Water Company Water Resources Plans

Total Page:16

File Type:pdf, Size:1020Kb

Water Company Water Resources Plans EA-WATER RESOURCES \ FIRST ANNUAL REVIEW OF Water Company Water Resources Plans E n v ir o n m e n t A g e n c y Published by: Environment Agency Rio House Waterside Drive Aztec West Almondsbury Bristol BS32 4UD Tel: 01454 624400 Fax: 01454 624409 www.environment-agency.gov.uk ISBN 1-85-705548-9 © Environment Agency All rights reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the Environment Agency. HO-03/01 -300-A Printed on Cyclus print Contents Summary i 1 introduction 2 1.1 Background 2 1.2 April 1999 to March 2000 - a year in water resources 2 1.3 Structure of the report 4 2 Analysis of resource zone information 5 2.1 Household water meter penetration 5 2.2 Per capita consumption 5 2.3 Household occupancy rate 9 2.4 Leakage 14 2.5 Industry and commerce 14 2.6 Summary 14 3 Issues raised by water companies 19 3.1 Resource availability 19 3.2 Demand forecasts 19 3.3 Water efficiency 19 3.4 Leakage 20 4 Recommendations 21 References 23 environment agency 074587 £/V< WtU-tf CiX'6 OX 3 FI RSlMN NUAIIWEVI RGESf PLANSf - FIRST ANNUAL REVIEW OF WATER COMPANY WATER RESOURCES PLANS - March 2001 Summary This 1$ the Environment Agency's report on the • some companies have produced new estimates first annual review of water company water of future per capita consumption on the basis of resources plans. It covers the period from April 1999-2000 information. We need to look at the 1999 to March 2000. We are pleased to be able robustness of such estimates; to report that all companies have provided us • methods of estimating household occupancy with the information that we required. We are rates seem to play a significant part in the also pleased to report that all companies have calculation of per capita consumption. We need adequate plans for public water supply, to consider the relevant sources of information although some need to make progress to and the consistency of the assumptions adopted ensure adequate security of supply. by companies; In March 1999 all the water companies of England and • water companies have revised their estimates of Wales submitted water resources plans to the future meter penetration. We need to consider Environment Agency. These plans provided for the first the effects of these changes. time a clear picture of how the water companies of England and Wales planned to manage public water We will discuss all these issues with Ofwat, DETR, NAW supply to 2025. We reported to Ministers on these in and the water industry (through Water UK). june 1999 in a report entitled Planning public water supplies (Environment Agency, 1999). Ministers asked We have also noted matters that we will keep under the Agency to keep water companies' plans under active review with companies. We will consider the annual review. In February 2000, after consultation implications of these for future reviews of water with the Department of the Environment, Transport company plans and amend our data requirements and the Regions (DETR), the National Assembly for accordingly. Wales (NAW), Ofwat and the water industry, the Agency issued a template for the submission of annual The issues raised in this report demonstrate the value review information. In response to water companies' of the annual review of water company plans. DETR requests, we agreed that submissions covering the year and NAW have told us that they expect us to continue to April 2000 should be submitted by October 2000. with these reviews. We will work with DETR, NAW, Ofwat and the water industry to define the information Each water company's supply area consists of one or that should be provided for the 2000-01 review. We more resource zones. A resource zone is defined as the will consult before the end of April 2001 and write to largest possible zone in which all resources, including water companies with our requirements during May external transfers, can be shared and hence the zone in 2001. It is likely that we will expect 2000-01 which all customers experience the same risk of supply submissions to be produced by the end of September failure from a resource shortfall. In their annual review 2001. submissions, companies have provided the Agency with information on each resource zone. The analysis of resource zone information is an effective way both to identify issues that have already arisen and areas that will need to be tracked in the future. In our analysis, we have noted several important issues that require further attention: | FIRST ANNUAL REVIEW OF WATER COMPANY WATER RESOURCES PLANS - March 2001 _______ D 1 Introduction This is the Environment Agency's annual review plans provided for the first time a clear picture of how of water companies' water resources plans for the water companies of England and Wales planned to the year 1999-2000. Its objective Is to review manage public water supply to 2025. progress against companies' stated plans and to report on significant departures from the Only the plan submitted by South East Water was plans produced In March 1999. unacceptable to the Agency. This was principally because, in our view, the company had failed to plan for sufficient water supplies for the needs of its 1.1 Background customers in the short term. We asked South East Water to submit a new plan in October 1999. This In England and Wales, public water supply is provided proved to be more acceptable, but we will continue to by private water companies. The Environment Agency keep the company's actions under close scrutiny. is the statutory body with a duty for strategic water resources planning. Our role is to protect the long-term In their response to Planning public water supplies, future of the water environment while encouraging Ministers asked the Agency to keep water companies' sustainable development. In guidance in January 1999, plans under annual review. In February 2000, after central Government set out the legal framework within consultation with the Department of the Environment, which water companies operate: Transport and the Regions (DETR), the National Assembly for Wales (NAW), Ofwat and the water industry, the Agency issued a template for the *Each water company has a key duty to develop and submission of annual review information. In response maintain an efficient and economical system of water to water companies' requests, we agreed that supply. The Environment Agency has the duty to submissions covering the year to April 2000 should be secure the proper use of water resources in England submitted by October 2000. and Wales, within a general framework of policy and directions determined by the Secretaries of State. The Director General of Water Services has the duty 1.2 April 1999 to March 2000 - to ensure that companies can finance the proper a year in water resources conduct of their functions. The Secretaries of State, the Director Ceneral and the Environment Agency Following their submission of water resources plans to each have general environmental duties to take into the Environment Agency in March 1999, water account when considering proposals relating to the companies gave Ofwat their supply-demand balance functions of water companies." submissions in April 1999 as part of the requirements of the periodic review of water company price limits. (iMaintaining Public Water Supplies, Department of After the Environment Agency and Ofwat had the Environment, Transport and the Regions and previously arranged that the reporting requirements for the Welsh Office, January 1999) the water resources plans and the business plans were consistent, central Government asked Ofwat and ourselves to ensure that supply-demand balance In March 1999 all the water companies of England and submissions reflected the contents of companies' water Wales submitted water resources plans to the resources plans. We worked with Ofwat to provide Environment Agency. We reported to Ministers on commentaries on the companies' water resources these in June 1999 in a report entitled Planning public aspirations and to provide answers to particular queries water supplies (Environment Agency, 1999). These that were raised. FIRST ANNUAL REVIEW OF WATER COMPANY WATER RESOURCES PLANS - March 2001 _______ | In June 1999 the Water Industry Act 1999 was enacted. companies can ask Ofwat for an interim price Among other provisions, this allows household determination if Ofwat's assumptions about meter customers to choose to have a water meter fitted free. uptake are shown to be incorrect and if this has a Any household customer choosing to have a water material effect on the company's costs and revenues. meter fitted can revert to the previous charging basis within a year if they wish. The Act also banned the use The price determinations allowed for the funding of of selective metering except on change of house most elements of the Environment Agency's National occupier and for household customers with high Environment Programme (NEP). This programme, discretionary use of water. The latter includes uses such approved by central Government and the National as swimming pool filling and garden watering with Assembly, plans to improve the water environment by automatic sprinkler systems. The Water Industry improving the quality of effluent discharges and (Vulnerable Croups) Regulations 1999 spelled out the reducing abstraction by water companies at central Government's view for the need for social environmentally sensitive sites. We are working with equity to be considered in charging for water. The water companies on the implementation of this Water Industry (Prescribed Conditions) Regulations, programme and will be publishing a report in Autumn also made under the 1999 Act, make provision for 2001 detailing progress over the last 18 months.
Recommended publications
  • Appendix C. List of Consultees
    Appendix C. List of Consultees C.1. Introduction C.1.1 This appendix provides a list of the organisations consulted under section 42, section 47 and section 48 of the Planning Act 2008 . C.2. Section 42(1)(a) Prescribed Consultees C.2.1 Prescribed consultees are set out under Schedule 1 of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 ; these are outlined in Appendix Table A below. Any variation from the list of organisations set out in Schedule 1 is clarified within column 3 of the table. C.2.2 The Planning Inspectorate provided a list of prescribed consultation bodies in accordance with Regulation 9(1)(b) of the EIA Regulations and Advice Note three 1 (see Appendix A ), referred to as the “Regulation 9 list”. Those consultees included in the Reg 9 list are included in Table A, B and C. Those consultees that were not previously identified as a prescribed consultee as per Schedule 1 are identified with asterisk (*), and were consulted in the same way as the Schedule 1 consultees. C.2.3 The list of parish councils consulted under section 42 (1) (a) is outlined separately in Appendix Table C. The list of statutory undertakers consulted under Section 42 (1) (a) is outlined separately in Appendix Table B . C.2.4 Organisations noted in Appendix Tables A, B and C were issued with a copy of the Section 48 notice, notifying them of the proposed application and with consultation information, including the consultation brochure and details of how to respond. Appendix Table A: Prescribed Consultees Variation from the schedule where Consultee Organisation applicable The proposed application is not likely The Welsh Ministers N/A to affect land in Wales.
    [Show full text]
  • Draft Detailed Water Cycle Strategy up to 2031 PDF 4 MB
    Public Document Pack Cambridge City Council DEVELOPMENT PLAN SCRUTINY SUB-COMMITTEE To: Councillors Ward (Chair), Znajek (Vice-Chair), Herbert, Pogonowski, Saunders and Tunnacliffe Alternates Councillors Dryden, Nimmo-Smith and Wright Despatched: Wednesday, 10 November 2010 Date: Tuesday, 16 November 2010 Time: 9.30 am Venue: Committee Room 1 & 2 - Guildhall Contact: Toni Birkin Direct Dial: AGENDA 8 DRAFT CAMBRIDGE WATER STRATEGY PHASE 2 (Pages 1 - 160) Appendices published as a supplements (Pages 1 - 160) i This page is intentionally left blank Agenda Item 8 Cambridgeshire Horizons Detailed Water Cycle Strategy up to 2031 Major Growth Areas in and around Cambridge Phase 2 – Detailed Strategy Choosing a water services infrastructure future October 2010 Halcrow Group Limited Halcrow Group Limited Endeavour House Forder Way Cygnet Park Hampton Peterborough Cambridgeshire pe7 8gx England Tel +44 (0)1733 560033 Fax +44 (0)1733 427988 www.halcrow.com Halcrow Group Limited has prepared this report in accordance with the instructions of their client, Cambridgeshire Horizons, for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2010 1 Page 1 Cambridgeshire Horizons Detailed Water Cycle Strategy up to 2031 Major Growth Areas in and around Cambridge Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Signed 3 0 Final report 08.08.10 EJG 3 1 Revised final report 29.10.10 AJC Page 2 2 Cambridge (and surrounding major growth areas) WCS Phase 2 Executive Summary A significant number of new homes are planned for Cambridge and South Cambridgeshire before 2031.
    [Show full text]
  • Display PDF in Separate
    S AV I N G Water f A THE NRA'S APPROACH TO WATER CONSERVATION & DEMAND MANAGEMENT Se p t e m b e r 1995 CONSULTATION REPORT NATIONAL RIVERS AUTHORITY “ The NRA strongly encourages water companies and other major abstractors to adopt policies and procedures that result in the efficient use of water in their operations and by the public, through a balanced approach combining water conservation and demand management with phased traditional source development where appropriate. Balanced policies will have regard to both cost to customers and environmental impact. ” THE NRA AND THE ENVIRONMENT AGENCY The National Rivers Authority will form the major part of a new organisation which will have responsibilities for the environmental protection of water, land and air. The new Environment Agency starts its work of managing the environment in England and Wales on 1 April 1996. A)&4 t A ) 4 S ’) P r e f a c e BACKGROUND The Environment Agency is due to come into being in 1996. As one of the existing bodies that will make up the new Agency the National Rivers Authority’s (NRA) policies for sustainable development and water conservation will take on a greater significance. Conservation of water resources involves the co-operation of Government, the regulators, the water industry, agriculture, industry and the general public. The NRA as ‘Guardians of the Water Environment’ is intent upon ensuring that water resources are used effectively and efficiently and not wasted. This consultation report reviews current water conservation and demand management practices both in the UK and overseas, and establishes the potential for saving water in England and Wales.
    [Show full text]
  • 40 Innovation in the Water Industry in England and Wales
    Innovation in the water industry in England and Wales FINAL REPORT Cave Review of competition and innovation in water markets Prepared by London Economics February 2009 Innovation in the water industry in England and Wales Final Report Cave Review of competition and innovation in water markets Prepared by London Economics February 2009 © Copyright London Economics. No part of this document may be used or reproduced without London Economics’ express permission in writing. Table of Contents Page 1 Introduction 20 1.1 Project objectives 20 1.2 Structure of the report 20 2 Definition of innovation 22 2.1 Review of innovation definitions from the international literature 22 2.2 Definition of innovation for the purpose of this study 24 3 International comparisons 27 3.1 Cross-country comparison of R&D expenditure 28 3.2 Data on Patents 34 3.3 Conclusions 37 4 Survey of water and sewerage companies 38 4.1 Methodological approach 38 4.2 The innovation questionnaire 39 5 Findings from the survey of water companies 41 5.1 Innovation input measures 41 5.2 Innovation output measures 56 5.3 Benchmarking water and sewerage companies 58 6 Contractor survey 64 6.1 Innovation inputs 64 6.2 Innovation outputs 66 7 Competition upstream and in retail services 68 8 Barriers to innovation and recommendations 71 8.1 Regulatory co-ordination and common agency 71 iii Table of Contents Page 8.2 Flexible environmental and natural resource incentives 75 8.3 Return on investment 82 8.4 Road testing tools for policy 85 9 References 89 Annex 1 R&D data 91 Annex 2 Summary of output measures 93 Annex 3 Reproduction of the innovation questionnaire 99 Annex 4 Comments from questionnaire testing stage 111 iv Tables & Figures Page Table 1: Water companies R&D expenditure rankings (total expenditure and as % of turnover) 11 Table 2: Innovation Summary Table.
    [Show full text]
  • Drinking Water Quality, Second Edition
    This page intentionally left blank Drinking Water Quality This textbook provides a comprehensive review of the problems associated with the supply of drinking water in the developed world. Since the first edition of this book was published there have been enormous changes in the water industry, especially in the way drinking water is perceived and regulated. Water companies and regulators have been presented with numerous new challenges – global warming has seriously affected the sustainability of water supplies as well as impacting water quality; advances in chemical and microbial analysis have revealed many new contaminants in water that were previously undetectable or unknown; and recent terrorist attacks have demonstrated how vulnerable water supplies could be to contamination or disruption. This new edition is an overview of the current and emerging problems, and what can be done to solve them. It has been completely updated, and includes the new WHO Revised Drinking Water Guidelines. Drinking Water Quality is an ideal textbook for courses in environmental science, hydrology, environmental health, and environmental engineering. It also provides an authoritative reference for practitioners and professionals in the water supply industry. N. F. GRAY is a Professor at the Centre for the Environment at Trinity College, Dublin. He has worked in the area of water technology for 30 years, and is internationally known as a lecturer and author in water quality and pollution control. His research specializes in the operational problems associated with supplying drinking water and treating wastewaters. Drinking Water Quality Second Edition N. F. Gray University of Dublin CAMBRIDGE UNIVERSITY PRESS Cambridge, New York, Melbourne, Madrid, Cape Town, Singapore, São Paulo Cambridge University Press The Edinburgh Building, Cambridge CB2 8RU, UK Published in the United States of America by Cambridge University Press, New York www.cambridge.org Information on this title: www.cambridge.org/9780521878258 © N.
    [Show full text]
  • THE DEVELOPMENT of the WATER INDUSTRY in ENGLAND and WALES Cover Photograph: Ryburn Dam, Yorkshire
    THE DEVELOPMENT OF THE WATER INDUSTRY IN ENGLAND AND WALES Cover photograph: Ryburn Dam, Yorkshire. Courtesy of Yorkshire Water Services Limited. This document sets out our understanding of the development of, and of some of the legal provisions affecting, the water industry in England and Wales. Every reasonable effort has been made to make the information and any commentary accurate and up to date, but no responsibility for its accuracy and correctness, or for any consequences of relying on it, is assumed by the Office of Water Services. The information and commentary does not, and is not intended to, amount to legal advice to any person, nor is it a substitute for the relevant legal provision. Anyone in doubt about how they may be affected by any of the legal provisions referred to in the document should seek legal advice. CONTENTS 1. OVERVIEW 1 1.1 GOVERNMENT POLICY 1 1.2 EARLY CONSOLIDATION 1 1.3 RESTRUCTURING 2 1.4 PRIVATISATION 3 1.5 THE INDUSTRY TODAY 3 2. INITIAL CO-ORDINATION OF WATER RESOURCES IN ENGLAND & WALES 5 2.1 INTRODUCTION 5 2.1.1 Water supply 5 2.1.2 Sewerage & sewage disposal 6 2.1.3 Other interests in water resources 7 2.2 WATER RESOURCES ACT 1963 8 2.2.1 Background 8 2.2.2 River Authorities 8 2.2.3 Water Resources Board 9 2.2.4 Central government 9 2.3 MANAGEMENT OF RESOURCES UNDER THE 1963 ACT 10 2.4 SERVICE DELIVERY 11 2.5 THE NEED FOR CHANGE 11 3. ESTABLISHMENT OF THE WATER AUTHORITIES 12 3.1 INTRODUCTION 12 3.2 WATER ACT 1973 12 3.2.1 Policy proposals 12 3.2.2 Functions of the water authorities 15 3.2.3 Financial arrangements 16 3.2.4 Constitution of the water authorities 16 3.2.5 Board structure 17 3.2.6 Role of central government 18 3.2.7 National Water Council 19 3.2.8 Household water bills 19 3.2.9 Statutory water companies 20 3.2.10 Pollution control 20 3.3 THE POST 1974 OPERATING ENVIRONMENT 22 3.3.1 Access to finance 22 3.3.2 Environmental performance 26 3.4 WATER ACT 1983 27 3.4.1 Constitutional changes 27 3.4.2 Financial changes 28 3.5 THE NEED FOR CHANGE 28 4.
    [Show full text]
  • A Natural Person User of a Mobile Telephone
    3154: USER OF A FAMILY AND 4685: USER OF A HALIFAX BUILDING 4945: MEMBER OF FIANNA NA HEIREANN SOCIETY EASYCASH ACCOUNT FRIENDS RAILCARD 4687: USER OF A ROYAL BANK 3460: BRIDGE EGG DONOR OF SCOTLAND KEY ACCOUNT 1123: BRITISH ORGAN DONOR SOCIETY LIVER 5136: REGISTERED WITH YOUR CHOICE HOMES DONOR 2934: EMPLOYED AS A VOLUNTEER FOR 8822: IN CONTROL OF AN ARTIFICIAL 2013: IN RECEIPT OF A SOCIAL 1241: USER OF A MONEY-GO-ROUND BRISTOL A MIND CHARITY SHOP PERSON USER OF A GMAIL EMAIL FUND CRISIS LOAN INNER CITY CREDIT UNION ACCOUNT ADDRESS 1344: CUSTOMER OF SOUTH WEST WATER A NATURAL 8644: IN CONTROL OF AN ARTIFICIAL PERSON USER OF A T-MOBILE MOBILE PERSON USER TELEPHONE CONTRACT ACCOUNT 8540: MEMBER OF THE BRISTOL LAW 1591: LICENSED TO SELL ALCOHOL 8039: MEMBER OF NLARGE PHOTOGRAPHIC GROUP SOCIETY OF A MOBILE 8419: SUBSCRIBER TO ST GEORGES POSTAL MAILING LIST TELEPHONE 4824: OWNER OF AN EQUIFAX CREDIT 3462: USER OF A MARKS AND 1137: MAGISTRATE REPORT 1045: ELECTORALLY REGISTERED SPENCER &MORE CHARGE STORE CARD 3151: USER OF A SENIOR RAILCARD 2719: SUBSCRIBER TO THE NEW STATESMAN 1157: CUSTOMER OF BRITISH GAS 2420: IN RECEIPT OF INCOME BASED JOB SEEKER'S ALLOWANCE 1876: IN RECEIPT OF WARM FRONT MAGAZINE 2399: IN RECEIPT OF NATURAL PERSON 8091: MEMBER OF A INCUBATOR SPACE GRANT 1121: BRITISH ORGAN DONOR SOCIETY LUNG Status CHILD MAINTENANCE Mapping S P DONOR sourced from Project 2001: IN RECEIPT OF THE SOCIAL 1858: OWNER OF CERTIFIED COPY OF 8843: MEMBER OF 20TH CENTURY FLICKS FUND COMMUNITY CARE GRANT DEATH CERTIFICATE A1014 VIDEO LIBRARY 8372:
    [Show full text]
  • Final Water Resources Management Plan
    Cambridge Water Company Final Water Resources Management Plan Final Water Resources Management Plan January 2010 1 Cambridge Water Company Final Water Resources Management Plan Contents Page Executive Summary 3 1.0 Overview 1. 1 Introduction 5 1. 2 Consultation 5 1. 3 Summary of Plan 6 1. 4 Cambridge Water Cycle Study 7 1. 5 Directions 7 2.0 Water Resources Plan 2. 1 Plan Content and Development 9 2. 2 Water Supply 12 2. 3 Water Demand 15 2. 4 Climate Change 25 2. 5 Greenhouse Gas Emissions 27 2. 6 Target Headroom 27 2. 7 Baseline Supply-Demand Balance 28 2. 8 Option Appraisal 28 2. 9 Final Water Resources Strategy 29 3.0 Tables 31 4.0 Appendices 1 - Consultation 32 2 - Strategic Environmental Assessment 36 3 - Economic Level of Leakage Assessment * 48 4 - Target Headroom Calculation * 49 5 - Effects of Climate Change on Supply 50 6 – Outage Assessment * 54 7 – 25 Year Appraisal of Metering Policies 55 * available on request 2 Cambridge Water Company Final Water Resources Management Plan Executive Summary Cambridge Water’s water resources management plan sets out how the Company will manage its resources to meet the needs of existing and future customers, and those of the environment, over the next 25 years. The Company’s supply-demand balance (the amount of water available for use, compared with the quantity actually used) could be influenced by a range of factors: this plan describes those factors, and assesses their likelihood and impact. Using this assessment the Company’s supply-demand surplus (headroom) has been calculated over the planning period.
    [Show full text]
  • Stephen P. Tomkins Cam Valley Forum
    Stephen P. Tomkins Cam Valley Forum What is the Cam Valley Forum ? A community group concerned with the welfare of the River Cam. • Its flow & water quality • Its heritage value and its environmental importance • Its Natural History • Its right use for both amenity & recreation. We want to represent:- • The people who live and work beside it: • People whose recreation is beside it: walkers , cyclists, anglers and birders. Etc.. • People who enjoy being in or on it:- boaters, rowers, sailors, canoeists, punters & swimmers. • The River itself…………..as it has no voice, no vote & no advocate. We engage with:- • Local Authorities, City Council, Cam Conservators. Etc.. • Farmers and Landowners. • Conservation Groups: Wildlife Trust, Cambridge PPF. CPRE, Etc.. • Anglian Water, Affinity Water and Cambridge Water. WRE. • The Environment Agency, DEFRA and Natural England. Some River Cam Related Groups Abington River Care Group Federation of Cambridge Residents Bin Brook Group Associations Barrington Conservation Trust Friends of Ditton Meadows Cam Valley Forum Friends of Queens’ Green Friends of the Cherry Hinton Brook Friends of Midsummer Common Friends of the River Shep Friends of Sheep’s Green Friends of the River Granta Friends of Stourbridge Common Wilbraham River Protection Society Save Our Open Spaces Mel River Restoration Group Alban Academy Boat Club Cambridge Past Present and Future Cam Conservators CPRE Cam Rowers The Wildlife Trust Cam Sailing Club The Countryside Restoration Trust Cambridge Canoe Club The Hobson’s Conduit Trust College College Boat Clubs Scudamores Newnham Riverbank Club Traditional Punting Company Cambridge Trout Club Our Cam Valley Forum’s greatest concerns Over-abstraction from the Cambridge chalk aquifer hugely reduces flow.
    [Show full text]
  • Paying for Water: Water Pricing and Equity in England and Wales Author(S): Karen J
    Paying for Water: Water Pricing and Equity in England and Wales Author(s): Karen J. Bakker Source: Transactions of the Institute of British Geographers, New Series, Vol. 26, No. 2 (2001), pp. 143-164 Published by: Blackwell Publishing on behalf of The Royal Geographical Society (with the Institute of British Geographers) Stable URL: http://www.jstor.org/stable/3650665 . Accessed: 17/08/2011 17:04 Your use of the JSTOR archive indicates your acceptance of the Terms & Conditions of Use, available at . http://www.jstor.org/page/info/about/policies/terms.jsp JSTOR is a not-for-profit service that helps scholars, researchers, and students discover, use, and build upon a wide range of content in a trusted digital archive. We use information technology and tools to increase productivity and facilitate new forms of scholarship. For more information about JSTOR, please contact [email protected]. Blackwell Publishing and The Royal Geographical Society (with the Institute of British Geographers) are collaborating with JSTOR to digitize, preserve and extend access to Transactions of the Institute of British Geographers. http://www.jstor.org Paying for water: water pricing and equity in England and Wales Karen J Bakker Over the past three decades, the business of water supply in England and Wales has been gradually transforming from the supply of a service to citizens, to the sale of a commodity to customers. The paper provides a genealogy of concepts of efficiency and equity in water regulation over the past thirty years, prior to evaluating the implications for water consumers of one aspect of this process - the shift away from policies prioritizing inter- and intra-regional equalization (implying a principle of social equity) towards policies prioritizing economic efficiency (implying a principle of economic equity) in water charging.
    [Show full text]
  • Natural Person Core
    01318: USER OF AN O2 MOBILE 03634: OWNER OF A PHOTO ME 03430: USER OF AN EVANS STORE INSTANT BUSINESS CARD TELEPHONE PAY AS YOU GO ACCOUNT 03427: USER OF AN OUTFIT STORE CARD CARD 00555: MEMBER OF LOVE FILM VIDEO 02941: IN CONTROL OF AN ARTIFICIAL LIBRARY 08831: USER OF A SAINSBURY'S RECYCLER PERSON USER OF AN ESSO CARD 01207: USER OF A 3 MOBILE ACCOUNT VEHICLE FUEL ACCOUNT MOBILE TELEPHONE CONTRACT ACCOUNT 03590: USER OF A NATIONAL EXPRESS 04396: MEMBER OF A LOVE FILM 05110: OWNER OF A HAMAS T-SHIRT FAMILY COACHCARD 03868: USER OF A BRISTOL FERRY VIDEO LIBRARY BOAT COMPANY ANNUAL PASS PHOTOCARD 03270: FRIEND OF THE TOBACCO FACTORY 05115: OWNER OF A HAMAS FLAG 05114: OWNER OF AN AL QAIDA NATURAL FLAG 01206: USER OF AN O2 MOBILE 04975: MEMBER OF THE RED HAND TELEPHONE CONTRACT ACCOUNT 02946: EMPLOYED AS A WWOOFER 03419: ABLE TO TRAVEL BY RYAN DEFENDERS PERSON AIR AIRLINE 05973: MEMBER OF BRISTOL CANOE CLUB 01344: CUSTOMER OF SOUTH WEST WATER 01367: FRIEND OF BRISTOL CITY MUSEUM AND ART GALLERY 03631: USER OF A MARRIOTT LOYALTY CORE 08383: OWNER OF CERTIFIED COPY OF 08119: EMPLOYED AS A VOLUNTEER FOR MEMBERSHIP CARD CIVIL PARTNERSHIP CERTIFICATE THE KNOWLE WEST MEDIA CENTRE 01350: CUSTOMER OF BRISTOL WATER 05058: CUSTOMER OF AMAZON BOOK SHOP 01365: REGULAR GIVER TO OXFAM 03188: MEMBER OF THE CUBE CINEMA 02964: IN CONTROL OF AN ARTIFICIAL PERSON USER OF A EUROSHELL VEHICLE 08813: CUSTOMER OF MARRIOT 00377: CUSTOMER OF STAMP DESGNER FUEL ACCOUNT 01089: USER OF A T-MOBILE MOBILE 03153: USER OF A QUICKSILVERSCREEN CLUB TELEPHONE PAY AS YOU
    [Show full text]
  • Introduction to Water Supply
    Cambridge University Press 978-0-521-70253-9 - Drinking Water Quality, Second Edition N. F. Gray Excerpt More information PART I INTRODUCTION TO WATER SUPPLY © Cambridge University Press www.cambridge.org Cambridge University Press 978-0-521-70253-9 - Drinking Water Quality, Second Edition N. F. Gray Excerpt More information Chapter 1 The water business 1.1 Introduction The water supply industry is vitally important not only to maintain the health of the community, but for the sustainability of industry, business and agriculture. Without adequate water supplies our present society would never have evolved, and our lives today would be unrecognizable. Our dependence on treated water is now incalculable, and threats to that supply are comparable to the worst natural and man-made disasters. The volumes of water consumed each day by agriculture, industry and the public are vast, requiring an enormous infrastructure to satisfy the demand. Like the other service providers, electricity, telephone and gas, the water utilities deliver their product to the home, which requires a network of distribution pipes to service each household, but unlike the other utilities these are stand alone local or regional networks, rather than integrated national supply networks. In England and Wales there are 26 private water companies that together supplied 52.7 million consumers in 2004/5 with 15 807 million litres (Ml dÀ1) of water each day. Sixty-eight per cent of this came from surface waters and the remainder (32%) from groundwater. It requires 1344 plants to treat this volume of water, which is supplied to consumers via 326 471 km of distribution mains.
    [Show full text]