Action Plan on Implementing CAREC TTFS 2020 By Sabino Sikandar Jalal CAREC Focal Person on Transport

13th CAREC TSCC Meeting 14−15 May 2014

VISION

Achieve national cohesion and regional integration through development of sustainable communication infrastructure for socio-economic uplift of the country by providing enabling environment to facilitate movement of people, goods and services in minimum time and cost.

TARGETS

. Develop Pakistan as a hub of sub regional connectivity between high growth East Asia & resource rich Middle East . Improve regional connectivity (links with , / CARs, Iran, India etc.)

. Establish efficient and well integrated transport system to achieve competitive economy . Reduce transport costs and enhance affordability . Increase road density from 0.32 to 0.64 Km / Km2

ROAD NETWORK

. a Are =796,096 Sq- km . Total Road Network =260,000 Kms . National Highways & Motorways =12,131 Kms . Roads have dominant share in both transport of passengers (90%) and the Goods (95%) followed by rail. . Total Number of Vehicles more than 8 million . e55.4% ar two Wheelers and 44% four Wheelers (including Cars) . Annual growth rate is 9 %

PAKISTAN’S GEO-STRATEGIC SIGNIFICANCE RUSSIA

URALSK K A Z A K H S T A N

GURYEV DZHURALY C H I N A

UKRAINE ARAL SEA

KYRGYZSTAN

MOLDAVIA SHEVCHENKO UZBEKISTAN RUSSIA

ROMANIA B L A C K S E A GEORGIA TURKMENISTAN BULGARIA AZARBIJAN JAMMU & DISPUTED GREECE TERRITORY

T U R K E Y

I R A N Amratsar

DEHLI MEDITERRANEAN SYRIA SEA IRAQ I N D I A

KUWAIT

PALESTINE Persian Gulf Ajmer ARABIAN S E A QATAR EGYPT SAUDI ARABIA UAE

RED SEA OMAN Mumbai Khunjrab Pass

NATIONAL HIGHWAYS & Karimabad 8611m Chitral Kalam MOTORWAYS NETWORK IN PAKISTAN Sazin Pass Drosh N-35 Dambu 5575m Dir Jalkhad Chakdara N-15 J A M U & Saidu Naran Malakand Jalalabad Muzaffarabad K A S H MLeh I R M-1 S-3 Torkham Abbotabad S-2 Chakothi KohalaN- 75 DISPUTED Parachinar HasanabdalMurree TERRITORY Kohat KhushalGarh Jhelum Kharian Karak Gujrat Wazirabad Sambarial Pindi DI Khan Bhattian Mughal Kot M-3 Zhob Faisalabad Retra Okara QilaSaifullah Taunsa Sahiwal Kuchlak Mianchannu Loralai DG Khan MultanKhanewal Muzaffargarh Mastung Sibi Lodhran Taftan Nushki Dadhar Bahawalpur Kalat Rajanpur

Nok Kundi Surab DeraMuradJamali Jacobabad Rahimyar Khan Ubauro Besima Shikarpur Nag Ratodero Ghotki Sukkur Wad Larkana Khairpur Punjgur N- Ranipur Kotri Kabir 25 Dadu Naushero Firoz Kararo Moro M-8 Awaran Hoshab Bela Kakkar Liari Uthal Hala S Mirpurkhas I N D Gabd Duregi N-120 Khokhropar Pleri Kotri Pasni Hyderabad Jiwani Ormara Umarkot KARACHI Gharo Thatta ARABIAN SEA N-110 Keti Bandar ACTION PLAN - PROJECTS No. IP No. Route Cost Progres Imp Period ($ Mill) 55 101 Realignment of Karakoram at 275 37% Start: July 2012 – (Exim Bank of China) End: Jan 2015 56 103 Karachi-Hub-Dureji-Sehwan (M-7) Funds not firmed Start: Jan 2015 250 Km up End: Jan 2018 57 104 Sehwan-Ratodero (N-55) (Expressway - 160 54% Start: Dec 2010 199 Km) – (JBIC & GOP) End: Dec 2014 58 105 Ratodero-Dera Ghazi (DG) Khan (N-55) Funds not firmed Start: Jan 2015 (Expressway - 200 Km) up End: Jan 2018 59 110 255 - Funds not Start: Jan 2015 Peshawar-Torkham Expressway (50 km) firmed up End: Jan 2018 60 111 Gwadar-Hoshab Motorway (M-8) – 550 60% Start: Jan 2010 (GOP) End: Dec 2015 I). Gwadar-Dasht (Section-I) II). Dasht-Turbat (Section-II) III). Turbat-Hoshab (Section-III) ACTION PLAN - PROJECTS No. IP No. Route Cost Progres Imp Period ($ Mill) 61 115 BCP Expansion and up-gradation at Pakistan Customs targeted to Torkham, Wagah and Chaman – prepare Project Documents by June (ADB Funded) 2014 – ADB Loan Considerations 62 116.1 Funds Land Start: Jan 2015 M-4 (Section 2 - Gojra-Shorkot not being End: Jan 2018 (4-Lane Motorway) firmed acquired up

63 116.2 M-4 (Section 3 – Shorkot-Khanewal Funds Land Start: Jan 2015 not being End: Jan 2018 (4-Lane Motorway) including bridges firmed acquired over Ravi and Sidhnai Rivers up 64 118 M-4 (Section 1 Faisalabad – Gojra 4- 170 82% Start: Feb 2010 Lanes Motorway) – (ADB Funded) End: Jun 2014

65 119 Lahore-Peshawar Railway Rehabilitation - - - ACTION PLAN - PROJECTS

No. IP No. Route Details Cost Progress Impl Period ($ Mill) 66 120.1 Hoshab-Sorab (National Highways N-85 & N-25) 450 Funds to Start: 2015 be End: 2018 arranged 67 120.2 Sorab – Kalat (National Highways N-85 & N-25) 100 Funds to Start: 2015 be End: 2018 arranged 68 121 E-35 (Section 1 Hasanabdal – Havelian) 4-Lanes 150 Procurem Start: Oct 2014 Motorway –ADB Funded ent End: Jun 2016 69 122 E-35 (Section 1 Havelian – Mansehra) 4-Lanes 200 Land Start: 2015 Motorway being End: 2018 acquired 70 123 M-4 (Section 4 Khanewal – ) 4-Lanes 150 38% Start: Dec Motorway – IDB Funded 2011 End: Sep 2015 71 124 N-70 Muzaffargarh – DG Khan Section 150 Funds to Start: 2015 (Upgradation of existing road to 4-Lanes dual be End: 2018 carriageway) arranged

KARAKORAM HIGHWAY

Khunjrab-Raikot Section (335 Km) 99% Completedj CHINA

TASHKURGAN

CORRDOR KHUNJERAB SUST (7788M) Realignment of KKH HUNZA at – BHASHA DIAMIR DAM GILGIT 275 Million, Exim CHILAS RAIKOT K2(8721) Bank of China, 36% Completion by Jan PATTAN SKARDU SAZIN (8125M) 2015

MANSEHRA INDIA PESHAWAR

HASANABDAL ISLAMABAD ALIGNMENT OF FAISALABAD- KHANEWAL MOTORWAY (M - 4, 224 KM)

INTERCHANGES Mian Chunnu

EXISTING ROADS KHANEWAL Kamalia MOTORWAY ALIGNMENT MULTAN

Khiddar wala Rajhana Kabirwala SAMUNDRI END Shorkot cantt POINT T T SINGH GOJRA FAISALABAD M - 4 ALIGNMENT

PAINSARA SHORKOT

M - 2

M - 3 JHANG CHINIOT PINDI 58 Km Section of BHATTIAN Bhawana Faisalabad-Khanewal Motorway – US$ 170 M, START POINT ADB Financing, 82% Completion by June 2014 Economic Corridor KHUNJERAB

SUST JAGLOT Roads, Rails, Ports, Energy, GILGIT CHINA ATTABAD National Highway S-1 SKARDU Special Economic Zones N-35 N-45 Authority N-95 CHILAS N-15 MANSEHRA PESHAWAR ABBOTABAD MUZAFFARABAD HARIPUR KOHALA BRIDGE -Khunjrab – Gwadar Highway (2400 Km) BURHAN DISPUTED ISLAMABAD TERRITORY - Karachi-Lahore Motorway (1060 Km) JAND FATEHJHANG PINDIGHEB AFGHANISTAN TALAGANG MANGLA / MIRPUR MIANWALICHAKWAL DINA KUNDIAN FAISALABAD D.I KHAN SARGODHA LAHORE DARYA PINDI N-50 KHAN BHATIAN LAYYAH SAMUNDRI JARANWALA SHORKOT PIR MEHAL Boundary QUETTA TAUNSA DG KHAN MULTAN OKARA LORALAI SAHIWAL N-70 KHANEWAL • Main Cities RAJANPUR YAKMUCH NOSHKI SIBI SHUJABAD NOKUNDI • Towns N-40DALBANDIN PADAG N-25 DERA BUGTI ZAHIR PIR N-65 SUI • Rivers JACOBABAD RAHIM YAR KHAN GHOTKI KHUZDAR PANUAQIL INDIA M-8 IRAN RATODERO SUKKUR Existing N-85 NAG LARKANA PANJGUR • Motorways DADU N-25 • Highways M-8 TURBAT HOSHAB LIARI Proposed Projects Jiwani N-10 HYDERABAD GWADAR N-120 KARACHI • PCEC • LKM ARABIAN SEA • MMM KHUNJERAB Sust CHINA Pakistan Jaglot GILGIT Attabad Karachi – Lahore Motorway (KLM) National Highway S-1 N-35 Authority N-45 N-95 Chilas N-15 SKARDU Mansehra Boundary PESHAWAR Abbotabad Muzaffarabad Torkham Haripur Kohala Bridge • Main Cities Burhan DISPUTED • Towns ISLAMABAD TERRITORY AFGHANISTAN Jand Fatehjhang • Rivers Pindigheb Sarai Gambila Talagang Mangla / Mirpur Existing Highways Mianwali Chakwal Dina DI KHAN Kundian FAISALABAD Sargodha M1,2,3&4 (633 km) Darya Pindi Highways N-50 Khan Bhatian Chaman Mughalkot LAHORE Layyah Samundri Jaranwala Shorkot Pir mehal QUETTA Taunsa DG KHAN MULTAN Okara Loralai Sahiwal Lahore – Multan N-70 Khanewal Noshki Rajanpur Yakmuch Dalbandin Padag Sibi Shujabad (330 Km) Est. Cost Nokundi N-40 Bahawalpur N-25 Dera murad Jamali Dera Bugti Zahir Pir US$ 1,57.48 Million N-65 Sui JACOBABAD Rahim Yar Khan Ghotki KHUZDAR Panuaqil INDIA M-8 IRAN Besima Ratodero SUKKUR N-85 Nag Larkana Multan – Sukkur Panjgur Dadu (375 Km) Est. Cost N-25 M-8 Turbat Hoshab Awaran US$ 257.88 Million Liari Jiwani N-10 HYDERABAD GWADAR N-120 KARACHI Sukkur – Hyderabad ARABIAN SEA (345 Km) Est. Cost US$ 2,37.25 Million (32 KM) GAWADER LINKAGES

ROUTE LENGTH TO QUETTA TO PESHAWAR A. Gawader to Hoshab (M-8) = 233 Km (Progress 68%) Hoshab to Sorab (N-85) = 454 Km (Progress 22%) Sorab to Khuzdar (N-25) = 94 Km (Completed) Khuzdar to Ratodero = 243 Km (99 km completed, 144 km in progress 73%) 94 km B. Makran Costal Highway (N-10) = 650 Km (Completed and 40 km 56 km Ratodero operational) Khori Q.S.K Khuzdar 45 km 35 km 50 km 20 km SK 70 km Wangu

AFGHANISTAN AWARAN Wad

HOSHAB 85 km Completed Sections of M-8 TURBAT Kararo 50 km

M- 8 MAND Bela

55 km N-10: MCHP LIARI IRAN SUNSTAR Uthal GABD BUZI PASS AGHOR Pleri MALAN JIWANI PASNI ORMARA GAWADAR

Karachi To Karachi

15 KALAT-QUETTA-CHAMAN (N-25) D.I.Khan

Mughalkot Zhob AFGHANISTAN Dhan asar NWFP Chaman Q. Saifullah -Balance works + Chaman Bypass

-USAID Funding US$90 Million Kuchlak - To be completed by Nov 2015 Loralai QUETTA D.G.Khan Lakpass Sariab Chowk

Taftan Sibbi Kalat Nok Kundi Dalbandin PUNJAB Sorab

IRAN Basima Sukkur Ratodero Nag Khuzdar

Panjgur Wad Kakkar

136

Bela Awaran 80 M-7 Turbat Hoshab Uthal Ormara Gabd 72 Jiwani Pasni GWADAR Hub 18 KARACHI PAKISTAN STANCE

. Sukkur-Hyderabad Section (345 Km, $237 Million) of proposed Karachi-Lahore Motorway in the list of CAREC Priority Investment Projects

. Governments of Pakistan and Afghanistan have agreed to develop Peshawar-Kabul Motorway (265 Km). Technical & Financial assistance is required for the development of this vital socio-economic route which is part of CAREC Transport Corridors 5 & 6.