infrastructural20 connection 50 50 30 10 10 20 60 40 surface water and will have an impact on sustainable urban points across the Garden City. 0 20 0 10 20 drainage systems (SuDS). 60 40 10 0 10 0 50 20 20 50 20 20 60 40 60 30 40 70 Ebbsfle et Public Realm Strategy80 Landscape Character Overview 60 80 30 70 80 50 80 90 70 80 90 80 30 70 80 50 90 80 90 Landscape character MAPPING National character areas Greater Thames Estuary Open views along the Greater Thames Estuary Enclosed view within the North Kent Plains Quarries North Kent Plains Open views along the Greater Thames Estuary Enclosed view within the North Kent Plains Quarries This diagram is based on Natural England’s NCA profiles National Character Areas Greater Thames Estuary North Kent Plains Greater Thames Estuary Ebbsfleet Garden City is located within two distinct national landscape character areas: The Greater Thames Estuary and the • flat, low lying coastal landscape • undulating chalk above sea level North Kent Plains.
Recommended publications
  • Appendix 7.1 Policy
    THE LONDON RESORT PRELIMINARY ENVIRONMENTAL INFORMATION REPORT Appendix 7.1 Policy INTRODUCTION This appendix outlines key policies relating to the London Resort at the national, regional and local planning authority (LPA) levels, in relation to socio-economics. The policies of the following key stakeholders have been reviewed and presented in this appendix: local authorities within the core study area (CSA), namely Dartford, Gravesham and Thurrock, local enterprise partnerships (LEPs), regional bodies including the Kent and Medway Economic Partnership (KMEP), the Thames Gateway Kent Partnership (TGKP) and Kent County Council (KCC), and government departments. This appendix aims to act as a more detailed review of the polices that are referenced in Chapter 7: Land-use and socio- economics, with a focus on the key themes of relevance to socio-economics. POLICY SUMMARIES This section summarises the policy priorities and requirements across all stakeholders, grouped by key topic area. The key purpose of this section is to provide a link to where each policy theme is addressed in Chapter 7: Land-use and socio-economics. Economic growth The NPPF chapter 6 focuses on growing a strong, competitive economy. At the sub- regional levels, both the Kent and Medway Economic Partnership (KMEP) and the Thames Gateway Kent Partnership (TGKP) note productivity issues in their economies (as is the case at the national level) and establish policies focusing on improving their productivity. In fact, the TGKP identifies the Swanscombe Peninsula area as a key employment location in which they would like to attract and retain investment. At the Core Study Area (CSA) level, Dartford’s Core Strategy states that key growth sectors include the creative industries, hospitality, leisure, built environment and construction.
    [Show full text]
  • Thames Gateway Risk Profile
    Review of Emergency Response Provision: Thames Gateway Cluster Risk Profile RERP - Thames Gateway Cluster Risk Profile Contents Introduction ........................................................................................................................... 4 Description of Cluster ............................................................................................................ 5 Cluster Demographics and Population Risk Factors.............................................................. 6 Deprivation .......................................................................................................................... 10 Overall Cluster Risk ............................................................................................................ 11 Dwellings ......................................................................................................................... 11 Special Service ................................................................................................................ 12 Geodemographic Segmentation .......................................................................................... 13 Cluster Geodemographic Segmentation .......................................................................... 14 Building Usage as a Risk Identifier ...................................................................................... 16 Other Building Risk ............................................................................................................. 17 Sleeping Accommodation
    [Show full text]
  • Preliminary Environmental Information Report Volume 1 – Main Text 19/02/18 Status: A1 Signed Off - Publication Document Ref: HE543917-ATK-EAC-RP-LM-000001.Docx
    Et12 Regional Investment Programme A2 Bean and Ebbsfleet Junction Improvements Preliminary Environmental Information Report Volume 1 – Main Text 19/02/18 Status: A1 Signed off - Publication Document Ref: HE543917-ATK-EAC-RP-LM-000001.docx Regional Investment Programme A2 Bean and Ebbsfleet Junction Improvements Preliminary Environmental Information Report Volume 1 – Main Text Notice This document and its contents have been prepared and are intended solely for Highways England’s information and use in relation to A2 Bean and Ebbsfleet Junction Improvement Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 183 pages including the cover. Document history Job number: HE543917 Document ref: HE543917-ATK-EAC-RP-LM-000001 Purpose Revision Status Originated Checked Reviewed Authorised Date description Issue for C03 A1 AR LJB AMB CH 19/02/18 Consultation C02 B1 For HE 2nd Review AR LJB AMB AEM 16/02/18 For Initial Review & C01 A1 AR LJB AMB CH 26/01/18 Comment Client signoff Client Highways England Project A2 Bean Ebbsfleet Junction Improvements Document title Regional Investment Programme A2 Bean and Ebbsfleet Junction Job no. HE543917 Copy no. Document HE543917-ATK-EAC-RP-LM-000001 C03 reference Status A1 Signed off - Publication Revision C03 Page 2 of 183 Regional Investment Programme A2 Bean and Ebbsfleet Junction Improvements Preliminary Environmental Information Report Volume 1 – Main Text Table of contents Chapter Pages Volume 1 7 Chapter 1 - Introduction 8 1.1. Overview of project 8 1.2. Purpose of the Preliminary Environmental Information Report (PEIR) 9 1.3.
    [Show full text]
  • Fragile Gods: Ceramic Figurines in Roman Britain Volume 1
    Fragile Gods: Ceramic Figurines in Roman Britain Volume 1 Thesis submitted for the degree of Doctor of Philosophy Department of Archaeology, University of Reading Matthew G. Fittock December 2017 Declaration I certify that this is my own work and that use of material from other sources has been properly and fully acknowledged in the text. I have read the University’s definition of plagiarism and the department’s advice on good academic practice. I understand that the consequence of committing plagiarism, if proven and in the absence of mitigating circumstances, may include failure in the Year or Part or removal from the membership of the University. I also certify that neither this piece of work, nor any part of it, has been submitted in connection with another assessment. Signature: Date: i Abstract As small portable forms of statuary, pipeclay objects provide a valuable insight into the religious beliefs and practices of the culturally mixed populations of the Roman provinces. This thesis provides a complete catalogue of the nearly 1000 published and unpublished pipeclay objects found in Britain, including figurines, busts, shrines, animal vessels and masks. This research is the first study of this material conducted since the late 1970s. Pipeclay objects were made in Gaul and the Rhine-Moselle region but not in Britain. Attention thus focuses on where and how the British finds were made by analysing their styles, types, fabrics and any makers’ marks. This reveals how the pipeclay market in Britain was supplied and how these objects were traded, and suggests that cultural rather than production and trade factors were more influential on pipeclay consumption in Britain.
    [Show full text]
  • Officer Presentation
    Creating a 21st Century Garden City Eastern Quarry AGENDA ITEM 005 Reserved Matters Application for the construction of a public house including an ancillary hotel, restaurant, function room, associated residential accommodation, car parking and landscaping Application - EDC/19/0137 Applicant - Shepherd Neame Castle Hill Local Centre Cherry Orchard Castle Hill Ebbsfleet Valley Kent SITE CONTEXT Greenhithe Swanscombe Ebbsfleet international Bluewater station Ebbsfleet A2 Green EQ PLANNING FRAMEWORK Eastern Quarry Outline Permission Reserved Matters Reserved Matters SITE WIDE MASTER PLANS Ashmere Alkerden Castle Hill CASTLE HILL SITE LOCATION PLAN N Village Green Fastrack Undeveloped land Commercial Centre School & Community Centre Village Centre Car Park SITE PHOTOS SITE PHOTOS SITE PHOTOS SITE PHOTOS No.53 Pub garden No.24 Undeveloped land Fastrack FLOOR PLANS SECOND FLOOR UPPER GROUND FLOOR FIRST FLOOR LOWER GROUND FLOOR ELEVATIONS Fastrack Cherry Orchard ELEVATIONS Rear Elevation West Elevation STREET SCENES Cherry Orchard Fastrack Corridor View from Fastrack looking north-east View from Cherry Orchard looking east View from Cherry Orchard Looking South View from Fastrack looking north-west View from Fastrack looking north-east PARKING PROVISION & DEMAND Local Parking Standards • Parking is optimal for operations. • Highly sustainable location. • Encourages local community to travel sustainably. • Travel plan secured. Local Centre Parking Demand with Public House Overspill Disabled parking, cycle storage and the provision of active electric vehicle charging all meet or exceed the Dartford SPD requirements. Fri Sat Sun Ebbsfleet Public Realm Strategy Update Update on progress. • Public engagement - June 2019 • Strategy adopted by EDC Board in September. • Strategy supported by Dartford Borough Council. • Strategy presented to Gravesham Strategic Environment Committee in November for endorsement.
    [Show full text]
  • Implementation Framework Summary
    WelcomeImplementation to Framework EbbsfleetSummary 2017 Ebbsfleet Development Corporation 1 Ebbsfleet Implementation Framework Summary Contents Welcome to Ebbsfleet, a Garden City for the 21st Century Welcome to Ebbsfleet Welcome to Ebbsfleet 2 Sitting on the banks of the Thames, only 17 minutes from Kings Ebbsfleet’s connections 4 Cross / St Pancras, Ebbsfleet is being planned to grow out of the A rich landscape 6 chalk quarries and industrial heritage of northern Kent to become a Ebbsfleet in 2035 healthy, happy new place to invest, live, work and play within. A 21st Century Garden City 8 Ebbsfleet is sponsored by been developed together with the and other stakeholders, investing Government to become a ‘Garden city’s developers, local authorities, public money to implement the Ebbsfleet Central 12 City’ to add ambition, quality and pace and local people to create a shared framework, increasing the pace, to planned development between vision for Ebbsfleet. quality and ambition of planned Northfleet Riverside 14 Dartford and Gravesend. developments, and securing the It assimilates their experience and Eastern Quarry 16 best possible returns for the local The Garden City benchmark is a current ambitions, as well as the community and national tax payer. commitment to build on the legacy of existing planning permissions, to Swanscombe Peninsula 18 Ebenezer Howard’s original Garden provide a shared spatial framework Cities at Welwyn and Letchworth, for delivering a 21st Century The role of the Spatial Framework and create a place founded on quality Garden City Implementation Framework place-making, community building This summary document provides Delivering Ebbsfleet 20 and sustainability, making long term The Framework supports the needs of the existing communities an overview of Ebbsfleet’s arrangements for the care of public Implementation Framework.
    [Show full text]
  • Situation of Polling Stations
    SITUATION OF POLLING STATIONS Dartford Borough Council Election of the Police and Crime Commissioner For the Kent Police Area Thursday 6 May 2021 The situation of polling stations is as follows: Description of Station Situation of Polling Station persons entitled Number to vote Arrow Riding Centre (Arrow Riding Centre), Darenth Park Avenue, Darenth, Kent, DA2 6LZ 1 / BEA1 1 to 746 Bean Village Hall (Bean Village Hall), High Street, Bean, Dartford, Kent, DA2 8AS 2 / BEA2 1 to 1230 Dartford Bridge Learning & Community Campus (BRG1), Birdwood Avenue, Dartford, Kent, 3 / BRG1 1 to 1970 DA1 5GB Dartford Bridge Learning & Community Campus (BRG2) (Dartford Bridge Learning & 4 / BRG2 1 to 595 Community Campus (BRG2)), Birdwood Avenue, Dartford, Kent, DA1 5GB Dartford Primary Academy (Juniors), York Road, Dartford, Kent, DA1 1SQ 5 / BRT1 1 to 1600 Princes Park, Grassbanks, Dartford, Kent, DA1 1RT 6 / BRT2 1 to 423 Fleetdown Library (BRT3), Swaledale Road, Dartford, Kent, DA2 6JZ 7 / BRT3 1 to 2397 Holy Trinity C of E School, Chatsworth Road, Dartford, Kent, DA1 5AF 8 / BUR1 1 to 2215 Darenth Hall (DAR1), Ladywood Road, Darenth, Dartford, Kent, DA2 7LL 9 / DAR1 1 to 1123 Darenth Hall (DAR2), Ladywood Road, Darenth, Dartford, Kent, DA2 7LL 10 / DAR2 1 to 912 Castle Hill Community Centre, Cherry Orchard, Castle Hill, Ebbsfleet Valley, Kent, DA10 11 / EBB1 1 to 2263 1AD Mobile Unit, Snowden Hill, Northfleet, Kent, DA11 9AE 12 / EBB2 1 to 562 Knockhall Academy, Eynsford Road, Greenhithe, Kent, DA9 9RF 13 / GRE1 1 to 2267 Sir John Franklin, High Street,
    [Show full text]
  • A2 Bean and Ebbsfleet Junction Improvements Made Order
    A2 Bean and Ebbsfleet Junction Improvements Made Order The Highways England (A2 Trunk Road Bean and Ebbsfleet Junction Improvements) Compulsory Purchase Order 2019 Order and Schedule 2019 Contents THE HIGHWAYS ENGLAND (A2 TRUNK ROAD BEAN AND EBBSFLEET JUNCTION IMPROVEMENTS) COMPULSORY PURCHASE ORDER 2019 Order (Order and Schedule Booklet) Schedule (Table 1 & 2) The Plan Folio Key Key Plan (Plans Booklet) Sheets 1 & 2 THE HIGHWAYS ENGLAND (A2 TRUNK ROAD BEAN AND EBBSFLEET JUNCTION IMPROVEMENTS) COMPULSORY PURCHASE ORDER 2019 THE HIGHWAYS ACT 1980 AND THE ACQUISITION OF LAND ACT 1981 Highways England Company Limited (in this Order called “the acquiring authority”) makes the following Order: 1. Subject to the provisions of this Order, the acquiring authority is under Sections 239, 240, 246, 249 and 250 of the Highways Act 1980 hereby authorised to purchase compulsorily the land and new rights over land described in paragraph 2 for the purposes of – (1) the construction of highways which shall become trunk road in pursuance of The A2 Trunk Road (Bean and Ebbsfleet Junction Improvements) (Slip Roads and Roundabouts) Order 20..; (2) the improvement of the A2 Trunk Road; (3) the construction and improvement of highways and the provision of new means of access to premises in pursuance of The Highways England (A2 Trunk Road Bean and Ebbsfleet Junction Improvements) (Side Roads) Order 2019; (4) use by the acquiring authority in connection with the construction and improvement of highways and the provision of private means of access to premises as aforesaid; and (5) mitigating the adverse effect which the existence or use of the highways proposed to be constructed or improved will have on the surroundings thereof.
    [Show full text]
  • Ebbsfleet Development Corporation's Implementation
    From: Mark Dance, Cabinet Member for Economic Development Barbara Cooper, Corporate Director Growth Environment & Transport To: Growth Economic Development & Communities Cabinet Committee - 22 March 2017 Subject: Ebbsfleet Development Corporation’s Implementation Framework Key Decision: No Classification: Unrestricted Electoral Divisions: Dartford East, Dartford Rural, Swanscombe & Greenhithe, Northfleet & Gravesend West. Summary: This report provides an update on the current position of the Ebbsfleet Development Corporation’s Implementation Framework following the presentation that was given to the Growth, Economic Development & Communities Cabinet Committee on 13 December 2016. Recommendation(s): The Growth, Economic Development & Communities Cabinet Committee is asked to consider this report and recommend that the Cabinet Member for Economic Development advise the Ebbsfleet Development Corporation that: i) the County Council endorses the Ebbsfleet Implementation Framework as the EDC’s statement of ambition for the Garden City, and ii) the County Council will work closely with the EDC to secure the necessary infrastructure to deliver well planned housing and economic growth for the benefit of the local community and the wider area. 1. Introduction 1.1 The Ebbsfleet Garden City was announced by the Chancellor of the Exchequer in his budget speech of 2014 along with the formation of a Development Corporation tasked with delivering up to 15,000 new homes at pace. The Ebbsfleet Development Corporation (EDC) was established by Statutory Instrument on 21 April 2015 and its planning powers were granted under a separate Statutory Instrument which came into force on 1 July 2015. As part of the Comprehensive Spending Review and Autumn Statement of 2015 the Government announced the allocation of £310m of capital funding for the EDC covering the 5-year period 2016/17 to 2020/21.
    [Show full text]
  • 1 Agenda Item: 07 LIST of APPLICATIONS DETERMINED UNDER DELEGATED POWERS
    Agenda Item: 07 LIST OF APPLICATIONS DETERMINED UNDER DELEGATED POWERS Period for Report: 1 February 2020 – 31 March 2020 EASTERN QUARRY: Application Reference: EDC/20/0005 Decision Date: 12 February 2020 Location: Parcels B & C Castle Hill, Eastern Quarry, Watling Street, Swanscombe, Kent Applicant: Taylor Wimpey Proposal: Application for the partial discharge of condition 4 attached to planning permission reference no. EDC/19/0090 relating to Building Regulations part M4(2) compliance. Ward: Ebbsfleet Decision: Condition Discharged Application Reference: EDC/19/0211 Decision Date: 04 March 2020 Location: Eastern Quarry - Phase 5 - Site L, Watling Street, Swanscombe, Kent Applicant: Chartway Group Proposal: Application for a non-material amendment to Reserved Matters approval reference EDC/17/0148 for the minor modification to the location and quantum of external lighting within the site. Ward: Ebbsfleet Decision: Approved Subject to Conditions Application Reference: EDC/19/0210 Decision Date: 04 March 2020 Location: Eastern Quarry - Phase 5 - Site I, Watling Street, Swanscombe, Kent Applicant: Chartway Group Proposal: Application for a non-material amendment to planning permission EDC/17/0064, to allow modification to the location, quantum and refinement of external lighting. Ward: Ebbsfleet Decision: Approved Subject to Conditions 1 Application Reference: EDC/20/0009 Decision Date: 13 March 2020 Location: Castle Hill Neighbourhood Area, Cherry Orchard, Castle Hill, Ebbsfleet Valley, Kent Applicant: David Lock Associates Proposal: Change of Use of Unit 3 from A1, A2, A3, A5 to A1, A2, A3, D1. Ward: Ebbsfleet Decision: Approved Subject to Conditions Application Reference: EDC/19/0103 Decision Date: 17 March 2020 Location: Redundant Buildings Eastern Quarry Watling Street Swanscombe Kent Applicant: Erith Contractors Ltd Proposal: Temporary change of use of land for use as a construction compound for the production of ready mixed concrete including the installation of associated plant.
    [Show full text]
  • London Resort Springhead, Kent
    London Resort Springhead, Kent Desk-Based Assessment and Statement of Archaeological Significance (Palaeolithic) for main access road (eastern route), and people-mover tram/cycle route options Prepared for: London Resort Company Holdings Prepared by: Wessex Archaeology 69 College Road Maidstone Kent ME15 6SX www.wessexarch.co.uk July 2017 Report Ref: 106571.01 © Wessex Archaeology Ltd 2016, all rights reserved Wessex Archaeology Ltd is a Registered Charity No. 287786 (England & Wales) and SC042630 (Scotland) London Resort, Springhead, Kent Desk-Based Assessment and Statement of Archaeological Significance (Palaeolithic) for main access road (eastern route), and people mover tram/cycle route options Quality Assurance Project Code 106571 Accession Client Code Ref. Planning Ordnance Survey 561241, 174202 Application (OS) national grid Ref. reference (NGR) Version Status* Prepared by Checked and Approver’s Signature Date Approved By v01 I FWS MAW 20/07/2017 File: R:\PROJECTS\106571\_Reports\PalaeoDBA\2017_07_21\106571_PalaeoDBA_V1.doc v02 I FWS MAW File: R:\PROJECTS\106571\_Reports\PalaeoDBA\2017_07_28\106571_PalaeoDBA_V2.doc File: File: File: * I = Internal Draft; E = External Draft; F = Final DISCLAIMER THE MATERIAL CONTAINED IN THIS REPORT WAS DESIGNED AS AN INTEGRAL PART OF A REPORT TO AN INDIVIDUAL CLIENT AND WAS PREPARED SOLELY FOR THE BENEFIT OF THAT CLIENT. THE MATERIAL CONTAINED IN THIS REPORT DOES NOT NECESSARILY STAND ON ITS OWN AND IS NOT INTENDED TO NOR SHOULD IT BE RELIED UPON BY ANY THIRD PARTY. TO THE FULLEST EXTENT PERMITTED BY LAW WESSEX ARCHAEOLOGY WILL NOT BE LIABLE BY REASON OF BREACH OF CONTRACT NEGLIGENCE OR OTHERWISE FOR ANY LOSS OR DAMAGE (WHETHER DIRECT INDIRECT OR CONSEQUENTIAL) OCCASIONED TO ANY PERSON ACTING OR OMITTING TO ACT OR REFRAINING FROM ACTING IN RELIANCE UPON THE MATERIAL CONTAINED IN THIS REPORT ARISING FROM OR CONNECTED WITH ANY ERROR OR OMISSION IN THE MATERIAL CONTAINED IN THE REPORT.
    [Show full text]
  • The PHB Stadium, Ebbsfleet United Football Club Ltd Stonebridge Road Northfleet Gravesend DA11 9GN
    Application no: 20150081 Location: The PHB Stadium, Ebbsfleet United Football Club Ltd Stonebridge Road Northfleet Gravesend DA11 9GN Description: Hybrid planning application (part outline and part full detailed) for the proposed phased demolition of existing stands, ancillary buildings and structures and erection of new Stonebridge Road Stand (Phase 1 - full detailed) and erection of Plough End, Town End and Swanscombe End Stands with associated access and parking (Phase 2 - outline with all matters except layout reserved). Applicant: Ebbsfleet United Football Club Decision Level: Planning Regulatory Board Recommendation Permission with Conditions and Informatives Draft recommended conditions will be set out in a supplementary report 1. Site Description 1.1 The site comprises the Ebbsfleet United Football Ground currently known as the PHB Stadium in Stonebridge Road, Northfleet situated in an industrial/commercial location near the western edge of the Borough. 1.2 The ground has three stands and an open end at the western end of the ground (Swanscombe end) and there are other areas adjacent to the stands which are also uncovered and open to the elements. 1.3 The Town or main stand on the north side of the pitch, and which contains the changing rooms and offices, is the oldest stand at the ground dating from 1914 and is a partly wooden and partly corrugated iron sheeted structure. 1.4 At present the Stadium holds around 4,532 spectators of which 500 are seated. There is no restriction on ground capacity in planning terms. Average attendances at the ground are considerably lower than this - in the current season (2014/2015) this is around 960.
    [Show full text]