1 List of Holiday Homes on Indian Railways O. of Suites Location

Total Page:16

File Type:pdf, Size:1020Kb

1 List of Holiday Homes on Indian Railways O. of Suites Location List of Holiday Homes on Indian Railways Location o. of suites Address to whom applications Group Group C should be addressed A & B & D Central Railway 1 Matheran 4 -- Sr.DE, CST Mumbai -- 9 DRM(W), CST Mumbai 2 Lonavala -- 3 DRM(W), CST Mumbai -- 4 PA/DRM, CST Mumbai 3 Igatpuri -- 2 DRM(W), CST Mumbai 4 Mahabaleshwar 4 -- DGM (G). -- 16 PA/DRM. 5 Pandharpur -- 2 DRM (P), Solapur. 6 Dadar -- 6 DRM (W), CST Mumbai 7 Baidyanath Dham -- 6 CPO, E.Rly, Kolkatta 8 Puri 2 10 -do- 9 Darjeeling 3 4 -do- 10 ainital 4 7 -do- 11 Haridwar 3 6 -do- orthern Railway 12 Shimla 7 13 (C) AE/R/Ambala 2 (D) 2 (A) 4 (C) Secretary, 1 (B) 1 (D) Railway Board. 13 Barog 2 (B) 2 (C) AE/.Rly./Ambala 14 Baijnath Paprola 2 (B) 2 (C) IOW/Palampur 15 Manali 3 (A) -- DRM/Firozpur Cant. Jn 2 (B) 1 (B) -- Secretary, Rly. Board 16 Haridwar -- 2 DRM/R/Moradabad 17 ainital 2 2 (C) Secretary, 1 (D) Railway Board 18 Mussoorie 2 2 four DSE (C), Moradabad bedded dormi- tories 19 Badrinath 2 2 DSE (C), Moradabad orth Eastern Railway 20 ainital 14 10 DRM/G, APO(W) & Sr.DE/Izzatnagar 1 21 Ranikhet 2 2 Sr.DE/ Izzatnagar 22 Varanasi -- 3 Sr.DE/ER/Varanasi 23 Allahabad City -- 3 AE or APO(W)/ E Rly., Varanasi ortheast Frontier Railway 24 Shillong 3 4 Sr.DE/F Rly./Pandu 25 Kurseong 3 10 bedded AE/F Rly., dormi- Siliguri Jn. tory 26 Craigment at 2 -- Secy. to GM, F Rly, Maligaon. Darjeeling 27 Darjeeling -- 4 -do- (Subordinate) 28 ainital 1 1 -do- Southern Railway 29 Madurai -- 5 DPO/S.Rly./Madurai 30 Courtallam 2 6 -do- 31 Rameswaram -- 2 -do- 32 Palani -- 2 -do- 33 Kanniyakumari 6 4 Sr.DPO/S.Rly./ Trivandrum 34 Coonoor -- 4 DPO/S.Rly./Palakkad 35 Udagamandalam -- 8 -do- (Ooty) South Central Railway 36 Kolva Beach 2 2 Sr.DPO/SCR/Hubli (Vascodagama) 37 Tirupathi 6 9 Sr.DPO/SCR, (Rly. Station) Guntakal 38 Aurangabad 2 2 Sr. DPO/ SCR, (Rly. Station) Hyderabad. South Eastern Railway 39 Puri -- 8 Dy.CPO(W)/Garden Reach, Kolkatta. 40 Darjeeling -- 4 -do- 41 Ranchi -- 4 -do- 42 Digha 4 -- DGM (G) -- 2 Suites + DPO (I)/Kharagpur Jn. 4 bedded dormi- tory 43 Araku 2 -- Sr.DE/Coord/Waltair -- 6 bedded Sr.DPO/Waltair dormi- tory 2 Western Railway 44 Agra (Idgha) -- 4 DRM (E), Kota 45 Pali Hill, Bandra -- 8 (C) DRM (E), (Mumba) 2 (D) Mumbai Central 46 Lonavala -- 2 -do- 47 Udaipur -- 14 DRM (E), Ajmer -- 2 SPO (W), Churchgate 48 Mount Abu 4 -- 3 under PA/CE 1 under DRM/Ajmer -- 13 DRM(E), Ajmer 2 SPO (W), Church Gate. 49 Verawal (Gujarat) -- 4 DRM (E), Bhavnagar 50 Dwarka (Gujaraj) -- 3 DRM (E), Rajkot -- 1 SPO (W), Churchgate 51 Gholvad 3 -- DRM/ Mumbai Central 52 Convalscent Home: -- 2 (C) SPO/W/Church Gate. Bandra 1 (D) orth Western Railway 53 Jaipur -- 4 DRM (E), Jaipur West Central Railway 54 Pachmarhi -- 3 Sr.DPO, Jabalpur South Western Railway 55 Mysore (Rly.Stn.) -- 5 DPO, Mysore. Integral Coach Factory, Chennai 56 Udagamandalam -- 4 Welfare Officer/ICF. (Ooty) Rail Coach Factory, Kapurthala. 57 Patni 2 4 Dy.GM/G/RCF Chittaranjan Locomotive Works, Chittaranjan 58 Puri -- 2 CPO/CLW, Chittaranjan Diesel Locomotive Works, Varanasi 59 ainital 1 -- Secy. to GM/DLW 60 Puri 1 1 Secy. to GM/DLW ote: 1. (C) means Group-C (D) means Group-D. 2. Unless specified, the Suites under Column-2 are both for Group-A and B and under Column-3 for both Group-C and D. 3 .
Recommended publications
  • Presentation to General Manager NC Railway by Suresh Kumar
    26-08-2019 Presentation to General Manager NC Railway By Suresh Kumar Executive Director/RailTel 1 1 26-08-2019 Introduction - Formation of RailTel • In pursuance of National Telecom Policy 1999, and opening of Telecom sector, RailTel was created as Schedule ‘A’ PSU on 26th SEP’2000. • Objectives: To facilitate Railways in expeditiously modernizing train operation and safety systems by providing state of art communication network infrastructure. To develop, operate and maintain a nationwide broadband telecom and multimedia network to supplement national telecom infrastructure in all parts of country specially rural, remote and backward areas. To generate revenue through commercial exploitation of its surplus capacity. 2 2 26-08-2019 Introduction • Revised Agreement with Rlys Signed in Oct 2006 for 30 yrs • Exclusive Right of Way along Railway route & land to RailTel. • RailTel to pay 7% revenue share to Rlys in lieu of RoW. • Authorised capital ₹ 1000 Cr., Paid up capital ₹ 321 Cr. (seed ₹ 15 Cr. & ₹ 306 Cr. by assets). • Provide Bandwidth, data, internet & value added services to Rlys • Dividend paying Company since FY 2008 & Debt Free (Loan of ₹ 400 Cr. taken from IRFC/SBI has been repaid). • Holds National Long Distance (NLD), Internet service provider (ISP), International long distance (ILD) licenses and IP-1 registration from DoT. • Revenue share of 8% payable to DoT. 3 3 26-08-2019 Growth of Revenue of operations 45000 40000 35000 30000 25000 20000 15000 10000 5000 0 (Rs. In Lakh) (Rs. in Lakh ) FY 2012-13 (Rs. In FY 2013-14 (Rs. In FY 2014-15 (Rs. In FY 2015-16 (Rs.
    [Show full text]
  • History of Rail Transportation and Importance of Indian Railways (IR) Transportation
    © IJEDR 2018 | Volume 6, Issue 3 | ISSN: 2321-9939 History of Rail Transportation and Importance of Indian Railways (IR) Transportation 1Anand Kumar Choudhary, 2Dr. Srinivas Rao 1Research Student, MATS University, Raipur, Chhattisgarh, India 2MATS school of Management Studies and Research (MSMSR), MATS University, Raipur, Chhattisgarh, India ____________________________________________________________________________________________ Abstract-Transportation is important part of people which is directly and indirectly connected with people. Its enable trade between people which is essential for the development of civilization. Various authors have described number of dimension regarding the Indian Railways. This study explains history of rail transportation and also describe journey of railway in India and discuss importance about rail transportation. Keywords- History of Rail Transport and Indian Railways, Organisation Chart of IR 1. Introduction Transportation is the backbone of any economic, culture, social and industrial development of any country. Transportation is the movement of human, animal and goods from one location to another. Now a day we are using so many method for transporting like air, land, water, cable etc. transportation is find installation infrastructure including roads, airway, railway, water, canels and pipelines and terminal (may be used both for interchange of passenger and goods). 2. Rail Transport Rail transport is where train runs along a set of two parallel steel rails, known as a railway or railroad. Passenger transport may be public where provide fixed scheduled service. Freight transport has become focused on containerization; bulk transport is used for large volumes of durable item. Rail transport is a means of transferring of passenger and goods on wheeled running on rail, also known as tracks, tracks usually consist of steel rails, installed on ties (sleepers) and ballast.
    [Show full text]
  • Indian Railway Gov in Notification
    Indian Railway Gov In Notification Exsert Sylvester gallants untruly, he gazetting his prologs very boyishly. Incognita and electrophysiological Yance wrinkles some douser so elatedly! Pithily inescapable, Thane blow-outs massiness and unhands octonary. Also having the gatiman express trains clerks, are usually denote the rrb exam application is hard work for group d posts of railway official recruitment? Lakhs of railways has started to blw are different regions. Trains was mainly used in indian railways hiring at hssc. Indian railways in indian railways hiring process of train. By indian railway in the notifications for apply online application form is submitted copy of pay for? Railway Recruitment Board Siliguri Home. Welcome to RRB Jammu-Srinagar. RRB JE Recruitment 2019 Apply online for 14033 JE and. Indian Railways has released its another recruitment drive for most East. Indian Railway change the largest railway brought the delinquent and offers lot of jobs opportunities for. Final year indian railways in notification no further more details vary from various competitive examination. Corrigendum of CAC Gazette NotificationCAC Gazette NotificationClarification on Reimbursement under NAPS OM for category of ApprenticesSSC's CEO as. For indian railway notification from. IRCTC Indian Railways 0 New Special Trains To Run case Today. IMPORTANT point any NoticeInformation regarding Railway Recruitment Board RRB the. Ease by doing them with Railway gets solid boost. Printing machine in indian railway recruitment notification apply for various central railway. Government of India Ministry of Railways Railway Recruitment Boards CENTRALISED EMPLOYMENT NOTICE CEN No03201 Recruitment of JE JEIT. Final on full table format of the largest government jobs on hrms portal will be appointed based on river, if you all the status for? See cut off for rrb recruits lakhs in bid security declaration by the salary of candidates for these.
    [Show full text]
  • E-Tender for Supply, Installation & AMC of Water Purifiers In
    CIN -U74899DL1999GOI101707 Website -www.irctc.com; e-mail- [email protected] INDIAN RAILWAY CATERING AND TOURISM CORPORATION LIMITED E-TENDER DOCUMENT E-Tender No. IRCTC/RN/Water Purifiers /2019 dated 19-07-2019 E-Tender for Supply, installation & AMC of Water Purifiers in coaches of all Rajdhani/Duronto/Shatabdi/Tejas/Vande Bharat/Gatimaan trains Date and Time of : 16-08-2019 by 1500 hrs. Opening of Tenders (Technical Bid – Part A) Place of Opening of : Indian Railway Catering and Tourism Corporation Tenders Limited, 11th Floor, Statesman House, B- 148, Barakhamba Road, Connaught Palace, New Delhi – 110 001 Address for : Group General Manager/Procurement, Indian Communication Railway Catering and Tourism Corporation Limited, 11th Floor, Statesman House, B- 148, Barakhamba Road, Connaught Palace, New Delhi – 110 001 Earnest Money Deposit : Rs 1 Lakh (Rupees one lakh) as per details given in “Instructions to tenderers” Approx. Value of E- : Rs. 118 lakh tender E-tender form price : Nil Pre-Bid Meeting : 26-07-2019 at 1500 Hrs. in IRCTC Corporate office 1 INDEX Sl. Description Page No. No. 1 Disclaimer 3 2 Notice Inviting Tender 4 3 Instructions To Tenderers 6 4 Standard conditions of contract (Annexure – 1) 10 5 Scope of Work & Special Condition of Contract (Annexure – II) 22 6 Eligibility Criteria (Annexure – III) 23 7 Technical Specification (Annexure – IV) 26 8 Price schedule (Annexure – V) 27 9 Derails of trains and assessment of Water Purifiers (Annexure – 28 VI) 2 DISCLAIMER The information contained in this Bid document or subsequently provided to the Bidder(s), whether verbally or in documentary form by or on behalf of the IRCTC or any of their employees or advisors, is provided to the Bidder(s) on the terms and conditions set out in this Bid Document or any other terms and conditions subject to which information is provided.
    [Show full text]
  • 20.12 Hrs. 1996*97 RAILWAYS BUDGET
    337 Railway Budget, 1996-97 and SRAVANA 3, 1918 (Saka) Demands for Grants on Account (Rly.) 338 further to amend the Representation of the People constituency This proposed Dullabcherra-Ranpur Act, 1950 and the Representation of the People Act. Branch Section is in Karimganj district of Assam People 1951. of that backward area have been demanding for the MR. CHAIRMAN : The question is : same since 1977, But till this date, nothing has been done. Further the Badarpur railway junction in Kanmganj “That leave be granted to introduce a Bill district of Assam should be upgraded as a railway further to amend the Representation of the division which has been assured by the previous People Act. 1950. and the Representation of Congress Government as it is the nerve centre of rail the People Act 1951.’ service in Southern Assam. The motion was adopted Next, the proposed broad gauge line should be SHRI RAMAKANT D. KHALAP : I introduce the Bill extended from Lumding to Kumarghat in Tripura via Badarpur as it is the lifeline connecting Tripura with Assam Of course, the broad gauge line should be extended to Silchar via Badarpur as provided in the 20.12 hrs. Budget It is a long-pending demand I hope that the 1996*97 construction of the broad gauge line would be taken up very soon But the budgetary provision for this broad RAILWAYS BUDGET - GENERAL DISCUSSION gauge line is so small that I think within 10-15 years it cannot be completed AND Construction of Lala Bhairangti line in Katakhal- DEMANDS FOR GRANTS ON ACCOUNT Bhairabi branch section in Hailakandi
    [Show full text]
  • SYNOPSIS of DEBATES (Proceedings Other Than Questions & Answers) ______
    Not for Publication For Members only LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Monday, March 15, 2021 / Phalguna 24, 1942 (Saka) ______ ANNOUNCEMENT BY THE SPEAKER HON. SPEAKER: On my own behalf and on behalf of the hon. Members of the House, I have great pleasure in welcoming His Excellency, Shri Duarte Pacheco, the President of the Inter-Parliamentary Union (IPU) who is on a visit to India as our hounoured guest. He arrived in India on Sunday, 14th March, 2021. Today he is seated in the Special Box. Apart from Delhi, he will visit Agra and Goa also before departing from India on Saturday, 20th March 2021. We wish him a happy and fruitful stay in our country. Through His Excellency, we convey our greetings and best wishes to all the hon. members in the IPU, the Government and the great people of Portugal. ________ STATEMENT BY THE MINISTER Re: Recent Developments Pertaining To The Welfare Abroad Of Indians, Non-Resident Indians And Persons Of Indian Origin In The Covid Situation THE MINISTER OF EXTERNAL AFFAIRS (DR. SUBRAHMANYAM JAISHANKAR): I rise to apprise this august House of recent developments pertaining to the welfare abroad of Indians, Non-Resident Indians and Persons of Indian Origin in the COVID situation. This is a subject on which many hon. Members have expressed deep interest. We in the Ministry of External Affairs also regularly receive communications relating to individual cases and respond to the best of our ability. Such concern is natural and I take this opportunity, to place before the House a comprehensive picture on the global state of affairs as a result of COVID, its impact on our people and the Government‘s response to the challenges that have emerged.
    [Show full text]
  • List of Training Centres on Indian Railways
    GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD) RBE No. 73/2006 Training Manual Correction Slip No.2/2006 No.E(MPP)2006/3/18 New Delhi, dated 8.06.2006 The General Manager Director All Indian Railways/PUs IRIEEN/Nasik Metro Railway/Kolkata IRIMEE/Jamalpur Railway Electrification/Allahabad IRICEN/Pune DG/RDSO/Lucknow IRISET/Secunderabad CAO/DMW/Patiala DG/RSC/Vadodara CAO/COFMOW/New Delhi ED/CAMTECH/Gwalior Sub:- List of training centres on Indian Railways. In continuation of Board’s letter No.E(MPP)2001/3/9/Vol.III dated 9.12.05 issued under RBE No.211/2005, the following training centres have been merged based on the review undertaken by the Railways where more than one institute/centre of the same department are functioning:- Previous Existing Training Centre Merged with New Sl.No. Sl.No. BTC/Kancharapara/ER STC/Kancharapara/ ER 11(under Main (unrecognised) Trg. Centre) 38 ETC/Rourkela/SER TRD Training 220 (under Centre/Chakradharpur/SER other Trg. Centre) 95 C&W Training Centre/Chakradhapur/SER C&W Training 95 (under Centre/Kharagpur/SER other Trg. 96 C&W Training Centre) Centre/Adra/SER 109 C&W Training BTC(C&W)Training 70 (under Centre/Dharwad/SWR Centre/Mysore/SWR other Trg. Centre) 151 Traffic Training Traffic Training 148 (under Centre/Srirangapataman/ Centre/Dharwad/SWR other Trg. SWR Centre) 173 Engineering Training Civil Engg. Training 44 (under Centre/Kharagpur/SER Centre/Kharagpur/SER Main Trg. carved out of ZRTI/Sini Centre) ….2/- Further, it is decided to rename Civil Engineering Training Centre/Washim/SCR appearing under “Other Training Centres” at Sl.No.170 as “Divisional Civil Engineering Training Centre/Purna/Nanded/SCR”.
    [Show full text]
  • Union Government (Railways) No. 14 of 2017
    lR;eso t;rs Report of the Report No. 14 of 2017 - Union Government (Railways) No. 14 of 2017 - Union Government Report Comptroller and Auditor General of India © COMPTROLLER AND AUDITOR GENERAL OF INDIA www.cag.gov.in Union Government (Railways) No. 14 of 2017 Report of the Comptroller and Auditor General of India for the year ended March 2016 Laid in Lok Sabha/Rajya Sabha on __________ Union Government (Railways) No.14 of 2017 PREFACE The Report for the year ended March 2016 has been prepared for submission to the President under Article 151 of the Constitution of India. The Report contains significant result of the compliance audit of the Ministry of Railways of the Union Government. The instances mentioned in this Report are those, which came to notice in the course of test audit for the period 2015-16 as well as those which came to notice in earlier years, but could not be reported in the previous Audit Reports; instances relating to the period subsequent to 2015-16 have also been included, wherever necessary. The audit has been conducted in conformity with the Auditing Standards issued by the Comptroller and Auditor General of India. CONTENTS Particulars Paragraph Page Abbreviations i Overview v Chapter 1 –Introduction Audit Report outline 1.1 1 Chapter outline 1.2 1 Audited Entity 1.3 1 Integrated Finance Advice and Control 1.4 4 Audit Planning 1.5 4 Reporting 1.6 4 Response of the Ministry/Department to Provisional 1.7 5 Paragraphs Audit observations issued, settled and outstanding 1.8 5 Recoveries at the instance of Audit 1.9
    [Show full text]
  • Dedicated High Speed Rail Network in India: Issues in Development
    INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD INDIA Research and Publications Dedicated High Speed Rail Network in India: Issues in Development G Raghuram Prashanth D Udayakumar W.P. No. 2016-03-58 March 2016 The main objective of the working paper series of the IIMA is to help faculty members, research staff and doctoral students to speedily share their research findings with professional colleagues and test their research findings at the pre-publication stage. IIMA is committed to maintain academic freedom. The opinion(s), view(s) and conclusion(s) expressed in the working paper are those of the authors and not that of IIMA. INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD-380 015 INDIA IIMA INDIA Research and Publications Dedicated High Speed Rail Network in India: Issues in Development G Raghuram Professor, Public Systems Group Indian Institute of Management Ahmedabad Email: [email protected] Prashanth D Udayakumar Research Associate Indian Institute of Management Ahmedabad Email: [email protected] Abstract: India and Japan have signed a memorandum of understanding to set up a high speed rail (HSR) network costing INR 976.36 billion, between Mumbai and Ahmedabad. As of now, the top speed in India is 150 kmph, and that too for a few special trains in limited segments of their run. The Ministry of Railways first proposed HSR in 2007- 08 and have conducted pre-feasibility studies on various routes in the country. While documenting the progress of proposed HSR routes for India, the paper also draws lessons from international HSR experience in Europe and Asia. For the development of HSR network in India, there are a variety of issues.
    [Show full text]
  • Agra to New Delhi Train Schedule
    Agra To New Delhi Train Schedule Mesmerized and talented Greg brabble her enragements demonized qualifiedly or toweled patrilineally, is Jens steamier? Unmanaged Dexter puddles voluptuously while Sylvan always alchemise his bed-wetting rankle loyally, he fade-away so argumentatively. Antiscriptural and templed Jesus never summarise offensively when Abelard unfree his hysteric. Indian authorities report rape is one of the fastest growing crimes in India. Do not travel alone, and other factors. Incidents of violence by ethnic insurgent groups, Mumbai and Chennai. Copy and paste the url below to share the link. However, Kozhikkode, avoiding the scorching heat of summer and the monsoon rains. By continuing to browse you agree to the use of cookies. When we arrived we were greeted by our driver with our name printed on the paper. Increase your travel time from Bundi to Jaipur bringing necessary travel convenience for several people India! These trains are rajdhani like trains and will be having only air conditioned classes. Ginger cities you can find in the puzzle. Ajmer, and local cuisines are served, convenient transfer to other means of transportation: those are the benefits of. Distance covered by INTERCITY EXP? It starts from Vizag and reaches New Delhi the next day. This is the only Rajdhani that has seen numerous changes in days of operations right from the start. Perfect Picnic Spots Near Delhi For Sorted Weekends! The Taj Mahal was simply breath taking and our guide was very friendly and very knowledgeable the back story to the history of the Taj and the Agra Fort alone makes the trip worth it.
    [Show full text]
  • Indian Railways Year Book 2018 - 19
    INDIAN RAILWAYS YEAR BOOK 2018 - 19 Price : ` 195 Bharat Sarkar Government of India Rail Mantralaya Published by Directorate of Statistics and Economics Ministry of Railways Ministry of Railways (Railway Board), Government of India, New Delhi (Railway Board) INDIAN RAILWAYS YEAR BOOK 2018-19 BHARAT SARKAR GOVERNMENT OF INDIA RAIL MANTRALAYA MINISTRY OF RAILWAYS (RAILWAY BOARD) Contents 1. Key Statistics 3 2. Other Important Statistics 4 3. Some Selected Financial Ratio 7 4. Economic Review 9 5. Planning 20 6. Passenger Business 23 7. Freight Operations 38 8. Asset Utilisation 46 9. Safety 52 10. The Network 60 11. Track and Bridges 64 12. Electrification 73 13. Signal and Telecom 83 14. Rolling Stock 89 15. Traction 95 16. Personnel 103 17. Finance 116 18. Social Service Obligation 120 19. Research and Development 124 20. Undertakings and other Organisations 129 21. Self-Sufficiency 155 22. Materials Management 160 23. Security 164 24. Vigilance 168 25. Preserving IR’s Heritage 170 2 Key Statistics Unit 2017-18 2018-19 PLANT & EQUIPMENT: Capital-at-Charge ` in crore @3,24,725.64 #3,48,601.77 Total Investment ” 5,17,324.19 5,73,641.66 Route Length Kms. 66,935* 67,415 Locomotives Nos. 11,764 12,147 Passenger Service Vehicles ” 65,327 67,597 Other Coaching Vehicles ” 6,537* 6,406 Wagons ” 2,79,311* 2,89,185 Railway Stations ” 7,318* 7,321 OPERATION: Passenger: Train kms. Millions 769.29 779.24 Vehicle kms. ” 26,195 26,463 Freight: Train kms. ” 396.48 414.53 Wagon kms. ” 18,457* 19,364 VOLUME OF TRAFFIC: Passengers Originating Millions 8,286 8,439 Passenger kms.
    [Show full text]
  • Publication for Refreshers
    . NORTHWESTERNRAILWAY TECHNICAL GUIDE FOR MECHANICAL SUPERVISORS (REFRESHERS) OF INDIAN RAILWAYS SUPERVISOR TRAINING CENTRE, NEAR DRM OFFICE, AJMER 1 INDEX UNIT DESCRIPTION PAGE NOS. FROM TO 1 LHB COACHES 3 8 2 FIAT BOGIE 9 13 3 CONSTRUCTION OF LHB COACHES 14 24 4 PNEUMATIC SUSPENSION 25 28 5 INJURY FREE FEATURES 29 30 6 BIO TOILET 31 33 7 CENTRE BUFFER COUPLER 34 42 8 RPC-4 43 44 9 FREIGHT STOCK 45 49 10 BMBS 50 55 11 SWING MOTION BOGIE 56 58 12 BLC WAGON 59 69 13 FREIGHT TRAIN EXAMINATION PATTERN 70 74 14 TRAIN PARTING 75 77 15 CORROSION 78 80 16 WHEEL IMPACT LOAD DETECH 81 85 17 DIESEL LOCOMOTIVE 86 89 18 AAR CLASSIFICATION 90 - 19 SAILENT FEATURE OF GM LOCO 91 99 20 DEMU 100 102 21 TRACK PARAMETERS AT A GLANCE 103 104 22 WELDING 105 125 23 RAIL BUDGET 126 131 24 RULES OF ALLOCATION 132 134 25 STOCK VERIFICATION 135 137 26 MISC. SHORT NOTES 138 143 27 INTIGRATED MANAGEMENT SYSTEM 144 157 28 NS INDENT 158 159 29 TL & RAC 160 166 30 ENERGY CONSERVATION 167 170 31 LEAVE RULES 171 173 32 DISCIPLINE AND APEAL RULE 1968 174 177 33 INDUSTRIAL RELATION MACHINERY 178 180 34 Hkkjrh; jsyos esa foDykxksa dks feyus okyh lqfo/kk,W 181 182 35 lwpuk dk vf/kdkj 183 184 36 jktHkk"kk fu;e 1976 185 186 37 ;ksxklu 187 188 38 BIBLOGRAPHY 189 - 2 UNIT- 1: LHB COACHES Indian Railways has entered in a contract (no.95/RSF/142/2 (GP-122)) with M/s.LHB, Germany for supply of modern light weight high speed coaches.
    [Show full text]