HIGH SPEED RAIL(LONDON WEST- MIDLANDS) | SES3 and AP4 ES SES3 AP4 and HIGH SPEED RAIL (LONDON - WEST | Volume 5 | Technical appendices | Transport Assessment | Transport appendices 5 | Technical Volume MIDLANDS) Supplementary Environmental Statement 3 and Additional Provision 4 Environmental Statement Volume 5 | Technical appendices Transport Assessment (TR-001-000) High Speed Two (HS2) Limited One Canada Square Revised version issued 30 October 2015 London E14 5AB T 020 7944 4908 E
[email protected] Z70 SES3 and AP4 ES 3.5.1.10.1 AP4 SES3 and AP4 ES – VOLUME 5 SES3 and AP4 ES – VOLUME 5 www.gov.uk/hs2 AP4 SS&Pur A4P-1.indd 37 30/10/2015 15:49:36 HIGH SPEED RAIL (LONDON - WEST MIDLANDS) Supplementary Environmental Statement 3 and Additional Provision 4 Environmental Statement Volume 5 | Technical appendices Transport Assessment (TR-001-000) NOTE: this document was updated on 30th October 2015 to correct specific traffic data relating to CFAs 7, 8, 10, 11, 12, 13 and 15. The corrected text is highlighted in yellow. These corrections do not affect the outcome of the traffic assessments. October 2015 SES3 and AP4 ES 3.5.1.10.1 www.gov.uk/hs2 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, One Canada Square, London E14 5AB Details of how to obtain further copies are available from HS2 Ltd.