2018 Recreational Trails Program/Trail Grant

Total Page:16

File Type:pdf, Size:1020Kb

2018 Recreational Trails Program/Trail Grant 2018 Recreational Trails Program/Trail Grant Projects (75 Projects) Grant ID Community Agency Title Description Award Amount Match This project will replace the narrow foot bridge over the spillway in Ashland State Park. This Department of bridge (and trail) is part of the regional multi-use pathway project that is an area of focus for RTP1880 Ashland Conservation and Ashland State Park MAPC’s Landlines project. Upgrading this bridge will improve access for park users by making $36,500.00 $9,125.00 Recreation it ABA compliant as well as wide enough for multiple users to cross the span at the same time. The Lampson Brook Farm Trail project seeks to create a new ¾-mile, natural surface pedestrian trail, extending from a trailhead/parking area at the New England Small Farm Institute’s Jackson Street Program Barn, running south to connect with an access road that serves the Town’s Foley Field recreational area and the adjacent Lake Wallace trail loop. The New England Small Lampson Brook Farm RTP1841 Belchertown Project proposes to refurbish an existing old farm road; to construct an interpretive Viewing $37,828.00 $12,848.40 Farm Institue, Inc. Trail Pavilion at the trail’s high point, providing a strategic resting spot, a stunning view, and an opportunity to interpret the site’s natural resources and cultural history; and to install two pre-fabricated, post & beam trailhead kiosks, each furnished with a trail map and other pertinent information for visitors to the site. This project represents an ongoing program to improve the trail base of the Rail Road Bed Project - Improved Rail through “leveling” some broadly rutted sections of the trail by bringing in fill and machine Mill Valley Road Trail Bed and a leveling. It also includes a team of trail workers who will specifically perform the labor RTP1885 Belchertown $12,508.00 $3,126.00 Snowmobile Club Small Equipment involved in the “final smoothing out” of some of these sections. This grant includes the Purchase purchase of a new brush cutting attachment and a trailer to store and transport the collection of hands tool necessary for these projects. Using a multi-phased approach, the Beartown State Forest comprehensive OHV Trails Rehabilitation Project will design, permit, and then implement repairs and improvements to Department of Beartown State Forest Berkshire specific locations along multi-use trails throughout the state forest, including Beebe, Sky RTP1827 Conservation and OHV Trails $75,000.00 $75,000.00 County Peak and Wildcat Trails. This grant project includes funding for Phase 1, limited to Recreation Rehabilitation Project evaluation/assessment, design and permitting costs for the various trail enhancement activities. This project seeks funding to continue recent efforts that will turn the 85-acre Charity Farm Lot (CFL) into a much-needed recreation destination for the community. Work, expected to Charity Farm Lot Trail Friends of the Charity be performed by the Student Conservation Association (SCA), will include restoration of RTP1837 Bernardston Creation and $17,000.00 $4,250.00 Farm Lot eroded trails by installing crossings, stairs, and adjusting grades. To complement their Improvement efforts, volunteers from Friends of the CFL will continue to provide additional trail grooming and expansion, aligned with installation of cohesive signage. This project seeks funding for the design and construction of a 1700 linear foot shared-use RTP1856 Billerica Town of Billerica Yankee Doodle Bikeway $100,000.00 $125,000.00 path that will provide universal access to regional bike routes in the region. This project will fund biddable plans, specs and estimates for a new, accessible gateway and path into the Arnold Arboretum for people who live in the Environmental Justice Bussey Brook Meadow - communities east of the commuter rail tracks. When constructed, this connection will Boston Transportation RTP1877 Boston Arboretum Road Green transform a neglected and trash-strewn tunnel under the tracks into an inviting entrance, $91,200.00 $22,800.00 Department Link with signage and subtle lighting of the arch. Beyond the tunnel, a crushed stone path would connect to the Blackwell Path, the South Street Gate, and the rest of the 284-acre Arnold Arboretum. The proposed Hager Land Trail Connection will provide a safe bridge over wetlands to connect the Blanchard Memorial Elementary School and the Hager Conservation Trails. The bridge will bring many benefits to the community, including but not limited to: a safe egress Hager Land Trail Blanchard Memorial from the school in case of an emergency; safe passage between the school and conservation RTP1883 Boxborough Connection and $48,315.00 $11,890.00 School trails; increased collaboration between the community, school, and town conservation Maintenance groups for trail education programs; and increased access to Boxborough’s existing trail network. Lastly, the project will also include widening of current trails and the clearing of an old trail that has since overgrown for easier access of younger ages and classes of children. Drummer Boy Park is a multi-use park on historic Route 6A in Brewster that has seen significant degradation due to erosion. This project will convert the failing stone dust trail Drummer Boy Park Trail RTP1890 Brewster Town of Brewster into pavement that will be accessible to impaired/handicapped users, as well as fixing the $40,000.00 $29,780.00 Enhancement drainage issues that caused the original damage. It will also extend the trail network, improve the overlook area and improve the parking lot. The Charles River Reservation Pathway System is one of the most popular, used and valuable Charles River - off-road pathways in the Commonwealth, being used by tens of thousands every day. DCR Memorial Drive proposes to re-design, renovate and upgrade the Memorial Drive Pathway system from the RTP1832 Cambridge Massachusetts DCR $179,999.00 $200,149.00 Pathways Phase 3 BU Bridge to the Eliot Bridge, greatly enhancing safety and the path user experience. RTP Engineering funds would be used for the design and engineering necessary to access state Capital Construction funds. Deerfield River Trails (DiRT) is proposing to connect and improve the three extensive single- track trail networks in Charlemont and Hawley with new trail connections that will allow Connecting the riders and other trail users to enjoy a multi-day, variable-difficulty trail experience in the RTP1835 Charlemont Deerfield River Trails Deerfield River Trails $60,020.00 $15,020.00 Charlemont/Hawley area. DiRT will engage with stakeholders, specifically Youth Corps such Networks! as Student Conservation Association, Appalachian Mountain Club, and/or AmeriCorps in constructing these professionally-designed trails. Working closely with the U.S. Fish and Wildlife Service, this grant will be used to upgrade and improve the popular Boardwalk Trail’s overlook/observation areas according to accessibility Friends of Monomoy Coastal National guidelines, allowing wheelchair users access to these areas and expanded opportunities for RTP18100 Chatham National Wildlife Wildlife Refuge Access $10,640.00 $5,150.00 wildlife observation and photography. Improvements include re-grading and re-surfacing Refuge and Interpretation two popular overlook/observation areas, and replacement of four outdated, faded, and aging interpretive panels along the Boardwalk Trail’s popular overlook areas. This project will fund a seasonal Appalachian Trail Ridge Runner who will work exclusively on Department of Massachusetts' the National Scenic Appalachian Trail (AT) in Massachusetts. The AT Ridge Runner provides RTP1807 Chesire Conservation and Appalachian Trail Ridge education and information to trail visitors, and works closely with numerous volunteers that $11,699.20 $14,339.20 Recreation Runner Program help maintain the trail and associated overnight facilities. The AT Ridge Runner also helps to monitor trail conditions, record trail use and respond to emergencies as needed. This project will allow for the maintainenance of approximately 30 miles of multi-use trails through the town of Chesterfield, MA. During snow season these trails take approximately Chesterfield - 4 - Trail Maintenance and 90-135 hours a week to maintain a flat, safe surface for all to enjoy. With grant funds, the RTP1851 Chesterfield $50,000.00 $12,500.00 Seasons Grooming club will update 2 older, discontinued 1978 GRIZZLY utility snowmobilesand grooming drags with two Arctic Cat BearCat Groomer Specials, attachable drags and accompanying storage space. The Colrain Sno-Drifters Snowmobile Club is seeking to replace an older grooming machine with a new, more environmentally friendly model. Currently, the club’s 2002 Ski-Doo Skandic Eco-Friendly is in disrepair and the process of repairing this machine would be cost prohibitive when RTP1836 Colrain Colrain Sno-Drifters $16,872.94 $4,500.00 Replacement compared to purchasing a new, environmentally friendly 2018 Arctic Bearcat snowmobile. The new equipment will allow the club to reduce its carbon footprint in the pristine areas we maintain and invest more resources towards trail upkeep. The Trail Maintenance Equipment project will provide equipment for maintaining trails both in summer and winter as well as additional secure storage for the equipment when not in Conway Snowmobile Trail Maintenance use. The Conway Snowmobile Club, Inc. is requesting funding to replace older, outdated, RTP1809 Conway $57,016.00 $14,254.00 Club, Inc. Equipment unreliable, and inefficient equipment in order to maintain the club’s 120 miles of snowmobile trails. The trails connect to four bordering towns and encompass the Conway State Forest, South River State Forest, town lands, and private lands. Saftey Improvement - This project will fund bicycle and pedestrian safety improvements at Cape Cod Rail Trail’s Cape Cod Rail Trail crossing at South Gages Road in Dennis, MA. The improvements will provide increased sight RTP18101 Dennis Town of Dennis $99,105.00 $24,800.00 Crossing of South Gages distance at the crossing and pedestrian activated beacons to alert drivers of crossing foot- Way traffic.
Recommended publications
  • DEERFIELD RIVER WATERSHED Assessment Report
    DEERFIELD RIVER WATERSHED Assessment Report 2004-2008 Downstream of Fife Brook Dam The Commonwealth of Massachusetts Executive Office of Environmental Affairs The Commonwealth of Massachusetts Executive Office of Environmental Affairs 251 Causeway Street, Suite 900 Boston, MA 02114-2119 Mitt Romney GOVERNOR Kerry Healey LIEUTENANT GOVERNOR Tel: (617) 626-1000 Fax: (617) 626-1181 Ellen Roy Herzfelder or (617) 626-1180 SECRETARY http://www.state.ma.us/envir November 19, 2004 Dear Friends of the Deerfield River Watershed: It is with great pleasure that I present you with the Assessment Report for the Deerfield River Watershed. The report helped formulate the 5-year watershed action plan that will guide local and state environmental efforts within the Deerfield River Watershed over the next five years. The report expresses some of the overall goals of the Executive Office of Environmental Affairs, such as improving water quality, restoring natural flows to rivers, protecting and restoring biodiversity and habitats, improving public access and balanced resource use, improving local capacity, and promoting a shared responsibility for watershed protection and management. The Deerfield River Watershed Assessment Report was developed with input from the Deerfield River Watershed Team and multiple stakeholders including watershed groups, state and federal agencies, Regional Planning Agencies and, of course, the general public from across the Watershed. We appreciate the opportunity to engage such a wide group of expertise and experience as it allows the state to focus on the issues and challenges that might otherwise not be easily characterized. From your input we have identified the following priority issues: • Water Quantity • Water Quality • Fish Communities • Wildlife and Terrestrial Habitat • Open Space • Recreation I commend everyone involved in this endeavor.
    [Show full text]
  • The Mohawk Trail Region the Official Visitors Mohawk Guide 2018 - 2019 Trail Region Eugene Michalenko Tourist Information
    The Mohawk Trail REGION The Official Visitors Mohawk Guide 2018 - 2019 Trail www.mohawktrail.com REGION Explore The Trail Region 4-6 Ride off the beaten path ....33 Historic and literary figures Savoy .............................33 travelled The Trail ............7 Rowe ..............................33 Traffic on The Trail Annual Events for millenniums ................7 along The Trail ..........34-35 Tourist Information ... 8-10 map of the Ice Cream along The Trail ...11 mohawk trail find a place to region ...............36-37 enjoy yourself Charlemont ...................38 in the mohawk Shelburne Falls .............43 trail region Colrain ...........................46 The Arts & Culture .........12 Shelburne ......................46 Places to Eat & Drink .12-13 Greenfield .....................48 Places to Stay ..................13 Cultural Districts ..............49 Places to Shop .................14 Deerfield .......................49 Services ...........................15 South Deerfield .............51 www.mohawk trail.com How to Get Here .............15 Turners Falls .................51 Distances from Bernardston ..................52 BIENVENIDO | BIENVENUE North Adams to ? ...........15 Northfield .....................54 Camping, State Parks & Gill .................................54 WILLKOMMEN | BENVENUTO Outdoor Recreation .......16 Athol .............................55 欢迎 Sights to See .................17 Phillipston ....................55 ようこそ | cities & towns Westminster .................55 in the trail Farmers’ Markets ...56-57
    [Show full text]
  • Deerfield River Watershed Association
    A Watershed-Based Plan to Maintain the Health and Improve the Resiliency of the Deerfield River Watershed Franklin Regional Council of Governments Staff: Kimberly Noake MacPhee, P.G., CFM, Land Use and Natural Resources Program Manager Mary Chicoine, Senior Land Use and Natural Resources Planner Ryan Clary, Senior GIS Specialist Alyssa Larose, Land Use and Natural Resources Planner Megan Rhodes, AICP, Senior Transportation/Land Use Planner With technical assistance provided by: Fuss & O’Neill, Inc., Erik Mas, PE Field Geology Services, John Field, Ph.D., P.G. and Nicolas Miller Franklin Conservation District Deborah Shriver Consulting, Deborah M. Shriver Acknowledgements: Watershed stakeholders provided valuable comments and insight during the development of this plan. This plan also benefitted from the assistance and advice of the following organizations and individuals: Brian Yellen, Researcher, Department of Geosciences, UMass Amherst Andy Fisk, Executive Director, Connecticut River Conservancy Rita Thibodeau, District Conservationist, USDA, NRCS Carrie Banks, MA Division of Ecological Restoration, Dept. Fish & Game Erin Rodgers, Ph.D., Western New England Project Coordinator, Trout Unlimited Michael B. Cole, Ph.D., Cole Ecological Will Sloan Anderson, Franklin Land Trust Photographs: Cover Deerfield River landscape Matthew MacPherson http://mattmacpherson.com Pp. 2-3 Deerfield River landscape Matthew MacPherson http://mattmacpherson.com P. 11 Flooding in Deerfield Town of Greenfield P. 39 Crowningshield property Franklin Land Trust P. 45 Dam sites Erin Rodgers, Trout Unlimited Pp. 82-105 Maps, figures and photos Field Geology Services This project has been financed with Federal Funds from the Environmental Protection Agency (EPA) to the Massachusetts Depart- ment of Environmental Protection (the Department) under an s.
    [Show full text]
  • Continuous Forest Inventory 2014
    Manual for Continuous Forest Inventory Field Procedures Bureau of Forestry Division of State Parks and Recreation February 2014 Massachusetts Department Conservation and Recreation Manual for Continuous Forest Inventory Field Procedures Massachusetts Department of Conservation and Recreation February, 2014 Preface The purpose of this manual is to provide individuals involved in collecting continuous forest inventory data on land administered by the Massachusetts Department of Conservation and Recreation with clear instructions for carrying out their work. This manual was first published in 1959. It has undergone minor revisions in 1960, 1961, 1964 and 1979, and 2013. Major revisions were made in April, 1968, September, 1978 and March, 1998. This manual is a minor revision of the March, 1998 version and an update of the April 2010 printing. TABLE OF CONTENTS Plot Location and Establishment The Crew 3 Equipment 3 Location of Established Plots 4 The Field Book 4 New CFI Plot Location 4 Establishing a Starting Point 4 The Route 5 Traveling the Route to the Plot 5 Establishing the Plot Center 5 Establishing the Witness Trees 6 Monumentation 7 Establishing the Plot Perimeter 8 Tree Data General 11 Tree Number 11 Azimuth 12 Distance 12 Tree Species 12-13 Diameter Breast Height 13-15 Tree Status 16 Product 17 Sawlog Height 18 Sawlog Percent Soundness 18 Bole Height 19 Bole Percent Soundness 21 Management Potential 21 Sawlog Tree Grade 23 Hardwood Tree Grade 23 Eastern White Pine Tree Grade 24 Quality Determinant 25 Crown Class 26 Mechanical Loss
    [Show full text]
  • New England Cycling.Pdf
    KLMNO TrSUNDAYav, MAY 6, 2018 . SECTIONe F l EZ EE Along the East Coast, cyclists give old rail lines new purpose ISLAND LINE IMAGES A grand tour verything we love about New England route under development from Canada to Key is better by bike. When you’re on two West, Fla., is a good place to start. Bruce wheels, the air is crisper, the small Donald, acting New England coordinator for towns lovelier, the coast a bit more like of New the Greenway Alliance, said the region is Eheaven, and the wild blueberries may even be further along than the rest of the East Coast in sweeter. Greenway development. Many of the region’s Last summer, when I found myself without trails are built on former railways, guarantee- a bike while visiting family in Vermont, I ing a relatively flat ride. Also appealing: the rented one at Omer and Bob’s Sportshop in England variety of cycling options in New England. nearby Lebanon, N.H., and rode part of the “You have the urban areas where people are Northern Rail Trail. I pedaled on flat, easy commuting and suburban sections with fewer terrain through a tunnel of brilliantly green BY MELANIE D.G. KAPLAN cars,” Donald said, “and then you get to these trees and detoured to a sparkling lake. Since Special to The Washington Post bucolic places — in every state — and you’re then, I’ve started jotting down names of other literally in the woods with nature, with an trails in the region that I want to bike this eagle and the occasional black bear.” summer — probably many summers hence, by If you’re not sold yet, just wait until the the length of my list.
    [Show full text]
  • Massachusetts Department of Conservation and Recreation Bureau of Forestry
    Silviculture Prescription South River 2016 Massachusetts Department of Conservation and Recreation Bureau of Forestry Western Connecticut Valley South River State Forest Conway, MA Prepared by: Nicholas Anzuoni – Management Forester – WCV Massachusetts Department of Conservation and Recreation 740 South Street, Pittsfield- MA 01201 [email protected] – 1-413-442-8928 x 129 November 1, 2016 Approved by: Management Forestry Program Supervisor ______________________________ Date:___________December 15,2016 William N. Hill, CF 1 Overview: The South River State Forest is located in the town of Conway along the Deerfield River south of Bardwell Ferry. It was transferred to DCR (DEM) in 1965 as part of a land swap with a major utility company and prior to that it was held in private ownership. The forest was managed for timber, fuelwood and Christmas trees in cooperation with the Commonwealth of Massachusetts Forestry program which provided management services to the previous landowner since the 1950’s. This site was selected for a vegetation management project in order to continue with projects that were started over fifty years ago and complies with the DCR Management Guidelines for Woodlands. The Ecosystem Services section of these guidelines provides a number of goals that would be met by this forest management project including the protection of forest productivity with the state of the art sustainable forestry, sustainable production of renewable wood products and the ecological restoration of degraded natural community types. The project area contains red pine and Norway spruce plantations that are declining in health and vigor. Hemlock trees are showing advanced signs of Hemlock Wooly Adelgid and Hemlock Elongated Scale infestation which will quickly kill the host trees.
    [Show full text]
  • Affordable Housing and Transportation
    Annual Report Fiscal Year 2003 Cape Cod Commission Barnstable County • Massachusetts Cape Cod Commission Fiscal Year 2003 ( July 1, 2002 through June 30, 2003) Robert D. Deane, Chair Robert Randolph, Vice Chair (through April 2003) Susan Kadar, Secretary Appointed Representatives: Barnstable ....................................................................................... David Ansel Bourne ..................................................................................... Robert D. Deane Brewster .................................................................................... Elizabeth Taylor Chatham .................................................................................. Catherine Frazer Dennis............................................................................................ Brad Crowell Eastham ........................................................................................ Ian Aitchison Falmouth ............................................................................. Henry F. Owens III Harwich ...................................................................................... Lawrence Cole Mashpee ...................................................................................... Ernest Virgilio Orleans......................................................................................Frank H. Hogan Provincetown .................................................................................. Len Stewart Sandwich....................................................................................
    [Show full text]
  • Outdoor Recreation Recreation Outdoor Massachusetts the Wildlife
    Photos by MassWildlife by Photos Photo © Kindra Clineff massvacation.com mass.gov/massgrown Office of Fishing & Boating Access * = Access to coastal waters A = General Access: Boats and trailer parking B = Fisherman Access: Smaller boats and trailers C = Cartop Access: Small boats, canoes, kayaks D = River Access: Canoes and kayaks Other Massachusetts Outdoor Information Outdoor Massachusetts Other E = Sportfishing Pier: Barrier free fishing area F = Shorefishing Area: Onshore fishing access mass.gov/eea/agencies/dfg/fba/ Western Massachusetts boundaries and access points. mass.gov/dfw/pond-maps points. access and boundaries BOAT ACCESS SITE TOWN SITE ACCESS then head outdoors with your friends and family! and friends your with outdoors head then publicly accessible ponds providing approximate depths, depths, approximate providing ponds accessible publicly ID# TYPE Conservation & Recreation websites. Make a plan and and plan a Make websites. Recreation & Conservation Ashmere Lake Hinsdale 202 B Pond Maps – Suitable for printing, this is a list of maps to to maps of list a is this printing, for Suitable – Maps Pond Benedict Pond Monterey 15 B Department of Fish & Game and the Department of of Department the and Game & Fish of Department Big Pond Otis 125 B properties and recreational activities, visit the the visit activities, recreational and properties customize and print maps. mass.gov/dfw/wildlife-lands maps. print and customize Center Pond Becket 147 C For interactive maps and information on other other on information and maps interactive For Cheshire Lake Cheshire 210 B displays all MassWildlife properties and allows you to to you allows and properties MassWildlife all displays Cheshire Lake-Farnams Causeway Cheshire 273 F Wildlife Lands Maps – The MassWildlife Lands Viewer Viewer Lands MassWildlife The – Maps Lands Wildlife Cranberry Pond West Stockbridge 233 C Commonwealth’s properties and recreation activities.
    [Show full text]
  • Massachusetts Forests at the Crossroads
    MASSACHUSETTS FORESTS AT THE CROSSROADS Forests, Parks, Landscapes, Environment, Quality of Life, Communities and Economy Threatened by Industrial Scale Logging & Biomass Power Deerfield River, Mohawk Trail Windsor State Forest, 2008, “Drinking Water Supply Area, Please protect it!” March 5, 2009 EXECUTIVE SUMMARY The fate of Massachusetts’ forests is at a crossroads. Taxpayer subsidized policies and proposals enacted and promoted by Governor Patrick’s office of Energy and Environmental Affairs seriously threaten the health, integrity and peaceful existence of Massachusetts forests. All the benefits provided by these forests including wilderness protection, fish and wildlife habitat, recreation, clean water, clean air, tourism, carbon sequestration and scenic beauty are now under threat from proposals to aggressively log parks and forests as outlined below. • About 80% of State forests and parks are slated for logging with only 20% set aside in reserves. (p.4) • Aggressive logging and clear-cutting of State forests and parks has already started and new management plans call for logging rates more than 400% higher than average historical levels. (p. 5-18) • “Clear-cutting and its variants” is proposed for 74% of the logging. Historically, selective logging was common. (p. 5-18) • The timber program costs outweigh its revenue . Taxpayers are paying to cut their own forests.(p.19) • The State has enacted laws and is spending taxpayer money devoted to “green” energy to promote and subsidize the development of at least five wood-fueled, industrial-scale biomass power plants. These plants would require tripling the logging rate on all Massachusetts forests, public and private. At this rate, all forests could be logged in just 25 years.
    [Show full text]
  • Official Transportation Map 15 HAZARDOUS CARGO All Hazardous Cargo (HC) and Cargo Tankers General Information Throughout Boston and Surrounding Towns
    WELCOME TO MASSACHUSETTS! CONTACT INFORMATION REGIONAL TOURISM COUNCILS STATE ROAD LAWS NONRESIDENT PRIVILEGES Massachusetts grants the same privileges EMERGENCY ASSISTANCE Fire, Police, Ambulance: 911 16 to nonresidents as to Massachusetts residents. On behalf of the Commonwealth, MBTA PUBLIC TRANSPORTATION 2 welcome to Massachusetts. In our MASSACHUSETTS DEPARTMENT OF TRANSPORTATION 10 SPEED LAW Observe posted speed limits. The runs daily service on buses, trains, trolleys and ferries 14 3 great state, you can enjoy the rolling Official Transportation Map 15 HAZARDOUS CARGO All hazardous cargo (HC) and cargo tankers General Information throughout Boston and surrounding towns. Stations can be identified 13 hills of the west and in under three by a black on a white, circular sign. Pay your fare with a 9 1 are prohibited from the Boston Tunnels. hours travel east to visit our pristine MassDOT Headquarters 857-368-4636 11 reusable, rechargeable CharlieCard (plastic) or CharlieTicket 12 DRUNK DRIVING LAWS Massachusetts enforces these laws rigorously. beaches. You will find a state full (toll free) 877-623-6846 (paper) that can be purchased at over 500 fare-vending machines 1. Greater Boston 9. MetroWest 4 MOBILE ELECTRONIC DEVICE LAWS Operators cannot use any of history and rich in diversity that (TTY) 857-368-0655 located at all subway stations and Logan airport terminals. At street- 2. North of Boston 10. Johnny Appleseed Trail 5 3. Greater Merrimack Valley 11. Central Massachusetts mobile electronic device to write, send, or read an electronic opens its doors to millions of visitors www.mass.gov/massdot level stations and local bus stops you pay on board.
    [Show full text]
  • 2006 MACROINVERTEBRATE ASSESSMENT (Franklin County, Massachusetts)
    SOUTH RIVER WATERSHED 2006 MACROINVERTEBRATE ASSESSMENT (Franklin County, Massachusetts) MICHAEL B. COLE DEERFIELD RIVER WATERSHED ASSOCIATION 15 Bank Row, Suite A Greenfield, Massachusetts May 2007 DRAFT EXECUTIVE SUMMARY • As part of the Deerfield River Watershed Association’s (DRWA) commitment to protecting the watershed’s resources, the DRWA has performed water quality monitoring to supplement the efforts of regulatory agencies to monitor the watershed’s condition. In recognizing the need to more thoroughly assess biological conditions in the Deerfield River watershed, the DRWA implemented in 2005 a long-term macroinvertebrate monitoring program. The objectives of the program are to 1) augment MA DEP/DWM biomonitoring efforts to assess surface waters in the watershed with respect to their aquatic-life-use status and 2) familiarize citizens of the watershed with biological monitoring to increase support for and participation in watershed enhancement and protection activities. The South River watershed was sampled in 2006 under this program. • Twelve river and stream reaches were selected in the South River watershed for sampling in 2006. Eight sites were selected on the South River ranging from within the town of Ashfield downriver to the confluence with the Deerfield River. The Bear River, a less developed and neighboring drainage to the north, was selected as the reference site against which to compare conditions in the mainstem South River below its confluence with Creamery Brook. Five tributaries to the South River were also sampled, including two reaches on the upper mainstem of the South River which are small enough to warrant comparison with other tributaries in the watershed. Lower Chapel Brook was selected as the reference reach for the tributaries in this assessment, as it occurs in a largely forested drainage.
    [Show full text]
  • Or Rail Trail.”
    or rail trail.” Old Eastern Marsh Trail | Salisbury , MA 30 City of Fall River | RFQ #20-5 Gateway Cities Projects • Twin Cities Rail Trail, Fitchburg - Leominster • Concord River Greenway, Lowell • Methuen Rail Trail, Methuen • Monoosnoc Brook Trail, Leominster • Northern Strand Rail Trail, Everett, Malden, Revere, Saugus, Lynn • Taunton River Trail, Taunton MassDOT (Community-funded design, MassDOT construction) • Powwow Riverwalk Trail, Amesbury • Groveland Community Trail, Groveland • Border to Boston Trail, Boxford, Georgetown, Newbury, Salisbury • Community Trail (Design and construction funded by the community) • Clipper City Rail Trail, Newburyport • Swampscott Rail Trail, Swampscott • Mt. Hope Bay Greenway Conceptual Design and Feasibility Study, Fall River • DCR Trail Projects • Blackstone River Greenway • Southern New England Trunkline Trail, Franklin, Bellingham • Mystic River Trail, Somerville • • Cape Cod Rail Trail Connection, Brewster • Manuel Correllus State Forest Bike Path, Edgartown, West Tisbury • Muddy River Trail, Boston • Mystic River Reservation Trail, Medford Stantec Consulting Services Inc. 31 Designing the ultimate trail experience BICYCLE AND PEDESTRIAN SERVICES Whether traveling on two wheels or two feet, we help communities stay active and sustainable. This page: Mystic River Reservation Trail | Somerville, MA Front cover: Quequechan River Rail Trail | Fall River, MA What’s Overview Projects Inside Our Team With more than 500 miles of paths and trails built or in the planning or design stage, Stantec is
    [Show full text]