Item 31

ChiefChief CapitalCapital ManagementManagement OfficerOfficer ReportReport

February 19, 2009 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension ProjectProject UpdateUpdate FebruaryFebruary 19,19, 20092009 • 6 Mile Alignment • 1.7 Miles of Tunnel • 8 Stations (6 At-grade & 2 Underground) • Park & Ride Facility • Direct Connection to the Pasadena Metro Gold Line • $898.8 million • On-Time/Within Budget • Opens in Mid-2009

Gold Line 2 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension OverallOverall ConstructionConstruction ProgressProgress

• Construction began in July 2004. As of mid-February 2009, the Project is over 94% complete. • The Contractor has worked over 3.8 million hours without a lost-time accident. • Construction of the two underground stations at 1st/Boyle and 1st/Soto is 91% complete. • Construction of the six at-grade stations is 78% complete. • Systems installation is 93% complete.

Gold Line 3 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension OverallOverall ConstructionConstruction ProgressProgress RemainingRemaining WorkWork

2008 2009 2010 ACTIVITY JFMAMJJASONDJFMAMJJASONDJFMAMJ

1st/Boyle & 1st/ Boyle Heights/ & Soto Stations Architecture & 1st/Alameda Site Finishes Little Tokyo/Arts District Station

1st/Utah Pico/Aliso Station

Indiana Indiana Station

3rd/Ford Maravilla Station

3rd/Mednik East LA Civic Station

Pomona/Atlantic Atlantic Station

Pomona/Atlantic Parking Structure

1st Street Bridge Widening Third Party Interfaces LAUSD Re-Build Ramona Opportunity High School

Systems Systems Installation & Integration Testing Installation & (Phases I & II) Testing/ Pre-Revenue Operations Pre-Revenue Revenue Operations Date Gold Line 4 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension ScheduleSchedule StatusStatus (Critical(Critical Path)Path)

2008 2009 2010 JFMAMJ JASONDJFMAMJ JASONDJFMAMJ

Boyle Heights/Mariachi Plaza & Soto Stations

Energize Traction Power Substations

OCS Functional / Integration Testing

Communication System

Systems Integeration Testing / Pre-Revenue Operations

Forecast Revenue Operations (July 2009) FFGA Revenue Operations (December 2009) Gold Line 5 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension SystemsSystems ConstructionConstruction andand RailRail ActivationActivation

2008 2009 RESPONSIBILITY Dec Jan Feb Mar Apr May June July

Complete Phase I Testing

Achieve Construction Substantial Completion ELRTC Begin Phase I Testing Phase II Testing Support

Metro Construction

Complete Phase II Testing Metro Rail REVENUE OPERATIONS Operations Begin Phase II Testing Begin Pre-Revenue Operations

Primary Responsibility ELRTC JESSE DIAZ RAIL ACTIVATION COORDINATOR

Support Responsibility Metro Construction JOHN KNIGHTON SYSTEMS ACTIVATION MANAGER

Metro Rail Operations DAVIDE PUGLISI RAIL ACTIVATION MANAGER Gold Line 6 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension LightLight RailRail TransitTransit StationsStations

LittleTokyo/ Pico/Aliso Boyle Heights/ 1st/Soto Arts District Mariachi Plaza

Maravilla Indiana Station East Pomona/Atlantic Civic Center

Gold Line 7 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension UndergroundUnderground StationStation ConstructionConstruction BoyleBoyle Heights/MariachiHeights/Mariachi PlazaPlaza StationStation

The underground ventilation system is Architectural finishes, ceilings and being installed and inspected by the ductwork for the ventilation system are Metro Fire/Life Safety Committee. being installed in the underground station.

Gold Line 8 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension UndergroundUnderground StationStation ConstructionConstruction 11stst/Soto/Soto StationStation

Escalators and elevators are being Installation of floor finishes continues on installed along with architectural finishes. the train passenger platform.

Gold Line 9 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension At-GradeAt-Grade StationStation ConstructionConstruction

Little Tokyo/Arts District Station Pomona/Atlantic Station

Architectural elements are being installed at all of the six at-grade stations.

Gold Line 10 MetroMetro GoldGold LineLine EastsideEastside ExtensionExtension VehicleVehicle ClearanceClearance TestTest

The first Light Rail Vehicle clearance test began on January 27, 2009 during which a new 2550 Ansaldobreda Vehicle was being pulled along the entire alignment to ensure that the vehicle clears all of the stations and other physical elements. The Traction Power Sub- Stations will be energized by early March 2009 to provide power to the vehicles.

Gold Line 11 Metro Gold Line Eastside Extension Feasibility of Four Quadrant Gates

Construction Committee Meeting 10:30 a.m. February 19, 2009

12 Metro Gold Line Eastside Extension Feasibility of Four Quadrant Gates NECESSARY STEPS Step 1 – Determine Feasibility ($80,000-$100,000) 4-6 months ‰ Board Authorization to Fund Step 1 ‰ Conceptual Layout ‰ City & County Review ‰ CPUC Feedback Step 2 – Implementation Phase ($20-$30 million) 3-6 years ‰ Determine Funding Source ‰ Board Authorization to Fund the Project ‰ Environmental Analysis ‰ CPUC Hazard Analysis Studies ‰ Preliminary Engineering & Final Environment Approval ‰ Final Design ‰ City & County Design Approvals ‰ CPUC Crossing Application Approval ‰ Procurement Process ‰ Grade Crossing Equipment Installation & Testing ‰ CPUC Approval to Operate

13 I-405 Sepulveda Pass Widening Project Project Update February 2009

14 I-405 Sepulveda Pass Project Summary Schedule Calendar Year

2008 2009 2010 2011 2012 2013 2014

ROD Environmental Legend Completed Planned Preliminary PE Complete Engineering

RFQ IFB Contract Award D/B Procurement

Start ROW Complete ROW ROW Acquisitions

Start Relocations Complete Relocations Utility Relocations

Complete Construction NTP D/B Construction

2/09

15 I-405 Sepulveda Pass Project Recent Accomplishments

¾ Issued Amendment No. 7 to the IFB on January 28, 2009. ¾ Continued responding to questions from bidders. ¾ Working with the City of LA to resolve design/construction issues. ¾ Negotiating with Caltrans to finalize field staffing levels. ¾ Drafted amended contract language to address State funding issue.

1616 I-405 Sepulveda Pass Project Areas of Concern

9 State funding uncertainty. 9 Estimated Project Budget may exceed funding. 9 Significant utility issues (i.e., MWD water line). 9 FHWA/Caltrans design approval process may cause schedule delays. 9 Contractor’s concerns about Caltrans/Metro processes could result in more expensive bids. 9 Caltrans has not resolved design conflicts with GSA, City of LA and homeowners.

1717 Expo Line Transit Project

Exposition Light Rail Transit Project

Expo Board Presentation Monthly Project Status Update February 5, 2009 18 Expo Line Transit Project

PHASE 1

19 Expo Line Transit Project Phase 1 Project Status

Design ƒ Baseline Design is approximately 95% complete ƒ Venice/Robertson design is approximately 85% complete

Construction ƒ Construction is approximately 30% complete

Construction Packages ƒ Negotiated 14 of the 20 construction packages totaling $347 million

20 Expo Line Transit Project Phase 1 Project Status Project Schedule

ƒ Contractor’s latest schedule update shows a 26-week project delay • Delay in the relocation of LADWP overhead power lines at the La Cienega structure is driving most of the delay • Delays in the relocation of LADWP overhead power lines at the La Brea structure • Authority has requested a recovery schedule from the contractor ƒ Areas of potential further delay • Aerial structures at La Brea, La Cienega and Ballona Creek • Any changes to the Farmdale Ave and/or Harvard Blvd crossings • LADWP power line relocations • Culver City aerial station

• Storage and Inspection Facility 21 Expo Line Transit Project Phase 1 Project Status

CPUC Grade Crossing Applications

ƒ On October 22nd, ALJ issued his proposed decision denying the pending applications at Harvard and Farmdale in favor of constructing pedestrian overcrossings at these two locations. ƒ Assigned commissioner issued a draft revised decision that still denied both applications, but did not mandate the construction of a pedestrian overcrossing at Harvard. ƒ Another commissioner issued an alternative decision that denies our application for Farmdale, but does approve our application for Foshay ƒ CPUC commission is now scheduled to rule on February 20th

22 Expo Line Transit Project Construction Progress

Sub-grade Preparation in Support of Invert Slab Placement at Grade Separation Trench Structure 23 Expo Line Transit Project Construction Progress

Preparation for drilling of dowels at A3 Trench walls

24 Expo Line Transit Project Construction Progress

Boring for Ductbank Conduits at Arlington Ave. and Exposition Blvd. 25 Expo Line Transit Project Construction Progress

Completing the 11’ CIDH piles for La Cienega overcrossing 26 Expo Line Transit Project Construction Progress

Concrete Placement for End Diaphragms at National Boulevard Bridge 27 Expo Line Transit Project Phase 1 Project Status Project Budget Summary ƒ Construction Budget • 14 of 20 construction packages have been negotiated in an amount totaling $347 million • Currently within the revised construction budget

ƒ Project Budget • All tasks are within the overall project budget • Remaining significant risks to the budget include: - Contracts yet to be negotiated (including Storage and Inspection Facility) - Any significant contractor claims - Changes to the Farmdale and Harvard crossings - Any significant owner related project delays

28 Expo Line Transit Project

PHASE 2

29 Expo Line Transit Project Phase 2 Project Status

Phase 2 Milestones Activity Forecast Status Completion Date Scoping Meetings & Report May - 07 Complete

Screening of Alternatives Oct - 07 Complete

Administrative Draft to FTA Nov - 08 No longer applicable

Conversion to CEQA Document Dec - 08/Jan - 09 Complete

Public Comment Period/Hearings on DEIR Jan/March - 09 Began on Jan. 28

Board Discussion of Preferred Alternative April - 09 Updated

Board Adoption of Final EIR Oct - 09

Design-Build Contract Award Jan - 2010

30