SUMMARY: Environmental Impact Assessment Report for Modifications to the Petitcodiac River Causeway

Total Page:16

File Type:pdf, Size:1020Kb

SUMMARY: Environmental Impact Assessment Report for Modifications to the Petitcodiac River Causeway Summary of the Environmental Impact Assessment Report for Modifications to the Petitcodiac River Causeway October 2005 Prepared by the New Brunswick Department of Environment and Local Government EIA Summary - Modifications to the Petitcodiac River Causeway October 2005 Table of Contents 1.0 INTRODUCTION .................................................................................................................................................1 2.0 BACKGROUND....................................................................................................................................................1 3.0 ENVIRONMENTAL ASSESSMENT METHODS ............................................................................................2 4.0 PUBLIC, STAKEHOLDER, ABORIGINAL COMMUNITY MEETINGS AND REGULATORY CONSULTATION.......................................................................................................................................................2 5.0 DESCRIPTION OF PAST AND EXISTING ENVIRONMENT ......................................................................3 5.1 CAUSEWAY AND CONTROL STRUCTURE ..............................................................................................................3 5.2 PHYSICAL CHARACTERISTICS OF THE PETITCODIAC RIVER ESTUARY..................................................................3 General .................................................................................................................................................................3 Tidal Bore .............................................................................................................................................................3 Sources and Fate of Sediment in the River ...........................................................................................................4 Seasonal Changes and Sediment Transport..........................................................................................................4 5.3 ATMOSPHERIC ENVIRONMENT .............................................................................................................................5 5.4 FISH AND FISH HABITAT ......................................................................................................................................5 Water Quality........................................................................................................................................................5 Sediment Quality...................................................................................................................................................6 Commercial Fisheries...........................................................................................................................................6 5.5 TERRESTRIAL AND WETLAND ENVIRONMENTS....................................................................................................6 Wetlands ...............................................................................................................................................................6 Wildlife and Vegetation.........................................................................................................................................6 Migratory Birds ....................................................................................................................................................6 Mudflat Productivity .............................................................................................................................................7 5.6 MUNICIPAL SERVICES AND INFRASTRUCTURE .....................................................................................................7 Dykes, Aboiteaux, and Wharves............................................................................................................................7 Other Infrastructure..............................................................................................................................................8 5.7 ROAD TRANSPORTATION NETWORK ....................................................................................................................8 5.8 VESSEL TRAFFIC AND NAVIGATION .....................................................................................................................9 5.9 LAND USE AND VALUE ........................................................................................................................................9 Land Use...............................................................................................................................................................9 Land Value..........................................................................................................................................................10 5.10 PAST AND PRESENT USE OF LAND AND RESOURCES FOR TRADITIONAL PURPOSES BY ABORIGINAL PERSONS 10 5.11 TOURISM..........................................................................................................................................................10 5.12 RECREATION ....................................................................................................................................................11 5.13 LABOUR AND ECONOMY ..................................................................................................................................11 5.14 HERITAGE AND ARCHAEOLOGICAL RESOURCES ..............................................................................................11 5.15 PUBLIC HEALTH AND SAFETY ..........................................................................................................................12 Vehicular Accidents ............................................................................................................................................12 Non-vehicular Accidents.....................................................................................................................................12 Groundwater.......................................................................................................................................................12 Surface Water Resources ....................................................................................................................................12 Human Disease Vectors......................................................................................................................................12 Flooding and Flood Risk ....................................................................................................................................13 Human Food Resources......................................................................................................................................13 6.0 EVALUATION OF THE STATUS QUO AND PROJECT OPTIONS IN ACHIEVING THE FISH PASSAGE PROJECT OBJECTIVE .......................................................................................................................13 EIA Summary - Modifications to the Petitcodiac River Causeway October 2005 7.0 PROJECT DESCRIPTION AND IMPLEMENTATION ...............................................................................14 7.1 PROJECT OPTION 3.............................................................................................................................................15 7.2 PROJECT OPTIONS 4 ...........................................................................................................................................16 Project Option 4A ...............................................................................................................................................16 Project Option 4B ...............................................................................................................................................16 Project Option 4C...............................................................................................................................................16 7.3 STATUS QUO ......................................................................................................................................................16 7.4 ACCIDENTS AND MALFUNCTIONS ......................................................................................................................17 7.5 ENVIRONMENTAL MANAGEMENT ......................................................................................................................17 8.0 FUTURE ANTICIPATED CHANGES TO THE RIVER ...............................................................................17 9.0 ENVIRONMENTAL EFFECTS ANALYSIS...................................................................................................18 9.1 ATMOSPHERIC ENVIRONMENT ...........................................................................................................................18 Evaluation of Potential Environmental Effects...................................................................................................19 Climate............................................................................................................................................................................. 19 Air Quality ....................................................................................................................................................................... 19 Odour ..............................................................................................................................................................................
Recommended publications
  • Type Your Frontispiece Or Quote Page Here (If Any)
    A LATE MARITIME WOODLAND PESKOTOMUHKATI FISHERY FROM THE MAINLAND QUODDY REGION, SOUTHWESTERN NEW BRUNSWICK, CANADA by W. Jesse Webb B.A. (Hons.), Anthropology, 2009 A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree of Master of Arts in the Graduate Academic Unit of Anthropology Supervisors: Susan E. Blair, Ph.D, Anthropology, Chair Matthew W. Betts, Ph.D, Anthropology Examining Board: Darcy J. Dignam, M.A., Anthropology Richard A. Cunjak, Ph.D., Biology This thesis is accepted by the Dean of Graduate Studies THE UNIVERSITY OF NEW BRUNSWICK April 2018 © William Jesse Webb, 2018 ABSTRACT The nature of precontact Indigenous fisheries and their significance to subsistence economies, seasonal mobility, and diachronic cultural change remain underdeveloped in the archaeology of the Maritime Peninsula, northeastern North America. This thesis presents an analysis of a precontact fishery from BgDs-15, a small shell-bearing site located on the northern mainland of Passamaquoddy Bay, southwestern New Brunswick, Canada. Several hundred bones recovered during the 2004 field excavations and over 3,000 fish remains from midden column and bulk feature samples were examined. Most of these fish bones are attributable to Atlantic tomcod (Microgadus tomcod Walbaum, 1792) and unidentified, tomcod-sized gadids, with some herring (Clupeidae) present. Multiple lines of complementary evidence, including taxonomic composition, relative abundances, skeletal element frequency, seasonality, and the ethnohistoric record were examined to produce a high-resolution analysis of the BgDs-15 fishery and provide insight into ancestral Peskotomuhkati settlement-subsistence strategies during the Late Maritime Woodland period (ca. 1350–550 BP). ii ACKNOWLEDGMENTS The process of developing this thesis has, on the one hand, been the ideal of curiosity-driven academic research and, on the other, a Sisyphean personal struggle.
    [Show full text]
  • Memorial of the 121St and of the 122Nd Anniversary of The
    )12 89 f 1 -MmfarByitfh J&mkjMl^LJilLLJii, Jlimili -41H IJItl 4u-iii»- UtiU"! iHilM liiilM jB4jllbilltillllliMHlfjlli-iiittttjlB--lllLi-lllL UlllJll 4JH4Jifr[tti^iBrJltiitfhrM44ftV- 'ilVJUL -Mi 4-M-'tlE4ilti XJ ill JMLUtU ^^ I Memorial = - ()!•' THE iaist jlisto oi^ the: laancl IB MNIVKRSAfiY OF THE ' SEnLERIEUT OF TRUBO BY THE BRITISH BEI^G THE Fl^ST CELiEBRATIOH Op THE TOWN'S NATAL DAY, § SEPTEMBER 13th, 1882. % eiliillintft •] l*«li*««««««»it»««l • • » • » • •••. •• •• » ••• .. ••• ••••• ••••• ••••• ••••• ••• • • •• • • • • • • •• • • • • • COMMITTEE OF PUBLICATION • •••• RICHARD CRAIG-, Esq., Chairman. ISRAEL LONGWORTH, Q. C. F. A. LAURENCE, Q. C. MEMORIAL One Hundred and Twenty-second, and of the One Hundred and Twenty-first, advertised as the One Hundred and Twenty-third OF T^E SEJTLE/I\EflJ Of 51^0, BY THE BRITISH, Being the F^st Celebration of THE TOWN'S MT4L MY, September 13th, 1882. TRURO, N. S. Printed by Doane Bros., 1894. PREFACE The committee in charge of the publication of this pamphlet, in per- forming their duty, exceedingly regret that the delay has rendered it im- possible to furnish the "Guardian's" account of Truro's eventful Natal Day, as well as to give the address delivered by F. A. Ljaurence, Esq., Q. C, on the memorable occasion, published in September or October, 1882, in that newspaper. After much diligent inquiry for the missing num- bers of the "Guardian," by advertisement and otherwise, they are not forthcoming. If not discovered in time for the present publication the committee hope that the matter of a supplementary nature in the form of an appendix, will be found of sufficient historical importance to, in some measure, compensate for that which has been lost.
    [Show full text]
  • EIA Final Report (PDF)
    YB299A ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR MODIFICATIONS TO THE PETITCODIAC RIVER CAUSEWAY Submitted to: New Brunswick Department of Supply and Services Fredericton, New Brunswick Submitted by: AMEC Earth & Environmental, A Division of AMEC Americas Limited Fredericton, New Brunswick September 30, 2005 TE23520.4 NB Department of Supply and Services EIA Report Modifications to the Petitcodiac River Causeway September 2005 EXECUTIVE SUMMARY Background This document is the Environmental Impact Assessment (EIA) Report for the Modifications to the Petitcodiac River Causeway Project. The Petitcodiac River causeway (“causeway”) is a gated dam structure with an installed vertical slot fishway that was built across the Petitcodiac River between the City of Moncton and the Town of Riverview. Figure 1 shows the location of the Petitcodiac River and Figure 2 shows an aerial view of the causeway. Completed in 1968, the causeway was intended to create a second transportation link between the two communities, offer flood protection for farmland between the causeway and the head of tide at Salisbury, and create a freshwater headpond with potential for recreation and as an industrial water source. A bridge would have achieved the transportation objective, but not the other benefits. As early as 1961, it was recognized by Fisheries and Oceans Canada (“DFO”) that fish passage would be an issue if a causeway was built across the Petitcodiac River. Consequently, DFO required that a fishway be included in the structure. However, the construction of the causeway with the fishway resulted in fish passage issues from the outset. The fishway proved ineffective for all fish species that require passage for life cycle purposes, including the Inner Bay of Fundy Atlantic salmon that is now also protected under the Species at Risk Act because of declining numbers.
    [Show full text]
  • All Donations Recognized in the “Friends for Life” Donor Recognition Program Are Cumulative Over the Lifetime of the Donor Beginning January 1, 1990
    All donations recognized in the “Friends for Life” donor recognition program are cumulative over the lifetime of the donor beginning January 1, 1990. Tous les dons reconnus dans le cadre du programme de reconnaissance des donateurs Amis pour la vie sont cumulatifs jusqu’au décès du donateur à compter du 1er janvier 1990. Dream Builders /Bâtisseur de rêves $150,000 + President's Circle / Cercle du Président / Cercle de la Présidente $100,000 – $149,999 Benefactor / Bienfaiteur / Bienfaitrice $50,000 – $99,999 Partner / Partenaire $25,000 – $49,999 Companion / Compagnon / Compagne $10,000 – $24,999 Associate gold / Assococié or $5,000 – $9,999 Associate silver / Assococié argent $1,000 – $4,999 Aliant Dream Builder Assomption Vie / Assumption Life Dream Builder C-103 / XL96 Dream Builder Estate of Ruth and Murray Caines Dream Builder Canadian Breast Cancer Foundation-Atlantic Chapter Dream Builder City of Moncton Dream Builder CN Dream Builder Corey Graig Group Dream Builder In Loving Memory of Esther Fine - Isadore and Fami Dream Builder FMH Management Ltd. Dream Builder Bud and Betty Fogarty Dream Builder Harrison Trimble High School Students Assoc. Dream Builder Hillsborough Fashions Dream Builder David and Nancy Holt Dream Builder Kinsmen Club of Moncton Dream Builder Estate of Marion E. Kirk Dream Builder Len and Peggy Lockhart Dream Builder Lounsbury Company Ltd. Dream Builder Estate of Cecilia M. and Walter J. Lutes Dream Builder Ronald E. and Margurite (Peg) MacBeath Dream Builder Jon and Leslie Manship Dream Builder Freda and William Marr Dream Builder Estate of Elspeth Ross McBeath Dream Builder Modern Enterprises Dream Builder Moncton Lions Club Inc.
    [Show full text]
  • The Petitcodiac River Watershed Preliminary Water Classification Report
    The Petitcodiac River Watershed Preliminary Water Classification Report By: Eric R Arseneau Project Coordinator P.O. Box 23046 Moncton, N.B., E1A 6S8 Tel (506) 384-3369 Fax (506) 854-4824 [email protected] Your Environmental Trust Fund at Work ! Votre Fonds en fiducie pour l’Environnement au Travail ! FOREWORD The summation of this report is the result of 4 years of study relating to the water quality found within the Petitcodiac River watershed. Like the environment that we live in, this is a living document. Until this report is submitted to the Minister of Environment and Local Government, the citizens residing within this watershed still have a say in what goals they see attainable in the future for this area. This document should be viewed as a road map to what lies ahead in terms of protecting, rehabilitating and maintaining all of our water resources that touch every part of our lives. As you will see in this report, some watercourses are more impacted than others. With this in mind, it is important to remember that anything can be improved as long as we put the necessary effort into it. This report would not have been possible if not for the contribution of our dedicated volunteers who gathered water samples throughout the years, taking time during their weekends to help promote this project. For this, PWMG is forever grateful. A special thanks also goes out to all the field technicians that have worked for this organization since 1997 Georges Brun, Kevin Murphy, Pascal Levesque, Annie Haché and Shawn Craig as well as the previous coordinators Isabelle Frenette and Sandra Cashin.
    [Show full text]
  • East Bay Hills Wind Project Mi'kmaq Ecological Knowledge Study
    East Bay Hills Wind Project Mi’kmaq Ecological Knowledge Study Prepared for: Cape Breton Hydro Inc. December 2012 – Version 1 M.E.K.S. Project Team Jason Googoo, Project Manager Dave Moore, Author and Research Craig Hodder, Author and GIS Technician Mary Ellen Googoo, MEKS Interviewer John Sylliboy, MEKS Traditionalist Prepared by: Reviewed by: ___________________ ____________________ Craig Hodder, Author Jason Googoo, Manager Executive Summary This Mi’kmaq Ecological Knowledge Study, also commonly referred to as an MEKS or a Traditional Ecological Knowledge Study (TEKS), was developed by Membertou Geomatics Solutions (MGS) on behalf of Cape Breton Hydro Inc. (CBHI) for the proposed East Bay Hills Wind Power Project. This MEKS mandate is to consider land and water areas which the proposed project will utilize, and to identify what Mi’kmaq traditional use activities have occurred, or are currently occurring within, and what Mi’kmaq ecological knowledge presently exists in regards to the area. In order to ensure accountability and ethic responsibility of this MEKS, the MEKS development has adhered to the “Mi’kmaq Ecological Knowledge Protocol”. This protocol is a document that has been established by the Assembly of Nova Scotia Mi’kmaq Chiefs, which speaks to the process, procedures and results that are expected of a MEKS. The Mi’kmaq Ecological Knowledge Study consisted of two major components: • Mi’kmaq Traditional Land and Resource Use Activities , both past and present, • A Mi’kmaq Significance Species Analysis , considering the resources that are important to Mi’kmaq use. The Mi’kmaq Traditional Land and Resource Use Activities component utilized interviews as the key source of information regarding Mi’kmaq use in the Project Site and Study Area.
    [Show full text]
  • Broken Brooks Improving Acccess to Aquatic Habitat Through Diverse Partnership
    2019–2020 BROKEN BROOKS IMPROVING ACCCESS TO AQUATIC HABITAT THROUGH DIVERSE PARTNERSHIP Prepared by Shane Boyd PETITCODIAC WATERSHED ALLIANCE 0 This page was intentionally left blank. i DISCLAIMER The Petitcodiac Watershed Alliance (PWA) is a non-profit environmental charity who works to protect and improve the ecological systems within the Petitcodiac River Watershed. We use local science to educate community members within the watershed about the ecology within the Petitcodiac River’s watershed boundary, and the importance of protecting this unique river system. Photographic Credits Unless otherwise indicated, photographs, charts, and maps in this publication are courtesy of the Petitcodiac Watershed Alliance. All other photograph or map credits appear following the image caption. General Disclaimer While every effort has been made to present accurate maps and data, the Petitcodiac Watershed Alliance does not guarantee that the maps and data are correct. Users of facts presented in this report, as well as the data herein must take care to ensure that applications envisaged for these data are appropriate uses. The opinions expressed in this document are solely those of the author, and do not necessarily represent the opinion of the employees and board members of the organisation, or of the Petitcodiac Watershed Alliance. The Petitcodiac Watershed Alliance 236 St. George St., Suite 405 Moncton, NB E1C 1W1 (506) 384-3369 ii We gratefully acknowledge the support of the Atlantic Salmon Conservation Foundation, New Brunswick’s Environmental Trust Fund, Government of Canada’s Recreational Fisheries Conservation Partnerships Program, New Brunswick’s Student Employment Experience Development and Government of Canada Summer Jobs. iii Table of Contents Executive Summary .............................................................................................................
    [Show full text]
  • Support for Delineation of Inner Bay of Fundy Salmon Marine Critical Habitat Boundaries in Minas Basin and Chignecto
    Canadian Science Advisory Secretariat Maritimes Region Science Response 2015/035 SUPPORT FOR DELINEATION OF INNER BAY OF FUNDY SALMON MARINE CRITICAL HABITAT BOUNDARIES IN MINAS BASIN AND CHIGNECTO BAY Context In April 2014, the Fisheries and Oceans Canada (DFO) Species at Risk Management Division (SARMD) in the Maritimes Region requested information from DFO Science to assist with the delineation of boundaries for critical habitat (CH) being considered for Inner Bay of Fundy (IBOF) Atlantic Salmon within Chignecto Bay and Minas Basin, specifically: to assist with the delineation of the boundary between estuarine and marine habitat for several large, tidal estuaries (i.e., Petitcodiac River, Avon River, Salmon River Colchester, Shubenacadie River estuary and Cumberland Basin). DFO Science had previously provided advice on the characteristics and general location of important marine and estuarine habitat for IBOF salmon (DFO 2008; DFO 2013); however, additional information was requested to assist in delineating the precise boundaries of important marine habitat within Chignecto Bay and Minas Basin in order to subsequently propose, describe and map these as CH within an amended Recovery Strategy for IBOF salmon. Once identified in the Recovery Strategy, measures will be taken to protect this marine CH under the Species at Risk Act (SARA). This Science Response Report results from the Science Response Process of 11 July 2014 on Support for Delineation of Inner Bay of Fundy Salmon Marine Critical Habitat Boundaries. Background The inner Bay of Fundy populations of Atlantic salmon (Salmo salar) are listed as Endangered under the Species at Risk Act, and SARA requires the identification of CH for endangered species within a Recovery Strategy (or Action Plan).
    [Show full text]
  • Mike Weir Wine Master • Maître Vigneron
    Destinations TAKE ME HOME TAKE | CE MAGAZINE EST À VOUS CE MAGAZINE EST MIKE WEIR Wine Master • Maître vigneron vol. 10 n0 3 BUSINESSWOMEN DOSSIER FEMMES D’AFFAIRES MAY/JUNE 2013 MAI/JUIN 2013 ichard R onic M A word from VIA Rail Mot de VIA Rail © Coming soon to a VIA Rail train near you… Marc Laliberté Bientôt à l’affiche… President and CEO Président et chef de la direction à bord d’un train de VIA Rail Dear travellers, Chers voyageurs, Travel time on a train, unlike most other forms of travel, is useful and produc- Voyager en train, c’est rendre son temps de voyage utile et productif : le tive time; time for a peaceful meal, a conversation, time to read, or to connect temps d’un paisible repas, d’une conversation, d’une lecture, ou encore to others online. And soon, choosing to travel by train will include the option l’occasion d’une connexion avec d’autres personnes en ligne. Et pro- of entertainment on-board. Coming this spring to a train near you… VIA Rail’s chainement, choisir le train offrira l’option de se divertir à bord. Bientôt à all-Canadian on-board entertainment system. Offered to passengers in the l’affiche, ce printemps, à bord d’un train près de chez vous : le système de country's two official languages, the platform will feature CBC/Radio-Canada Divertissement à bord de VIA Rail entièrement canadien. Sera offerte aux television programs and series, documentaries and animation films from the passagers une programmation canadienne bilingue et gratuite, incluant des National Film Board of Canada, and Heritage Minute vignettes produced by The bulletins de nouvelles et émissions de télévision de CBC/Radio-Canada, des Historica-Dominion Institute.
    [Show full text]
  • Cro April Canadian National
    CRO APRIL CANADIAN NATIONAL Loaded rail train U780 is seen on the CN Waukesha Sub ducking under the UP bridge (Former CNW Adams Line) at Sussex, Wisconsin. This US Steel unit rail train for Gary, Indiana was photographed by William Beecher Jr. on March 11th. http://www.canadianrailwayobservations.com/2011/apr11/cn2242wb.htm Joe Ferguson clicked CN C40-8W 2145 in BNSF paint with CN “Noodle”, in Du Quoin, IL and CN 2146 fresh from the paint shop at Centralia on March 1st 2011. http://www.canadianrailwayobservations.com/2011/apr11/cn2146joeferguson.htm CN C40-8 2148, (which had been heavy bad-ordered at Woodcrest since received from BNSF), finally entered service February 27th sporting full CN livery. As seen in the photo, prior to her Woodcrest repaint, CN 2148 was one of the better looking ex-BNSF units still in the warbonnet paint. She now sports the thick CN cab numbers, gold Scotchlite and the web address tight to the CN Noodle. Larry Amaloo snapped the loco working in Kirk Yard just after her release. http://www.canadianrailwayobservations.com/2011/apr11/cn2148larryamaloo.htm Rob Smith took this shot of CN 2141 leading train 392 as it passes 385 on the adjacent track in Brantford, ON, January 24th. CN 2141 is significant as it was the first of the former ATSF/BNSF C40-8W’s to be repainted at Woodcrest Shop. On March 3rd CN 2141 was noted at the SOO/CP Humboldt Yard. http://www.canadianrailwayobservations.com/2011/apr11/cn2141robertsmith.htm On March 4th George Redmond clicked CN C40-8W 2138 at Centralia in fresh paint, looking like a model with no windshield wipers and detail.
    [Show full text]
  • Just A. Ferronut's September 1998 Railway Archaeology Art Clowes
    Just A. Ferronut’s September 1998 Railway Archaeology Art Clowes 234 Canterbury Avenue Riverview, NB E1B 2R7 E-Mail: [email protected] Summer seems to have flashed by so quickly! As Transcontinental Railway reached Moncton and the early 1920s, always, I am behind in both my material for R&T as well as numerous other track changes took place, but need a map and a answering various letters and e-mails that show up on my door separate article to properly describe them! step. Except for a couple of quick trips down to Hillsborough to From the 1915 construction of their rail connection see them get ex-CN 1009 ready for the TV-movie “Paradise until late 1922, all rail traffic between Moncton and both the Siding”, I tell myself I haven’t done much over the past months. NTR and ICR used about 0.75 miles of the old ICR mainline Perhaps this is not totally true, since there is always tons of un- (later the Moncton Shop Lead and presently Vaughan Harvey filed material begging to get put on the computer, etc. Now that Boulevard) between Moncton Station towards the Moncton Shop more temperate days of fall are here, I am looking forward to complex. At a point, near the present intersection of Gordon and getting in a day trip to Prince Edward Island, as well as a couple Cornhill Streets, the NTR trackage joined the ICR. From this of scouting trips north along the New Brunswick East Coast junction, rail traffic would then travel along the NTR to Pacific Railway.
    [Show full text]
  • Fort Beauséjour National Park Museum CATALOGUE of EXHIBITS
    CATALOGUE OF EXHIBITS IN THE Fort Beauséjour National Park Museum CATALOGUE OF EXHIBITS IN THE Fort Beauséjour National Park Museum PREPARED BY J. C. WEBSTER, C.M.G., M.D., D.Sc. LL.D., F.R.S.C. Member of the Historic Sites and Monuments Board of Canada HONORARY CURATOR DEPARTMENT OF MINES AND RESOURCES HON. T. A. CRERAR. Minister CHARLES CAMSELL, Deputy Minister LANDS, PARKS AND FORESTS BRANCH R. A. GIBSON, Director NATIONAL PARKS BUREAU F. H. H. WILLIAMSON, Controller OTTAWA, CANADA 43910—U FORT BEAUSËJOUR NATIONAL PARK NEW BRUNSWICK Introduction HE site of old Fort Beauséjour, located on the long ridge between the Aulac and Missaguash rivers, and over­ Tlooking Chignecto Bay, forms one of the most interest­ ing historical places in New Brunswick. The fort was originally constructed by the French between 1751 and 1755 on the orders of de la Jonquière, Governor of Canada, as a counter defence against the English Fort Lawrence, which stood on a parallel ridge about a mile and half to the south­ east. It derived its name from an early settler, Laurent Chatillon, surnamed Beauséjour, after whom the southern end of the ridge had been named Pointe-à-Beauséjour. In 1755, before its actual completion, Fort Beauséjour was attacked by an expedition from Boston under the com­ mand of Colonel the Honourable Robert Monckton. Landing at the mouth of the Missaguash river, the English force, which numbered about 2,000 New Englanders, encamped at Fort Lawrence before marching on the fort, being joined there by 300 British regulars. Following the capture of an outpost at Pont à Buot, heavy guns and mortars were landed from the boats, gun-emplacements were dug over 800 yards north of the fort, and a heavy fire was opened on the fortifi­ cations by the batteries.
    [Show full text]