Mr Paul Jones by Email: Request-310153-D7f5cf65

Total Page:16

File Type:pdf, Size:1020Kb

Mr Paul Jones by Email: Request-310153-D7f5cf65 Mr Paul Jones Network Rail By email: [email protected] Freedom of Information The Quadrant Elder Gate Milton Keynes MK9 1EN T 01908 782405 E [email protected] 9th February 2016 Dear Mr Jones, Information request Reference number: FOI2016/00044 Thank you for your request of 12th January 2016. You requested the following information: I would like to know when the following current Signalling Control Centres, will technically become classed as a ROC (Rail Operating Centre), and what will/should each be definitively known as within Network Rail? I assume that it is once the Route control/TOCs are situated there, and are operating from that facility alongside signalling controllers. East Kent Signalling Centre (Gillingham) Date becomes/became ROC: ??/??/?? ROC Name/Shorthand: ??? / ??? East Midlands Control Centre (Derby) Date becomes/became ROC: ??/??/?? ROC Name/Shorthand: ??? / ??? Thames Valley Signalling Centre (Didcot) Date becomes/became ROC: ??/??/?? ROC Name/Shorthand: ??? / ??? West of Scotland Signalling Centre (Cowlairs, Glasgow) Date becomes/became ROC: ??/??/?? ROC Name/Shorthand: ??? / ??? South Wales Signalling Centre (Cardiff) Date becomes/became ROC: ??/??/?? ROC Name/Shorthand: Wales ROC (W-ROC) < known Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk Edinburgh IECC Signalling Centre (Edinburgh) Date becomes/became ROC: ??/??/?? ROC Name/Shorthand: ??? / ??? I understand that locally they'll probably be referred to informally e.g. Thames Valley Signalling Centre - TVSC, Didcot ROC, Thames Valley ROC, Western ROC etc. This is why I'd like to know Network Rails intention in their naming within the media/industry. I'd also like to know the new ROCs, and what they are to be referred as: Three Bridges ROC (TB-ROC) < known Manchester ROC (M-ROC) < known York ROC (???) Basingstoke ROC (???) Rugby ROC (???) Romford ROC? (???) I have processed your request under Freedom of Information Act 2000 (FOIA). I can confirm that we hold some of the information you requested. For ease of reference I have reproduced your request in a similar format using the table below. Signalling Centre/ROC Additional Information East Kent Signalling Centre (Gillingham) I can inform you that East Kent is an Date becomes ROC: UNKNOWN older facility and requires significant ROC Name/Shorthand: enhancements to reach the agreed ROC East Kent ROC / EKROC standard; therefore the date that this will happen is currently unknown. You may also be interested to know that it only houses the signalling operations function for the foreseeable future, until the electrical control functions migrates (subject to confirmation). East Midlands Control Centre (Derby) Date became ROC: Roughly 2014 ROC Name/Shorthand: East Midlands Rail Operating Centre (EMROC) Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk Signalling Centre/ROC - Continued Additional Information Thames Valley Signalling Centre (Didcot) The name change will occur at TVSC Date becomes ROC: likely 2016 when the first West Country signalling ROC Name/Shorthand: location migrates to Didcot Great Western Rail Operating Centre (GWROC) West of Scotland Signalling Centre (Cowlairs, The West of Scotland Signalling Centre Glasgow) (WSSC) was built as a Signalling Centre Date becomes/became ROC: Sept 2015 originally to house Signalling Control for ROC Name: West of Scotland ROC the West of Scotland from 2006-2008 and was commissioned in December 2008. The national strategy changed and we wanted Signalling Control and Control(s) merged together for a marked improvement in managing the timetable. We now refer to WSSC as the West of Scotland ROC as both Signalling and Control are in the same building and indeed the operating floor. South Wales Signalling Centre (Cardiff) Date became ROC: 2010 ROC Name/Shorthand: Wales ROC (W-ROC) Edinburgh IECC Signalling Centre (Edinburgh) I can inform you that Edinburgh Date becomes UNKNOWN Integrated Electronic Control Centre ROC Name: East of Scotland ROC (IECC) is still a Signalling Centre. IECC is a power signal box where all data displays, safety interlocking, etc are computer controlled and under normal circumstances trains are signalled automatically according to their Train ID. The date the Edinburgh IECC SC will become the East of Scotland (Edinburgh ROC) is presently not confirmed. Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk I can also confirm that not all the ROCs are abbreviated please see the current ROC list below. Three Bridges ROC (T-BROC) Manchester ROC (M-ROC) York ROC Basingstoke ROC Rugby ROC Romford ROC If you have any enquiries about this response, please contact me in the first instance at [email protected] or on 01908 782405. Details of your appeal rights are below. Please remember to quote the reference number at the top of this letter in all future communications. Yours sincerely, Rebecca Lindsay Information Officer The information supplied to you continues to be protected by copyright. You are free to use it for your own purposes, including for private study and non-commercial research, and for any other purpose authorised by an exception in current copyright law. Documents (except photographs) can also be used in the UK without requiring permission for the purposes of news reporting. Any other re-use, for example commercial publication, would require the permission of the copyright holder. Please contact me if you wish to re-use the information and need to seek the permission of the copyright holder. Appeal Rights If you are unhappy with the way your request has been handled and wish to make a complaint or request a review of our decision, please write to the FOI Compliance and Appeals Manager at Network Rail, Freedom of Information, The Quadrant, Elder Gate, Milton Keynes, MK9 1EN, or by email at [email protected]. Your request must be submitted within 40 working days of receipt of this letter. If you are not content with the outcome of the internal review, you have the right to apply directly to the Information Commissioner for a decision. The Information Commissioner can be contacted at: Information Commissioner's Office Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk Wycliffe House Water Lane Wilmslow Cheshire SK9 5AF Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk .
Recommended publications
  • ATOC Guidance Note – Risks & Opportunities from Rocs and TM
    Uncontrolled When Printed Document comes into force on 24/05/2016 Published by RSSB on behalf of Association of Train Operating Companies (ATOC) on 03/09/2016 ATOC/GN036 Issue 1.1 24 May 2016 ATOC Guidance Note – Risks & Opportunities from ROCs and TM Submitted by Steve Price Synopsis Operations Planning Advisor, ATOC This document provides guidance to train operators on identifying the risks Authorised by: and opportunities that arise from the introduction of Rail Operating Centres and Traffic Management. Roger Cobbe Chair, ATOC ERTMS Steering Group Gary Cooper Director of Operations, Engineering and Major Projects, ATOC Uncontrolled When Printed Document comes into force on 24/05/2016 Published by RSSB on behalf of Association of Train Operating Companies (ATOC) on 03/09/2016 ATOC Guidance Note - Risks & Opportunities ATOC/GN036 Issue 1.1 from ROCs and TM May 2016 Contents Section Description Page Part A Issue Record 3 Responsibilities 3 Explanatory Note 3 Document Status 3 Supply 3 Part B 1 Purpose 4 2 Scope 4 3 Definitions 4 4 Introduction 4 5 Industry Standards and Governance 8 6 Rail Operating Centres 11 7 Traffic Management 19 8 Reference Material 40 9 Abbreviations 41 Appendices A Three models of control co-location 42 B Upgrading stock & crew provision Case Study 1 45 C Upgrading stock & crew provision Case Study 2 47 D Checklist of Train Operator Responsibilities and Actions – Activities moving to a ROC 50 E Checklist of Train Operator Responsibilities and Activities – Introducing TM 52 Page 2 of 53 Uncontrolled When Printed Document comes into force on 24/05/2016 Published by RSSB on behalf of Association of Train Operating Companies (ATOC) on 03/09/2016 ATOC Guidance Note - Risks & Opportunities ATOC/GN036 Issue 1.1 from ROCs and TM May 2016 Part A Issue Record This document will be updated when necessary by distribution of a complete replacement.
    [Show full text]
  • Report on Railway Accident with Freight Car Set That Rolled Uncontrolledly from Alnabru to Sydhavna on 24 March 2010
    Issued March 2011 REPORT JB 2011/03 REPORT ON RAILWAY ACCIDENT WITH FREIGHT CAR SET THAT ROLLED UNCONTROLLEDLY FROM ALNABRU TO SYDHAVNA ON 24 MARCH 2010 Accident Investigation Board Norway • P.O. Box 213, N-2001 Lillestrøm, Norway • Phone: + 47 63 89 63 00 • Fax: + 47 63 89 63 01 www.aibn.no • [email protected] This report has been translated into English and published by the AIBN to facilitate access by international readers. As accurate as the translation might be, the original Norwegian text takes precedence as the report of reference. The Accident Investigation Board has compiled this report for the sole purpose of improving railway safety. The object of any investigation is to identify faults or discrepancies which may endanger railway safety, whether or not these are causal factors in the accident, and to make safety recommendations. It is not the Board’s task to apportion blame or liability. Use of this report for any other purpose than for railway safety should be avoided. Photos: AIBN and Ruter As Accident Investigation Board Norway Page 2 TABLE OF CONTENTS NOTIFICATION OF THE ACCIDENT ............................................................................................. 4 SUMMARY ......................................................................................................................................... 4 1. INFORMATION ABOUT THE ACCIDENT ..................................................................... 6 1.1 Chain of events ...................................................................................................................
    [Show full text]
  • Archives) INFORMED SOURCES E-Preview December 2018
    Informed Sources e-preview by Roger Ford (view all archives) INFORMED SOURCES e-Preview December 2018 INFORMED SOURCES e-Preview December 2018 Some old favourites return this month including an update on the spread of zombie franchises and a farewell to the Traffic Management System (TMS) procurement which has kept us diverted for the last nine years. Steventon Bridge highlights APCO challenge Explosion of the Zombie franchises. TMS boondoggle ends with a whimper Informed Updates However, we start with the practical implications of the Department for Transport’s cunning plan to cut costs by not providing clearances for electrification at bridges and tunnels. Instead, you buy bi-mode trains, which can drop the pantograph and run through tunnels and other height restrictions under diesel power. This would be achieved, quite painlessly, with the use of Automatic Power Change Over (APCO). Back in November 2017 I revealed that the first opportunity to test this concept would be on the Great Western Main Line at Steventon High Street Bridge west of Didcot. The problem is not the clearance under the bridge itself, where Special Reduced Clearance has been used. However, approaching the bridge from the West, the adjacent Stocks Lane level crossing requires the contact wire to be at maximum height, before reducing to the minimum height for the bridge in about a quarter of a mile. As the contact wire height falls, the wire is pushing the pantograph head down and for every action there is an equal and opposite reaction, which is not good for either the catenary or the pan’.
    [Show full text]
  • October 2019
    News October 2019 Ladbroke Grove Resilience Back to basics what have we learnt and the digital railway fundamentals of train control systems back to business Saying goodbye to summer is always hard but why not get back to business and improve your existing knowledge or start afresh as a signalling engineer. Here at Signet Solutions we've got courses to suit all! Our training school is here to offer excellent value for money, training to meet each customer’s requirements, and not to mention fully qualified and competent trainers to ensure each trainee’s needs are met...what more could you want? Take a look online at our courses coming up, our friendly staff will be happy to give you all the information you’ll need when booking a course. +44 (0)1332 343 585 [email protected] www.signet-solutions.com back to business People resilience Issue 259 This month’s IRSE News features a number of articles exploring the topic of engineering resilience. Resilience on the railway can mean the ability to keep the October 2019 railway running during equipment failure, or during environmental events such as bad weather, but it can also mean the ability to cope with changes in the workforce and the skillsets expected of them. Resilience also applies to human health with In this issue evidence showing that serious harm to physical and mental well-being can be caused by stress at work. A recent newspaper article claimed that the incidence of mental issues in the Feature articles construction industry is greater than average, with suicides occurring in extreme cases.
    [Show full text]
  • Technical Strategy June 2013
    Technical Strategy June 2013 A future driven by innovation Go to contents Summary 2 Network Rail Limited Technical Strategy Go to contents Summary Themes “ We see a future that challenges the limits of our current technical approaches. A future where we must increasingly rely on our Asset themes ability to exploit a rich stream of innovation.” Richar d Parry-Jones Enablers Chairman Next steps Glossary Network Rail Limited Technical Strategy 1 Go to contents Go to contents Foreword In compiling the NRTS, we have been The challenge of the future railway requires dramatic and sustained change to the way we operate, manage and improve driven by the desire to offer customers the railway system. That future must be driven by innovation, & passengers a better rail journey identifying and bringing into use technical solutions that experience and by the need to deliver improve the railway across all our key outcomes: safety, performance, customer experience, capacity, cost-efficiency our business outcomes. and sustainability. Network Rail’s success relies on highly technical and complex systems engineering. Our capability today enables us to The industry’s Rail Technical Strategy (RTS) was launched by operate and maintain one of the most intensively used railway the Technical Strategy Leadership Group in December 2012 networks in the world whilst delivering major upgrades to the which presented a vision of the future railway. In so doing, it infrastructure. Of course we don’t do this alone. Our network called for the industry to step forward and convert the vision of carries trains as part of a railway system which in turn carry the RTS into reality.
    [Show full text]
  • The Banbury Bulletin the Rotary Club of Banbury Rotary International Club No
    The Banbury Bulletin The Rotary Club of Banbury Rotary International Club No. 19229 District 1090 President Owen Kyffin www.banburyrotaryclub.org.uk Banbury.Rotary @BanburyRotary October 2016 The October Diary 2nd Canal Day 5th Community & Vocational Committee 5th Classification & President Owen’s September round up Membership Committee Well September saw a busier time in Club and out and about. 7th Rotary Meeting nd 8th Stroke Awareness Day After Club meeting on Friday 2 September saw me joining Neil and John Brodey at Norbar Torque Tools where they were 12th Foundation Committee interviewing the two candidates for the Brodey Bursary James 13th District Darts Gregory and Octavia Lewis. 14th Rotary Meeting I am delighted to say both were successful and can been seen 17th District Meet the Scholars here receiving their first cheque. 18th Sports & Entertainment Committee 19th World Polio Day 19th Youth Services Committee 19th International Committee 20th Meet the Scholars 21st Rotary Meeting 26th Council Meeting 28th Rotary Meeting 31st Ardley Energy Recovery Facility Visit For the full year’s diary visit As you will all know the Brodey bursary was created by the www.banburyrotaryclub.org.uk Brodey family to help encourage and support engineering students. Rotary are very grateful to the Brodey family and Norbar for their continued support. Page 1 On Monday 5th September we enjoyed an evening Saturday 24th saw a number of our Club join of fun and fellowship at Banbury Cricket Club Banbury Inner Wheel Club at their Big Band where we playing a fiercely contested Aunt Sally Concert at Tudor Hall School.
    [Show full text]
  • Western Route Strategic Plan V7
    Route Strategic Plan Western Route Version 7.0: Strategic Business Plan submission 2nd February 2018 Western Route Strategic Plan Contents Section Title Description Page 1 Foreword and summary Summary of our plan giving proposed high level outputs and challenges in CP6 3 2 Stakeholder priorities Overview of customer and stakeholder priorities 14 3 Route objectives Summary of our objectives for CP6 using our scorecard 26 4 Activity prioritisation on a page Overview of the opportunities, constraints and risks associated with each objective area, the 32 controls for managing these and the resulting output across CP5 and CP6 5 Activities & expenditure High level summary of the cost and activity associated with our plan based on the prioritisation in 41 section 4 6 Customer focus & capacity strategy Summary of customer and capacity themed strategies that will be employed to deliver our plan 66 7 Cost competitiveness & delivery strategy Summary of delivery strategies that will be employed, and of headwinds and efficiency plans 69 accounted developed to date 8 Culture strategy Summary of the culture themed strategies that will be deployed to deliver our plan 80 9 Strategy for commercial focus Summary of our strategy and plans to source alternative investment 86 10 CP6 regulatory framework Information relating to our revenue requirement and access charging income 88 11 Sign-off Senior level commitment from relevant functions 91 Appendix A Joint performance activity prioritisation by Overview of the opportunities, constraints and risks associated
    [Show full text]
  • Grade Crossings - Handbook
    GRADE CROSSINGS - HANDBOOK 2016-12-14 RDIMS # 12526323 This document is meant to be used in conjunction with the Grade Crossings Regulations as well as the Grade Crossings Standards. i TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................ II FORWARD ............................................................................................................................................ 1 PART A – PREFACE .................................................................................................................................... 2 BACKGROUND ..................................................................................................................................... 2 OBJECTIVES ........................................................................................................................................ 3 DESCRIPTION ...................................................................................................................................... 4 ARTICLE 1 – INTERPRETATION ......................................................................................................... 7 ARTICLE 1.1 – AREMA INTERPRETATIONS ................................................................................... 13 ARTICLE 2 – CITATIONS ................................................................................................................... 14 ARTICLE 3 – UNITS OF MEASUREMENT .......................................................................................
    [Show full text]
  • Signalling and Traffic Management
    House of Commons Transport Committee Rail technology: signalling and traffic management Seventh Report of Session 2016–17 Report, together with formal minutes relating to the report Ordered by the House of Commons to be printed 17 October 2016 HC 67 Published on 27 October 2016 by authority of the House of Commons Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its associated public bodies. Current membership Mrs Louise Ellman MP (Labour (Co-op), Liverpool, Riverside) (Chair) Robert Flello MP (Labour, Stoke-on-Trent South) Mary Glindon MP (Labour, North Tyneside) Karl McCartney MP (Conservative, Lincoln) Stewart Malcolm McDonald MP (Scottish National Party, Glasgow South) Mark Menzies MP (Conservative, Fylde) Huw Merriman MP (Conservative, Bexhill and Battle) Will Quince MP (Conservative, Colchester) Iain Stewart MP (Conservative, Milton Keynes South) Graham Stringer MP (Labour, Blackley and Broughton) Martin Vickers MP (Conservative, Cleethorpes) Powers The Committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication Committee reports are published on the Committee’s website at www.parliament.uk/transcom and in print by Order of the House. Evidence relating to this report is published on the inquiry publications page of the Committee’s website. Committee staff The current staff of the Committee are Gordon Clarke (Committee Clerk), Nehal Bradley-Depani (Second Clerk), James Clarke (Committee Specialist), Andrew Haylen (Committee Specialist), Daniel Moeller (Senior Committee Assistant), Michelle Owens (Committee Assistant) and Estelle Currie (Media Officer).
    [Show full text]
  • (CCS) and Migration to ERTMS
    FEASIBILITY STUDY REFERENCE FEASIBILITY STUDY REFERENCE SYSTEM ERTMS FinalSYSTEM Report ERTMS DigitalisationFinal Report of CCS (Control Command and Signalling) and MigrationDigitalisation to ERTMS of CCS (Control Command and Signalling) and Migration to ERTMS European Railway Agency - 2017 23 OP European Railway Agency - 2017 23 OP 14 AUGUST 2018 14 AUGUST 2018 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS Contact ANDRÉ VAN ES Arcadis Nederland B.V. P.O. Box 220 3800 AE Amersfoort The Netherlands Our reference: 083702890 A - Date: 2 November 2018 2 of 152 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS CONTENTS 1 INTRODUCTION 9 1.1 EU Context of Feasibility Study 9 1.2 Digitalisation of the Rail Sector 9 1.3 Objectives of Feasibility Study 11 1.4 Focus of Feasibility Study 11 1.5 Report Structure 12 2 SCOPE AND METHODOLOGY 13 2.1 Methodology 13 2.2 Scope Addition 15 2.3 Wider Pallet of Interviewed Parties 15 2.4 Timeframes 19 3 INFRASTRUCTURE MANAGERS 20 3.1 Findings and Trends Infrastructure Managers 20 3.2 Reasons for Replacing Non-ETCS Components 28 3.3 Short-Term versus Long-Term 31 4 OPERATING COMPANIES 33 4.1 Dutch Railways (NS) 33 4.2 DB Cargo 35 4.3 RailGood 36 4.4 European Rail Freight Association 37 4.5 Findings and Trends Operating Companies 38 5 RAIL INDUSTRY SUPPLIERS 40 5.1 Supplier 1 40 5.2 Supplier 2 41 5.3 Supplier 3 42 5.4 Supplier 4 42 5.5 Supplier 5 42 Our reference: 083702890 A - Date: 2 November 2018 3 of 152 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS 5.6 Findings and Trends Suppliers 43 6 RAILWAY INDUSTRY DEVELOPMENT INITIATIVES
    [Show full text]
  • Siemens Completes Major Christmas Commissionings
    Press Chippenham, UK 22 January 2015 Siemens Completes Major Christmas Commissionings Over the recent Christmas and New Year period, project teams from Siemens Rail Automation successfully commissioned a series of major main line programmes. Over a ten-day blockade between Christmas Eve and 5 January, the company completed the signalling work for Stage L of the Reading Station Area Redevelopment programme. Representing the third of four major commissionings for the seven-year project, Siemens commissioned an upgrade to three Trackguard Westlock interlocking systems and brought two new signal gantries into service. This was part of the programme which saw the introduction of a 1.7 kilometre viaduct to carry the Great Western Main Lines into Reading station through a fully re-modelled track layout. The majority of the signalling and telecommunications work covered the installation of trackside equipment and cabling – all fully tested back to Siemens’ Trackguard Westlock data interlocking at Network Rail’s Thames Valley Signalling Centre. The relief lines were handed back into use on 27 December, enabling passenger lines to be brought back into service as soon as possible, with the main lines being handed back on 5 January. Following a major blockade, Siemens’ delivery team also handed back the low level station at London Bridge on 5 January. The commissioning took place from midnight on 20 December and marked an important chapter in the station’s development, with the introduction of the last two of six new terminal platforms at the station. The sheer volume of work that needed to be completed was a huge challenge for all involved, not only in terms of the resignalling work, with the transfer of control to Network Rail’s new Rail Operating Centre at Three Bridges, but also due to the significant track and station works that needed to be conducted at the same time.
    [Show full text]
  • A Review of the Thameslink Programme
    The Institution of Railway Signal Engineers Inc Australasian Section Incorporated A Review of the Thameslink Programme Georgina Hartwell MEng (Hons) AMIRSE MIET Network Rail Consulting SUMMARY The aim of this paper is to provide a project description and update to Network Rail’s Thameslink Programme in London. It discusses the history behind the programme and key design considerations. The paper then goes on to look at the reasons behind the decision to implement ATO over ETCS Level 2, before explaining some of the supporting projects and work-streams. In order to successfully commission ATO, a migration strategy and comprehensive set of system proving is required; testing activities are discussed in the paper. Finally, examples of best practice and lessons learned are given, before highlighting key considerations to be made by other high capacity infrastructure projects. 1 INTRODUCTION 3 WHAT IS THAMESLINK? Opened in 1988, the Thameslink route runs along the 3.1 Three Stages North – South plane of London, connecting services KO0 was completed in March 2009 and saw the number through the heart of the city. It currently covers 68 stations and 225km of track, with the majority of services running of trains per hour (tph) through the core area increase from Bedford to Brighton via London Bridge. The route from 8 to 15 in the peak. serves two airports, London Luton and London Gatwick, KO1 was completed in December 2011, introducing 12 as well as King’s Cross St Pancras where connections to car trains across the whole route, along with an increased Eurostar services can be made.
    [Show full text]