Western Harbour Tunnel Project Update August 2018 August 2018 Western Harbour Tunnel Project update faster r s e a i f s e a r e Western Harbour Tunnel including the Warringah Freeway Upgrade Contents Project overview ................................................................ 4 Public transport .................................................................18 Project benefits ...................................................................5 Active transport ................................................................19 Design changes led by community feedback ............ 6 Stronger measures on tunnel emissions ....................20 Design facts and map ........................................................8 Design and construction ................................................ 22 Project need ........................................................................ 9 Western Harbour Tunnel vertical alignment ........... 28 Future Transport 2056.....................................................10 Construction ......................................................................30 Integrated planning .......................................................... 12 Immersed tube tunnel construction sequence ......... 31 Sydney Harbour – the challenge ...................................14 Temporary construction sites ....................................... 32 Sydney Harbour – the solution ...................................... 15 Safety is the number one priority ................................ 43 Beaches Link – a companion project ...........................16 Next steps ..........................................................................44 Western Harbour Tunnel and Beaches Link map ..... 17 Environmental impact assessments ............................ 45 Project overview Western Harbour Tunnel is a With Western Harbour Tunnel . major transport infrastructure people will spend less time in Western Harbour project that will make it easier, traffic and have more time for themselves and their families. Tunnel will: faster and safer to get around Sydney. Western Harbour Tunnel includes • Cr eate a western over six kilometres of mainline bypass of the CBD Sydney Harbour Bridge and tunnels as well as upgrading over and take pressure off Sydney Harbour Tunnel are at the nine kilometres of surface roads. heart of Sydney’s road transport the congested Sydney Largely underground, the network. Harbour Bridge, Western Harbour Tunnel has Anzac Bridge and Both are now at over-capacity been designed to have minimal and a single incident can have impacts on communities and to Western Distributor a major flow-on effect on travel minimise property needs. • I ntegrate with public times across the transport transport, improve network and impact our The project includes: travel times and economy. Western Harbour Tunnel boost reliability for As Sydney continues to grow, – a new tunnel from the Rozelle cross-harbour trips with more and more trips being interchange, under Sydney made, so will the challenges to Harbour to the Warringah and the broader our transport network. Freeway network Western Harbour Tunnel is key to The Warringah Freeway Upgrade • Pr ovide core capacity delivering the transport vision for – streamlining Australia’s that enables improved busiest road. Sydney. links across Sydney. It will change the way people move around Sydney and how people travel between the North Shore, the central business district (CBD) and Western and Western Southern Sydney. Harbour Tunnel less time in traffic, more time for you more than 4.3 millionpeople cross Sydney Harbour Bridge and Tunnel by car, bus and train every week 4 Western Harbour Tunnel – Project update Project benefits Western Harbour Tunnel delivers Streamline a new crossing of Sydney Harbour the Warringah and creates a western bypass of Freeway the Sydney CBD. • Safer and simpler journeys • Easier to navigate The project includes upgrading Ernest St • Reduces traffic weaving four kilometres of Australia’s St Leonards Falcon St • Optimises traffic flow busiest road, the Warringah across three crossings OFF Freeway. RAMP Miller St ON RAMP Berry St Warringah Freeway Improved public transport • New free-flowing, Waverton continuous dedicated bus lane on the Warringah Freeway from Miller Street to Sydney Harbour Bridge Birchgrove • Direct bus access to North Sydney for fast interchange with the new Sydney Metro more than and Sydney Trains Balmain 2.3 million people Sydney Harbour Bridge cross the Sydney Harbour Bridge and Tunnel Sydney Harbour Tunnel Harbour Sydney by car and bus every week Rozelle Pyrmont Anzac Bridge Take pressure off City West Link Sydney Harbour Bridge and Tunnel To M4 Lilyfield To M5 WESTERN SYDNEY SYDNEY HARBOUR HARBOUR HARBOUR TUNNEL BRIDGE TUNNEL Inner West, Sydney CBD Eastern Suburbs West, South West Pyrmont Southern Sydney Airport Darling Harbour Airport Travel time savings More direct Rozelle to North Sydney harbour crossings Improved up to 10 minutes Chatswood to Airport active Change how we cross up to 21 minutes transport Sydney Harbour Mosman to Airport • Dedicated cycleway between • Take pressure off Sydney up to 18 minutes Miller Street, Cammeray Park Harbour Bridge and Tunnel, and Falcon Street Anzac Bridge and Western Olympic Park to North Sydney up to 13 minutes • Improved connections over the Distributor, easing congestion Warringah Freeway at Ridge Street, • Providing an alternative way Manly to Parramatta Ernest Street and High Street to get to Sydney Airport up to 25 minutes Western Harbour Tunnel – Project update 5 Design changes led by community feedback In March 2017, the NSW Government released a project concept and started detailed design work on the Western Harbour Tunnel project. Since then, there has been extensive community engagement, geotechnical testing, field studies and market sounding with the finance and construction industries. This project update provides an overview of how the proposed design has evolved, incorporating feedback from community and stakeholder groups over the past year. Roads and Maritime Services want to hear what you think about where we are up to. We will shortly commence community engagement on the design presented in this project update. Once we have heard your feedback, we will continue to refine the design. The NSW Government will then progress Aerial view of Birchgrove this refined design through the planning assessment process. This will include the exhibition of Inner West Environmental Impact Statements (EISs) when the community can What we heard How the design addresses this provide formal feedback. Do not use Birchgrove Oval for No proposal to use Birchgrove construction purposes Oval for construction What we’ve heard Keep heavy construction traffic No tunnel spoil transport Extensive engagement has off the streets of Balmain and through Balmain or Birchgrove Birchgrove local streets included over 5000 face- to-face conversations via Water transport to be used wherever possible a series of 16 community feedback sessions, 12 shopping centre Concerns about air quality and Ventilation facility will be the proposed location of a located at the planned Rozelle displays, workshops and ventilation facility in Rozelle Interchange meetings with schools and Air quality has been assessed community groups. as part of the WestConnex M4-M5 Link EIS and is also We have made significant being addressed in the Western changes to the design Harbour Tunnel environmental based on what we assessment have heard from the No additional facilities required community. for the Western Harbour Tunnel in the Inner West 6 Western Harbour Tunnel – Project update Cammeray and North Sydney What we heard How the design addresses this Minimise the impact to St Leonards Park and Motorway facilities located at Cammeray Golf Course Anzac Park next to the Warringah Freeway – not St Leonards Park Temporary impact to St Leonards Park in the sloping area between the bowls club and the Warringah Freeway Minimal, permanent impact generally along the Warringah Freeway Minimal temporary impact to Anzac Park for installation of drainage and kerb realignment Concerns about air quality and the proposed Ventilation facilities will be located near the tunnel location of ventilation facilities in Cammeray ramps, in the Warringah Freeway corridor An air quality assessment, taking into account local conditions (including topography), is being undertaken and will be detailed in the EIS Desire for improved active transport connections Dedicated cycleway between Miller Street, Cammeray Park and Falcon Street and improved connections over the Warringah Freeway at Ridge Street, Ernest Street and High Street Cammeray Western Harbour Tunnel – Project update 7 Design facts and map Western Harbour Tunnel Western Harbour Tunnel 6.5 kilometres Three lanes each way Major streamlining, improved The Warringah Freeway Upgrade 4 kilometres way-finding, reduced merging Spit Bridge Seaforth Balgowlah Heights Artarmon Gore Hill Freeway Northbridge Reserve Road Lane Cove Cammeray Mosman Ernest St St Leonards Falcon St Crows Nest Spit Bridge Seaforth OFF RAMP Cremorne Miller St Balgowlah Heights Artarmon Neutral Bay Northbridge Gore Hill Freeway ON Berry StRAMP Reserve Road North Woolwich Sydney High St Cremorne Point Lane Cove Cammeray Mosman Ernest St St Leonards Falcon St Crows NestWaverton OFF Cremorne RAMP Kirribilli Miller St SydneyNeutral Bay Birchgrove ON Berry StRAMP Harbour Bridge Sydney Vaucluse North Woolwich Harbour Drummoyne Sydney High St Cremorne Point Sydney Harbour Tunnel Balmain
Recommended publications
  • Sydney Harbour Bridge Other Names: the Coat Hanger Place ID: 105888 File No: 1/12/036/0065
    Australian Heritage Database Places for Decision Class : Historic Identification List: National Heritage List Name of Place: Sydney Harbour Bridge Other Names: The Coat Hanger Place ID: 105888 File No: 1/12/036/0065 Nomination Date: 30/01/2007 Principal Group: Road Transport Status Legal Status: 30/01/2007 - Nominated place Admin Status: 19/09/2005 - Under assessment by AHC--Australian place Assessment Recommendation: Place meets one or more NHL criteria Assessor's Comments: Other Assessments: National Trust of Australia (NSW) : Classified by National Trust Location Nearest Town: Dawes Point - Milsons Point Distance from town (km): Direction from town: Area (ha): 9 Address: Bradfield Hwy, Dawes Point - Milsons Point, NSW 2000 LGA: Sydney City NSW North Sydney City NSW Location/Boundaries: Bradfield Highway, Dawes Point in the south and Milsons Point in the north, comprising bridge, including pylons, part of the constructed approaches and parts of Bradfield and Dawes Point Parks, being the area entered in the NSW Heritage Register, listing number 00781, gazetted 25 June 1999, except those parts of this area north of the southern alignment of Fitzroy Street, Milsons Point or south of the northern alignment of Parbury Lane, Dawes Point. Assessor's Summary of Significance: The building of the Sydney Harbour Bridge was a major event in Australia's history, representing a pivotal step in the development of modern Sydney and one of Australia’s most important cities. The bridge is significant as a symbol of the aspirations of the nation, a focus for the optimistic forecast of a better future following the Great Depression. With the construction of the Sydney Harbour Bridge, Australia was felt to have truly joined the modern age, and the bridge was significant in fostering a sense of collective national pride in the achievement.
    [Show full text]
  • Sydney Harbour Superyacht Guidelines
    Sydney Harbour superyacht guidelines Guidelines for Masters operating Superyachts on Sydney Harbour Contents Executive Summary 1 Qualifications and registration 9 Port procedures 2 Boat licences and certificates of competency 9 Directions for navigation 2 Registration of vessels 9 Directions and regulations to be observed 2 Protected animals 10 Required charts 2 Approach distances 10 Port services 2 Speed 10 Pilotage requirements 2 Approach directions 10 Wind and weather 3 Action if a marine mammal approaches 11 Port Authority of NSW Vessel Traffic Service 3 Communications 11 Pilot boarding place 3 VHF channels 11 Sydney Harbour – general considerations 3 Important contact details 11 General 3 Useful websites 12 Speed limits 3 Photographs 13 Speed restricted areas 4 Anzac Bridge 13 Conduct within Sydney Harbour 7 Rozelle Bay Superyacht Marina 13 Prohibited areas for general navigation 7 Campbells Cove 14 General 7 Sydney Cove – Circular Quay 15 Restricted access areas 7 Fort Denison 15 Collision or incident reports 8 Garden Island Naval Base 15 Berthing at commercial wharves 8 Walsh Bay 16 Pollution, nuisance or danger 8 Sydney Harbour Bridge 17 Marine Pollution Act 1987 8 Jones Bay Wharf, Pyrmont 17 Pump-out facilities 8 Kirribilli Point 17 Garbage 9 Anzac Bridge 18 Causing of nuisance or danger 9 Glebe Island Bridge 18 Farm Cove 18 Wind frequency analyses 19 FRONT COVER PHOTO: ANDREA FRANCOLINI Executive Summary Welcome to Sydney. The aim of these guidelines is to assist superyacht masters Superyachts are free to enter and move around with their preparations for a visit to Sydney Harbour and to Sydney Harbour subject to compliance with the provide a reference document during the visit.
    [Show full text]
  • Arcure Continues Its International Expansion by Equipping the Westconnex Motorway, Mega-Construction Site in Sydney
    Paris, the 11th of October 2019 Arcure continues its international expansion by equipping the WestConnex Motorway, mega-construction site in Sydney Specializing in artificial intelligence (AI) applied to image processing in the industrial world, Arcure has been selected by the consortium Lendlease Samsung Bouygues Joint Venture (LSBJV) to equip machines working on the WestConnex M4-M5 Link project in Sydney with Blaxtair®, the reference solution for pedestrian protection around industrial vehicles. « WestConnex is one of the largest road infrastructure projects in Australia. Having equipped industrial sites in the Greater Paris area and also supplied Blaxtair® pedestrian detection systems for mobile plant on parts of the London underground expansion project, we are proud to work on the safety element of this huge undertaking. This new collaboration on an infrastructure operation of this size testifies to the relevance of the Blaxtair® solution and has spurred us to actively seek further international projects and opportunities », Franck Gayraud, CEO and co-founder of Arcure. Blaxtair® is the result of a collaboration between Arcure and the CEA's (note to editors: in France, the CEA is the Alternative Energies and Atomic Energy Commission) research laboratories and is considered the industry-leading, embedded detection system. This innovative 3D camera detects obstacles around mobile plant and/or materials handling equipment. Thanks to AI, Blaxtair® differentiates between pedestrians in the designated detection zone and objects/obstacles, thus helping to avoid pedestrian collisions. Its unique technology will warn a driver in case of danger, avoiding unnecessary alarms and untimely stops. The adaptability and responsiveness offered by the Blaxtair® system allows mobile plant to be used with minimal risk to pedestrians on industrial sites with the most demanding operating conditions.
    [Show full text]
  • Westconnex New M5 Environmental Impact Statement
    15 Social and economic This chapter outlines the potential social and economic impacts associated with the project. A detailed social and economic impact assessment has been undertaken for the project and is included in Appendix M. The Secretary of the NSW Department of Planning and Environment (DP&E) has issued a set of environmental assessment requirements for the project; these are referred to as Secretary’s Environmental Assessment Requirements (SEARs). Table 15-1 sets out these requirements as they relate to social and economic matters, and identifies where they have been addressed in this environmental impact statement (EIS). Table 15-1 SEARs – social and economic SEAR Where addressed A description of the existing socio-economic environment. Section 15.2 Social and economic impacts to businesses and the community within Section 15.3 the vicinity of the proposal, with associated property acquisition, traffic, access, property, public domain and open space, and amenity and health related changes (including the broader regional impacts associated with the closure of the Alexandria landfill site should this be part of the proposal). An assessment of the impact of the proposal on community facilities, Section 15.3 including open space and recreational facilities. The assessment must include the use of existing facilities impacted by the proposal, and options and opportunities for the relocation and / or reconfiguration of the community facilities, both temporary and permanent. Impacts on directly affected properties and land uses, including impacts Section 15.3 related to access, land use, settlement and subsidence associated with tunnel excavation, property acquisition (including relocations and Chapter 13 (Land use and expenses for those properties acquired) and amenity related changes.
    [Show full text]
  • Contextual Analysis and Urban Design Objectives
    Rozelle Interchange Urban Design and Landscape Plan Contextual Analysis and Urban Design Objectives Artists impression: Pedestrian view along Victoria Road Caption(Landscape - Image shown description at full maturity and is indicative only). 03 White Bay Power Station Urban Design Objectives 3 Contextual analysis 3.1 Contextual analysis Local context WestConnex will extend from the M4 Motorway at The Rozelle Interchange will be a predominately Parramatta to Sydney Airport and the M5 underground motorway interchange with entry and Motorway, re-shaping the way people move exit points that connect to the wider transport through Sydney and generating urban renewal network at City West Link, Iron Cove and Anzac opportunities along the way. It will provide the Bridge. critical link between the M4 and M5, completing Sydney’s motorway network. Iron Cove and Rozelle Rail Yards sit on and are adjacent to disconnected urban environments. While the character varies along the route, the These conditions are the result of the historically WestConnex will be sensitively integrated into the typical approach to building large individual road built and natural environments to reconnect and systems which disconnect suburbs and greatly strengthen local communities and enhance the reduce the connectivity and amenity of sustainable form, function, character and liveability of Sydney. modes of transport such as cycling and walking. Rather than adding to the existing disconnection, An analysis of the Project corridor was undertaken the Project will provide increased
    [Show full text]
  • Technical Paper 1 Traffic Report
    Technical Paper 1 Traffic report 1 WestConnex Updated Strategic Business Case Contents List of Tables ..................................................................................................................................................... 3 List of Figures .................................................................................................................................................... 4 Preface .............................................................................................................................................................. 6 Terminology ....................................................................................................................................................... 7 1 Executive summary .................................................................................................................................... 8 1.1 Background to this report ................................................................................................................... 8 1.2 Traffic methodology ........................................................................................................................... 9 1.3 Road network performance without WestConnex ........................................................................... 10 1.4 Traffic effects of WestConnex.......................................................................................................... 12 1.5 Traffic operations and influence on WestConnex design ...............................................................
    [Show full text]
  • Draft South District Plan
    Draft South District Plan co-creating a greater sydney November 2016 How to be involved This draft District Plan sets You can read the entire Before making a submission, out aspirations and proposals draft District Plan at please read our privacy for Greater Sydney’s South www.greater.sydney and send statement at District, which includes the feedback: www.greater.sydney/privacy local government areas of • via www.greater.sydney For more information Canterbury-Bankstown, visit www.greater.sydney Georges River and Sutherland. • by email: call us on 1800 617 681 It has been developed by the [email protected] Greater Sydney Commission. • by post: or email: Greater Sydney Commission [email protected] This draft District Plan is on Draft South District Plan formal public exhibition until PO Box 257, the end of March 2017, and will Parramatta NSW 2124 be finalised towards the end of 2017 to allow as many people as possible to provide input. This document was updated on 21 December 2016 to address typographical errors and production faults. A detailed list of the errata can be found at www.greater.sydney/content/publications Draft South District Plan Exhibition THIS SEPARATE DOCUMENT DOCUMENT Overview Draft District Maps Background Website Plan Material Dashboard Our vision — Towards our Greater Sydney 2056 Summary The requirements A compilation of Data and Reports How the A draft brochure of the legislative maps and spatial used to inform the draft District Plan is amendment to of the draft framework information used draft District Plan to be monitored update A Plan for District Plan to inform the draft Growing Sydney District Plan You can view these supporting components, as well as Our vision — Towards our Greater Sydney 2056, SOUTH DISTRICT our proposed 40-year vision for Greater Sydney, at www.greater.sydney.
    [Show full text]
  • Sydney Harbour Birdge Southern Toll
    Appendix C Consultation strategy and stakeholder correspondence Community and communications plan Sydney Harbour Bridge southern toll plaza precinct upgrade Bridge Approaches Sydney Harbour Bridge Southern toll plaza precinct upgrade Communications plan October 2012 Draft 4 – internal working document __________________________________________________________ 1. Project overview Roads and Maritime Services (RMS) proposes to realign and resurface the traffic lanes on the Bradfield Highway, on the southern approaches to the Sydney Harbour Bridge, (the proposal). The proposal is aimed at simplifying traffic movements and reducing road safety hazards for the quarter of a million people including 27,000 bus passengers who use road transport to cross the Sydney Harbour Bridge daily. The proposal would involve removal of the toll booths from the southern approaches to the Sydney Harbour Bridge where tolling operations have been undertaken since the bridge was opened to traffic in 1932. Electronic tolling became fully operational in 2009, which means the additional road lanes which facilitated manual tolling are no longer required. The proposal would also involve upgrading the traffic management systems to ensure greater efficiencies in traffic management. This proposal has been made possible by a separate project to modernise and relocate the bridge tolling system to a location north of the bridge, which was determined under a separate environmental assessment (RMS, 2012). The proposal presents an opportunity to upgrade and rationalise the southern toll plaza precinct to simplify traffic movement on the bridge, improve operational flexibility, reduce road safety hazards, and to realise cost efficiencies for RMS. Simplifying and rationalising the lanes would also support separate initiatives to improve bus travel-time reliability to Wynyard in the northern Sydney central business district (CBD).
    [Show full text]
  • Choices for Efficient Private Infrastructure Provision in East Asia
    Choices for Efficient Private Infrastructure Provision in East Asia Edited by Harinder Kohli, Ashoka Mody, and Michael Walton The World Bank Washington, D.C. Contents 1 Making the Next Big Leap: Systemic Reform for Private Infrastructure in East Asia 1 Harinder Kohli, Ashoka Mody, and Michael Walton 2 Organizing the Government for EfÞcient Private Participation in Infrastructure: Lessons from Australia 21 Donald Russell 3 Contracting for Private Provision of Infrastructure: The Malaysian Experience 43 Yahya Yaacob and G. Naidu 4 Regulating Private Involvement in Infrastructure: The Chilean Experience 55 Alejandro Jadresic 5 Managing Environmental and Resettlement Risks and Opportunities in East Asian Infrastructure 71 Bradford S. Gentry 6 Financing Private Infrastructure: Lessons from India 81 Montek S. Ahluwalia iii 1 Making the Next Big Leap: Systemic Reform for Private Infrastructure in East Asia Harinder Kohli, Ashoka Mody, and Michael Walton uch is expected of private Þnancing to support. Recognizing the limits to private help meet the infrastructure require- involvement under the incremental approach, Mments of the rapidly growing East some countries are undertaking broader policy Asian economies. In the Þrst half of the 1990s and institutional reforms aimed at creating an private Þnancing did grow briskly. East Asia led environment more conducive to private partici- the developing world in total international pation, but these efforts are still at an early stage. Þnance for infrastructure, and a sharply grow- Designing such reforms, improving methods of ing share of that Þnance went to private projects contracting with private parties, building regu- (Þgures 1.1 and 1.2). In 1996, $13 billion in inter- latory capacity, and developing domestic capital national capital ßowed to East Asian infrastruc- markets remain on the policy agenda in all the ture projects, more than $9 billion of it for regionÕs economies.
    [Show full text]
  • A Realistic Method of Strengthening Iron Cove Bridge
    Strengthening of Bridge over Iron Cove, Sydney NSW - A Realistic Design Load Wije Ariyaratne, B.Sc (Eng), M.Eng.Sc, Grad Dip Bus, FIE Aust. Manager Bridge Engineering, Bridge Section, RTA Operations Parvez Shah, B.Sc (Eng), M.Eng (Struc.), Grad Dip Bus, MIE Aust. Manager, Bridge Evaluation and Assessment, Bridge Section, RTA Operations Henry Fok, B.Sc (Eng), M.E Eng.Sc, MIStructE Project Engineer, Bridge Evaluation and Assessment, Bridge Section, RTA Operations ABSTRACT The bridge over Iron Cove on Victoria Road consists of seven steel truss spans of 52m and four continuous plate girder approach spans of 18m. The bridge has a carriageway width of 13.7m between kerbs and it carries four lanes of traffic. In addition it has one 3.1m wide dedicated BUS lane on the southern side and one footway on the northern side. The bridge is on a major arterial road and carries B-Doubles. The bridge was built in 1955 when the design load was MS18 (33t), which was significantly less than current legal loads (eg 42.5t Semi- Trailers and 62.5t B-Doubles). Generally, strengthening of bridges is carried out in accordance with the 1996 AUSTROADS Bridge Design Code (’96 ABDC). However, because of the earlier studies conducted in assessing the bridge, it was evident that strengthening the bridge as per ’96 ABDC would have been exceptionally expensive. In addition, it was thought that the bridge would not experience the live loads stipulated in the ’96 ABDC for the next 50 years or during its expected life. Therefore, the Bridge Section proposed a realistic method of determining live loads for strengthening the bridge for legal loads based on the current legal loads experienced by the bridge, the probability of multiple presences of legal loads and the predicted future growth of legal loads over the route.
    [Show full text]
  • New M5 EIS Vol 1B Chapter 14 Visual Impacts
    14 Visual impacts and urban design This chapter provides an assessment of the urban design, landscape character and visual amenity implications associated with the project. The Technical working paper: Landscape character and visual impact and the Urban design report have been prepared, and are provided in Appendix K and Appendix L. This chapter provides a summary of those documents and an assessment of the potential impacts of the project. Table 14-1 sets out the Secretary’s Environmental Assessment Requirements (SEARs) as they relate to urban design, landscape character and visual amenity, and notes where these have been addressed in the environmental impact statement (EIS). Table 14-1 SEARs – urban design, landscape character and visual amenity SEARs Where addressed A consideration of the urban design and visual amenity implications of Potential impacts to visual the proposal, including supporting infrastructure, during construction amenity during the and operation. The assessment must identify urban design and construction and operation landscaping objectives to enhance the ventilation stacks, phase are provided in interchanges, tunnels, ‘cut and cover’ arrangements, consider resulting Sections 14.3.1 and 14.3.2. residual land and treatments, and demonstrate how the proposed hard and soft urban design elements of the proposal would be consistent Urban design and with the existing and desired future character of the area traversed landscaping objectives are affected by the proposal. provided in Section 14.1.3 and Sections 3.1 and 3.3 of Appendix L. Consideration of the existing and desired future character of the area is provided in Sections 14.1.1 and 14.3.2.
    [Show full text]
  • Bridge Aesthetics
    Bridge Aesthetics Design guideline to improve the appearance of bridges in NSW Centre for Urban Design | February 2019 The curved bridge over the Woronora River with its pedestrian and bicycle foot bridge hung below the road deck and the remodelling of its foreshores, fits in with the river, topography and sandstone and bush landscape of Sutherland. With its ten spans, 30 metre high piers, and approaches cut into the opposing hillsides the bridge produces a sweeping, dramatic and elegant built form. Acknowledgments This document has been prepared by the TfNSW Centre for Urban Design with input from Bridge Section, Environmental Branch, and the Government Architects. The information in this document is current as at February 2019. All photographs are sourced from Transport for NSW unless otherwise indicated. Cover image: Yandhai Nepean Crossing. Contents Foreword ............................................................................................................................................................................................................................................. 3 Introduction ....................................................................................................................................................................................................................................... 5 1.1 Purpose and structure of the guideline 6 1.2 Urban design policy 8 1.3 Aesthetics 8 1.4 Perception of bridges 13 1.5 Responsibility of the designers 15 Design approach .............................................................................................................................................................................................................................17
    [Show full text]