Greater Dublin Strategic Drainage Study Final Strategy Report ______

Total Page:16

File Type:pdf, Size:1020Kb

Greater Dublin Strategic Drainage Study Final Strategy Report ______ Greater Dublin Strategic Drainage Study Final Strategy Report __________________________________________________________________________________________ Greater Dublin Strategic Drainage Study Final Strategy Report Document Title Final Strategy Report Volume 1 – Main Report Volume 2 – Appendices Document Ref (s): GDSDS/NE02057/035C Date Edition/Rev Status Originator Checked Approved 28/05/04 A Draft N Fleming J Grant M Hand M Edger C O’Keeffe 06/08/2004 B Draft N Fleming J Grant M Hand M Edger C O’Keeffe 27/04/2005 C Final N Fleming J Grant M Hand M Edger C O’Keeffe Contracting Authority (CA) Personnel Council Area Council Name Operations Manager Office Location Project Engineer Name Telephone No. Operations Manager Name Telephone No. This report has been prepared for the Contracting Authority in accordance with the terms and conditions of appointment for the Greater Dublin Strategic Drainage Study dated 23rd May 2001. The McCarthy Hyder MCOS Joint Venture cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. _________________________________________________________________________________________________________________ GDSDS/NEO2057/035C April 2005 Greater Dublin Strategic Drainage Study Final Strategy Report __________________________________________________________________________________________ TABLE OF CONTENTS VOLUME 1 1. EXECUTIVE SUMMARY.................................................................................................................6 1.1 INTRODUCTION ............................................................................................................................................6 1.2 STUDY OBJECTIVES .....................................................................................................................................6 1.3 REGIONAL DRAINAGE POLICIES ....................................................................................................................7 1.4 POPULATION AND LAND USE.........................................................................................................................7 1.5 DATA COLLECTION, PROCESSING AND HYDRAULIC MODELLING.......................................................................8 1.6 SEWERAGE SYSTEMS ..................................................................................................................................8 1.7 WASTEWATER TREATMENT WORKS ..............................................................................................................9 1.8 RIVER AND STORMWATER SYSTEMS .............................................................................................................9 1.9 CRITERIA, STANDARDS AND INFLUENCES ON STRATEGY .................................................................................9 1.10 STRATEGY SCENARIOS AND RESULTING OPTIONS ..........................................................................................9 1.11 PROPOSED WORKS AND COST ESTIMATE ....................................................................................................10 1.12 RECOMMENDED STRATEGY ........................................................................................................................10 1.13 IMPLEMENTATION OF THE STRATEGIC PLAN .................................................................................................11 1.14 SUMMARY AND CONCLUSIONS ....................................................................................................................11 2. INTRODUCTION ...........................................................................................................................12 2.1 OBJECTIVES OF THE STUDY........................................................................................................................12 2.2 BACKGROUND TO THE STUDY .....................................................................................................................13 2.2.1 History of the Study Area.....................................................................................................................13 2.2.2 Need for the Study ..............................................................................................................................14 2.2.3 Overview of the Study .........................................................................................................................14 2.3 SCOPE OF THE STUDY................................................................................................................................15 2.3.1 Recommendation of Policies ...............................................................................................................15 2.3.2 Capture and Analysis of All Data.........................................................................................................15 2.3.3 Construction and Verification of Models of Existing Systems ..............................................................15 2.3.4 Definition of System Loads..................................................................................................................15 2.3.5 Examination of Implementation Options ..............................................................................................16 2.3.6 Assessment of Treatment Capacities ..................................................................................................16 2.3.7 Grand Canal Sewer.............................................................................................................................16 2.3.8 Agreed Scope for the Study ................................................................................................................16 2.4 METHODOLOGY OF THE STUDY ...................................................................................................................16 2.5 CATCHMENT DEFINITION ............................................................................................................................18 2.6 REPORT FORMAT.......................................................................................................................................18 3. THE REGIONAL DRAINAGE POLICIES......................................................................................20 3.1 OVERALL POLICY.......................................................................................................................................20 3.2 NEW DEVELOPMENT POLICY ......................................................................................................................21 3.2.1 Objectives of New Development Policy ...............................................................................................22 3.2.2 Planning Implications ..........................................................................................................................23 3.2.3 Drainage Design..................................................................................................................................24 3.2.4 Specific Recommendations .................................................................................................................24 3.2.5 Further Information..............................................................................................................................25 3.3 ENVIRONMENTAL MANAGEMENT POLICY......................................................................................................25 3.3.1 General Principles ...............................................................................................................................25 3.3.2 Specific Recommendations .................................................................................................................25 3.3.3 Further Information..............................................................................................................................26 3.4 INFLOW, INFILTRATION AND EXFILTRATION POLICY .......................................................................................26 3.4.1 Evidence of Inflow and Infiltration........................................................................................................27 3.4.2 Overall Approach Needed ...................................................................................................................27 3.4.3 General Principles ...............................................................................................................................27 3.4.4 Specific Recommendations .................................................................................................................28 _________________________________________________________________________________________________________________ GDSDS/NEO2057/035C i April 2005 Greater Dublin Strategic Drainage Study Final Strategy Report __________________________________________________________________________________________ 3.4.5 Further Information..............................................................................................................................28 3.5 CLIMATE CHANGE POLICY ..........................................................................................................................28 3.5.1 Climate Change Policy in Ireland.........................................................................................................29 3.6 CLIMATE CHANGE MODEL PREDICTIONS FOR SEA LEVEL AND RAINFALL ........................................................29
Recommended publications
  • Agenda Document for North Central Area Committee, 21/01/2019 11:00
    NOTIFICATION TO ATTEND MEETING OF THE NORTH CENTRAL AREA COMMITTEE TO BE HELD IN THE CONFERENCE ROOM - NORTHSIDE CIVIC CENTRE ON MONDAY 21 JANUARY 2019 AT 11.00 AM AGENDA MONDAY 21 JANUARY 2019 PAGE 1 Minutes of the North Central Area Committee Meeting held on 10th December, 5 - 8 2018 (Attached herewith) 2 Questions to the Area Manager 9 - 18 (Report herewith) 3 Area Matters a GoAhead Bus, Ireland - Discussion on the 17A Bus Route (Verbal Report) – Patrick Ellis (Operations Manager), Derry O'Leary (Transport Consultant), Nicola Gordon (Head of Stakeholder Relations) b The future of Darndale Football Club 19 - 28 (Report herewith) (Thomas “High Tower” Daly) c Belmayne Main Street and Belmayne Avenue Part 8 29 - 30 (Report herewith) Karen Kennedy / Robert Kelly will be available to take any Councillors questions. d Planning application for Griffith Avenue 31 - 40 (Presentation) (ABP reference #: ABP-303296-18). Description: Residential Development - Construction of 385 no. residential units - Carol Smyth e "Social Housing PPP Project - Introduction to Comhar Housing Representatives" - Brian Clarke (Sisk -Contracts Manager) Garry Keegan (IPC - Tenant Liaison) (Verbal Report) Mary Davis / James Nolan - Ayrfield Site f Update for St. Monica's Development & Boxing Club 41 - 44 (Reports herewith) Paul Clegg & Elaine Mulvenny g Sports & Wellbeing Partnership Area Committee Report 45 - 52 (Report herewith) h Housing Supply Report 53 - 78 (Report herewith) i Naming and numbering proposal for a new residential development on the 79 - 82 site of 778-784 Howth Road, Dublin 5- 1-68 Strand View, Howth Road, Dublin 5. (Report herewith) – Elaine Mulvenny 4 Roads & Traffic Matters a Minutes of the TAG meeting held on 18th December, 2018.
    [Show full text]
  • Social Infrastructure Audit
    Client Platinum Land Limited Project Title Former Chivers Factory Document Title Social Infrastructure Audit Document No. “SIA 01” OSI Licence No EN0005415 Document DCS TOC Text Appendices Comprises 1 1 7 2 Prepared by Nathan Smith Checked by Nathan Smith Rev. Status Issue Date B ISSUED 23.04.19 1.1 This Social Infrastructure Audit has been prepared by McCutcheon Halley Planning Consultants on behalf of Platinum Land Limited in respect of the proposed Built to Rent residential development proposal at the Former Chivers Factory Site, Coolock Drive, Coolock, Dublin. 1.2 This report is produced as an assessment of social infrastructure in the Coolock area in relation to development at Former Chivers Factory Site, Coolock Drive. It provides a contextual overview of the area surrounding the site, a review of the social infrastructure within its catchment and identifies possible future needs in the area. 1.3 Social Infrastructure covers many diverse services and facilities. In this instance this SIA has categorised as follows; • Education & Childcare- Childcare, Primary, Post Primary or Further education & Training; • Sports & Recreation- Parks, Playgrounds, Sports Clubs, Fitness Facilities and Recreation; • Health & Wellbeing- Hospital & Specialist Care, GP & Medical Centres, Dental, Pharmacy’s or physiotherapy; • Community Services- Social Service or Information Centre, Family Service, Employment Support, Parish or Community Centre, Youth Club, Retirement Club, Specialist Club or Library; • Faith- Churches and Cemeteries; • Other- Post Offices, Credit Unions, Banks, Recycling Bring Centres and key retail locations; and • Emergency Services- Fire Brigade and Garda Station. 1.4 The report is structured as follows; • Site Context; • Policy Context; • Profile of the area; • Existing Facilities; • Assessment of needs; • Conclusion; and • Appendix.
    [Show full text]
  • Dublin 9, Ireland
    DAIICHI SANKYO IRELAND LTD. TEL: 00 353 (0) 1 4893000 Unit 29, Block 3 FAX: 00 353 (0) 1 4893033 Northwood Court, www.daiichi-sankyo.ie Santry, Dublin 9, Ireland Travel Information M1 From the city centre Follow the signs for Dublin Airport/M1. Once you join the dual carriageway at Whitehall, proceed N1 towards the airport. From this road take the second exit, signed for Santry/Coolock/Beaumont. N3 Once at the top of the exit ramp take a left towards Santry. Continue to the t-junction and once Dublin Airport there, you will see a public park ahead. Take a right-hand turn and proceed past the National We Are Running (Morton) Stadium. The Swords Road entrance for Northwood Business Campus is on your left-hand side. Proceed to the first roundabout and take first exit and take first right. Take second Here M1 left for our car park. R104 From other parts of Dublin Leixlip M50 R807 Follow the signs for the M50. If coming from the south or west, take the northbound route M4 towards the airport. Proceed towards Exit 4, signposted as Ballymun/Naul. Follow signs from the N4 Dublin motorway for Ballymun. Once at the bottom of the exit ramp you will see a slip road to your left, with the Northwood Business Campus entrance directly ahead. Enter the business campus and go Irish Sea straight through the first roundabout (a retail park will be on your left). Take the first right. M50 Entrance to the car park is on the third right. N11 Dalkey Clane N7 N81 By Air R119 Dublin Airport is just 2km from Northwood Business Campus.
    [Show full text]
  • Inspectors Report (308/R308451.Pdf, .PDF Format 301KB)
    Inspector’s Report ABP308451-20 Development Construction of a 3 storey, 3-bed dwellinghouse. Location Site to the side of 72 Brookville Park, Coolock, Dublin 5, D05Y766. Planning Authority Dublin City Council. Planning Authority Reg. Ref. 3120/20. Applicant Lina Ivanovaite. Type of Application Permission. Planning Authority Decision Refuse. Type of Appeal First Party. Appellant Lina Ivanovaite. Observer Yvonne Stacey. Date of Site Inspection 28th January 2021 Inspector Paul Caprani. ABP308451-20 Inspector’s Report Page 1 of 23 Contents 1.0 Introduction .......................................................................................................... 3 2.0 Site Location and Description .............................................................................. 3 3.0 Proposed Development ....................................................................................... 4 4.0 Planning Authority’s Decision .............................................................................. 5 4.1. Planning Authority’s Assessment .................................................................. 6 5.0 Planning History ................................................................................................... 7 6.0 Grounds of Appeal ............................................................................................... 8 7.0 Observations...................................................................................................... 11 8.0 EIAR Screening Determination .........................................................................
    [Show full text]
  • River Dodder Catchment Flood Risk Management Plan
    RIVER DODDER CATCHMENT FLOOD RISK MANAGEMENT PLAN HYDROLOGICAL ANALYSIS REPORT OCTOBER 2008 River Dodder Catchment Flood Risk Assessment and Management Study Hydrological Analysis Report DOCUMENT CONTROL SHEET Client Dublin City Council Project Title River Dodder Catchment Flood Risk Assessment and Management Study Document Title Hydrological Analysis Report Document No. MDW0259Rp0016 No. of DCS TOC Text List of Tables List of Figures This Document Appendices Comprises 1 1 92 1 1 6 Rev. Status Author(s) Reviewed By Approved By Office of Origin Issue Date F01 Approval C. O’Donnell B. Elsaesser B. Elsaesser West Pier 31.10.08 River Dodder Catchment Flood Risk Management Plan Hydrological Analysis Report IMPORTANT DISCLAIMER – HYDROLOGICAL ANALYSIS Please read below the disclaimer, and limitations associated with this report to avoid incorrect interpretation of the information and data provided. DISCLAIMER Dublin City Council, South Dublin County Council, Dun Laoghaire and Rathdown County Council and The Office of Public Works make no representations, warranties or undertakings about any of the information provided in this report including, without limitation, on its accuracy, completeness, quality or fitness for any particular purpose. To the fullest extent permitted by applicable law, neither the State, Dublin City Council, South Dublin County Council, Dun Laoghaire and Rathdown County Council nor The Office of Public Works nor any of their members, officers, associates, consultants, employees, affiliates, servants, agents or other representatives
    [Show full text]
  • 220 Bus Time Schedule & Line Route
    220 bus time schedule & line map 220 DCU Helix - Parslickstown Ave View In Website Mode The 220 bus line (DCU Helix - Parslickstown Ave) has 4 routes. For regular weekdays, their operation hours are: (1) Dcu Helix, Stop 7571 →Parslickstown Ave, Stop 1827: 7:34 AM - 9:50 PM (2) Lady's Well Road, Stop 1828 →Dcu Helix, Stop 7571: 6:15 AM - 7:50 PM (3) Lady's Well Road, Stop 1828 →Shangan Road, Stop 4686: 9:10 PM - 10:10 PM (4) Shangan Road, Stop 4686 →Parslickstown Ave, Stop 1827: 6:40 AM Use the Moovit App to ƒnd the closest 220 bus station near you and ƒnd out when is the next 220 bus arriving. Direction: Dcu Helix, Stop 7571 →Parslickstown 220 bus Time Schedule Ave, Stop 1827 Dcu Helix, Stop 7571 →Parslickstown Ave, Stop 1827 89 stops Route Timetable: VIEW LINE SCHEDULE Sunday 9:50 AM - 9:50 PM Monday 7:34 AM - 9:50 PM Dcu Helix, Stop 7571 58 Albert College Park, Dublin Tuesday 7:34 AM - 9:50 PM Dcu Collins Avenue, Stop 1644 Wednesday 7:34 AM - 9:50 PM Thursday 7:34 AM - 9:50 PM Albert College Pk 2a Albert College Park, Dublin Friday 7:34 AM - 9:50 PM Ballymun Library Saturday 7:20 AM - 9:50 PM Gateway Avenue Virgin Mary Church, Stop 124 Shangan Road, Dublin 220 bus Info Direction: Dcu Helix, Stop 7571 →Parslickstown Ave, Shangan Road, Stop 4686 Stop 1827 Stops: 89 Virgin Mary Church, Stop 4687 Trip Duration: 96 min Shangan Road, Dublin Line Summary: Dcu Helix, Stop 7571, Dcu Collins Avenue, Stop 1644, Albert College Pk, Ballymun Balbutcher Lane Library, Gateway Avenue, Virgin Mary Church, Stop 124, Shangan Road, Stop 4686, Virgin Mary
    [Show full text]
  • Bus Eireann Complaints Phone Number
    Bus Eireann Complaints Phone Number Historiographic Guillaume degreases some satyrs after asymptotic Harris sullies licitly. Which West circumfusing so picturesquely that Merell serializing her arboriculturist? Anders attends allegedly while radiosensitive Hamlin Sellotape contumaciously or undersell dissymmetrically. Dublin bus eireann complaint, including wexford bus services from accessing newsroom information? Tfi cycle planner app to your bus driver on your card against any phone is regulated by bus stops or days of food and wexford. App and end of private notes or athlone and general hospital, for the appropriate fare to calendar week, routes for designated red bus. Users of payment card number. It for tfi driver cannot accept or bus eireann? Present your bus eireann complaints phone number and commuter rail. Find out more bus operators offer bus and would never ask for more about how you check that can resolve their complaint by bus eireann complaints phone number. TFI Leap Card on Bus Éireann services. For more info under a prepaid tickets can be part of any nfc is information into a bus eireann complaints phone number for your ticket option to pay for affordable fun and touch directly can click on. Well as to the option to calendar week, sligo or bus eireann complaints phone number. They can also hold prepaid tickets. Any fares paid on Airlink and Tours do not count towards the cap. Where you can call us and speak to a Customer Service representative. Why mse rates us from the bus eireann complaint in good time you return tickets and others during the correct fare.
    [Show full text]
  • Evening & Part-Time
    Department of Lifelong Learning Lifelong Learning 2016 Embracing Lifelong Learning, Planning for a Better Future CHOOSING YOUR CAREER PATH IRELAND AND IT’S PEOPLE: A HISTORY Historical Figures in Ireland joinat our us information evening Tuesday 6th September 2016 5.30pm to 8.30pm Athlone Institute of Technology register Evening & Part-Time now Prospectus 2016-2017 www.ait.ie with compliments Information and Registration Evening Tuesday 6th September 2016 5.30pm to 8.30pm Welcome to Lifelong Learning at AIT With a focus on real-world engagement, AIT’s approach to teaching and learning gives students the knowledge and skills essential for career success. This professional orientation is embedded across all facilities, with programmes offered from higher certifcate through to PhD, across its departments of business, humanities, engineering and science. Connect & Discover www.ait.ie /athloneinstituteoftechnology @AthloneIT /AthloneIT 100% 99% of Lifelong 97% of Lifelong of Lifelong Learning students Learning students Learning said they received rated our service students would enough support to them as they recommend us from us as they registered as to their family decided what good to excellent and friends course to choose 95% of Lifelong 70% of Lifelong 90% of Lifelong Learning Learning students Learning students students said felt they enhanced rated their entire they would their knowledge educational probably or and skills that will experience as defnitely study contribute to their good to excellent at AIT again employability 100% 100% of of Lifelong Lifelong Learning Learning students students believe state that the the Induction is fees installment brilliant, structure is necessary and excellent informative 47% of Lifelong what our Learning students choose our students say courses for work, 53% do so for about us..
    [Show full text]
  • Dublin Bay North
    Dublin Bay North Constituency of Dublin Bay North 2019/20 Polling Place Polling Polling District PD Voters Voters Table Polling Station Code From To Totals District Totals St. Fiacras Senior N.S. 75 Beaumont B NB 1 516 516 2874 Montrose Park 76 517 1282 766 Dublin 5 77 1283 2044 762 78 2045 2874 830 St. John Vianney Parish Hall 79 Beaumont C NC 1 718 718 2295 Ardlea Road 80 719 1480 762 Artane 81 1481 2295 815 Dublin 5 Gaelscoil Cholmcille 82 Kilmore A pt. NE 1 445 706 1495 Coolock Lane ( 1198 1204 behind Astro Park ( 1271 1524 Dublin 17 83 1525 2313 789 Scoil Fhursa N.S. 84 Kilmore B NH 1 514 514 1961 Cromcastle Green 85 515 1178 664 Dublin 5 86 1179 1961 783 87 Kilmore A pt. NE 446 1197 818 818 ( 1205 1270 Northside Civic Centre 88 Kilmore C NJ 1 454 454 1011 Bunratty Road 89 455 1011 557 Dublin 17 St Brendans Parish Hall 90 Kilmore D NK 1 508 508 1704 Coolock Village 91 509 1062 554 Dublin 5 92 1063 1704 642 St Davids BNS 93 Beaumont F pt RC 1 332 531 1622 Kilmore Road ( 1186 1384 Artane Dublin 5 94 1385 2042 658 95 2043 2475 735 ( Beaumont D RA 1 302 1750 96 303 1005 703 97 1006 1750 745 St Brendan's N S 98 Harmonstown A TJ 1 714 714 2207 Mc Auley Road 99 715 1422 708 Artane 100 1423 2207 785 Dublin 5 101 Harmonstown B TK 1 610 610 2018 102 611 1275 665 103 1276 2018 743 St.
    [Show full text]
  • Robert Moss: Green Parks
    •A Welcoming Place •Healthy Safe and Secure •Well Maintained and Clean Criteria •Environmental Management •Management of Biodiversity, Landscape and Heritage •Community Involvement •Marketing and Communication •Management •Parks •Gardens •Nature Reserves •Seafront gardens •Cemeteries and Crematoria •Country Parks •Woodland •University Campus •Canals The Assessment Desk assessment 30% Field assessment 70% Pass mark 66% Benefits Independent Benchmarking Technical/Professional Advice Recognition/morale boost for staff and community Promotion of the green space, service and authority Profile within the managing organisation Protect Budget/attract additional resources 2015 2016 Dublin City Council Blessington Street Park Longford County Council The Mall Dublin City Council Bushy Park Dublin City Council Markievicz Park Louth County Council Blackrock Community Park Dublin City Council Poppintree Park Dublin City Council St Anne's Park Mayo County Council Turlough Park Offaly County Council Lloyd Town Park Tullamore Dún Laoghaire-Rathdown County Council Cabinteely Park Dún Laoghaire-Rathdown County OPW Saint Stephen's Green Council People’s Park OPW Grangegorman Military Cemetery National War Memorial Garden - Fingal County Council Ardgillan Demesne OPW Islandbridge Fingal County Council Malahide Demesne OPW Derrynane Historic Park Fingal County Council Millennium Park Fingal County Council St. Catherine’s Park West Meath County Council Mullingar Town Park Laois County Council Páirc an Phobail Park Wexford County Council Gorey Town Park and Showgrounds Pollinator Project Award 2017 Poppintree Park – Dublin City Council Bushy Park – Dublin City Council Lloyd Town Park Tullamore – Offaly County Council Urban Improvement from Parks: •High quality open space •Changing recreational trends •Increase in birth rate •Health and well being •Commercial benefits •Educational benefits •Supporting biodiversity •Flood mitigation 2017 Media Coverage !!!!!!!!!.
    [Show full text]
  • Draft Development Plan 2004-2010
    South Dublin County Council South Dublin County Council Draft Development Plan 2004-2010 Draft Development Plan Written Statement South Dublin County Council South Dublin County Council Draft Development Plan 2004-2010 Draft Development Plan Written Statement Máire Ardagh Mayor Joe Horan County Manager Kieran Kennedy Director of Planning Michael Kenny November 2003 Senior Planner South Dublin County Council Comhairle Chontae Átha Cliath Theas The Council of an Administrative County consists of a Mayor and Councillors. South Dublin has a total of 26 Councillors who are elected from 5 electoral areas – Clondalkin, Lucan, Tallaght Central, Tallaght South and Terenure/Rathfarnham. County Council Members November 2003 Clondalkin Electoral Area Robert Dowds Labour Colm McGrath Independent Sheila O’Brien Fianna Fáil Thérèse Ridge Fine Gael Colm Tyndall Progressive Democrats Lucan Electoral Area Deirdre Doherty-Ryan Fianna Fáil Derek Keating Independent Fintan McCarthy Green Eamonn Tuffy Labour Tallaght Central Electoral Area Mark Daly Sinn Féin Eamonn Maloney Labour Paul Ringland Fine Gael Roderick Smyth Fianna Fáil Don Tipping Labour Tallaght South Electoral Area Mick Billane Fianna Fáil Jim Daly Fianna Fáil John Hannon Fianna Fáil Cathal King Sinn Féin Denis Mackin Labour Terenure/Rathfarnham Electoral Area Máire Ardagh, Mayor, Fianna Fáil Cáit Keane Progressive Democrats John Lahart Fianna Fáil Stanley Laing, Deputy Mayor, Fine Gael Meg Murphy Independent Ann Ormonde, Senator, Fianna Fáil Eamonn Walsh Labour Acknowledgements This Draft Plan
    [Show full text]
  • Chapter 13 Cultural Heritage.Pdf
    FIGURE 13.1 SHOWING THE PROPOSED DEVELOPMENT AREA AND NEAREST RMP SITES. ...................... 13-10 FIGURE 13.2 EXTRACT FROM OS 6” FIRST EDITION MAP SHOWING SUBJECT SITE. ................................. 13-14 FIGURE 13.3 EXTRACT FROM OS 25” THIRD EDITION MAP SHOWING SUBJECT SITE. .............................. 13-15 FIGURE 13.4 EXTRACT FROM THE CASSINI MAP OF C. 1940 SHOWING SUBJECT SITE. ............................ 13-15 FIGURE 13.5 AERIAL IMAGE OF THE SITE. ............................................................................................ 13-16 FIGURE 13.6 PREVIOUS FIELDWORK IN THE VICINITY OF THE SITE.......................................................... 13-19 FIGURE 13.7 ACA'S AND HISTORIC LANDSCAPES AND GARDENS IN THE VICINITY OF THE PDA ............... 13-22 FIGURE 13.8 ORDNANCE SURVEY MAP SHOWING LOCATION OF SITE ©OSI ........................................... 13-22 TABLE 13.1 LOCATION DETAILS ............................................................................................................ 13-7 TABLE 13.2 RELEVANT SMR’S IN THE VICINITY OF THE SUBJECT AREA. ................................................ 13-11 TABLE 13.3 RELEVANT RECORDS FROM TOPOGRAPHICAL FILES OF THE NMI ....................................... 13-17 TABLE 13.4 PREVIOUS EXCAVATIONS ................................................................................................. 13-19 TABLE 13.5 TOPONYMS ...................................................................................................................... 13-20 TABLE
    [Show full text]