World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan: March 17, 2017 2. Date of General Procurement Notice: May 4, 2015 3. Period covered by this procurement plan: March 2017 to Feb 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 15 Moderate risk Public Disclosure Authorized installation of plant and equipment and PPP) 2. (Goods; Information Technology & Non- 4 Moderate risk Consulting Services) 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA Public Disclosure Authorized 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. 9. Renewal or extension of individual consultants contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the Public Disclosure Authorized project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. March 17, 2017 PROCUREMENT Eastern Africa : EA Regional Transport , Trade and Development Facilitation Project (Second Phase of Program) PLAN General Information Country: Eastern Africa Banks Approval Date of the Original Procurement Plan: 2017-02-20 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-03-20 Project ID: P148853 GPN Date: Project Name: EA Regional Transport , Trade and Development Facilitation Project (Second Phase of Program) Loan / Credit No: IDA / 56380 Executing Agency(ies): Kenya National Highways Authority, Kenya Revenue Authority, Ministry of Transport and Infrastructure, ICT Authority WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KENHA-7172-CW-RFB / Component 1: Upgrading Single Stage - One Upgrading of Kainuk Bridge and IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 16,000,000.00 14,970,566.48 Signed 2017-02-14 2017-02-23 2017-02-14 2017-02-14 2017-02-14 2017-03-27 2017-02-14 2016-10-06 2019-09-02 Envelope Approach Roads Infrastructure KE-KENHA-7177-CW-RFB / Component 1: Upgrading Single Stage - One Upgrading of the Loichangamatak IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 68,000,000.00 65,721,295.96 Signed 2017-02-14 2017-03-02 2017-02-14 2017-02-14 2017-02-14 2017-03-30 2017-02-14 2016-11-10 2020-10-26 Envelope - Lodwar Road Infrastructure KE-KENHA-7179-CW-RFB / Component 1: Upgrading Single Stage - One Upgrading of Lodwar - Lokitaung IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 83,000,000.00 0.00 Canceled 2017-02-15 2017-02-15 2017-02-15 2017-02-15 2017-03-15 2021-05-23 Envelope Junction Road Infrastructure KE-KENHA-7180-CW-RFB / Component 1: Upgrading Single Stage - One Upgrading of the Lokitaung IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 84,000,000.00 0.00 Canceled 2017-02-15 2017-02-15 2017-02-15 2017-02-15 2017-03-15 2021-05-23 Envelope Junction - Kalobeiyei River Road Infrastructure KE-KENHA-7184-CW-RFB / Component 1: Upgrading Single Stage - One Upgrading of Kalobeiyei River - IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 79,000,000.00 0.00 Canceled 2017-02-15 2017-02-15 2017-02-15 2017-02-15 2017-03-15 2021-05-23 Envelope Nadapal Road Infrastructure KE-KENHA-8325-CW-RFB / Upgrading of Lot 1: Lodwar - Component 1: Upgrading Lokitaung Junction, Lot 2: Single Stage - One IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 246,000,000.00 239,760,464.51 Signed 2017-02-24 2017-02-24 2017-02-24 2017-02-24 2017-03-27 2017-03-24 2017-03-28 2021-06-01 Lokitaung Junction - Kalobeiyei Envelope Infrastructure River and Lot 3: Kalobeiyei River - Nadapal (A1) Road KE-ICTA-12405-CW-CD / Design Component 4: Enhancing Pending and Build Optic Fibre Cable: IDA / 56380 Prior Competitive Dialogue Open - International Multi Stage 19,200,000.00 0.00 2017-05-08 2017-05-13 2017-07-22 2017-11-03 2017-12-08 2019-06-01 Internet Connectivity Implementation Eldoret-Nadapa/Nakodok KE-ICTA-12407-CW-CD / Rehabilitation/Redundancy of Component 4: Enhancing Single Stage - One Pending IDA / 56380 Post Request for Bids Open - National 2,500,000.00 0.00 2017-09-27 2017-10-02 2017-11-13 2017-12-13 2018-01-17 2018-07-16 Optic Fibre Cable: Eldoret- Internet Connectivity Envelope Implementation Lokichogio- Nadapal KE-KENHA-42522-CW-RFB / Component 1: Upgrading Single Stage - One Under Upgrading of the Lokichar - IDA / 56380 Selected Critical Road Prior Request for Bids Open - International 50,000,000.00 0.00 2018-03-07 2018-03-12 2018-04-23 2018-05-23 2018-06-27 2018-12-24 Envelope Implementation Loichangamatak Road (A1) Infrastructure GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KRA-8276-GO-RFB / Component 4: Enhancing Single Stage - One improvement of ICT infrastructure IDA / 56380 Prior Request for Bids Open - International 2,000,000.00 0.00 Under Review 2017-03-20 2018-02-27 2017-03-25 2017-05-06 2017-05-10 2017-06-14 2017-10-12 Internet Connectivity Envelope at Kilindini port KE-MOTI-11649-GO-DIR / Procurement of Three Toyota Component 2: Facilitation of Under Prados KDJI50R grey VXL IDA / 56380 Regional Transport, Trade and Prior Direct Selection Direct 414,750.00 0.00 2017-05-10 2017-05-15 2017-06-19 2017-12-16 Implementation automatic with sequential shifting Development gear NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KENHA-7094-CS-QCBS / Consulting services for the Component 1: Upgrading Quality And Cost- Construction Supervision of IDA / 56380 Selected Critical Road Prior Open - International 2,600,000.00 2,617,403.27 Signed 2017-02-14 2017-02-14 2017-02-14 2017-02-14 2017-02-14 2017-02-16 2017-05-03 2017-03-23 2017-04-12 2019-10-09 Based Selection Kainuk Bridge and the Approach Infrastructure Roads KE-KENHA-7098-CS-QCBS / Component 1: Upgrading Consulting Services for Quality And Cost- IDA / 56380 Selected Critical Road Prior Open
Recommended publications
  • In Kenya —Background Paper
    A Collaborative Research Project Funded by: Implemented by: An Overview of the Poultry Sector and Status of Highly Pathogenic Avian Influenza (HPAI) in Kenya —Background Paper John M. Omiti Sam O. Okuthe Africa/Indonesia Region Report No. 4 Pro‐Poor HPAI Risk Reduction Table of Contents Page PREFACE ........................................................................................................................................ VI ACRONYMS AND ABBREVIATIONS ............................................................................................... VIII EXECUTIVE SUMMARY ..................................................................................................................... X 1. INTRODUCTION ...................................................................................................................... 1 1.1 Motivation ................................................................................................................................ 1 1.2 Significance and scope ............................................................................................................ 1 1.3 Summary of key findings ......................................................................................................... 1 1.4 Road map ................................................................................................................................ 2 2. VITAL COUNTRY STATISTICS .................................................................................................... 3 2.1 Size and location
    [Show full text]
  • The Charcoal Grey Market in Kenya, Uganda and South Sudan (2021)
    COMMODITY REPORT BLACK GOLD The charcoal grey market in Kenya, Uganda and South Sudan SIMONE HAYSOM I MICHAEL McLAGGAN JULIUS KAKA I LUCY MODI I KEN OPALA MARCH 2021 BLACK GOLD The charcoal grey market in Kenya, Uganda and South Sudan ww Simone Haysom I Michael McLaggan Julius Kaka I Lucy Modi I Ken Opala March 2021 ACKNOWLEDGEMENTS The authors would like to thank everyone who gave their time to be interviewed for this study. They would like to extend particular thanks to Dr Catherine Nabukalu, at the University of Pennsylvania, and Bryan Adkins, at UNEP, for playing an invaluable role in correcting our misperceptions and deepening our analysis. We would also like to thank Nhial Tiitmamer, at the Sudd Institute, for providing us with additional interviews and information from South Sudan at short notice. Finally, we thank Alex Goodwin for excel- lent editing. Interviews were conducted in South Sudan, Uganda and Kenya between February 2020 and November 2020. ABOUT THE AUTHORS Simone Haysom is a senior analyst at the Global Initiative Against Transnational Organized Crime (GI-TOC), with expertise in urban development, corruption and organized crime, and over a decade of experience conducting qualitative fieldwork in challenging environments. She is currently an associate of the Oceanic Humanities for the Global South research project based at the University of the Witwatersrand in Johannesburg. Ken Opala is the GI-TOC analyst for Kenya. He previously worked at Nation Media Group as deputy investigative editor and as editor-in-chief at the Nairobi Law Monthly. He has won several journalistic awards in his career.
    [Show full text]
  • Kenya Malaria General Malaria Information: Predominantly P
    Kenya Malaria General malaria information: predominantly P. falciparum. Transmission occurs throughout the year, with extremely high transmission in most counties surrounding Lake Victoria. Some areas with low or no transmission may only be accessible by transiting areas where chemoprophylaxis is recommended. Location-specific recommendations: Chemoprophylaxis is recommended for all travelers: elevations below 2,500 m (8,200 ft), including all coastal resorts and safari itineraries; all cities and towns within these areas (including Nairobi). No preventive measures are necessary (no evidence of transmission exists): elevations above 2,500 m. Preventive measures: Travelers should observe insect precautions from dusk to dawn in areas with any level of transmission. Atovaquone-proguanil (Malarone or generic), doxycycline, mefloquine, and tafenoquine are protective in this country. G6PD testing is required prior to tafenoquine use. 34°E 37°E 40°E 43°E NUMBERED COUNTIES 5°N SOUTH Ilemi 1 - Nairobi 25 - Kakamega 2 - Kajiado SUDAN Triangle ETHIOPIA 26 - Vihiga 3 - Makueni 27 - Nandi Lokichogio 4 - Machakos 28 - Baringo " 5 - Embu 29 - Elgeyo/Marakwet Lake Sibiloi N.P. 6 - Tharaka-Nithi Turkana 30 - Uasin Gishu 7 - Meru 31 - Bungoma " 37 8 - Kirinyaga 32 - Trans Nzoia Moyale Lodwar 9 - Murang'a 33 - West Pokot " 36 El 10 - Kiambu 34 - Turkana Wak " 11 - Nyeri 35 - Samburu T u r Marsabit 12 - Laikipia k 36 - Marsabit w N.P. e Marsabit 13 - Nyandarua 37 - Mandera l " 34 14 - Nakuru 38 - Wajir 2°N m ua M 15 - Narok 39 - Isiolo UGANDA S a Wajir l Losai m " 16 - Bomet 40 - Kitui a N.P. l t 33 e 38 17 - Nyamira 41 - Tana River 35 39 18 - Kisii 42 - Garissa 32 29 SOMALIA 19 - Migori 43 - Lamu 28 Samburu N.P.
    [Show full text]
  • Evaristus M. Irandu University of Nairobi Nairobi, Kenya Dawna L
    Journal of Air Transportation Vol. 11, No. 1 -2006 THE DEVELOPMENT OF JOMO KENYATTA INTERNATIONAL AIRPORT AS A REGIONAL AVIATION HUB Evaristus M. Irandu University of Nairobi Nairobi, Kenya Dawna L. Rhoades Embry-Riddle Aeronautical University Daytona Beach, Florida ABSTRACT Air transportation plays an important role in the social and economic development of the global system and the countries that seek to participate in it. As Africa seeks to take its place in the global economy, it is increasingly looking to aviation as the primary means of connecting its people and goods with the world. It has been suggested that Africa as a continent needs to move toward a system of hubs to optimize its scarce resources. Jomo Kenyatta International Airport in Nairobi, Kenya, is one of the airports in the eastern region of Africa that is seeking to fill this role. This paper discusses the prospects for success and the challenges that it will need to overcome, including projections through 2020 for the growth in passenger and cargo traffic. _____________________________________________________________________________ Evaristus M. Irandu received his Ph.D. in Transport Geography from the University of Nairobi. He is a Senior Lecturer and formerly, the Chairman of the Department of Geography and Environmental Studies in the University of Nairobi. He teaches Economic and Transport Geography, International Tourism and Tourism Management, at both undergraduate and graduate level. His research interests include: aviation planning, liberalization of air transport, non-motorized transport, urban transport, international tourism and ecotourism. His research work has appeared in several journals such as Anatolia: An International Journal of Tourism and Hospitality Research, Asia Pacific Journal of Tourism Research and Environment and Culture.
    [Show full text]
  • United Nations Development Programme
    United Nations Kenya Country Office Host Community Projects in Kenya Project Initiation Document (PID) Budget: $USD 2,016,925 Funding Source: UNHSF - Japan On behalf of: Signature: Date: Ministry of State for Special Rachel A. Arunga, CBS, Programmes, OP Permanent Secretary UNDP Elizabeth Lwanga Resident Representative Ms Olivia Yambi, UNICEF Country Representative Burkard Oberle WFP Country Director UNHCR Mr Eddie Gedalof, Country Representative December 2007-November 2009 Table of Contents Table of Contents ............................................................................................................................ 2 List of abbreviations ........................................................................................................................ 3 Project Site Map .............................................................................................................................. 4 Purpose ............................................................................................................................................ 5 Background ..................................................................................................................................... 5 Project Definition ............................................................................................................................ 9 Project Scope and Exclusions .................................................................................................... 10 Defined Method of Approach ...................................................................................................
    [Show full text]
  • Disaster Relief Emergency Fund (DREF) Kenya: Polio Outbreak The
    Disaster relief emergency fund (DREF) Kenya: Polio Outbreak DREF operation n° MDRKE019 GLIDE n° EP-2011-000174-KEN 23 November 2011 The International Federation of Red Cross and Red Crescent (IFRC) Disaster Relief Emergency Fund (DREF) is a source of un-earmarked money created by the Federation in 1985 to ensure that immediate financial support is available for Red Cross and Red Crescent emergency response. The DREF is a vital part of the International Federation’s disaster response system and increases the ability of National Societies to respond to disasters. CHF 314, 019 has been allocated from the IFRC’s Disaster Relief Emergency Fund (DREF) to support the Kenya Red Cross Society in conducting polio campaigns in 58 targeted districts to reach 2,122,964 children aged under five years as a contribution to the eradication of Polio in Kenya, following an outbreak in Nyanza Province. Unearmarked funds to repay DREF are encouraged. Summary: Following confirmation of 2 Polio cases in Rongo District, Nyanza Province in September 2011, the Ministry of Public Health and Sanitation (MoPHS) with support of partners announced a 4 phase polio mop up campaign. The first and the second phases of the campaign were conducted from 24 to 28 September and 22 to 26 October respectively, targeting 32 districts in Nyanza A child being vaccinated by a health care worker during Province. A total of 1,185,038 children under the Round 1 and 2 vaccination. Photo: KRCS age of five were vaccinated, corresponding to 129% of the MoH target. However, the Ministry of Public Health and Sanitation indicates that 5,131,161 children aged under five years are at risk of Polio in six provinces based on past epidemiologic trends and patterns.
    [Show full text]
  • Sammy Makama Head, Port Health Services Unit MOH, Kenya 1
    Sammy Makama Head, Port Health Services Unit MOH, Kenya 1. POEs in Kenya (Int. Airports) 2. Objectives of Port Health Services at POEs 3. Key PHS functions 4. Core capacity requirements 5. Preparedness at POEs 6. Use of information generated at POEs 7. Challenges 8. Achievements 1. Part IV ; Points of Entry 2. Part V: General Provisions a) Article 23: Health measures on arrival and departure b) Article 31: Health measures relating to entry of travellers 3. Annex 1 (B): Core capacity requirements at POEs Prevention/control of spread of PHEICs through: - 1. Provision of basic health services for travellers 2. Control of disease causing vectors and vermins 3. Inspection and certification of exports/imports 4. Surveillance: communicable diseases and conditions 5. Ensure coordinated rapid response to any PHEICs CONTROLING DETECTING PUBLIC RESPONDING PUBLIC HEALTH RISKS HEALTH EVENTS TO EMERGENCIES At PORTS, AIRPORTS OF INTERNATIONAL GROUND CROSSING CONCERN (PHEICs) CONTINGENCY INSPECTION - SCREENING PLANS Airports, ports and ground: - 1. Permanent Capacities (Available at all times) 2. Capacity to respond to PHEIC (During emergencies) Permanent Capacities Capacity requirements at all times (routine) (b) Equipment & (a) Health service, personnel for staff & equipment transport (c) Trained personnel for (e) Trained staff and inspection of programme for conveyances vector control (d) ensure save environment, water, catering facilities, wash rooms, disposal services & inspection programmes Capacity to respond to PHEIC Capacity requirements for
    [Show full text]
  • The Geophysical Exploration for Groundwater at the Kakuma Refugee Camp and the Proposed Kalobeyei Refugee Camp in Turkana County, Kenya
    UNHCR The Geophysical Exploration for Groundwater at the Kakuma Refugee Camp and the Proposed Kalobeyei Refugee Camp in Turkana County, Kenya 6 October 2016 UNHCR THE GEOPHYSICAL EXPLORATION FOR GROUNDWATER AT THE KAKUMA REFUGEE CAMP AND THE PROPOSED KALOBEYEI REFUGEE CAMP IN TURKANA COUNTY, KENYA REV DESCRIPTION ORIG DATE 0 Issued as final 06-Oct-16 P. Bauman H:\GEOFIZX\KAKUMA Kenya SEG GWB Geophysics Program 2016\REPORTING\Rev 0 - Final\Geophysical Exploration GW Kakuma_Kalobeyei Turkana County-Rev 0.docx Page i Document No. GP-REP-0001 UNHCR THE GEOPHYSICAL EXPLORATION FOR GROUNDWATER AT THE KAKUMA REFUGEE CAMP AND THE PROPOSED KALOBEYEI REFUGEE CAMP IN TURKANA COUNTY, KENYA Disclaimer The information presented in this document was compiled and interpreted exclusively for the purposes stated in Section 2 of the document. This report has been provided for UNHCR solely for the purpose noted above. The author has exercised reasonable skill, care, and diligence to assess the information acquired during the preparation of this report, but makes no guarantees or warranties as to the accuracy or completeness of this information. The information contained in this report is based upon, and limited by, the circumstances and conditions acknowledged herein, and upon information available at the time of its preparation. The information provided by others is believed to be accurate but cannot be guaranteed. The author does not accept any responsibility for the use of this report for any purpose other than that stated in Section 2 and does not accept responsibility to any third party for the use in whole or in part of the contents of this report.
    [Show full text]
  • SN Company Type of Activities Address Contact Tel Fax Mobile Email Website Postal Code 1 Amin Transporters Transportation (Road) 412 Lodwar, Kenya Mr
    UNJLC- International Logistics Suppliers-Southern Sudan Page 1 of 1 Datecreated: 28/03/2010 May-10 Date Last modified: 05/05/2010 SN Company Type of Activities Address Contact Tel Fax Mobile Email Website Postal Code 1 Amin Transporters Transportation (Road) 412 Lodwar, kenya Mr. Amin Ali Mohamed +25420359322 +254202249948 +254722691147 [email protected] N/A 003500, Lodwar,Kenya 24705 Nairobi, Kenya Mr. Mohamed Ali +25420359323 +254733691148 [email protected] 00100, Nairobi, Kenya Mr. Abdi Welly Hajji +25420359320 +254711138244 +254722922344 2 Babuh Freighters Company Transportation (Road) NSSF Building, Block A, Eastern Wing, 14th Mr. Ally Babuh +254202726262 +254202726264 +254721916107 [email protected] N/A 329 – 00606,Nairobi, Ltd Floor, Nairobi, Kenya +254207226263 +254722853829 Kenya +254722786440 25,Kitale, Kenya +254728363140 +254725398484 3 Bomak Traders Ltd Transportation (Road) Koboko Transport Road, Uganda Mr. Achidri Yusin Agele +256782415250 N/A N/A [email protected] N/A 205, Kobokoa Uganda Construction Mr. Nyerere Simon Johnson +256772464310 Mr. Data Cris +256782636864 4 Clear Case Logistic .Ltd Transportation (Road) Nairobi, Kenya Mr.Samuel Githinji Kiama +254 20 2680503 +254 202214798 +254 722 600 920 [email protected] N/A 6301 , Kirima and Sons +254 202680503 +254 738920221 [email protected] Buildings- Moktar Daddah Street 5 Dan:xx ApS Vehicles Suppliers (Land Cruisers Englandsvej 14, 5700 Svendborg, Denmark Mr. Carsten Mortensen N/A +45 6221 1765 +45 6321 1499 [email protected] www.danxx.org 5700 Svendborg – etc) (Project Sales Manager) +45 2090 3065 Denmark 6 Deekay East Africa Limited Medicines & Surgical Items, Relief Chaka Bapartments, Chaka Road, Mr. Manpreet Singh Kohli N/A +254 2101713 +254 733758597 [email protected] N/A 907-00600- Nairobi Products, Hardware and Hurlingam, Nairobi-Kenya (Director) +254 720265301 miscellaneous Items 7 Ezra Transporters and Transportation (Road) Mr.
    [Show full text]
  • A Host Community Perspective from Turkana Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JENNIFER ALIX-GARCIA ERHAN ARTUC HARUN ONDER HARUN ERHAN ARTUC ALIX-GARCIA JENNIFER A HostCommunityPerspectivefromTurkana The Economics of Hosting Refugees The Economics of Hosting Refugees A Host Community Perspective from Turkana Report No: 113183 Republic of Kenya The Economics of Hosting Refugees A Host Community Perspective from Turkana GMF07 AFRICA Standard Disclaimer: This volume is a product of the staff of the International Bank for Recon- struction and Development/ The World Bank. The findings, interpreta- tions, and conclusions expressed in this paper do not necessarily reflect the views of the Executive Directors of The World Bank or the govern- ments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Copyright Statement: The material in this publication is copyrighted. Copying and/or transmit- ting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Develop- ment/ The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, USA, telephone 978-750-8400, fax 978-750-4470, http://www.copyright.com/.
    [Show full text]
  • Pastoral Conflict and Small Arms: the Kenya-Uganda Border Region
    REPORT Small arms and security in the Great Lakes region and the Horn of Africa Pastoral conflict and small arms: The Kenya-Uganda border region Kennedy Mkutu November 2003 Pastoral conflict and small arms: The Kenya-Uganda border region Kennedy Mkutu SAFERWORLD NOVEMBER 2003 Contents 1. Introduction 5 2. Factors contributing to conflict involving pastoralists in the border area 8 3. Current patterns of conflict and flows of small arms into the border area 19 4. Efforts to prevent or resolve conflict in the border area 28 5. Recommendations 38 MAPS AND DIAGRAMS The North Rift cross border region 20 Marakwet region 21 North Rift cross border arms movement 23 Ethnic/tribal pattern of relationships – February 2003 26 Arms trafficking in cross border Kenya, Sudan and Uganda – February 2003 26 Select bibliography 45 Acknowledgements Saferworld is grateful for the project funding received from the UK Government. Saferworld would also like to thank all those who have contributed to the project to enhance peace and security in pastoral areas of the Horn of Africa. In particular, the author would like to express his appreciation to Dr Owen Greene, Director of the Centre for International Co-operation and Security at Bradford University and Dr Jon Lunn, an independent human rights consultant, both of whom contributed significantly to this report. This report is based on ongoing research the author is currently undertaking for his PhD dissertation. It draws on a range of primary and secondary sources. Thanks are due to: the Kenyan National Archives in Nairobi; the District Documentation Centre in Kapenguria, District Commissioners and Officers in Kenya; the Lutheran World Federation Documentation Centre and Karamoja Project Initiative Unit, both in Moroto district, Uganda; SNV country director Uganda and Simon Simone of Pax Christi for the opportunity to return to Karamoja this year.
    [Show full text]
  • (Hereafter Referred to As “WFP”) And
    AGREEMENT This agreement is between United Nations World Food Programme (hereafter referred to as “WFP”) and ________________________________________________________________, (hereafter referred to as the “Agency”). This agreement limited to humanitarian agencies working in South Sudan defines a modality hereinafter referred to as “Targeted Aircraft Funding” (TAF). This agreement is administered by WFP aviation section hereafter referred to as UN Humanitarian Air Service (UNHAS) 1. Objective 1.1 The humanitarian Agencies in South Sudan have expressed their continued need of air support for which the Agencies’ donors or Agencies themselves have resources. WFP through UNHAS provides this support as regular passenger services, air-drops of bulk cargo, delivery by air of specialised cargo and chartering aircraft for fly into, out from and within southern Sudan. 1.2 WFP has developed substantial air transport capacity to move passengers and cargo, perform air-drops and air-lifts of relief/humanitarian items as well as airstrip maintenance (special operations), agency personnel movement control and air operations related support services. WFP has expressed interest to support other implementing Agencies in transporting passengers, relief items and equipment by air and providing cargo handling, booking and scheduling services. 1.3 The purpose of this document is to outline and define the policy and conditions upon which WFP will provide air transport and related support to the Agency. These include provision of passenger transport with accompanied and unaccompanied baggage, aircraft cargo space, handling and preparation of cargo, arrangements cost recovery, rates and terms of payment, ground support services, handling of prepayments, booking, scheduling, routing and consolidation of passenger movements and chartered flights.
    [Show full text]