Comanche Peak Units 3 and 4 COLA

Total Page:16

File Type:pdf, Size:1020Kb

Comanche Peak Units 3 and 4 COLA Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 3 - Environmental Report CHAPTER 2 ENVIRONMENTAL DESCRIPTION TABLE OF CONTENTS Section Title Page 2.0 ENVIRONMENTAL DESCRIPTION............................................................................ 2.0-1 2.1 STATION LOCATION ................................................................................................. 2.1-1 2.1.1 REFERENCES..................................................................................................... 2.1-2 2.2 LAND........................................................................................................................... 2.2-1 2.2.1 THE SITE AND VICINITY .................................................................................... 2.2-1 2.2.1.1 The Site........................................................................................................... 2.2-1 2.2.1.2 The Vicinity...................................................................................................... 2.2-2 2.2.2 TRANSMISSION CORRIDORS AND OFF-SITE AREAS..................................... 2.2-5 2.2.3 THE REGION........................................................................................................ 2.2-6 2.2.4 REFERENCES:..................................................................................................... 2.2-7 2.3 WATER ...................................................................................................................... 2.3-1 2.3.1 HYDROLOGY ....................................................................................................... 2.3-1 2.3.1.1 Surface Water ................................................................................................. 2.3-1 2.3.1.1.1 Hydrologic Setting .......................................................................................... 2.3-2 2.3.1.1.2 Regional Surface Water Net Loss .................................................................. 2.3-2 2.3.1.1.3 Middle Brazos – Palo Pinto Watershed........................................................... 2.3-3 2.3.1.1.4 Middle Brazos – Lake Whitney Watershed ..................................................... 2.3-3 2.3.1.1.5 Local Site Drainage......................................................................................... 2.3-3 2.3.1.1.6 Local Wetland Areas ....................................................................................... 2.3-4 2.3.1.2 Freshwater Streams........................................................................................ 2.3-5 2.3.1.2.1 Brazos River Description................................................................................. 2.3-6 2.3.1.2.2 Brazos River Characteristics .......................................................................... 2.3-6 2.3.1.2.3 Current Patterns and Channel Velocities ....................................................... 2.3-9 2.3.1.2.4 Sediment Transport and Erosional Characteristics ........................................ 2.3-9 2.3.1.2.5 Temperature and Bathymetry Surveys.......................................................... 2.3-12 2.3.1.2.6 Flood Profile ................................................................................................. 2.3-14 2.3.1.2.7 Water Quality Implication from Reservoir Operations ................................... 2.3-14 2.3.1.2.8 Thermal Stratification .................................................................................... 2.3-15 2.3.1.2.9 Description of Major Tributaries .................................................................... 2.3-16 2.3.1.2.10 Description of Local Tributaries ................................................................... 2.3-17 2.3.1.3 Lakes and Impoundments............................................................................. 2.3-18 2.3.1.3.1 Possum Kingdom Lake and Morris Sheppard Dam ...................................... 2.3-19 2.3.1.3.2 Lake Palo Pinto and Palo Pinto Creek Dam.................................................. 2.3-20 2.3.1.3.3 Lake Mineral Wells and Mineral Wells Dam.................................................. 2.3-21 2-i Revision: 0 Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 3 - Environmental Report TABLE OF CONTENTS (Continued) Section Title Page 2.3.1.3.4 Lake Granbury and DeCordova Bend Dam ................................................. 2.3-21 2.3.1.3.5 SCR and Squaw Creek Dam ........................................................................ 2.3-22 2.3.1.3.6 Wheeler Branch Reservoir and Wheeler Branch Dam ................................ 2.3-23 2.3.1.3.7 Lake Whitney and Whitney Dam................................................................... 2.3-24 2.3.1.3.8 Site Surface Water Impoundments .............................................................. 2.3-25 2.3.1.4 Estuaries and Ocean .................................................................................... 2.3-25 2.3.1.5 Groundwater ................................................................................................. 2.3-25 2.3.1.5.1 Physiographic Setting.................................................................................... 2.3-26 2.3.1.5.2 Regional and Local Geology ......................................................................... 2.3-27 2.3.1.5.3 Regional Hydrogeology ................................................................................. 2.3-28 2.3.1.5.4 Groundwater Occurrence and Usage ........................................................... 2.3-30 2.3.1.5.5 Site Hydrogeology ........................................................................................ 2.3-31 2.3.1.5.6 Groundwater Velocity ................................................................................... 2.3-34 2.3.1.5.7 Surface Soil Profiles ..................................................................................... 2.3-36 2.3.2 WATER USE....................................................................................................... 2.3-37 2.3.2.1 Surface Water ............................................................................................... 2.3-37 2.3.2.1.1 Surface Water Features ................................................................................ 2.3-37 2.3.2.2 Basin Wide Water Use ................................................................................. 2.3-39 2.3.2.2.1 Local Water Use ........................................................................................... 2.3-41 2.3.2.2.2 Recreational and Navigational Use ............................................................... 2.3-41 2.3.2.2.3 Lake Granbury Surface Water Withdrawal.................................................... 2.3-41 2.3.2.2.4 Plant Surface Water Use............................................................................... 2.3-42 2.3.2.3 Groundwater.................................................................................................. 2.3-43 2.3.2.3.1 Local Groundwater Use ................................................................................ 2.3-44 2.3.2.3.2 Plant Groundwater Use ................................................................................. 2.3-44 2.3.2.4 Future Water Use ......................................................................................... 2.3-44 2.3.2.5 Legal Restrictions.......................................................................................... 2.3-47 2.3.3 WATER QUALITY............................................................................................... 2.3-49 2.3.3.1 Surface Water Quality ................................................................................... 2.3-49 2.3.3.1.1 Historical Water Quality Evaluation ............................................................... 2.3-49 2.3.3.1.2 Local Surface Water Quality.......................................................................... 2.3-50 2.3.3.1.3 Regional Surface Water Quality .................................................................... 2.3-50 2.3.3.1.4 Texas Water Quality Monitoring .................................................................... 2.3-50 2.3.3.1.5 Texas Water Quality Standards .................................................................... 2.3-51 2.3.3.1.6 Water Quality of the Brazos River Basin ...................................................... 2.3-53 2.3.3.1.7 Middle Brazos-Palo Pinto Watershed............................................................ 2.3-54 2.3.3.1.8 Middle Brazos-Lake Whitney Watershed ...................................................... 2.3-55 2.3.3.1.9 Ecological Health Rating ............................................................................... 2.3-55 2.3.3.2 Groundwater Quality ..................................................................................... 2.3-56 2.3.3.2.1 Historical Groundwater Quality ..................................................................... 2.3-56 2.3.3.2.2 Local Groundwater Quality ........................................................................... 2.3-56 2.3.3.2.3 Regional Groundwater Quality ...................................................................... 2.3-57 2.3.3.3 Factors Affecting Water Quality .................................................................... 2.3-58 2.3.3.3.1 NPDES Program ........................................................................................... 2.3-59 2-ii Revision: 0 Comanche Peak Nuclear Power
Recommended publications
  • University of Texas Bulletin No
    University of Texas Bulletin No. 2607: February IS, 1926 THE SAN ANGELO FORMATION THE GEOLOGY OF FOARD COUNTY J. W. BEEDE AND D. D. CHRISTNER BUREAU OF ECONOMIC GEOLOGY J. A. Udden, Director E. H. Sellards, Associate Director PUBLISHED BY THE UNIVERSITY OF TEXAS AUSTIN Publications of the University of Texas Publications Committee : Frederic Duncalf C. T. McCormick D. G. Cooke E. K.McGinnis J. L.Henderson H. J. MULLER E. J. Mathews Hal G Weaver The University publishes bulletins four times a month, so numbered that the first two digits of the number show the year of issue, the last two the position in the yearly series. (For example, No. 2201 is the first bulletin of the year 1922.) These comprise the official publications of the University, publications on humanistic and scientific sub- jects, bulletins prepared by the Divisionof Extension, by the Bureau of Economic Geology, and other bulletins of general educational interest. With the exception of special num- bers, any bulletin willbe sent to a citizen of Texas free on request. Allcommunications about University publications should be addressed to University Publications, University of Texas, Austin. oiSi§ste> UNIVERSITY OP TEXAS PRESS. AUSTIN University of Texas Bulletin No. 2607: February 15, 1926 THE SAN ANGELO FORMATION THE GEOLOGY OF FOARD COUNTY J. W. BEEDE AND D. D. CHRISTNER BUREAU OF ECONOMIC GEOLOGY J. A. Udden, Director E. H. Sellards, Associate Director PUBLISHED BYTHE UNIVERSITYFOUR TIMES AMONTH,AND ENTERED AS SECOND-CLASS MATTER AT THE POSTOFFICE AT AUSTIN,TEXAS, UNDER THEACT OF AUGUST 24, 1912 The benefits of education and of useful knowledge, generally diffused through a community, are essential to the preservation of a free govern- ment.
    [Show full text]
  • To the D.Irector of the Bureau of Land Management NM State Office April
    To the D.irector of the Bureau of Land Management NM State Office April 28, 2019 BLM, NMSO SANTA FE RECEIVED BLM New Mexico State Office APR,;~,5o 2019 Attention: State Director PAID RECEIPT # _ 301 Dinosaur Trail Santa Fe, NM 87508 We are writing to ask you to stop the proposed lease sale of lands near Chaco Canyon slated for June 2019. Fossil fuel exploration on these sites is a threat to the people who live on the surrounding land and to Chaco Canyon, New Mexico's crown jewel and the ancestral home of Native Americans of the Southwest. Protection from oil and gas activity around Chaco Canyon is essential to protecting New Mexico's uhique history, environment and vital resources. Instead of continuing to develop fossil fuels on our public lands, we need to make a just transition to renewable energy to create ways to engage in environmentally sustainable, as well as culturally appropriate, economic development. We ask you to cancel the lease sale of parcels: NM-201906-012-24; 26-46; 48-51 and NM-201906-025 & 47 to protect Chaco Canyon and the Greater Chaco Region from oil and gas activities that could destroy this designated World Heritage Site, a landmark like no other on Earth. Attached: 11,962 requests for your attention to this matter. First Name Last Name City State Zip Code Daniel Helfman 6301 MAURY HOLW TX 78750-8257 Kenneth Ruby 18Tiffany Road NH 03079 Crystal Newcomer 2350 Dusty Ln PA 17025 Timothy Post 1120 PacificAve KS 66064 Marlena Lange 23 RoyceAve NY 10940-4708 Victoria Hamlin 3145 MaxwellAve CA 94619 L.
    [Show full text]
  • Draft Environmental Assessment for North Texas Optimization of Airspace and Procedures in the Metroplex
    Draft Environmental Assessment for North Texas Optimization of Airspace and Procedures in the Metroplex Volume II - Appendices September 2013 Prepared by: United States Department of Transportation Federal Aviation Administration Fort Worth, Texas Table of Contents APPENDIX A A.1 First Early Notification Announcement................................................................................ 1 A.1.1 Early Notification Letters ..................................................................................................... 1 A.1.2 Comments Received From the First Announcement........................................................23 A.1.3 Outreach Meetings............................................................................................................49 APPENDIX B B.1 List of Preparers.................................................................................................................. 1 B.1 Receiving Parties & Draft EA Notification of Availability..................................................... 3 APPENDIX C C.1 Contact Information............................................................................................................. 1 C.2 References.......................................................................................................................... 1 APPENDIX D D.1 List of Acronyms.................................................................................................................. 1 D.2 Glossary .............................................................................................................................
    [Show full text]
  • (Asos) Implementation Plan
    AUTOMATED SURFACE OBSERVING SYSTEM (ASOS) IMPLEMENTATION PLAN VAISALA CEILOMETER - CL31 November 14, 2008 U.S. Department of Commerce National Oceanic and Atmospheric Administration National Weather Service / Office of Operational Systems/Observing Systems Branch National Weather Service / Office of Science and Technology/Development Branch Table of Contents Section Page Executive Summary............................................................................ iii 1.0 Introduction ............................................................................... 1 1.1 Background.......................................................................... 1 1.2 Purpose................................................................................. 2 1.3 Scope.................................................................................... 2 1.4 Applicable Documents......................................................... 2 1.5 Points of Contact.................................................................. 4 2.0 Pre-Operational Implementation Activities ............................ 6 3.0 Operational Implementation Planning Activities ................... 6 3.1 Planning/Decision Activities ............................................... 7 3.2 Logistic Support Activities .................................................. 11 3.3 Configuration Management (CM) Activities....................... 12 3.4 Operational Support Activities ............................................ 12 4.0 Operational Implementation (OI) Activities .........................
    [Show full text]
  • Index of Surface Water Stations in Texas
    1 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY I AUSTIN, TEXAS INDEX OF SURFACE WATER STATIONS IN TEXAS Operated by the Water Resources Division of the Geological Survey in cooperation with State and Federal Agencies Gaging Station 08065000. Trinity River near Oakwood , October 1970 UNITED STATES DEPARTMENT OF THE INTERIOR Geological Survey - Water Resources Division INDEX OF SURFACE WATER STATIONS IN TEXAS OCTOBER 1970 Copies of this report may be obtained from District Chief. Water Resources Division U.S. Geological Survey Federal Building Austin. Texas 78701 1970 CONTENTS Page Introduction ............................... ................•.......•...•..... Location of offices .........................................•..•.......... Description of stations................................................... 2 Definition of tenns........... • . 2 ILLUSTRATIONS Location of active gaging stations in Texas, October 1970 .•.•.•.••..•••••..•.. 1n pocket TABLES Table 1. Streamflow, quality, and reservoir-content stations •.•.•... ~........ 3 2. Low-fla.o~ partial-record stations.................................... 18 3. Crest-stage partial-record stations................................. 22 4. Miscellaneous sites................................................. 27 5. Tide-level stations........................ ........................ 28 ii INDEX OF SURFACE WATER STATIONS IN TEXAS OCTOBER 1970 The U.S. Geological Survey's investigations of the water resources of Texas are con­ ducted in cooperation with the Texas Water Development
    [Show full text]
  • Stormwater Management Program 2013-2018 Appendix A
    Appendix A 2012 Texas Integrated Report - Texas 303(d) List (Category 5) 2012 Texas Integrated Report - Texas 303(d) List (Category 5) As required under Sections 303(d) and 304(a) of the federal Clean Water Act, this list identifies the water bodies in or bordering Texas for which effluent limitations are not stringent enough to implement water quality standards, and for which the associated pollutants are suitable for measurement by maximum daily load. In addition, the TCEQ also develops a schedule identifying Total Maximum Daily Loads (TMDLs) that will be initiated in the next two years for priority impaired waters. Issuance of permits to discharge into 303(d)-listed water bodies is described in the TCEQ regulatory guidance document Procedures to Implement the Texas Surface Water Quality Standards (January 2003, RG-194). Impairments are limited to the geographic area described by the Assessment Unit and identified with a six or seven-digit AU_ID. A TMDL for each impaired parameter will be developed to allocate pollutant loads from contributing sources that affect the parameter of concern in each Assessment Unit. The TMDL will be identified and counted using a six or seven-digit AU_ID. Water Quality permits that are issued before a TMDL is approved will not increase pollutant loading that would contribute to the impairment identified for the Assessment Unit. Explanation of Column Headings SegID and Name: The unique identifier (SegID), segment name, and location of the water body. The SegID may be one of two types of numbers. The first type is a classified segment number (4 digits, e.g., 0218), as defined in Appendix A of the Texas Surface Water Quality Standards (TSWQS).
    [Show full text]
  • 1991 Willowemoc Wild Forest Unit Management Plan
    DEC Publication I WILLOWEMOC-LONGPOND WILD FOREST UNIT MANAGEMENT PLAN October 1991 New York State Department of Environmental Conservation WILLOWEMOC - LONG POND WILD FOREST UNIT MANAGEMENT PLAN OCTOBER, 1991 New York state Department of Environmental Conservation Mario Cuomo Thomas C. Jorling Governor Commissioner OCT O7 1991 TO: The Record FROM: Thomas C. RE: Unit Management Plan Willowemoc-Long Pond Wild Forest The Unit Management Plan for the Willowemoc-Long Pond Wild Forest has been completed. It is consistent with the guidelines and criteria of the Catskill Park State Land Master Plan involved citizen participation, is consistent with the State Constitution, the Environmental Conservation Law, rules, regulations and policy. The Plan includes management objectives for a five-year period and is hereby approved and adopted. cc: L. Marsh WILLOWEMOC - LONG POND WILD FOREST UNIT MANAGEMENT PLAN PREFACE Unlike the more mountainous regions to the north and east which typify the Catskills, the Willowemoc - Long Pond Wild Forest is an area of subdued terrain with several ponds and a diversity of wetlands. Adding to the unique character of this unit is a network of wood roads providing both access and an opportunity for a variety of outdoor recreation. Having only recently acquired (1987/89) a nearly 4,000 acre portion of this unit where most of this network of wood roads exist, a primary focus of this management plan is to propose appropriate recreational use of this trail network. The following plan identifies the various resources, both natural and man-made, which make up the Willowemoc-Long Pond Wild Forest. It describes the historical and cultural influences which have shaped the character of the area.
    [Show full text]
  • Pennsylvania Active Industrial Minerals Mining Permits - January 2015
    Pennsylvania Active Industrial Minerals Mining Permits - January 2015 Primary Facility Kind County Municipality Mine Name Permit # Mailing Name Address1 Address2 City State Zip Code Telephone Bluestone General Permit Bradford Pike EDWARDS QUARRY 08112503 ANTHONY P BENNETT 3657 OLD STAGECOACH RD NULL WYALUSING PA 18853-8012 570-746-6015 Bluestone General Permit Bradford Stevens BILL JOHNSON GP-105 QUARRY 08122501 BILL JOHNSON 120 JOHNSON HILL LN NULL WYALUSING PA 18853-9759 570-746-2182 Bluestone General Permit Bradford Sheshequin BYERS 105 QUARRY 08122502 BISHOP BROS CONST CO INC PO BOX 289 NULL ULSTER PA 18850-0289 570-358-3655 Bluestone General Permit Bradford Rome COMSTOCK 105 QUARRY 08132501 BLACK KNIGHT QUARRIES INC. 293 BEACON LIGHT RD NULL TOWANDA PA 18848 570-265-8991 Bluestone General Permit Bradford Pike GOD III QUARRY 08122505 CHARLES H GOD II 46 RIVERWOODS LN NULL SUGAR RUN PA 18846-7857 570-721-0906 Bluestone General Permit Bradford Pike GOD II QUARRY 08122504 CHARLES H GOD II 46 RIVERWOODS LN NULL SUGAR RUN PA 18846-7857 570-721-0906 Bluestone General Permit Bradford Warren DEWEY QUARRY 08112502 JOHNSON QUARRIES INC PO BOX 136 NULL LE RAYSVILLE PA 18829-0136 570-744-1284 Bluestone General Permit Bradford Wyalusing CAMPTOWN QUARRY 08112501 MR DIRT INC 21186 RT 187 NULL TOWANDA PA 18848-9626 570-265-0857 Bluestone General Permit Bradford Wysox WYSOX PALMER QUARRY 08122503 NITTANY NOVA AGGREGATES LLC 2840 CLYMER AVE STE 400 NULL TELFORD PA 18969-1000 267-246-6176 Bluestone General Permit Bradford Asylum BEEBE QUARRY 08132502
    [Show full text]
  • Appendix C - Segment Descriptions
    Appendix C - Segment Descriptions (New material is underlined and deleted material is in brackets [ ].) The following descriptions define the geographic extent of the state's classified segments. Boundaries of bay and estuary segments have not been precisely defined. Segment boundaries are illustrated in the document entitled The State of Texas Water Quality Inventory, which is published by the Commission. SEGMENT DESCRIPTION 0101 Canadian River Below Lake Meredith - from the Oklahoma State Line in Hemphill County to Sanford Dam in Hutchinson County 0102 Lake Meredith - from Sanford Dam in Hutchinson County to a point immediately upstream of the confluence of Camp Creek in Potter County, up to the normal pool elevation of 2936.5 feet (impounds Canadian River) 0103 Canadian River Above Lake Meredith - from a point immediately upstream of the confluence of Camp Creek in Potter County to the New Mexico State Line in Oldham County 0104 Wolf Creek - from the Oklahoma State Line in Lipscomb County to a point 2.0 kilometers (1.2 miles) upstream of FM 3045 in Ochiltree County 0105 Rita Blanca Lake - from Rita Blanca Dam in Hartley County up to the normal pool elevation of 3860 feet (impounds Rita Blanca Creek) 0201 Lower Red River - from the Arkansas State Line in Bowie County to the Arkansas-Oklahoma State Line in Bowie County 0202 Red River Below Lake Texoma - from the Arkansas-Oklahoma State Line in Bowie County to Denison Dam in Grayson County 0203 Lake Texoma - from Denison Dam in Grayson County to a point immediately upstream of the confluence
    [Show full text]
  • Quality of Surface Waters of the United States 1958
    Quality of Surface Waters of the United States 1958 Parts 7 and 8. Lower Mississippi River Basin and Western Gulf of Mexico Basins Prepared under the direction of S. K. LOVE, Chief, Quality of Water Branch GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1573 Prepared in cooperation with the States of Arkansas, Kansas, Louisiana, New Mexico, Oklahoma, and Texas, and with other agencies UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1953 UNITED STATES DEPARTMENT OF THE INTERIOR STEWART L. UDALL, Secretary GEOLOGICAL SURVEY Thomas B. Nolan, Director For sale by the Superintendent of Documents, U.S. Government Printing Office, Washington 25, D.C. PREFACE This report was prepared by the Geological Survey in cooper­ ation with the States of Arkansas, Kansas, Louisiana, New Mex­ ico, Oklahoma, and Texas, and with other agencies by personnel of the Water Resources Division under the direction of L. B. Leopold, chief hydraulic engineer, and S. K. Love, chief, Quality of Water Branch. The data were collected and computed under the supervision of the following engineers or district chemists: D. M. Culbertson............... Lincoln, Nebr. T. B. Dover ............. Oklahoma City, Okla. Burdge Irelan .................... Austin, Tex. M. E. Schroeder..............Fayetteville, Ark. J. M. Stow............... Albuquerque, N. Mex. Ill CONTENTS Page Introduction.................................... 1 Collection and examination of samples........... 3 Chemical quality.............................. 4 Temperature................................... 4 Sediment.....................................
    [Show full text]
  • North Central Texas Council of Governments TO
    North Central Texas Council of Governments TO: NCTCOG Executive Board DATE: July 16, 2015 FROM: Mike Eastland Executive Director SUBJECT: Executive Board Meeting The next regular meeting of the NCTCOG Executive Board will be: DATE: July 23, 2015 Please RSVP to the Executive Director’s office as soon as possible by email or call (817) 695-9100. NEW BOARD MEMBER ORIENTATION (all Board members are welcome to attend) TIME: 9:30 am (Executive Director’s Conference Room) NCTCOG BOARD TIME: 12:00 noon – Lunch 12:45 pm – Executive Board Meeting PLACE: NCTCOG Offices Centerpoint II Conference Center 616 Six Flags Drive Arlington, TX 76011 Transportation Council Room I hope each of you will plan to attend this important meeting. I look forward to seeing you there! ME:sc 616 Six Flags Drive, Centerpoint Two P.O. Box 5888, Arlington, Texas 76005-5888 (817) 640-3300 FAX: 817-608-7806 www.nctcog.org North Central Texas Council of Governments 616 Six Flags Drive, Arlington, TX, 76011 EXECUTIVE BOARD AGENDA July 23, 2015 12:45 P.M. Executive Board ______John Horn ______Michael Glaspie ______Bobbie Mitchell ______Lissa Smith ______Kelly Allen Gray _______Keith Self ______Tom Lombard ______Clay Jenkins ______Kevin Strength ______Kathryn Wilemon ______Lee Kleinman ______Chris Watts ______Bruce Archer ______Jeff Leach ______Laura Wheat ______J. D. Clark ______ Dan McClendon ______ Glen Whitley Staff _____ Mike Eastland _____ Edith Marvin _____ Christy Williams _____ Monte Mercer _____Michael Morris _____ Lucille Johnson _____ Tim Barbee _____David Setzer _____ Stephanie Cecil _____ Doni Green _____Molly Thoerner REGULAR SESSION Call to order time: __________ Pledges ACTION: Motion/ Item # Name of Item Second ____/____ 1.
    [Show full text]
  • RUAA Recommendation for Double Mountain Fork Brazos River
    Double Mountain Fork Brazos River (1241) Recreational Use-Attainability Analysis Summary and Recommendation A recreational use-attainability analysis (RUAA) was conducted on Double Mountain Fork Brazos River (1241) in the summer of 2016 to determine the appropriate recreational use and numeric criteria. Double Mountain Fork Brazos River is an classified perennial water body in Kent, Haskell, Stonewall counties, TX, approximately 149 miles in length. It is currently listed on the 2018 Texas Clean Water Act Section 303(d) List of Impaired Water Bodies due to elevated bacteria levels. It was initially listed in 2010. The RUAA identified that the presumed use of primary contact recreation 1 (PCR 1) for Double Mountain Fork Brazos River is appropriate. PCR 1 is defined in §307.3 (a) of the Texas Surface Water Quality Standards as activities that are presumed to involve a significant risk of ingestion of water (e.g. wading by children, swimming, water skiing, diving, tubing, surfing, handfishing, and the following whitewater activities: kayaking, canoeing, and rafting). During the field surveys, field staff did not observe any type of recreation occurring on the stream. Field staff interviewed 56 stakeholders and landowners. Forty-two instances of personal use PCR were documented in interviews (i.e. swimming, wading children, tubing). PCR was reported eighteen times as an observed use. Physical characteristics of the stream include an average thalweg of 0.30 meters (11.8 in), 5 pools greater than one meter deep, and normal flow. At the time of the surveys, Double Mountain Fork Brazos River had a very moist Palmer Drought Severity Index.
    [Show full text]