Eurovision 2009 Moscow Witnesses a Record-Breaker
Total Page:16
File Type:pdf, Size:1020Kb
July_Cover:Cover 08/07/2009 16:39 Page 1 July 2009 entertainment, presentation, communication www.lsionline.co.uk Eurovision 2009 Moscow witnesses a record-breaker War of the Worlds NSDF’09 SSE Audio Group TF: Stage Lite LED The classic show on tour Technician: Impossible A long-playing record Luminaire check-up . PLUS: PLASA’09 Previewed; Underdrome at the Roundhouse; Corporate Social Responsibility; HippoSchool; Brits on Broadway; Headphones Reviewed; Audio File; Crew Cuts; Rigging Call & more . L&SI has gone digital! Register online FREE at www.lsionline.co.uk/digital Eurovision:Special Event 07/07/2009 09:04 Page 56 spectacular televised Words by Joan Lyman Photography courtesy of Procon The Eurovision Song Contest, now entering its 55th year, continues to evolve and even amaze. The 2009 contest in Moscow proved to be the biggest yet, breaking records in everything from number of viewers to roof load - precisely what the organisers wanted. Joan Lyman reports for L&SI . This year’s Eurovision was held in Moscow’s Olimpiysky Arena, safe results. Both Procon and Melzig know that unexpected site of the 1980 Summer Olympics, with a live audience of challenges need to be expected! In addition, host broadcaster 18,000 and an estimated 200 million television and internet Channel One had some big ideas on the docket. The show included some of the most elaborate Opening and Interval acts in viewers, second worldwide only to the Olympic Opening Eurovision history. These included Cirque du Soleil performing Eurovision Ceremonies. The secret weapon: a collection of a three-minute opener to 2008 winner Dima Bilan and an interval technical alums, teamed with an exceptionally ambitious team act featuring Fuerza Bruta in the final, which involved six of Russians, eager to show the world how it’s done . water-filled swimming pools lowered from the arena ceiling with performers swimming and splashing over the heads of the Procon Event Engineering of Hamburg, Germany was the main audience and the artists in Green Room. provider of technical crew and equipment for the gala of 42 songs, three opening acts, and three interval acts packed into The 2009 show also got some new-found attention from some three live broadcasts - two Semi-finals on 12 and 14 May, followed western European countries. Most improved was probably the by the Finals on 16 May. In all, 42 trailer trucks with over 400 United Kingdom, with a song composed by Andrew Lloyd Webber tonnes of technical equipment and a team of more than 70 people and performed by Jade Ewen (coming in a respectable 5th) and were required for this year’s event to handle all lighting, video, France with a composition performed by the legendary Patricia rigging and sound. Kaas. The Moscow vision was sparked the moment Russia won Sometimes, bigger really is better . Eurovision in Belgrade last year, with organisers immediately hungry With an overall span of over 100m from right to left, there was to make 2009 a landmark production in every way. Each year, more happening on stage than one could take in at a glance. technical suppliers must submit a tender to be chosen and Procon An enormous 1120sq.m Martin Professional LC LED screen won the Moscow bid in early 2009. Procon had been technical hugged a centre stage where literally every piece could fly, co-supplier for Eurovision in 2000, 2001 and 2002, Turnkey supplier separate, rotate, and display moving images. The stage design in 2006 and 2008, and had also supplied three Junior Eurovision was completed in late 2008 by another Eurovision alum, John Song Contests, so the knowledge was built into the foundation. Casey, principal designer of New York-based i.e. Design Events. Procon CEO Morten Carlsson hired Ola Melzig - who has managed Likely one of the most complicated stages in Eurovision history, it six previous Eurovisions - as production manager to further the contained approximately 2000sq.m of LED surface, moving back knowledge base. Melzig, alongside assistant production manager elements and a huge ring over the stage, which could separate Tobias Åberg (also with six previous Eurovisions under his belt) and into 12 pieces, capable of creating a myriad of stage looks. online.co.uk the rest of the Procon crew packed their cases for their 52-day stay in Moscow - a total of 3,171 hotel nights! Casey stated: “I tried to come up with a theatrical design for the contest that incorporates Russian avant garde art into Load-in began on 31 March, and not a day too soon. The Procon a contemporary setting, almost entirely made up of different www.lsi crew, led by technical production manager Matthias Rau, worked types of LED screens.” He added, “It’s an honour to act as around the clock for the next 50 days to ensure spectacular and Russia’s designer.” 56 Lighting&Sound - July 2009 Eurovision:Special Event 07/07/2009 09:04 Page 57 spectacular televised online.co.uk www.lsi Lighting&Sound - July 2009 57 Eurovision:Special Event 08/07/2009 12:52 Page 58 Crew Credits Production Manager: Ola Melzig Assisting Production Manager: Tobias Åberg Technical Production Manager: Matthias Rau Production Assistants: Joan Lyman, Olga Morr Lighting Designer: Al Gurdon Assistant to LD: Kerrie-Ann Keogh Lighting Programmers: Andy Voller, Ben Cracknell spectacular Lighting Crew Chief: Frank Karpinski Sound Designer: Klaus Rahe Sound Crew Chief: David Bergmann Video Crew Chief: Marco Scholwin, Hans Cromheecke Head Rigger: Mirko Hentze Head of Dimming: Sven ‘Klimper’ Jargstorf Head of Workshop: Björn Mittelstedt televised Chief Electrician: Ulf Richter PA Sound Operators: Bernd Buthe, Kai Reiss Logistics Manager: Manuel Vogt Monitor Operators: Karim Hubatsch, Matthias Hentschel Lighting System Engineer: Dennis Drewen, Johannes Wahl Lighting Gaffer: Rich Gorrod Best Boy: Dave Hallett Lighting Technicians: Angelika Apell, Dana Cicin-Angul, Kai Gerhardt, Maris Kruse, Maximilian Mass, Mirko Tauchert, Nadja Bartels, Olaf Pötcher, Ralf Streckmann, Robert Ulm, Veit Schlopschnat Bad Boy Technicians: Iestyn Thomas, Nick Edwards Catalyst Operator: Ian Reith Catalyst Technician: Nev Bull L&SI Digital Content Technicians: Lauren Cahill, Dave Newton Pufferfish Operator: Timo Kauristo Vision Supervisors: Chris Methven, Luke Chantrell is FREE Followspot Supervisor: Peter Canning Followspot Operators: Chris Henry, Simon Anderson, Janis Gipslis, Jack Gurdon, Elena Pozdnyanskaya, Free and Immediate access to L&SI – worldwide Galina Maksimova, Svetlana Agapova, Sergei Potapov, Ideal for emerging markets where cost of Alexander Balonuk, Andrei Mikhailov, Alexander Mikhailov, Ivan Sakharov, Sergei Supryaga, Anton subscription is high Rodionov, Yegor Volodin, Alexander Frolov, Dmitrii Great for far-flung countries who have a long wait Ostropik. for delivery Sound Stage Technicians: Rolf Gerling, Dimitry Zhukov, Daniel Borrmann Access to searchable archive of issues Sound System Engineer: Thorsten Maier Reference library of over 35 back issues of L&SI Find the company or product you’re looking for Sound Technicians: Leif Niederhuefner, Sebastian Kuhn in minutes Riggers: Axel Janssen, Fabian Rudolph, Guido Wydra, John von Look, Kai Brune, Manfred Janssen, Marcus Heinz, Martin Fruck, Martin Witte, Michael Bluhm, Access to downloadable versions of pages & articles Michael Körtge, Michael Steuber, Peder Predel, Philip Download the latest issue to read at your leisure Boht, Ralf Tieman, Ralph Matthiae, Thomas Glindmeier Download PDFs of pages for web posting or email Black Out Drapes: Sven Heidlas, Lars Köhn Media Server Managers: Jan Schröder, Mike Redmer Video Technicians: Andreas Stein, Benedikt Piaskowy, Christophe Cuyt, Daniel Zaffke, Detlef Liem, Herve’ online.co.uk Click here to register Bievelez, Jeroen Mathieu, Marcus Neumeier, Markus Doganay, Philip Hagen, Robert Förster, Svenja Bischoff, Thomas Reifferscheid, Thomas Zaorsky, Tino Müller, Xavier-John Elleboudt, Youri Mestag, Yves Van Acker, www.lsi www.lsionline.co.uk/digital Yves Winand. 58 Lighting&Sound - July 2009 Eurovision:Special Event 07/07/2009 09:04 Page 59 Visit us at PLASA Booth 1-E24 The stage was constructed by Sweden-based suspend the enormous amount of equipment Visual Act, led by Jim Fainberg, who has for the show. A combination of truss types mastered the Eurovision stage in Sweden including Prolyte and Eurotruss was hung from (2000), Estonia (2002), Latvia (2003) and Kiev 900 rigging points, suspended by 520 (2005). The stage itself was stunning, with the ChainMaster hoists. Head rigger Mirko Hentze most noticeable moving object being the stage oversaw the daily rigging, spending more time header (‘big ring’), although more than 70 in the roof than his own hotel room. movable axes were in use for the duration of the shows. Walls, ceiling, ribs, header and Although the total ceiling load of the arena was rearstage floor moved during the 32-second predetermined by the venue engineers, it was “postcard” in between each act to set the still monitored daily, since the team was adding stage for the next country. Behind the stage load to the roof almost right up to the was the Visual Act winch “farm” - with 30 broadcast. At the time of broadcast, the roof winches in a row connected to various flying load stood at an astounding 140 tonnes. There objects using over eight kilometers of wire. The was actually too much load from the winch motors were controlled by Rexroth Indra beginning, so a large scaffold was designed to Drives connected together via PROFIBUS, support an additional 40 tonnes of roof weight, moving 1000kg at 2m per second - all driven in addition to holding the Martin LC screen. Not by the Visual Act control desk. 250 of Element only did the crew have to allocate weight to the Labs’ 1m Versa-Tube HD fixtures were built into scaffold, at one point the engineers discovered the rear stage sticks, with 106 Thomas Pixeline that the roof wasn’t responding to the loads as fixtures lining the sides of the stage floor.