Pakistan Highway Rehabilitation Project

Total Page:16

File Type:pdf, Size:1020Kb

Pakistan Highway Rehabilitation Project Public Disclosure Authorized PAKISTAN HIGHWAY REHABILITATION PROJECT Resettlement Plan-N-5 (Phase 11) Document Stage: Final Project Number: 3 846 PAK Public Disclosure Authorized November 2007 Public Disclosure Authorized Public Disclosure Authorized Prepared by National Highway Authority, Islamic Republic of Pakistan for the World Bank. The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of the Bank's Board of Directors, Management, or staff, and may be preliminary in nature. Executive Summary Executive Summary A. THE HIGHWAY REHABILITATION PROJECT The 8,500-km-long national highway system managed by the National Highway Authority (NHA) carries 75-80% of Pakistan's total commercial traffic. Figure 10-1 depicts the existing national highway system in Pakistan. The major traffic movements are concentrated along the 1,760-km National Highway N5 that stretches south to north across the Karachi-Lahore-Rawalpindi-Peshawar- Torkham corridor. Parts of this highway date back 500 years. It is the main corridlor connecting the provinces of the NWFP, the Punjab, and Sindh, and serves more than half of Pakistan's inter-city traffic. It connects the northern parts of the country with international markets through the port of Karachi, which accounts for 96% of Pakistan's trade. About half the national highway network is in poor condition due to ever increasing traffic volumes, very high axle loads and inadequate maintenance. On the basis of past trends of increasing dependence of national economic growth on road infrastructure, it is estimated that traffic volume will increase by about 180% by 2024 over the base year 2001. Unless this situation is immediately addressed, the network will deteriorate rapidly over the next six years, causing a 32% increase in road user costs. The Government of Pakistan (GoP), therefore, is implementing the National Highways Improvement Program (NHIP) to address the degradation of the national highway system, through the phased improvement of approximately 2,700 km of roads. The program will result in a gradual reduction in average network roughness, leading to a 5% decrease in road user cos1;s- a saving of Rs 189 billion (USD 3.26 million) over a six-year period. The highway sections that fall under the NHIP have been divided into three groups prioritized according to need and source of -funding. The N5 currently carries the bulk of the country's commercial and passenger traffic, and this is a priority for improvement. For the implementation of the NHIP, the World Bank has extended financial assistance for selected sections of N5. The development objective of the World Bank-assisted Pakistan Highway Rehabilitation Project (PHRP) is the sustainable delivery of a productive and efficient national highway system contributing to lower transportation costs. The USD 282 million-project supports the borrower's program by financing a distinct se-gnent of NHIP works, sustaining essential reforms in the sector, as well as strengthening the capacity of the NHA. Under the HRP, 856 km of road along the N5 highway will be upgraded in two phases spread over five years. Of this total length, 550 km of the N5 will be upgraded under rehabilitation and maintenance projects (RMP), and 306 km of the N5 under resurfacing and strengthening projects (RSP). Rehabilitation and maintenance projects involve those sections of the project corridor that need major reconstruction work. All of the Phase I1 works are on N5. 5065019 - Contract Administration and Construction Supervision for Highway Rehabilitation Project - Pakistan N5(Phase II) Resettlement Action Plan, November 2007 Page ii '"$g@a'$&% +4FdSh%EC Executive Summary Figure 10-1 Pakistan National Highway System 5065019 - Contract Administration and Construction Supervision for Highway Rehabilitation Project -Pakistan N5(Phase II) Resettlement Action Plan, November 2007 Page iii Executive Summary The following is a list of the six Phase I1 project links. This Phase includes ihe rehabilitation and maintenance of 375.2 km along the N5, i.e. Contract 3 Moro - Ranipur, Contract 5 Ubauro - Shaikh Wahan, Contract 7 Mian Channu - Sahiwal, Contract 1 1A Mian Channu - Sahiwal Bypasses Contract 8 Lahore - Gujranwala and Contract 9 Turn01 - Chablat Contract 9 section was transferred from Phase I to Phase I1 due to the late introduction of changes in its development strategy. Table 1-1 also lists the sections se1ecte:d in Phase I1 for resurfacing and strengthening (RSP). These total 132 km spread over two road sections. Contract 11B Mian Channu - Sahiwal - Okara Contract 13 Kharian - Rawalpindi C. PROJECT IMPACTS The project is anticipated to produce favourable impacts over the long-term fhat will promote economic development and an improvement in living standards in the project areas. However, the project may also lead to some negative impacts, particularly during the construction period. Socio-economic surveys of projects and informed by Feasibility Studies indicate that 458 people will be adversely affected through project implementations. Extensive project-related documentation - including an Environmental Assessment (EA), Environmental Management Plan (EMP), Social Assessment (SA), - has bee:n prepared to set out measures to mitigate negative socio-environmental impacts that potentially would result from HRP works. D. SCOPE OF THE RESETTLEMENT ACTION PLAN (RAP) A RAP is a development plan in favour of people adversely impacted by HRP implementation. It is in keeping with the project policy framework reflecting both existing Pakistani laws and Work Bank policy, particularly the Operational Policy (OP) No. 4.12. In none of these projects will there be need for either land acquisition or demolition of structures. Adverse impacts include the need to relocate squatters' temporary commercial structures; encroacher's temporary commerciial structures and squatter-owned utilities. There will similarly be need to relocate public utilities. Reflecting Bank resettlement policy, a Social Assessment (SA) and Environmental Impact Assessment (EIA) must be undertaken. Analysis of survey results identifies categories of Project Affected People (PAPs). An Entitlement Matrix is then constructed, listing all categories of PAPs identified in these surveys along with respective mitigation measures (their entitlements). This Ehtitlement Matrix provides the basis around which the Resettlement Acton Plan (RAP) is composed. Excluding categories of PAP from the Entitlement Matrix renders the RAP non-compliant with Bank policy. The Entitlement Matrix is prepared at the initial stage of RAP preparation. An attempt to prepare a matrix prior to having to hand field survey results would almost certainly lead to Bank non-compliance. 5065019 - Contract Administration and Construction Supervision for Highway Rehisbilitation Project - Pakistan N5(Phase II) Resettlement Action Plan, November 2007 Page iv Executive Summary The following provides some clarification on the concepts of Eligibility, Legal Frameworl<, and Compensation and Entitlement Policy, central to resettlement policy. E. ELIGIBILITY Eligibility for PAP entitlements is prescribed in an Entitlement Matrix. This Matrix is to reflect Bank Resettlement Policy and to identify all categories of adversely impacted people triggered by that policy. A matrix commonly takes into account loss of agriciultural land; loss of residential, commercial or institutional land; loss of residential, cornmercial and/or institutional structures; loss of standing crops or trees and loss of public infrastructure. In addition, PAPs may be eligible for cash payments in lieu of lost income or for re-training and credit for business development. For legal title holders, customary or usufruct rights holders, cash compensation of affected land would be paid on the basis of replacement cost of the acquired land, in accordance with Bank Operational Policy 4.12. The tenants and sharecroppers will be compensated for the un- expired duration of the lease. The vulnerable encroachers or squatters will be compensated for affected structure at the replacement cost. The owners of the affected structure, with or without legal title, will be entitled to cash compensation at the replacement value (salvage value of the structure will not be deducted). The affected cultivators will be entitled to cash compensation for the damaged crops calculated on the basis of market prices. The owners of the affected trees, with or without land title, will be paid cash compensation, on the basis of market value of the trees according to the type, age, size and productivity of trees In case of the loss of any common resources or facilities, the project will replace or restore the affected facility or resource, in consultation with the affected community. The project will pay cash compensation to the relevant agency based upon the replacement value of the affected infrastructure. Alternatively, the project will replace or restore the damaged infrastructure in the pre-project condition or better, in consultation with the concerned agency. The project will pay cash compensation, at replacement cost, for damage to,, or relocation of public utilities. Similarly, the project will pay for the repair, relocation or reconstruct of religious site, in consultation with affected community. Project will al,so assist in the relocation of graves. The cut off date for eligibility is the last day of the Social Survey for the project. F. LEGAL FRAMEWORK The Pakistan Highway
Recommended publications
  • Flood Emergency Reconstruction and Resilience Project, Loan No. 3264
    Due Diligence Report on Social Safeguards Loan 3264-PAK: Flood Emergency Reconstruction and Resilience Project (FERRP)–Punjab Roads Component Due Diligence Report on Social Safeguards on Reconstruction of Daska – Pasrur Road March 2017 Prepared by: Communication and Works Department, Government of the Punjab NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This Social Safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PUNJAB COMMUNICATION & WORKS DEPARTMENT Flood Emergency Reconstruction and Resilience Project (FERRP) Social Due Diligence Report of Reconstruction of Daska- Pasrur Road (RD 0+000 – RD 30+000) March, 2017 Prepared by TA Resettlement Specialist for Communication and Works Department, Government of Punjab, Lahore Table of Contents CHAPTER 1 INTRODUCTION ................................................................................................................... 1 A. Background: .............................................................................................................
    [Show full text]
  • Tender Notice Dewatering Along-With Cleaning of Sumps of Underpasses, Muridke, Sadhoke, Kamoke & Eminabad (Punjab-North Region)
    NATIONAL HIGHWAY AUTHORITY TENDER NOTICE DEWATERING ALONG-WITH CLEANING OF SUMPS OF UNDERPASSES, MURIDKE, SADHOKE, KAMOKE & EMINABAD (PUNJAB-NORTH REGION) 1. National Highway Authority (NHA) intends to execute subject work in Punjab-North Region, from the contractors having valid Pakistan Engineering Council Certificate for the year 2017 of Category C-5 & above with specialization code (CE-01 & CE-10). Estimated cost and other detail is mentioned below:- ` S. Location Estimated Bid Cost Completion Contract No. Route Scope of Work # KM Cost (Rs.) (Rs) Period 1287+950, 1298+900, 2% of 1306+600 & Dewatering along-with cleaning Two 1 EM-PN-15-05-78 N-5 1,998,918/- Engineer’s 1316+032 of sumps of underpasses Months Estimate (NBC&SBC) 2. Tenders Documents can be downloaded from NHA websites (www.nha.gov.pk,). The tender rates and amount should be filled in figures as well as in words. 3. The tenders will be received on 4th August, 2017 at 1100 Hours in the Regional Office Building NHA, Lahore and will be opened on the same day at 1130 Hours in the presence of the contractors or their authorized representative who are interested to attend. Contractors are required to sign & stamp each and every page of tender documents. Incomplete and inappropriate tender will not be considered by the tender opening & evaluation committee. 4. The contractors may visit the site and consult concerned office of Deputy Director (Maintenance) and Director (Maintenance) Punjab-North for any clarification in respect of work / items etc. 5. NHA reserves the right to reject all bids as per the PPRA Rule No.
    [Show full text]
  • Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan
    ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Location Map Islamabad Capital Territory Punjab Province Islamic Republic of Pakistan Sindh Province Source: Prepared by the JICA Survey Team based on the map on http://www.freemap.jp/. February 2014 i Nippon Koei Co., Ltd. Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Summary Objectives and Scope of the Survey This survey aims to collect data and information in order to explore the possibility of cooperation with Japan for the improvement of the power sector in Pakistan. The scope of the survey is: Survey on Pakistan’s current power supply situation and review of its demand forecast; Survey on the power development policy, plan, and institution of the Government of Pakistan (GOP) and its related companies; Survey on the primary energy in Pakistan; Survey on transmission/distribution and grid connection; and Survey on activities of other donors and the private sector.
    [Show full text]
  • College Wise Demand of Ctis of Gujranwala Division No
    College Wise Demand of CTIs of Gujranwala Division No. of No. of Total No. of CTIs required Subject Sr. CMIS teachers students in the Subject Name of the College Division District in which CTI already No Code in the Minority Disable is required Working in Open Total Subject 5% 3% Subject Govt. P/G College (Boys), Sateelite Town, 1 341101 Gujranwala Gujranwala Commerce 0 528 1 0 0 1 Gujranwala. Computer 2 341102 Govt. Degree College (B) Qila Didar Singh Gujranwala Gujranwala 0 91 1 0 0 1 Science 3 341103 Govt. Postgraduate Islamia College Gujranwala Gujranwala Gujranwala Botany 0 100 1 0 0 1 Govt. FMF Post Graduate College Peoples Colony, Health & 4 341104 Gujranwala Gujranwala 0 134 1 0 0 1 Gujranwala Physical Govt. Post Graduate College (W) Model Town ComputerEducation 5 341106 Gujranwala Gujranwala 0 386 1 0 0 1 Gujranwala Science Govt. Post Graduate College (W) Model Town Pakistan 6 341106 Gujranwala Gujranwala 0 1050 1 0 0 1 Gujranwala Study Govt. Post Graduate College (W) Model Town 7 341106 Gujranwala Gujranwala Open 0 0 0 0 1 1 Gujranwala Govt. Post Graduate College (W) Model Town 8 341106 Gujranwala Gujranwala Fine Arts 0 95 1 0 0 1 Gujranwala Govt. Post Graduate College (W) Model Town Home 9 341106 Gujranwala Gujranwala 0 120 1 0 0 1 Gujranwala Economics Govt. Post Graduate College (W) Model Town 10 341106 Gujranwala Gujranwala Persian 0 350 1 0 0 1 Gujranwala Computer 11 341107 Govt. College For Women, Gujranwala City Gujranwala Gujranwala 0 425 1 0 0 1 Science 12 341107 Govt.
    [Show full text]
  • Estimates of Charged Expenditure and Demands for Grants (Development)
    GOVERNMENT OF THE PUNJAB ESTIMATES OF CHARGED EXPENDITURE AND DEMANDS FOR GRANTS (DEVELOPMENT) VOL - II (Fund No. PC12037 – PC12043) FOR 2011 - 2012 TABLE OF CONTENTS Demand # Description Pages VOLUME-I PC22036 Development 1 - 720 VOLUME-II PC12037 Irrigation Works 1 - 40 PC12038 Agricultural Improvement and Research 41 - 45 PC12040 Town Development 47 - 52 PC12041 Roads and Bridges 53 - 171 PC12042 Government Buildings 173 - 399 PC12043 Loans to Municipalities / Autonomous Bodies, etc. 401 - 411 GOVERNMENT OF THE PUNJAB GENERAL ABSTRACT OF DISBURSEMENT (GROSS) (Amount in million) Budget Revised Budget Estimates Estimates Estimates 2010-2011 2010-2011 2011-2012 PC22036 Development 100,099.054 81,431.616 127,207.412 PC12037 Irrigation Works 10,638.747 8,071.528 10,891.000 PC12038 Agricultural Improvement and Research 145.865 146.554 124.087 PC12040 Town Development 650.000 287.491 1,200.000 PC12041 Roads and Bridges 49,781.208 37,985.865 38,251.976 PC12042 Government Buildings 34,700.126 10,844.478 42,325.525 PC12043 Loans to Municipalities/Autonomous Bodies etc. 11,531.739 8,468.178 10,987.138 TOTAL :- 207,546.739 147,235.710 230,987.138 Current / Capital Expenditure detailed below: Daanish School System (3,000.000) - (3,000.000) Punjab Education Endowment Fund (PEEF) - - (2,000.000) Punjab Education Foundation (PEF) - - (6,000.000) TEVTA - - (2,000.000) DLIs for MDGs - - (8,500.000) Town Development (650.000) (287.491) (1,200.000) Population Welfare Programme (1,865.000) (1,341.127) (2,860.000) Companies: FIEDMC, PLDC, SWM, PLDDB, - - (6,440.000) PARB etc Current Capital Expenditure (11,531.739) (8,468.178) (10,987.138) Total (17,046.739) (10,096.796) (42,987.138) Net Annual Development Programme 190,500.000 137,138.914 188,000.000 BUDGET ESTIMATES REVISED ESTIMATES BUDGET ESTIMATES Page # GRANT/SECTOR/SUBSECTOR 2010‐11 2010‐11 2011‐12 SUMMARY Rs Rs Rs.
    [Show full text]
  • Village List of Gujranwala , Pakistan
    Census 51·No. 30B (I) M.lnt.6-18 300 CENSUS OF PAKISTAN, 1951 VILLAGE LIST I PUNJAB Lahore Divisiona .,.(...t..G.ElCY- OF THE PROVINCIAL TEN DENT CENSUS, JUr.8 1952 ,NO BAHAY'(ALPUR Prleo Ps. 6·8-0 FOREWORD This Village List has been pr,epared from the material collected in con" nection with the Census of Pakistan, 1951. The object of the List is to present useful information about our villages. It was considered that in a predominantly rural country like Pakistan, reliable village statistics should be avaflable and it is hoped that the Village List will form the basis for the continued collection of such statistics. A summary table of the totals for each tehsil showing its area to the nearest square mile. and Its population and the number of houses to the nearest hundred is given on page I together with the page number on which each tehsil begins. The general village table, which has been compiled district-wise and arranged tehsil-wise, appears on page 3 et seq. Within each tehsil the Revenue Kanungo holqos are shown according to their order in the census records. The Village in which the Revenue Kanungo usually resides is printed in bold type at the beginning of each Kanungo holqa and the remaining Villages comprising the ha/qas, are shown thereunder in the order of their revenue hadbast numbers, which are given in column o. Rokhs (tree plantations) and other similar areas even where they are allotted separate revenue hadbast numbers have not been shown as they were not reported in the Charge and Household summaries.
    [Show full text]
  • Gujranwala Blockwise
    POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL PUNJAB ADMIN UNIT POPULATION NO OF HH GUJRANWALA DISTRICT 5,014,196 747,214 GUJRANWALA CITY TEHSIL 259,556 38,614 EMINABAD TC 27,460 4235 CHARGE NO 03 27,460 4235 CIRCLE NO 01 14,794 2220 163030101 1,717 224 163030102 1,320 207 163030103 1,517 227 163030104 1,254 208 163030105 2,360 367 163030106 1,922 297 163030107 1,250 168 163030108 1,300 193 163030109 2,154 329 CIRCLE NO 02 12,666 2015 163030201 1,884 264 163030202 1,739 302 163030203 1,347 255 163030204 931 150 163030205 2,469 430 163030206 2,373 340 163030207 1,923 274 LUDHEWALA WARAICH M.C. 92,087 13078 CHARGE NO 04 92,087 13078 CIRCLE NO 01 10,933 1548 163040101 3,178 417 163040102 1,624 230 163040103 1,668 248 163040104 1,658 250 163040105 1,550 226 163040106 409 63 163040107 846 114 CIRCLE NO 02 17,153 2480 163040201 2,441 361 163040202 1,757 238 163040203 711 109 163040204 3,155 431 163040205 3,309 457 163040206 1,233 190 163040207 2,548 397 163040208 568 86 163040209 1,431 211 CIRCLE NO 03 13,094 1828 163040301 1,571 209 163040302 2,685 361 163040303 1,101 165 163040304 1,552 234 163040305 886 122 163040306 978 139 163040307 1,325 187 163040308 2,996 411 CIRCLE NO 04 20,883 2917 Page 1 of 98 POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL PUNJAB ADMIN UNIT POPULATION NO OF HH 163040401 2,874 411 163040402 2,373 320 163040403 2,942 422 163040404 2,699 354 163040405 1,693 282 163040406 2,405 319 163040407 1,983 300 163040408 1,722 225 163040409 2,192 284 CIRCLE NO 05 18,888 2742 163040501 2,002 283 163040502
    [Show full text]
  • Sch EMIS S Name 34110371 GMPS CHAK KHIZAR 34110391 GGPS
    Sch_EMIS S_Name 34110371 GMPS CHAK KHIZAR 34110391 GGPS NANDI PUR POWER HOUSE 34110418 GMPS HARDU PUR 34110455 GGPS DERA MEHDI HASSAN 34110601 GMPS DHINGARAN WALI CANTT 34120340 GGPS CHAK AZIZ 34120361 GMPS KHUSRAY 34120387 GMPS TAHLI WALA 34120401 GMPS OUJLA KALAN 34120425 GGPS BASTI PURANA TALAB 34120438 GMPS KOT MEHR ALI 34120458 GGCMS HARDO SAHARAN 34120491 GMPS DARWASHKE 34120513 GMPS ISLAM ABAD 34120549 GMPS JATTI SHAH REHMAN 34130263 GMPS MARAY WAIEN KALAN 34130278 GMPS QILA SUKHA SINGH 34130301 GGPS RAJA 34130325 GMPS BAQA PUR 34130363 GMPS BULLO WALI 34130417 GMPS NASSOKE 34140251 GGPS GOBIND PURA 34140288 GGPS TATLAY HAKIM HAIDER 34140315 GGPS HARDO UDDAY 34140335 GMPS TUNG KALAN 34140366 GGPS QILA MAJA SINGH 34140426 GMPS BHARIAN 34110637 GMPS RAHWALI SHARQI NO.3 34110224 GPS BAWRAY 34110273 GPS LADHAY WALA WARRAICH NO.1 34110512 GPS THATHA RAWAN 34120160 GPS WANJO WALI 34120169 GPS GHAKHAR NO.6 34120250 GPS KALAY WALA 34120289 GPS RASOOL NAGAR 34120659 GPS FARM CHAKAN WALI 34130132 GPS DALIAN WALI 34130184 GPS QILA NOHID SINGH 34130219 GPS KOTLI MOHARAN 34130233 GPS GHANIAN KOHNA 34140101 GPS KOT KESHO 34140136 GPS KARYAL KALAN NO.2 34140168 GPS MASANDA VIRKAN 34140225 GPS BADDOKE SEIKHWAN 34110279 GPS MANDIALA MIR SHIKARAN 34110326 GGPS NAVEED COLONY 34110424 GGCMS NOSHEHRA SANSI 34110600 GGPS KACHI PUMP WALI RASHEED COLONY 34120376 GGPS QUDRAT ABAD 34130309 GMPS QILA JANDA 34110636 GMPS RAILWAY GODAM 34110164 GPS QILA SUNDAR SINGH 34110191 GPS KIKRAN WALI 34110506 GPS MUBARAK COLONY 34120168 GPS GHAKHAR NO.1 34120654 GPS
    [Show full text]
  • Pak Pos and RMS Offices 3Rd Ed 1962
    Instructions for Sorting Clerks and Sorters ARTICLES ADDRl!SSBD TO TWO PosT-TOWNS.-If the address Dead Letter Offices receiving articles of the description re­ 01(an article contains the names of two post-town, the article ferred in this clause shall be guided by these instructions so far should, as a general rule, be forwarded to whichever of the two as the circumstances of each case admit of their application. towns is named last unless the last post-town- Officers employed in Dead Letter Offices are selected for their special fitness for the work and are expected to exercise intelli­ ( a) is obviously meant to indicate the district, in which gence and discretion in the disposal of articles received by case the article should be . forwar ~ ed ~ · :, the first­ them. named post-town, e. g.- A. K. Malik, Nowshera, Pes!iaivar. 3. ARTICLES ADDRESSED TO A TERRITORIAL DIVISION WITH­ (b) is intended merely as a guide to the locality, in which OUT THE ADDITION OF A PosT-TOWN.-If an article is addressed case the article should be forwarded to the first­ to one of the provinces, districts, or other territorial divisions named post-town, e. g.- mentioned in Appendix I and the address does not contain the name of any post-town, it should be forwarded to the post-town A. U. Khan, Khanpur, Bahawalpur. mentioned opposite, with the exception of articles addressed to (c) Case in which the first-named post-town forms a a military command which are to be sent to its headquarters. component part of the addressee's designation come under the general rule, e.
    [Show full text]
  • To Download UBL Branch List
    List of UBL Branches Branch S No Region Type of Branch Name Of Branch Address Telephone # Code KARACHI 1 2 RETAIL LANDHI KARACHI H-G/9-D, TRUST CERAMIC IND., LANDHI IND. AREA KARACHI (EPZ) EXPORT 021-5018697 NORTH KARACHI 2 19 RETAIL JODIA BAZAR PARA LANE, JODIA BAZAR, P.O.BOX NO.4627, KARACHI. 021-32434679 , 021-32439484 CENTRAL KARACHI 3 23 RETAIL AL-HAROON Shop No. 39/1, Ground Floor, Opposite BVS School, Sadder, Karachi 021-2727106 SOUTH KARACHI CENTRAL BANK OF INDIA BUILDING, OPP CITY COURT,MA JINNAH ROAD 4 25 RETAIL BUNDER ROAD 021-2623128 CENTRAL KARACHI. 5 47 HYDERABAD AMEEN - ISLAMIC PRINCE ALLY ROAD PRINCE ALI ROAD, P.O.BOX NO.131, HYDERABAD. 022-2633606 6 46 HYDERABAD RETAIL TANDO ADAM STATION ROAD TANDO ADAM, DISTRICT SANGHAR. 0235-574313 KARACHI 7 52 RETAIL DEFENCE GARDEN SHOP NO.29,30, 35,36 DEFENCE GARDEN PH-1 DEFENCE H.SOCIETY KARACHI 021-5888434 SOUTH 8 55 HYDERABAD RETAIL BADIN STATION ROAD, BADIN. 0297-861871 KARACHI COMMERCIAL 9 65 NAPIER ROAD KASSIM CHAMBERS, NAPIER ROAD,KARACHI. 32775993 CENTRAL CENTRE 10 66 SUKKUR RETAIL FOUJDARY ROAD KHAIRPUR FOAJDARI ROAD, P.O.BOX NO.14, KHAIRPUR MIRS. 0243-9280047 KARACHI 11 69 RETAIL NAZIMABAD FIRST CHOWRANGI, NAZIMABAD, P.O.BOX NO.2135, KARACHI. 021-6608288 CENTRAL KARACHI COMMERCIAL 12 71 SITE UBL BUILDING S.I.T.E.AREA MANGHOPIR ROAD, KARACHI 32570719 NORTH CENTRE KARACHI 13 80 RETAIL VAULT Shop No. 2, Ground Floor, Nonwhite Center Abdullah Harpoon Road, Karachi. 021-9205312 SOUTH KARACHI 14 85 RETAIL MARRIOT ROAD GILANI BUILDING, MARRIOT ROAD, P.O.BOX NO.5037, KARACHI.
    [Show full text]
  • Sr# Name Firm Name City Address Ph# Mob# Email 1 MIAN GULZAR AHMED ZAM ZAM SILK FACTORY 2 MR
    Sr# Name Firm Name City Address Ph# Mob# Email 1 MIAN GULZAR AHMED ZAM ZAM SILK FACTORY 2 MR. INAYAT ULLAH KAPOOR MOON STEAM BONE MILLS Wazirabad AHMAD NAGAR ROAD 055-6600146 0300-8620946 [email protected] 3 MR. MOHAMMAD ASIM BUTT RACHNA AGRI BUSINESS Gujranwala RACHNA COMPLEX SHEIKHUPURA ROAD 055-4803051-57 0300-8642253 [email protected] 4 MR. RANA FAHAD MUSHTAQ MODERN RICE & GENERAL MILLS Gujranwala MANDIALA TEGA ROAD FEROZEWALA 055-43840298 0300-8644801 [email protected] 5 MR. FAISAL RAUF NASQ INTERNATIONAL (PVT) LTD 6 MIRZA AURANGZEB MIRZA RICE MILLS (PVT) LTD. Gujranwala 5 KM GUJRANWALA ROAD, ALI PUR CHATTHA 055-6332614 0333-8281000 [email protected] 7 KHAWAJA BILAL AHMED AGROMAN CRYSTAL RICE MILLS (PVT) LTD Gujranwala QADIRABAD ROAD ALI PUR CHATTHA 055-6333865 0300-4137538 [email protected] 8 MIAN SHAHID HUSSAIN TARAR GALAXY RICE MILLS (PVT) LTD Gujranwala WAHNDO ROAD, EMINABAD 055-3264184 0300-8740881 [email protected] 9 MALIK MUHAMMAD JAHENGIR WHITE PEARL RICE MILLS LTD Hafizabad SOLGIN KHARL JALAL PUR BHATTIAN 7500022-33-44 0321-8404955 [email protected] 10 MUHAMMAD SALEEM FARRUKH SATTAR & COMPANY Hafizabad GHALLA MANDI JALAL PUR BHATTIAN TEH. PINDI BHATTIAN 054-7500187 0321-6526271 11 SANA ANWAR GREEN GOLD SEED INDUSTRIES (PVT) LTD Gujranwala 6-MINI STADIUM SHEIKHUPURA ROAD 4223542-43 12 ABDUL RAZAQ MUSLIM RICE TRADERS Gujranwala 129-SIE #2 0553844617 0321-6273747 [email protected] 13 LUBNA SAJJAD RANA AHSAN CHICKS Gujranwala 561 GALI KASHMIRIAN WALI AHSAN CHICKS 055-38664476 0300-8644838 14 ARSHAD IQBAL WAHLA RICE MILLS (PVT) LTD Gujranwala G.T. ROAD GHAKKHAR MANDI 3881825 0300-8740923 15 KH.
    [Show full text]
  • DEVELOPMENT WORKS REGARDING PRIME MINISTER's GLOBAL Sdgs PROGRAMME in RESPECT of DISCOS
    DEVELOPMENT WORKS REGARDING PRIME MINISTER'S GLOBAL SDGs PROGRAMME IN RESPECT OF DISCOS. Name of Company: GEPCO UPTO 04-01-19 Financial Sr. Approved Physical Date / Month of Name of Scheme Tehsil District Progress No Estimate Progress Completion (Fund utilized) Nai Abadi Habib Wali Tibba 1 KMK GRW 554,000 100% 100% 09/2017 Muhammad Nagar Kamoke Dera Abdul Ghafar P/O Village Raja 2 KMK GRW 500,000 100% 100% 09/2017 Sadhoke DERA GUJRAN P/O THATHA 3 NVK GRW 1,064,000 100% 100% 07/2017 MANIK DERA PORYAN WALA P/O THATHA 4 NVK GRW 1,020,000 100% 100% 07/2017 MANIK DERA DEENDARAN P/O JAGO 5 WALA DERA YASEEN ARAEEN P/O NVK GRW 886,000 100% 100% 09/2017 BABBAR DERA WARRIACHAN P/O 6 GRW GRW 517,000 100% 100% 09/2017 HARCHOKE ABADI MASTER SARDAR WALI P/O 7 SAHOKAY VIRKAN CHAH MASHER GRW GRW 1,097,000 100% 100% 09/2017 WALA P/O TAJOKEY 8 Nai Abadi Ram Garh P/O Ram Garh HFD HFD 559,000 100% 100% 06/2017 Dera Nasir S/O Khan Muhammad 9 HFD HFD 576,000 100% 100% 06/2017 P/O channi Hushnak Rai Dera Bajwa Near Kolo Tarar P/O 10 HFD HFD 521,000 100% 100% 06/2017 Malik Wala D/J VILL: RAJOO BHAND MAINZ 11 GRT GRT 764,311 100% 100% 07/2017 EAST SIDE 12 A/A VILL: BHALAISRANWALA GRT GRT 515,042 100% 100% 07/2017 A/A VILL: FATTA BHAND SHUMAL 13 GRT GRT 902,775 100% 100% 07/2017 MASHRIQ SIDE A/A MOH: CHAR GAH LOKRI 14 GRT GRT 506,916 100% 100% 08/2017 DINGA 15 MOH: RAM BAGH DINGA CITY GRT GRT 769,937 100% 100% 09/2017 Page 1 of 30 DEVELOPMENT WORKS REGARDING PRIME MINISTER'S GLOBAL SDGs PROGRAMME IN RESPECT OF DISCOS.
    [Show full text]