IMD 239-A08
9th Embraer Day
Defense and Government Market
Luiz Carlos Siqueira Aguiar November 2008 Executive Vice President, Defense and Government Forward Looking Statement
This presentation includes forward-looking statements or statements about events or circumstances which have not occurred. We have based these forward-looking statements largely on our current expectations and projections about future events and financial trends affecting our business and our future financial performance. These forward-looking statements are subject to risks, uncertainties and assumptions, including, among other things: general economic, political and business conditions, both in Brazil and in our market. The words “believes,” “may,” “will,” “estimates,” “continues,” “anticipates,” “intends,” “expects” and similar words are intended to identify forward-looking statements. We undertake no obligations to update publicly or revise any forward-looking statements because of new information, future events or other factors. In light of these risks and uncertainties, the forward-looking events and circumstances discussed in this presentation might not occur. Our actual results could differ substantially from those anticipated in our forward-looking statements.
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 2 Business Model
Low level of investment, no capital risk Very positive cash flow programs
It means that Embraer Defense programs have high level of shareholder added value. Besides that the Defense Programs generate technological spin-offs
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 3 Defense Products and Market Segments
Intelligence, Surveillance and Training Combat Reconnaissance
Transport Systems & Services
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 4 IMD 239-A08
Defense Programs Update Super Tucano – Brazil
BrazilianBrazilian AirAir ForceForce (FAB)(FAB)
A-29 ( FAB’s designation) Two version Four operational bases: (single and Natal (advanced twin -seater ) training), 99 aircraft Porto Velho , Boa Vista, 59 delivered and Campo Grande AFB (operational squadrons).
Ref.: Oct 2008
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 6 Super Tucano – Colombia
Colombian Air Force (FAC)
A-29 25 aircraft (twin -seater ) All aircraft already delivered (the last one in August 2008) Intensive utilization in COIN (Counter Insurgency) missions and successful operations against the FARC Two operational bases: Apiay and Barranquilla
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 7 Super Tucano Flight Simulator
Flight Simulator for the FAC’s Super Tucano Developed by Embraer Operational in the 3 rd quarter 2008 In addition to the simulator, other training and operational tools already developed (CBT – Computer Based Training, MPS/MDS (Mission Planning and Mission Debriefing Stations)) and in operation.
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 8 Super Tucano – Chile
Chilean Air Force (FACH) Contract signed in August 2008 12 Super Tucano ( twin -seater ) Tactical training First deliveries in the second semester 2009
TOSS – Training and Operational Support CONTRACT SIGNED IN 2008! System (MPS/MDS (Mission Planning/Debriefing Station ), Flight Simulator))
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 9 Super Tucano – Ecuadorian Air Force
24 Super Tucano ( twin -seater ) Advanced training and operational missions Contract already signed First deliveries expected in late 2009
CONTRACT SIGNED IN 2008!
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 10 Brazilian F-5 Modernization Program
F-5M (FAB’s designation) Air superiority fighter Fleet: 46 aircraft Modernization program includes structural modification and upgrade of avionics, sensors and armament system capability. 26 aircraft already delivered Last deliveries in 2009 Additional batch of 11 aircraft can be considered in the near future
Ref.: October 2008
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 11 Brazilian AMX Modernization Program
A-1M (FAB’s designation) Attack and reconnaissance aircraft Fleet to be modernized: 43 aircraft Modernization program includes upgrade of avionics, sensors and armament system capability, and fleet standardization. First deliveries in 2012 and the last ones in 2015 First two prototypes already being modified and tested by Embraer, and first flight scheduled to 1Q2009.
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 12 IMD 239-A08
Embraer ISR Systems Embraer ISR Systems
Cost Effective solutions for ISR 18 airplanes contracted:
Mexican Air Force: 3 EMB 145 AEW&C DRDO/CABS (India): 3 Airborne Early Warning and Control
EMB 145 AGS EMB 145 MP Airborne Ground Maritime Patrol Surveillance
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 14 EMB 145 AEW&C – India
Embraer platforms + DRDO/CABS mission systems
Platform improvements: Mission Systems: In-flight Refueling Primary and secondary radars Increased power generation SATCOM / COMINT / ELINT Increased cooling Countermeasures Systems
Contract: Three EMB 145 platforms (firm orders) Seven optional aircraft Signature in July 2008 CONTRACT SIGNED IN 2008! First delivery in 2011
DRDO: Defence Research and Development Organization / CABS: Centre for Airborne Systems
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 15 IMD 239-A08
Transport – Defense and Government ERJ 145 - Petroecuador
PetroEcuador (Ecuador) Ecuadorian State Oil Company One ERJ 145 Mission: transport of company’s employees Delivered in September 2008
CONTRACT SIGNED IN EARLY 2008 AND AIRCRAFT ALREADY DELIVERED!
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 17 ERJ 135 – Thailand – Army Royal Thai Army Two ERJ 135 (firm orders) Mission: transport Deliveries: the first one in November 2008 and the second one in the second semester 2009
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 18 ERJ 135 – Thailand – Navy
Royal Thai Navy One ERJ 135 Mission: Transport and Medical Evacuation Delivery in December 2008
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 19 Phenom 100 – Pakistan Air Force
First military customer: Pakistan Air Force Four Phenom 100 Mission: transport Deliveries: 1Q2009, 3Q2009 and the last two aircraft in 4Q2010.
CONTRACTS FOR THE THIRD AND FOURTH AIRCRAFT SIGNED IN 2008!
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 20 Legacy 600 – Brazil
Brazilian Air Force (GTE – Special Transportation Group) Fleet: 4 + 2 new Legacy 600 Mission: transport of authorities First aircraft delivered in October 2008 Second one to be delivered in December 2009
CONTRACT SIGNED IN 2008!
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 21 EMBRAER 190 – Brazil
Brazilian Air Force (GTE – Special Transportation Group)
Two EMBRAER 190 Replacement of the B737-200 New internal arrangement Extra range (additional fuel tanks) Contractual delivery dates: March CONTRACT SIGNED IN 2008! 2009 and November 2009
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 22 Legacy 600 – Ecuador
One Legacy 600 Mission: presidential aircraft Delivery in December 2008
CONTRACT SIGNED IN 2008!
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 23 Customer Support – new contracts French Armed Forces EMB 121 Xingu: Technical and Logistic Support – 4-year contract signed in September 2008;
FAB’s Legacy and ERJ 145 fleet: 5-year contract amended to include more aircraft EMB 121 Photo: Stéphane Pichard (total of 15 aircraft);
Chilean Air Force (FACH) Super Tucano: 5- year contract already signed and to be
implemented by November 2009. LEGACY 600
! 2008 ED IN SIGN CTS TRA CON
SUPER TUCANO - FACH ERJ 145
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 24 IMD 239-A08
F-X2 Program F-X2 Program
Brazilian F-X program restarted last May 2008 Multi-role fighter to replace the current fleet of fighters (F-2000, F-5M, A-1M) Short-listed aircraft: Initial batch of 36 airplanes (up to 120 aircraft) Strong emphasis in offset and technology transfer mainly for the Brazilian aeronautical industry. Embraer already started talking to short-listed companies, under FAB coordination Boeing F -18 E/F Super Hornet In 2008: RFP In 2009: RFP analysis Final decision Dassault Rafale Contract signature In 2015: first F-X2 aircraft in operation
Saab Gripen NG IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 26 IMD 239-A08
EMBRAER C-390 EMBRAER C-390 Program Update
A comprehensive review of aircraft requirements was performed in 2008, together with the Brazilian Air Force and some other selected potential customers Some aircraft characteristics were reviewed to better fit such requirements and an even more competitive configuration was defined for the EMBRAER C-390 A proposal is being delivered to the Brazilian Air Force, in response to a RFP issued last month. A contract for the development of the C-390 is expected to be signed soon Global market prospects remain very attractive Negotiations with potential partners and suppliers continue and major selections are planned for 2009
IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 28 IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 29 IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 30