Gujranwala Blockwise
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Punjab Roads Component
Due Diligence Report on Social Safeguards Loan 3264-PAK: Flood Emergency Reconstruction and Resilience Project (FERRP)–Punjab Roads Component Due Diligence Report on Social Safeguards on Reconstruction of Pasrur – Narowal Road March 2017 Prepared by: Communication and Works Department, Government of the Punjab NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This Social Safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Social Due Diligence Report Document stage: Final Date: March, 2017 PAK: Flood Emergency Reconstruction and Resilience Project, Loan No. 3264 Social Due Diligence Report of Reconstruction of 28 km long Pasrur – Narowal Road from RD 0+000 to RD 28+000), District Sialkot Prepared by: Abdul Hameed, TA Resettlement Specialist for Project Implementation Unit, Communications and Works Department, Government of Punjab, Lahore. This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of -
Repair Programme 2018-19 Administr Ative Detail of Repair Approval Name of Name Xen/Mobile No
Repair Programme 2018-19 Administr ative Detail of Repair Approval Name of Name Xen/Mobile No. Sr. No. Distt. MC Name of Work Strengthe Premix Contractor/Agency Name of SDO/Mobile No. Length Cost Raising ning Carepet in in Km. in lacs in Km in Km Km 1 2 3 4 5 6 7 8 9 10 11 PARTAPPURA TO DERA SEN BHAGAT M/S Kiscon Xen. Gurinder Singh Cheema/ 988752700 1 Jalandhar Bilga 2.4 15.06 0 0 2.4 (16 ft wide) (1.50 km length) Construction Sdo Gurmeet Singh/ 9988452700 MAO SAHIB TO DHUSI BANDH (KHERA M/S Kiscon Xen. Gurinder Singh Cheema/ 988752700 2 Jalandhar Bilga 4.24 40.31 0 2.44 4.24 BET)VIA KULIAN TEHAL SINGH Construction Sdo Gurmeet Singh/ 9988452700 MAU SAHIB TO RURKA KALAN VIA M/S Kiscon Xen. Gurinder Singh Cheema/ 988752700 3 Jalandhar Bilga PARTABPURA MEHSAMPUR (13.15= 21.04 128.57 0.31 0.82 21.04 Construction Sdo Gurmeet Singh/ 9988452700 16' wide) PHIRNI PIND MAOSAHIB TO MAOSAHIB M/S Kiscon Xen. Gurinder Singh Cheema/ 988752700 4 Jalandhar Bilga 0.8 7.75 0 0.435 0.8 DHUSI BAND ROAD Construction Sdo Gurmeet Singh/ 9988452700 PHILLAUR RURKA KALAN TO RURKA Sh. Rakesh Kumar Xen. Gurinder Singh Cheema/ 988752700 5 Jalandhar Bilga 3.35 31.06 0 1.805 3.35 KALAN MAU SAHIB ROAD Contractor Sdo Gurmeet Singh/ 9988452700 PHILLAUR NURMAHAL ROAD TO Sh. Rakesh Kumar Xen. Gurinder Singh Cheema/ 988752700 6 Jalandhar Bilga 3.1 24.27 0 1.015 3.1 PRATABPURA VIA SANGATPUR Contractor Sdo Gurmeet Singh/ 9988452700 Sh. -
Phillaur Assembly Punjab Factbook
Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D-100, 1st Floor, Okhla Industrial Area, Phase-I, New Delhi- 110020. Ph.: 91-11- 43580781-84 Email : [email protected] Website : www.indiastatelections.com Online Book Store : www.indiastatpublications.com Report No. : AFB/PB-030-0121 ISBN : 978-93-5301-563-3 First Edition : January, 2018 Third Updated Edition : January, 2021 Price : Rs. 11500/- US$ 310 © Datanet India Pvt. Ltd. All rights reserved. No part of this book may be reproduced, stored in a retrieval system or transmitted in any form or by any means, mechanical photocopying, photographing, scanning, recording or otherwise without the prior written permission of the publisher. Please refer to Disclaimer at page no. 226 for the use of this publication. Printed in India Contents No. Particulars Page No. Introduction 1 Assembly Constituency - (Vidhan Sabha) at a Glance | Features of Assembly 1-2 as per Delimitation Commission of India (2008) Location and Political Maps Location Map | Boundaries of Assembly Constituency - (Vidhan Sabha) in 2 District | Boundaries of Assembly Constituency under Parliamentary 3-10 Constituency - (Lok Sabha) | Town & Village-wise Winner Parties- 2019, 2017, 2014, 2012 and 2009 Administrative Setup 3 District | Sub-district | Towns | Villages | Inhabited Villages | Uninhabited 11-18 Villages | Village Panchayat | Intermediate Panchayat Demographic 4 Population Households | Rural/Urban Population | Towns and -
Contributions of Lala Har Dayal As an Intellectual and Revolutionary
CONTRIBUTIONS OF LALA HAR DAYAL AS AN INTELLECTUAL AND REVOLUTIONARY ABSTRACT THESIS SUBMITTED FOR THE AWARD OF THE DEGREE OF ^ntiat ai pijtl000pi{g IN }^ ^ HISTORY By MATT GAOR CENTRE OF ADVANCED STUDY DEPARTMENT OF HISTORY ALIGARH MUSLIM UNIVERSITY ALIGARH (INDIA) 2007 ,,» '*^d<*'/. ' ABSTRACT India owes to Lala Har Dayal a great debt of gratitude. What he did intotality to his mother country is yet to be acknowledged properly. The paradox ridden Har Dayal - a moody idealist, intellectual, who felt an almost mystical empathy with the masses in India and America. He kept the National Independence flame burning not only in India but outside too. In 1905 he went to England for Academic pursuits. But after few years he had leave England for his revolutionary activities. He stayed in America and other European countries for 25 years and finally returned to England where he wrote three books. Har Dayal's stature was so great that its very difficult to put him under one mould. He was visionary who all through his life devoted to Boddhi sattava doctrine, rational interpretation of religions and sharing his erudite knowledge for the development of self culture. The proposed thesis seeks to examine the purpose of his returning to intellectual pursuits in England. Simultaneously the thesis also analyses the contemporary relevance of his works which had a common thread of humanism, rationalism and scientific temper. Relevance for his ideas is still alive as it was 50 years ago. He was true a patriotic who dreamed independence for his country. He was pioneer for developing science in laymen and scientific temper among youths. -
Flood Emergency Reconstruction and Resilience Project, Loan No. 3264
Due Diligence Report on Social Safeguards Loan 3264-PAK: Flood Emergency Reconstruction and Resilience Project (FERRP)–Punjab Roads Component Due Diligence Report on Social Safeguards on Reconstruction of Daska – Pasrur Road March 2017 Prepared by: Communication and Works Department, Government of the Punjab NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This Social Safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PUNJAB COMMUNICATION & WORKS DEPARTMENT Flood Emergency Reconstruction and Resilience Project (FERRP) Social Due Diligence Report of Reconstruction of Daska- Pasrur Road (RD 0+000 – RD 30+000) March, 2017 Prepared by TA Resettlement Specialist for Communication and Works Department, Government of Punjab, Lahore Table of Contents CHAPTER 1 INTRODUCTION ................................................................................................................... 1 A. Background: ............................................................................................................. -
ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE of MS & HSD at PETROL PUMPS EFFECTIVE from 16Th MARCH-2021
ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE OF MS & HSD AT PETROL PUMPS EFFECTIVE FROM 16th MARCH-2021 Retail Price of Sr # Name of Civil District Province Petrol Pump City/Location S.F Amount HSD MS 1 ABBOTTABAD KP Sarfraz Filling Station (MSK) At 15 K.M From Jaika Gali ,On Barot Jhika Gali Road at Barot, 0.6926 116.77 112.59 2 ABBOTTABAD KP Kunhar Vally Filling Station At Village Boi, On Boi-Garhi Habib Ullah Road, 1.5284 117.61 113.43 At Mouza Khoda, On Rawalpindi – Hasanabdal – Peshawar Road National Highway (N-5), At 3 ATTOCK Punjab ALI F/S 0.3450 116.43 112.25 6.7 KM from Burhan Interchange, in Khasra No.398, Tehsil HASANABDAL District ATTOCK At Mouza & Village Lakar Mar, On Jand / Mukhad Road, Khasra No.4568, Khatooni No. 01, 4 ATTOCK Punjab KHATTAK P/S 0.3918 116.47 112.29 Khewat No 1811, Tehsil JAND District ATTOCK 5 ATTOCK Punjab PetrogasCNG Station GT Rd, Burhan 0.5152 116.60 112.42 6 BADIN Sind NADEEM & CO. At Badin Town, Plot No. 10-B, 10-C, At Deh Sonhar, On Golarchi Road, Taluka & Distt. Badin 1.1577 117.24 113.06 At Plot No.197/4, At Deh Barodari, in B/W 0-1 from Golarchi, On Golarchi – Garhore 7 BADIN Sind Seven Star P/S 1.0525 117.13 112.95 Sharif Road, Taluka Shaheed Fazil Rahu, District BADIN. At Deh & Tapo Walhar, in B/w 13 -14km, On Talhar / Badin Road, At Peeru Lashari, 8 BADIN Sind Al-Murtaza P/S 1.3157 117.40 113.22 Taluka Talhar, District Badin. -
Tender Notice Dewatering Along-With Cleaning of Sumps of Underpasses, Muridke, Sadhoke, Kamoke & Eminabad (Punjab-North Region)
NATIONAL HIGHWAY AUTHORITY TENDER NOTICE DEWATERING ALONG-WITH CLEANING OF SUMPS OF UNDERPASSES, MURIDKE, SADHOKE, KAMOKE & EMINABAD (PUNJAB-NORTH REGION) 1. National Highway Authority (NHA) intends to execute subject work in Punjab-North Region, from the contractors having valid Pakistan Engineering Council Certificate for the year 2017 of Category C-5 & above with specialization code (CE-01 & CE-10). Estimated cost and other detail is mentioned below:- ` S. Location Estimated Bid Cost Completion Contract No. Route Scope of Work # KM Cost (Rs.) (Rs) Period 1287+950, 1298+900, 2% of 1306+600 & Dewatering along-with cleaning Two 1 EM-PN-15-05-78 N-5 1,998,918/- Engineer’s 1316+032 of sumps of underpasses Months Estimate (NBC&SBC) 2. Tenders Documents can be downloaded from NHA websites (www.nha.gov.pk,). The tender rates and amount should be filled in figures as well as in words. 3. The tenders will be received on 4th August, 2017 at 1100 Hours in the Regional Office Building NHA, Lahore and will be opened on the same day at 1130 Hours in the presence of the contractors or their authorized representative who are interested to attend. Contractors are required to sign & stamp each and every page of tender documents. Incomplete and inappropriate tender will not be considered by the tender opening & evaluation committee. 4. The contractors may visit the site and consult concerned office of Deputy Director (Maintenance) and Director (Maintenance) Punjab-North for any clarification in respect of work / items etc. 5. NHA reserves the right to reject all bids as per the PPRA Rule No. -
5.4. R&D in Basmati Rice Production
CLUSTER DEVELOPMENT BASED AGRICULTURE TRANSFORMATION PLAN VISION-2025 Basmati Rice Cluster Feasibility and Transformation Study Planning Commission of Pakistan, Ministry of Planning, Development & Special Initiatives February 2020 1 KNOWLEDGE FOR LIFE 2 KNOWLEDGE FOR LIFE FOREWORD In many developed and developing countries, the cluster-based development approach has become the basis for the transformation of various sectors of the economy including the agriculture sector. This approach not only improves efficiency of development efforts by enhancing stakeholders’ synergistic collaboration to resolve issues in the value chain in their local contexts, but also helps to gather resources from large number of small investors into the desirable size needed for the cluster development. I congratulate the Centre for Agriculture and Bioscience International (CABI) and its team to undertake this study on Feasibility Analysis for Cluster Development Based Agriculture Transformation. An important aspect of the study is the estimation of resources and infrastructure required to implement various interventions along the value chain for the development of clusters of large number of agriculture commodities. The methodology used in the study can also be applied as a guide in evaluating various investment options put forward to the Planning Commission of Pakistan for various sectors, especially where regional variation is important in the project design. 3 KNOWLEDGE FOR LIFE FOREWORD To improve enhance Pakistan’s competitiveness in the agriculture sector in national and international markets, the need to evaluate the value chain of agricultural commodities in the regional contexts in which these are produced, marketed, processed and traded was long felt. The Planning Commission of Pakistan was pleased to sponsor this study on the Feasibility Analysis for Cluster Development Based Agriculture Transformation to fill this gap. -
National Outreach Programme
NATIONAL OUTREACH PROGRAMME Changing Destinies CONTENTS 03 MESSAGE FROM THE VICE CHANCELLOR 04 FAST FACTS 05 THE NATIONAL OUTREACH PROGRAMME 18 OUR NOP SCHOLARS SHARE THEIR EXPERIENCE 21 ALUMNI SUCCESS STORIES 31 GIVING MESSAGE FROM THE VICE CHANCELLOR The National Outreach Programme (NOP) is students. NOP scholars receive significant a signature initiative that we have been proud financial support for tuition, housing, to support for over two decades at LUMS. educational materials, and for other Year after year, the NOP has served large transitional needs. These resources go a long groups of students from across Pakistan in way in giving students the means to succeed their pursuits to attend university and excel and importantly, to focus on learning. NOP in higher education. The NOP itself is an Scholars have gone on to achieve professional enactment of our core principles of diversity, careers and to give back to their families and inclusion, and equity. The programme attracts to their communities. We are grateful for your variety of dedicated students from diverse investment in this programme and in your backgrounds; it includes a multitude of voices unwavering commitment changing the lives and experiences; and it invites participation of youth from all across Pakistan. based on merit. Bringing students together from all across Pakistan creates a mosaic of I hope you enjoy the extraordinary stories language and culture that we believe enriches shared in this Issue that highlight some educational experiences at LUMS both inside of our NOP graduates’ achievements, and and outside of classrooms and beyond our inspiring acts of citizenship. I look forward to campus walls. -
Water Supply & Sanitation
WATER SUPPLY & SANITATION VISION Provision of adequate, safe drinking water and sanitation facilities to the entire rural and urban communities of Punjab through equitable, efficient and sustainable services. WATER & SANITATION POLICY Drinking Water Policy: Safe drinking water is accessible at premises, available when needed and free from contamination on sustainable basis to whole population of Punjab in addition to acquiring and adopting improved knowledge about safe drinking water, sanitation and hygiene in their daily life. Sanitation Policy: Policy envisions developing a safely managed sanitation environment for all citizens of the province, contributing towards high quality life in Punjab. OBJECTIVES . To achieve Sustainable Development Goals and its targets ( Goal 6.1 & 6.2 of SDGs) . Improving standards of public health through provision of improved services backed by legal, regulatory and binding framework. Laying down a roadmap for mobilization of resources to ensure provision of drinking water & sanitation to all by targeted timelines, assigning a priority to unserved and under-served areas . Focusing on capacity building of local governments and promoting Public- Private Partnerships to improve the operation and maintenance of water supply & sanitation schemes . To raise living standard of communities by providing quality drinking water and improved sanitation services . To reduce the spread of water borne diseases 123 ECONOMIC IMPACT OF WATER AND SANITATION PROJECTS The need for improved water and sanitation infrastructure is fundamental to the wellbeing of all citizens and increased coverage of these essential services will significantly contribute to socio-economic development. A study conducted by World Bank (2012) for Pakistan has shown that impact of poor sanitation and hygiene has cost the economy PKR 344 billion (US$ 6.0 billion) annually in 2006, or the equivalent to 3.9% of Gross Domestic Product (GDP). -
Provincial Assembly Polling Scheme
FORM-28 [see rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY National Assembly Election to the *Provincial Assembly of the Punjab No. and name of constituency PP-135-Sheikhupura-I S. No. of Voters Number of Voters assigned to In case of rural areas In Case of Urban Area Number of Polling Booths on the Electoral polling Station No. and Name of Polling Sr. No roll in case Station Census Block Census Block Name of electoral area Name of Electoral Area electoral area is Male Female Total Male Female Total Code Code bifurcated 1 2 3 4 5 6 7 8 9 10 11 12 13 Mohallah Pir Bhukhari 199060101 402 0 402 1. Government.Boys High Mohallah Sharif Pura 199060102 566 0 566 1 School Ferozeabad 4 0 4 Mohallah Muzafrabad 199060103 343 0 343 Narang(Male) (P)* Sadar Bazar No.1 199060104 338 0 338 2. Government.Boys High Sadar Bazar No.2 199060105 462 0 462 2 School Ferozeabad Narang Sadar Bazar No.3 199060201 491 0 491 3 0 3 (Male) (P)* Sadar Bazar No.4 199060202 452 0 452 3. Government.Boys High Sadar Bazar No.5 199060203 372 0 372 3 School Ferozeabad Narang Mohallah Muzafrabad 199060204 413 0 413 2 0 2 (Male) (P)* Sadar Bazar No.6 199060205 486 0 486 Mohallah Pir Bhukhari 199060101 0 317 317 4. Government.Boys High Mohallah Sharif Pura 199060102 0 412 412 4 School Mandarwala Sadar 0 2 2 Mohallah Muzafrabad 199060103 0 280 280 Bazar Narang. (Female) (P)* Sadar Bazar No.1 199060104 0 303 303 5. -
(Pvt) Ltd. Shop No. 01, Ground
Network Position of Exchange Companies and Exchange Companies of 'B' Category As on September 27, 2021 S# Name of Company Address Outlet Type City District Province Remarks Shop No. 01, Ground Floor, Opposite UBL, Mirpur Chowk, 1 Ravi Exchange Company (Pvt) Ltd. Branch Bhimber Bhimber AJK Active Mirpur Road, Bhimber, Azad Jammu & Kashmir Shop No. 01, Plot No. 67, Junaid Plaza, College Road, Near 2 Royal International Exchange Company (Pvt) Ltd. Maqbool Butt Shaheed Chowk, Tehsil Dadyal, Distt. Mirpur Branch Dadyal Dadyal AJK Active Azad Kashmir Office No. 05, Lower Floor, Deen Trade Centre, Shaheed 3 Sky Exchange Company (Pvt) Ltd. Branch Kotli Kotli AJK Active Chowk, Kotli, AJK. Shop # 3&4 Gulistan Plaza Pindi Road Adjacent to NADRA 4 Pakistan Currency Exchange Company (Pvt) Ltd. Branch Kotli Kotli AJK Active off AJK Shop # 1,2,3 Ch Sohbat Ali shopping center near NBP main 5 Pakistan Currency Exchange Company (Pvt) Ltd. Branch Chaksawari Mirpur AJK Active bazar Chaksawari Azad Kashmir Shop No. 119-A/3, Sub Sector C/2, Quaid-e-Azam Chowk, 6 Pakistan Currency Exchange Company (Pvt) Ltd. Branch Dadyal Mirpur AJK Active Mirpur, District Mirpur, Azad Kashmir 7 Dollar East Exchange Company (Pvt.) Ltd. Shop # 39-40, Muhammadi Plaza, Allama Iqbal Road, Mirpur Branch Mirpur Mirpur AJK Active Shop No. 1-A, Ground Floor, Kalyal Building, Naik Alam 8 HBL Currency Exchange (Pvt) Ltd. Branch Mirpur Mirpur AJK Active Road, Chowk Shaheedan, Mirpur, AJK Sector A-5, Opp. NBP Br., Allama Iqbal Road, Mirpur Azad 9 NBP Exchange Company Ltd. Branch Mirpur Mirpur AJK Active Kashmir.