New Turnkey Program for Tenants & New Model Suites

Total Page:16

File Type:pdf, Size:1020Kb

New Turnkey Program for Tenants & New Model Suites 4881 YONGE STREET — UP TO 82,500 SQ. FT. AVAILABLE 2 SHEPPARD AVENUE EAST — 3,100 SQ. FT. AVAILABLE NEW TURNKEY PROGRAM FOR TENANTS & NEW MODEL SUITES COMING SOON NEW COMMISSION STRUCTURE $1.75 PER SQ. FT. PER ANNUM +SUBJECT TO TERMS AND CONDITIONS. 2 SHEPPARD AVENUE EAST // 4881 YONGE STREET AVAILABILITIES 4881 Yonge Suite 303 ‒ 2,208 sq. ft. Model Suite Suite 305 ‒ 4,660 sq. ft. Model Suite 3rd Floor – 9,467 sq. ft. 4th Floor ‒ 16,488 sq. ft. A HASSLE-FREE 5th Floor ‒ 16,488 sq. ft. 6th Floor ‒ 16,492 sq. ft. 7th Floor ‒ 16,492 sq. ft. SOLUTION FOR 8th Floor ‒ 16,492 sq. ft. LEASED 2 Sheppard 3rd Floor ‒ 3,100 sq. ft. Model Suite TENANTS TIMING Immediate / Model Suites Aug 2021 Call agents to discuss FROM 2,000 – 82,500 SQ. FT. ASKING RATE ADDITIONAL RENT1 $20.32 per sq. ft. per annum (2021 Estimate) + RioCan will turnkey any suite with a 120 day turnaround 1Exclusive of Hydro & water + Finishes to include glass sidelights, upgraded lighting, PARKING 1:1,200 sq. ft. at $185 per month and all new window blinds + Selection of layouts available to choose from to suit your COMMISSION Now paying $1.75 PSF per annum up to 10 years specific needs for all new deals completed in 2021 + Premium finishes or furniture available upon request * Applicable for most build-outs, subject to change based on complexity 4881 YONGE STREET FOUR SIMPLE STEPS TO YOUR BRAND NEW OFFICE 1 2 3 4 PLAN PRICE PAPER PAY We’ll work with you We’ll price out your We will prepare the offer We’ll pay! Collect to design a space that design and offer on our short-form term your bonus fee suits your needs competitive rates for sheet your preferred term 4881 YONGE STREET FLOOR PLANS 3RD FLOOR | MODEL SUITES + New Model Suites coming August 2021 + Ability to source furniture for your client + High-end, tech ready finishes throughout + Suite 305 is divisible to 1,700 sq. ft. per model suite plan SUITE 305 | MODEL SUITE SUITE 301 | CONCEPTUAL PLAN 4,660 SQ. FT. 5,800 SQ. FT. PRIVATE OFFICE MEETING ROOM MEETING ROOM MEETING ROOM PRIVATE OFFICE KITCHEN SUITE 301 SUITE 305 RECEPTION RECEPTION MEETING ROOM MEETING ROOM PRINTER MEETING ROOM DN UP ELECTRICAL WOMEN'S SERVER9,467 ROOM SQ. FT. PRINTER MEETING ROOM MECHANICAL DIVISIBLE/CUSTOMIZABLE DN MEN'S KITCHEN JAN. KITCHEN UP SUITE 304 ELECTRICAL KITCHEN KITCHEN SUITE 302 MEETING ROOM WALL LEGEND PRIVATE OFFICE PRIVATE OFFICE MEETING ROOM RECEPTION SUITE 303 PRINTER DEMO WALL PRINTER DEMISING WALL (SUITE 305) FT. SQ. 1,700 DIVISIBLE TO SMART DEMISE EXISTING WALL NEW WALL PRIVATE OFFICE MEETING MEETING ROOM OPEN COLLAB. PRIVATE OFFICE CAFE WORKSTATIONS OFFICE SUITE 303 | MODEL SUITE SUITE 302 | CONCEPTUAL PLAN CLIENT: PROJECT ADDRESS: SHEET NAME: SHEET NO.: 2,208 SQ. FT. 3,667TEST FIT SQ. FT. Riocan 4881 Yonge St. Suite 301, 302, 303, 304 & 305 SCALE: N.T.S. ISSUED DATE: 2021-02-14 N DRAWN BY: EZ R2 CLEARSPACE OFFICES INC. CHECKED BY: CM 2 SHEPPARD AVENUE EAST FLOOR PLANS 3RD FLOOR | REMAINING UNIT + Available Immediately + Model Suite Opportunity 3RD FLOOR 3,100 SQ. FT. FREIGHT ELEV. 4881 YONGE STREET FLOOR PLANS AS BUILT SAMPLE PLAN | FLOORS 4-7 + Available as-is, or with a custom turnkey + Efficient plates, with only two columns + Opportunity to demise any full floor 2,000 sq. ft. and up 16,500 SQ. FT. 2 SHEPPARD AVENUE EAST // 4881 YONGE STREET DIRECT & KEY AMENITIES ON-SITE AMENITIES INCLUDE Direct subway access, Longos, LA Fitness, and a newly renovated food court. Over 300K SF of additional on-site retail! 2 SHEPPARD AVENUE EAST // 4881 YONGE STREET CENTRAL GTA LOCATION ON TWO SUBWAY LINES Central Toronto office 01 location Located at the intersection of Yonge & Sheppard, the Yonge Sheppard Centre is at the nexus of trendy restaurants, premier office space, services, and a plethora of fitness & 06 banking amenities. Direct indoor access to 2 02 Subway lines Easy and direct access to both the Yonge & Sheppard subways from the lobby of the building as well as the 3-level underground parkade with 1,947 stalls. Conference Centre 03 Tenants have exclusive access to on-site 3,500 sq. ft. tenant conference centre suitable for meetings, townhalls and social gatherings. 24/7 Security & On-site 04 Daycare Manned security desk 24/7 with access to on-site daycare and Montessori. Cactus Club Restaurant 05 Coming Spring 2021 07 The 2nd floor of the 03 building has been leased 03 to the Cactus Club with a terrace overlooking the Yonge/Sheppard 04 05 intersection. Views 06 As one of the tallest 02 buildings in the neighbourhood, 2 Sheppard Avenue East 01 affords 360-degree views of North York. 07 300,000 sq. ft. Retail Mall The Yonge Sheppard Centre now boasts a new, exciting retail mall anchored by Longo’s, LA Fitness and Winners. After an extensive renovation of the mall interior, shoppers will have an elegant entrance to the bright new common areas illuminated with skylights and dramatic interiors, including soft seating and a variety of on-site trendy restaurants. Just a few of the on-site trendy restaurants & shops include: + Longos1 + IQ Foods + Freshly Squeezed + Purdy’s + GNC + Winners1 + Sweet Jesus + Jimmy the Greek + Second Cup + OLG + LA Fitness1 + Blaze Pizza + Kin Kin Bakery + Thai Express + Vivah + Shoppers Drug Mart1 + A&W + Mo’s Golden Pretzel + Tim Hortons + Fido + Flock + Butter Chick + Popeye’s + Villa Madina + Du Monde Optical + Basil Box + Furama + Potatopia + What a Bagel + Five Guys + Freshii + Potbelly Sandwiches + Wikki Hut 1Anchor retailers DREWRY AVE FINCH AVE W FINCH AVE E 2 SHEPPARD AVENUE EAST // 4881 YONGE STREET IN THE RIGHT COMPANY AMENITIES WITHIN 5 MINUTES BATHURST ST ELLERSLIE AVE Located at the busy intersection of Yonge St and Sheppard Ave, Yonge Sheppard Centre thrives through the variety of commuters and community members who take part in our daily adventures. With the highway nearby, accessibility YONGE ST through the two subway lines, and a large neighbourhood MAXWELL ST WILLOWDALE AVE WILLOWDALE proudly calling the area home, Yonge Sheppard Centre BEECROFT RD SENLAC RD SENLAC remains constantly busy with entertainment. DORIS AVE BAYVIEW AVE MAJOR POINTS OF INTEREST YONGE / UNIVERSITY SUBWAY LINE 1 Distance By Car by TTC 6.0 km 5 min 15 min 6.1 km 9 min 14 min SHEPPARD AVE W 5 MINUTES SHEPPARD AVE E 19.1 km 14 min 30 min TTC / LRT 84 SHEPPARD/YONGE SUBWAY LINE 4 22.0 km 20 min 1 hr 3 MINUTES 14.7 km 23 min 29 min ACCESS TO HWY 401 HWY 401 RESTAURANTS + Han Ba Tang BANKING + Passport Canada + The Frog + Ivari BATHURST ST + Moxie’s + TD + Barburrito + JOONS + CIBC + Invesco + Starbucks + Lee Nam Jang + RBC + Franklin Templeton BAYVIEW AVE + Pizza Nova + Dazzling Cafe + Freedom 55 + OLG + Spicy & Delicious + Bake Code + BMO + Tyco + Hero Burgers + Nome Izakaya + Money Gram + Service Ontario + Kinka Izakaya + Pizza Pizza + OHP + Whale Juice + YogenFruz FITNESS & SPA + The Minto Group + Presotea + Cheers Chicken & Burgers + Spa One + Poke Eats + McDonald’s + Goodlife Fitness + Taya Hair Salon + Allwyn’s RETAIL & GROCERY WALK SCORE + Indian Crown + Moksha Yoga + Whole Foods Walker’s + Nanashake + 101 Spa + Rexall PharmaPlus Paradise + Second Cup + The Maze + Chelsea NY + Daily errands + Union Social Eatery + Phase Hair Studio + PAT Spring Garden Market do not require + Holy Snack + Hollywood Nails & Waxing a car + Rabba Fine Foods 94 + Mymy Chicken + Salon Sonya Spa + 7-Eleven + Mamma’s Pizza + Salon de Elephant TRANSPORTATION SCORE + M2M + Sushi One + Print2Go + Tim Horton’s CORPORATE NEIGHBOURS + UPS Store Rider’s Paradise + Gol Takeout + Nestle + World- + Dollarama + Sushi Moto + P&G class public + Winners + Nolbu + AON 93 transportation + Quebecor Media CBRE Limited, David Chiarello* Jeff Friedman* Real Estate Brokerage Associate Vice President Executive Vice President 145 King St W, Suite 1100 416 495 6220 416 815 2363 Toronto, ON M5H 1J8 [email protected] [email protected] www.cbre.ca Byron Ahmet** Elaine Jenkins* Ryan Panet* Senior Vice President Senior Associate Vice President 416 815 2354 416 815 2322 416 495 6318 [email protected] [email protected] [email protected] *Sales Representative **Broker This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affiliated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved. Mapping Sources: Canadian Mapping Services [email protected]; DMTI Spatial, Environics Analytics, Microsoft Bing, Google Earth..
Recommended publications
  • Investment Insight
    SOUL CONDOS INVESTMENT INSIGHT David Vu & Brigitte Obregon, Brokers RE/MAX Ultimate Realty Inc., Brokerage Cell: 416-258-8493 Cell: 416-371-3116 Fax: 416-352-7710 Email: [email protected] WWW.GTA-HOMES.COM BUFRILDINGA GROUPM Developer: FRAM Building Group Architect: Core Architects Landscape Architect: Baker Turner Port Street Market in Port Credit Riverhouse in East Village, Calgary Interior Designer: Union 31 Project Summary FR A M Phase 1: 2 buildings BUILDING GROUP w/ 403 units, 38 townhomes Creative. Passionate. Driven. This is the DNA of FRAM. Phase 2: 3 buildings An internationally acclaimed company that’s known w/ 557 units, 36 townhomes for its next level thinking, superior craftsmanship, bold architecture and ability to create dynamic Community: 7.2 Acres of new development lifestyles and communities where people love to live. 1 Acre public park A team that’s built on five generations of experience, professionalism and courage with a portfolio of over GODSTONE RD 11,000 residences across the GTA. 404 KINGSLAKE RDALLENBURY GARDENS North Shore in Port Credit First in East Village, Calgary FAIRVIEW MALL DR DVP, 401 INTERCHANGE FAIRVIEW MALL DON MILLS RD DON MILLS SHEPPARD AVE EAST 401 DVP SOUL CONDOS 3 A DYNAMIC, MASTER-PLANNED COMMUNITY AT FAIRVIEW Soul Condos at 150 Fairview Mall Drive is part of a dynamic master-planned 7.2 acre new development with a 1 acre public park. This community is destined to become a key landmark in this vibrant and growing North York neighbourhood. ACCESS ON RAMP TO DVP / 401 INTERCHANGES DVP FAIRVIEW
    [Show full text]
  • Finch Avenue Sheppard Avenue Lawrence Ave. West Weston Rd . Sc Arlett Rd . Eglinton Ave. West Finch Avenue Sheppard Avenue
    FUTURE VAUGHAN METROPOLITAN CENTRE SUBWAY STATION SHOPPING FUTURE HWY 407 SUBWAY STATION SHOPPING STEELES AVENUE FUTURE STEELES WEST UNIVERSITY SUBWAY STATION OF TORONTO INSTITUTE FOR DANBY AEROSPACE WOODS STUDIES ELM KEELE CAMPUS PARK JOHN SHOREHAM PARK BOOTH FUTURE BOYNTON MEMORIAL STONG YORK UNIVERSITY WOODS ARENA POND SUBWAY STATION SAYWELL WOODS G. ROSS LORD DUFFERIN STREET PARK DRIFTWOOD MALOCA 400 HULMAR COMMUNITY GARDEN PARK RECREATION CENTRE BLACK CREEK JANE STREET EDGLEY PARKLAND PARK FINCH HYDRO CORRIDOR RECREATIONAL TRAIL DRIFTWOOD FUTURE PARK FINCH HYDRO CORRIDOR FINCH WEST FIRE RECREATIONAL TRAIL SUBWAY STATION FINCH HYDRO CORRIDOR STATION GARTHDALE PARK RECREATIONAL TRAIL FOUNTAINHEAD PARK FINCH AVENUE JANE FINCH MALL DERRYDOWN PARK BRATTY TOPCLIFF PARK PARK SENTINEL PARK FIRGROVE PARK ELIA MIDDLE SCHOOL CHURCH CHURCH GRANDRAVINE PARK OAKDALE FUTURE PARK GRANDRAVINE SHEPPARD WEST FENNIMORE ARENA SUBWAY STATION PARK FIRE STATION SPENVALLEY CHURCH PARK STANLEY PARK ST. JANE BLESSED BROOKWELL KEELE STREET FRANCES DOWNSVIEW MARGHERITA NORHTWOOD PARK PARK CATHOLIC OF CITTA CASTELLO SCHOOL PARK SHOPPING SPORT CENTRE SILVIO CATHOLIC SCHOOL WILSON HEIGHTS BLVD COLELLA SHOPPING DOWNSVIEW BANTING PARK LIBRARY SHEPPARD AVENUE SUBWAY PARK ST. MARTHA STATION CHURCH DIANA CATHOLIC PARK SCHOOL ALLEN ROAD GILTSPUR PARK DOWNSVIEW BELMAR DELLS PARKETTE PARK LANGHOLM KEELE STREET WILSON OAKDALE GOLF & PARK COUNTRY CLUB HEIGHTS BEVERLEY HEIGHTS PARK 400 MIDDLE SCHOOL BLAYDON PUBLIC SCHOOL EXBURY PARK CHURCH ST. CONRAD JANE STREET CATHOLIC ST. GERARD HEATHROW SCHOOL DOWNSVIEW MAJELLA PARK SECONDARY ANCASTOR ANCASTER FIRE CATHOLIC TUMPANE RODING SCHOOL MT. SINAI PUBLIC PARK STATION WILSON SCHOOL PUBLIC COMMUNITY MEMORIAL SCHOOL SUBWAY SCHOOL CENTRE LIBRARY PARK ANCASTER ST. NORBERT STATION MODONNA COMMUNITY CATHOLIC CHALKFARM RODING SCHOOL PARK ST.
    [Show full text]
  • Bathurst Manor
    Canadian Jewish Studies / Études juives canadiennes, vol. 31, 2021 181 Donna Bernardo-Ceriz A Jewish Tale of Suburbia: Bathurst Manor 182 Donna Bernado-Ceriz / A Jewish Tale of Suburbia: Bathurst Manor How does one tell the story of a neighbourhood? If examining the changing and de- veloping physical landscape, then records are in no short supply at various govern- ment archives: census records, municipal planning records, maps, assessment roles, directories, building surveys, and aerial photographs, to name only a few. Retelling the experiences of a community of people, however, requires a slightly different re- search strategy. Personal papers, photographs, letters, home movies, and oral histo- ries offer a glimpse into the lives of residents. Organizational records can provide insight into the cultural, religious, and social needs of a community and the services offered. But what if those records do not exist or cannot easily be located? The Ontario Jewish Archives (OJA) receive over 650 research requests each year. If we divide that by the number of working days (ignoring vacations, stat, and Jewish hol- idays), that equals 2.5 inquiries every day. Some of these inquiries are fairly quick and straightforward, and some are long, protracted research endeavours. We also receive over 50,000 unique users to our website each year; researchers whom we never in- teract with and whose research we never hear about. Of these research requests, a sizable number are related to Jewish spaces and shifting landscapes. “I’m researching the history of Kensington Market”; “Do you have any records on The Ward?”; “I’d like to study the small communities in Ontario”; “I’m interested in how Bathurst Street became the spine of Toronto’s Jewish community.” While these questions may appear well defined, it is the archivist’s job to determine what the researcher is actually asking.
    [Show full text]
  • REPORT for ACTION Westbound U-Turn Prohibition
    REPORT FOR ACTION Westbound U-Turn Prohibition - Sheppard Avenue East at Don Mills Road Date:September 19, 2019 To: North York Community Council From: Acting Director, Traffic Management, Transportation Services Wards: Ward 17, Don Valley North SUMMARY As the Toronto Transit Commission (TTC) operates bus service on Sheppard Avenue East, City Council approval of this report is required. Transportation Services is requesting that City Council prohibit westbound U-turn movements at all times on Sheppard Avenue East at Don Mills Road. The proposed turn prohibition will address congestion concerns between Don Mills Road and the Don Valley Parkway. RECOMMENDATIONS The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council prohibit westbound U-turn movements at all times on Sheppard Avenue East at Don Mills Road. FINANCIAL IMPACT All costs associated with the U-turn prohibition signage are included within the Transportation Services 2019 Operating Budget. DECISION HISTORY This report addresses a new initiative. Westbound U-Turn Prohibition - Sheppard Avenue East at Don Mills Road Page 1 of 4 COMMENTS Transportation Services was requested by Councillor Shelley Carroll to investigate westbound delays for traffic turning left onto Don Mills Road from Sheppard Avenue East. Staff were advised that during the p.m. peak traffic is seen to back up eastwards on Sheppard Avenue East, from the Don Mills Road intersection to the exit ramps from the Don Valley Parkway (DVP). Sheppard Avenue East is classified as a major arterial roadway. At the eastern leg of the intersection with Don Mills Road it is 28 metres wide with a raised median, a westbound left-turn lane, two westbound through lanes and a westbound shared through/right-turn lane.
    [Show full text]
  • Retail Plaza with Prime Redevelopment Potential Toronto, Ontario
    824 177,179,181 SHEPPARD AVE W & COCKSFIELD AVE RETAIL PLAZA WITH PRIME REDEVELOPMENT POTENTIAL TORONTO, ONTARIO Accelerating success. 824 Sheppard Avenue West, Toronto MASSING CONCEPT Job No. 19255 | 08.26.2019 Plan View Massing Views Proposed Driveway Access Cocksfield Avenue Cocksfield Avenue 45.8m3.0m 2 ST. 3.0m 4 ST. 5.5m Wilmington Avenue 6 Sheppard Avenue West 22.0m ST. 7.5m Minimum 1,038 sq.m. Floorplate 10.9m Proposed 9-storey Mixed-use Building 12.9m Blairville Road 22.0m Northwest View 15.0m PROPERTY PROFILE 122.4m 2 ST. 6 Proposed 9-storey ST. Proposed 9-storey Blairville Road Mixed-use Building 3.0m 9 Mixed-use Building ST. 3.0m Sheppard Avenue West 21.1m 1.5m 5.5m Minimum 5.5m 668 sq.m. Wilmington Avenue Floorplate 6 12 ST. 11 ST. Wilmington Avenue 22.0m ST. 10 Planned ROW 3.0m ST. 3.0m 2.7m Road Widening 36.0 m Cocksfield Avenue 3.0m 2.7m 32.4m Sheppard Avenue West Southwest View ADDRESS 824 Sheppard Avenue West, 177,Notes: 179 & 181 Cocksfield Avenue SITE GROSS CONSTRUCTION GROSS FLOOR AREA: SHEPPARD FRONTAGE COCKSFIELD FRONTAGE DENSITY: SITE AREA 51,296 SF | ± 1.19 Acres -Ground floor height= 4.5m AREA: AREA: (95% of GCA) MAX HEIGHT: MAX HEIGHT: (Lot Area Excludes Road Widening) BUILDING SIZE 15,500 SF -Residential floor height= 3.0m 4,705sq.m. [approx.] 21,750sq.m. [approx.] 20,660sq.m. [approx.] 12ST/39.5m 6ST/19.5mFRONTAGE 4.39FSI106 Ft on Sheppard Avenue; 151-Ground Ft on Cocksfield floor GFA =Avenue 3,022sq.m.
    [Show full text]
  • Keele Street Avenue Study
    KEELE STREET AVENUE STUDY (Sean_Marshall, 2008) by Daniel Hahn Bachelor of Arts, University of Toronto, 2014 A major research project presented to Ryerson University in partial fulfllment of the requirements for the degree of Master of Planning in Urban Development. Toronto, Ontario, Canada, 2019 © Daniel Hahn 2019 AUTHOR’S DECLARATION FOR ELECTRONIC SUBMISSION OF A MRP I hereby declare that I am the sole author of this MRP. This is a true copy of the MRP, including any required final revisions. I authorize Ryerson University to lend this paper to other institutions or individuals for the purpose of scholarly research. I further authorize Ryerson University to reproduce this MRP by photocopying or by other means, in total or in part, at the request of other institutions or individuals for the purpose of scholarly research. I understand that my MRP may be made electronically available to the public. DEDICATION Supported by: my loving and supportive parents and siblings. To: Professor Keeble, a friend and mentor. For: myself. There are three things extremely hard: steel, a diamond, and to know one’s self. II INTRODUCTION/ABSTRACT From its humble origins as a rural country road to its present form as a suburban arterial, the Keele Street Corridor - stretching from Wilson Avenue to Grandravine Drive - has long served the transportation and day-to-day needs of North York and Toronto residents. The following study presents the corridor as it was, as it is, and as it could be. Through a series of recommendations, this report intends to offer a vision of the corridor as an urbanized, livable, and beautiful corridor in keeping with the Official Plan’s Avenues policies and based on the following principles: Locating new and denser housing types that encourage a mix of use, make efficient use of lands, frame the right-of-way, are appropriately massed and attractively designed.
    [Show full text]
  • Ethnic Grocery Retailers and Perceptions of Food Access in Humbermede, Toronto
    DISRUPTING THE FOOD DESERT/OASIS BINARY: ETHNIC GROCERY RETAILERS AND PERCEPTIONS OF FOOD ACCESS IN HUMBERMEDE, TORONTO MICHAEL CHROBOK A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF ARTS GRADUATE PROGRAM IN GEOGRAPHY YORK UNIVERSITY TORONTO, ONTARIO September 2014 © Michael Chrobok, 2014 Abstract Contemporary studies of food accessibility often disregard ‘ethnic’ grocery retailers as sources of food or assume them to be attractive to all individuals. This body of research also frequently frames access as an issue of spatial proximity to grocery stores. Drawing on thirty interviews I conducted with residents of Humbermede, Toronto, I explore how food accessibility is perceived and experienced in a culturally-diverse neighbourhood where the only grocery retailers present are ethnic in nature. I argue that identity-related factors (food preferences, ethnic identification, language, and attitudes towards difference) and aspects of one’s life circumstances (purchasing power, mobility, and location or length of residence) – not merely distance – coalesce to influence understandings of one’s food retail environment and one’s store patronage decisions. These findings suggest that food shoppers are not homogenous, that all retailers are not equally attractive to all consumers, and that food accessibility has critical socio-cultural, economic, and spatiotemporal components. ii Dedication For my late Nana, who sparked my interest in food accessibility. iii Acknowledgements I would like to thank the thirty residents of Humbermede, Toronto who took the time out of their busy schedules to share their perspectives with me during interviews. Their insights were invaluable and made this thesis possible.
    [Show full text]
  • “This Issue Has Been with Us for Ages”
    “THIS ISSUE HAS BEEN WITH US FOR AGES” A COMMUNITY-BASED ASSESSMENT OF POLICE CONTACT CARDING IN 31 DIVISION FINAL REPORT NOVEMBER 2014 "THIS ISSUE HAS BEEN WITH US FOR AGES -- I REMEMBER PEOPLE TALKING ABOUT CHANGING THIS WHEN I WAS A TEENAGER. NOTHING HAS CHANGED." – SURVEY RESPONDENT, 31 DIVISION LOGICALOUTCOMES C/O CENTRE FOR SOCIAL INNOVATION 720 BATHURST STREET TORONTO, ON CANADA - M5S 2R4 [email protected] 1-674-478-5634 2 CAPP TABLE OF CONTENTS 4 ACKNOWLEDGEMENTS 64 RECOMMENDATIONS 6 EXECUTIVE SUMMARY 67 FINAL REPORT APPENDICES 9 LIST OF TABLES AND FIGURES APPENDIX A: The Police Are Going To Get A Backlash 10 NOTE ON TERMINOLOGY APPENDIX B: CAPP Community Advisory Committee Terms of Reference 14 INTRODUCTION: WHAT IS THIS STUDY ABOUT? APPENDIX C: Ethics Certificate From The Community 1.1 Study objectives Research Ethics Office 1.2 What Do We Know About Contact Carding? Numbers, Patterns and Controversies APPENDIX D: CAPP Survey Questionnaire 21 METHODOLOGY: WHAT METHODS DID WE USE TO ANSWER OUR QUESTIONS? 2.1 CAPP’s Research Approach 2.2 Survey Research Design and Questionnaire 2.3 Survey Sampling Approach 31 FINDINGS: WHAT DID WE LEARN FROM THE SURVEY? 3.1 Respondents’ Characteristics 3.2 Experiences of Respondents Who Have Been Carded 3.3 Experiences of Respondents Who Have Been Recently Carded (after June 2014) 3.4 Perspectives on Police Carding Practices in 31 Division 3.5 Perceptions of Racial Profiling 3.6 Perceptions of Police in 31 Division: Trust, Power and Respect 3.7 Satisfaction with Policing in 31 Division 3.8 Awareness of the New Community Contacts Policy 3.9 Concerns about Police-Community Relationships 51 FURTHER ELABORATIONS: AN IN-DEPTH DISCUSSION OF THE SURVEY 4.1.
    [Show full text]
  • REPORT for ACTION Scarborough Minor Arterial and Collector Road
    REPORT FOR ACTION Scarborough Minor Arterial and Collector Road Speed Limit Reductions as Part of Vision Zero Speed Management Strategy Date: November 15, 2019 To: Scarborough Community Council From: Director, Project Design and Management, Transportation Services Wards: Wards 20, 21, 22, 23, 24 and 25 SUMMARY This staff report is about a matter for which Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City policy or by-laws. The purpose of this report is to recommend speed limit reductions on minor arterials and collector roadways in Scarborough Community Council area as part of the Vision Zero Road Safety Plan Speed Management Strategy. RECOMMENDATIONS The Director Project Design and Management, Transportation Services, recommends that: 1. Scarborough Community Council reduce the speed limit from 60 km/h to 50 km/h on the minor arterial road segments set out in Attachment 1 to the report dated November 15, 2019 from the Director, Project Design and Management, Transportation Services. 2. Scarborough Community Council reduce the speed limit from 60 km/h to 50 km/h on the collector road segments set out in Attachment 2 to the report dated November 15, 2019 from the Director, Project Design and Management, Transportation Services 3. Scarborough Community Council reduce the speed limit from 50 km/h to 40 km/h on the collector road segments set out in Attachment 3 to the report dated November 15, 2019 from the Director, Project Design and Management, Transportation Services Minor Arterial and Collector Road Speed Limit Reductions - Vision Zero Page 1 of 5 FINANCIAL IMPACT The financial cost of installing the speed limit signs on the road segments included within this report is approximately $178,500.00.
    [Show full text]
  • STAFF REPORT ACTION REQUIRED 1050 Sheppard Avenue
    STAFF REPORT ACTION REQUIRED 1050 Sheppard Avenue West - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: September 26, 2013 To: North York Community Council From: Director, Community Planning, North York District Wards: Ward 10 – York Centre Reference 13 225608 NNY 10 OZ Number: SUMMARY This application proposes to amend the Official Plan and City of Toronto Zoning By-law No. 569-2013 to permit the development of a 15-storey, mixed-use building with 205 residential units, 846m2 of commercial space at grade and 177 parking spaces, at 1050 Sheppard Avenue West. This report provides preliminary information on the above-noted application and seeks Community Council's directions on further processing of the application and on the community consultation process. It is intended that a community consultation meeting be scheduled in consultation with the Ward Councillor. A Final Report and Public Meeting under the Planning Act to consider this application is targeted for the second quarter of 2014 provided any required information is submitted by the applicant in a timely manner. Staff report for action – Preliminary Report - 1050 Sheppard Avenue West 1 RECOMMENDATIONS The City Planning Division recommends that: 1. Staff be directed to schedule a community consultation meeting for the lands at 1050 Sheppard Avenue West together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site. 3. Notice for the public meeting under the Planning Act be given according to the regulations of the Planning Act. Pre-Application Consultation A pre-application consultation meeting was held with the applicant on March 20, 2013 to discuss complete application submission requirements.
    [Show full text]
  • Annual Report 2015 - 2016 Vision Statement We Envision a Community in Which All Older Adults Live in Wellness and Dignity with Equal Access to the Supports They Need
    St. Paul’s L’Amoreaux Centre Annual Report 2015 - 2016 Vision Statement We envision a community in which all older adults live in wellness and dignity with equal access to the supports they need. Mission Statement St. Paul’s L’Amoreaux Centre supports healthy aging by providing client-centred hous- ing, programs and services that meet the needs of diverse older adults Our S.E.N.I.O.R.S. Values Strategic Goals 2013 - 2017 1. Address and Respond to the Needs of the Seniors Community 2. Advance Organizational Capacity 3. Diversify and Develop Resources 4. Expand and improve Service and Housing Space 5. Strengthen Leadership through Governance everyone here belongs Message from the Chair of the Board and Executive Director At St. Paul’s L’Amoreaux Centre we are privileged to be serving one of the most diverse communities of older adults in the City of Toronto. Over 3,600 older adults connected with us in 2015- 2016 through services and care, active living programs, and health promotion and education. More than 450 people call this place home. We benefit from collaboration with hundreds of other health professionals and housing professionals who exchange knowledge, advise us, and support our work in numerous ways. The diversity of our staff, clients, caregivers, residents, and volunteers runs the range of languages, ethnicities, races, cultures and faiths. Many experience health and social complexities, which in combination with demographic diversity, result in barriers to accessing care that create vulnerabilities. We celebrate and value the uniqueness of each individual and endeavour to work in an equally complex system to develop care plans and healthy ageing opportunities that are right for each person.
    [Show full text]
  • Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach
    PG8.9 STAFF REPORT ACTION REQUIRED Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach Date: October 13, 2015 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division Wards: 1, 7, 8, 33, 39, 40, 41, 42 Reference P:\2015\Cluster B\PLN\PGMC\PG15114 Number: SUMMARY As a result of investment in rapid transit along the Finch Avenue West and Sheppard Avenue East corridors, City Planning initiated a review of these corridors. This report recommends areas for planning study on a priority basis in order to leverage investment in rapid transit and to encourage transit supportive development. The recommended future studies will implement the Official Plan's policy direction to integrate land use and transportation. To prioritize areas along the corridors for future planning study, each corridor was divided into segments and reviewed through three streams of work: corridor profiles consisting of demographics, employment and built fabric; a real estate market conditions study; and a planning overview, social equity scan and case studies of similar rapid transit lines. These three streams of work represent background research in the prioritization process, which was completed in partnership with Metrolinx. The next step involved analyzing findings based on an evaluation matrix, consisting of criteria in four categories: social equity, planning framework, city building objectives and market potential. The final step in this process is a prioritization approach and schedule for conducting future planning studies along each corridor. For the Finch Avenue West corridor, staff recommend that the area around Keele Street and Finch Avenue West be studied first, followed by areas around Jane Street and Finch Avenue West and the area around Albion Mall.
    [Show full text]