Alicante Tram Expansion 1 Marisa Gracia Gimenez, Managing Director, Ferrocarrils De La Generalitat Valenciana (FGV)

Total Page:16

File Type:pdf, Size:1020Kb

Alicante Tram Expansion 1 Marisa Gracia Gimenez, Managing Director, Ferrocarrils De La Generalitat Valenciana (FGV) Alicante tram expansion 1 Marisa Gracia Gimenez, Managing Director, Ferrocarrils de la Generalitat Valenciana (FGV) Ferrocarrils de la Generalitat Valenciana (FGV) at present has a 93km line in the province of Alicante, between Alicante and Denia, on which there are 44 stations and 18 units running. The Autonomous Community Authority's Ministry oí with an innovative integrated transport system, based on Infrastructures and Transports' development oí the Alicante the light rail system that allows tram units and train trams Metropolitan tram project is enabling the network run by to be combined . FGV to be modernised and extended and new sections to be incorporated . Two tram objectives In August 2003, the first 12.5km oí the tram service The overall design of the tram network envisages fulfilment between Alicante and El Campello were opened, preparing of two basic objectives.The first axis oí the tram entails the this section as a tram layout and getting under way the entry of the tram service into the city ofAlicante, to connect process oí extending this new transport system in the city the city centre with the closest municipalities .The building of of Alicante and on the rest of the line communicating this first phase will be formed around two lines, on which with Denia. modem tram units will run : Alicante Metropolitan tram service forms part oí the 2004-2010 Strategic Infrastructure Pían (PfE), undertaken Line 1 by the Generalitat Valenciana's Ministry of Infrastructures This line connects Alicante Multimodal station, where the and Transport . services oí RENFE, AVE and coaches are brought together, In Cine with the initiatives proposed in this plan, the with El Campello, vía Condomina .Apart from this line Generalitat Valenciana Autonomous Community Authority there are two different branch lines which connect this with is undertaking a programme of action intended to extend Puerta del Mar and with Cabo de Huertas (Avenida the metropolitan transport networks in the three main Costablanca) . metropolitan areas of the Valencian Community. The tram sets off underground from the future This programme is intended to provide the Metropolitan Multimodal Station and travels along the Avenida de la area of Valencia, Alicante and Castellón with a modern, Estación to its first stop beside the Plaza de los Luceros- energetically efficient transport system able to give a high ¡t then heads to Avenida Alfonso X El Sabio up to the degree oí accessibility to the whole population. intersection with Rambla Méndez Núñez, where the Market The development oí the Alicante Metropolitan tram 5tation, currently being built, is located, designed as an service enables the city oí Alicante and its su rroundings, by emblematic feature for Alicante and as a landmark oí the modernising and extending the Generalitat Valenciana's tram system . Alicante-Denia Railway line (FGV), to stand on a par with From the Market 5tation the line goes on towards the other majar European cities and become the first medium- Archaeological Museum Station, beside Avenida Vázquez sized Spanish urban centre (and the fifth city after Madrid, Mella and the Glorieta del Doctor Mas Magro. Barcelona,Valencia and Bilbao) to have a high capacity The tram then comes out onto the surface and soars transport system. ove r Avenida de Dé nia on an ove rhead cross ing . The line All in all, the tram service has an execution budget oí follows on by the Goteta canal, to later branch off more than ¬500 million and will provide the Alicante towards the sea as far as la Goteta stop, where the urban centre and the Benidorm-Altea-Denia coastal axis network has a connection with La Marina Station that wwvv_rnissellpublishing.coml 45 TRAM gives continuity te the tram fine as far as Puerta del great importante as a reference point for the users. Mar and aiso in the direction of El Campello new, with a branch which will enable travellers to get as far as Current service and foretast Cabo de Huertas . Alicante tram service runs every 20 minutes at peak hours and 30 minutes during the rest of the day on the Alicante-El Cine 2 Campello tram line .These services are modified when the This line starts out from the Multimodal 5tation to give new summer timetables are introduced from May and will be service te the Hospital, the Virgen del Carmen and Virgen extended during the nights of J une, July and August with del Remedio districts, the University Campus and San 'TRAMsnochador', the late night services, coinciding with the Vicente del Raspeig . Hogueras celebrations . The second axis of the tram links up the Multimodal These services will be extended with the arrival oí station with the Benidorm-Altea-Dénia axis by means of a the nine train-trams built by Alstom.The new units will semi-direct service and from 2006, as the present FCV layout start te run from the end of 2005 te early 2006, giving is adapted, will have the latest generation rolling stock known service on the Alicante-El Campello line (every 15 as train-trams . minutes and more frequently at peak hours), en the branch line to Cabo de Huertas (every 20 minutes) and Transport that fits its setting also heading for La Vila-Joiosa (every 30 minutes) leaving The introduction of a new rail-tram platform and the from Alicante . electrification of the layout is making it possible te replace At the end of the year the six refurbished units will the units of the traditional'trenet' local train service with be arriving te cover the La Vila-Joiosa-Denla line . modern tram cars which will in the future coexist with the Half way through 2006 the connection with Market train-trams . 5tation will come into operation (previously going by The urban development and re-arrangement of the space Marcl station) . through which the tram traveLs has meant a considerable The airn of the Ministry of Infrastructures and Transport improvement as regards the safety, amenities and urban and the FCV is for a direct service to be abre to be opened aesthetics of the new layouts . between Alicante and Benidorm between the end of 2006 Along with the urban redevelopment the design and and early 2007, extending the connection with la Vila- functionality of the stops set along the traen layout takes on Joiosa and later en heading towards Altea. Howden Ventilatoren GmbH Howden Ventilatoren is Fans for tunnel ventilation systems a part of the Howden Group Stubentalstrale 44 D-89528 Heidenheirn of Companies, the world's largest TeL: +49 (0)73211 352-o Fax. : +49 (0732,1352 -30 and most established fan supplier. E-Mail . mat@howden-ventilatoren .de Web . www.howden .co m Qur experience covers both road and rail or metro ventilation across the world and our expertise extends to more than simply the supply of fans. Using knowledge of a wide range of systems and understanding the particular needs that designer and operators may Nave, we are abre to provide optimised ventilation equipment..
Recommended publications
  • European Commission
    C 18/24 EN Offi cial Jour nal of the European Union 20.1.2020 OTHER ACTS EUROPEAN COMMISSION Publication of an application for amendment of a specification for a name in the wine sector referred to in Article 105 of Regulation (EU) No 1308/2013 of the European Parliament and of the Council (2020/C 18/08) This publication confers the right to oppose the application pursuant to Article 98 of Regulation (EU) No 1308/2013 of the European Parliament and of the Council (1) within two months from the date of this publication. REQUEST FOR AMENDMENT TO THE PRODUCT SPECIFICATION ‘MENFI’ PDO-IT-A0786-AM02 Date of application: 29.9.2014 1. Rules applicable to the amendment Article 105 of Regulation (EU) No 1308/2013 – Non-minor modification 2. Description and reasons for amendment 2.1. Article 1 of the product specification. Designation and wines/Categories. Amendment to the product specification and single document Description a) the category (4) Sparkling wine has been added, comprising: — Spumante bianco, including with indication of one of the following grape varieties: Chardonnay, Grecanico, Chenin Blanc and Moscato Bianco; — Spumante rosato; b) the category (15) Wine from raisined grapes has been extended to cover also: — Bianco passito; — Rosso passito; Reasons The newly introduced categories, sparkling wine and wine from raisined grapes, are well established products in the relevant area. There has been a lot of experimentation in the area where the DOC Menfi is produced over the last 20 years and the intention of this amendment is therefore to reflect the new reality.
    [Show full text]
  • Texto Tomado De La Revista Vía Libre Mayo-Junio 2020
    operadores El ferrocarril ante la crisis sanitaria La crisis sanitaria provocada por la pan- del Congreso el 27 de abril, se pusieron en marcha las primeras medidas, basadas en directrices del Ministe- demia del coronavirus ha afectado desde rio de Sanidad. Así, se adaptaron y revisaron los protocolos el punto de vista sanitario, social y eco- de actuación existentes en relación con el transpor- nómico a todo el mundo, sin exclusión te de viajeros, y a principios de marzo se implantó un procedimiento específico de actuación frente a posi- de sectores o segmentos de actividad. En bles casos en el ámbito ferroviario. Ya el 12 de marzo, Renfe abrió la posibilidad de devolución o el cambio el ferrocarril, que une a su condición de de billetes sin sobrecoste. El estado de alarma, de quince días de dura- estratégico social y económicamente, la ción inicial, en el ámbito del transporte supuso la he- de ser el del modo de transporte masivo rramienta para hacer frente a la crisis sanitaria, redu- ciendo la movilidad de los viajeros y garantizando el por excelencia, la pandemia y las medi- abastecimiento. El Real Decreto reducía los servicios, estable- das tomadas para atajarla, han puesto a cía la obligación de realizar una limpieza diaria de los vehículos de transporte, la inclusión de mensajes en prueba, como ninguna otra circunstancia, los sistemas de venta de billetes desaconsejando el a administraciones, reguladores, gestores viaje, y la necesidad de adoptar la máxima separación posible entre los pasajeros. de infraestructura, operadores e industria. Además, daba a los operadores un plazo de cinco días para cumplir con la oferta establecida de forma homogénea entre los distintos servicios, y facultaba a las autoridades competentes delegadas Ya antes de la declaración del estado de alarma, el 14 para adoptar medidas adicionales de limitación en de marzo, según detalló el ministro de Transportes, el transporte colectivo, necesarias para preservar la Movilidad y Agenda Urbana, José Luis Ábalos, en su salud pública.
    [Show full text]
  • Alicante, Spain – UNLV Course Approvals
    Alicante, Spain – UNLV Course Approvals 2017 – 2018 USAC Course Title Credits UNLV Equivalent Language of Instruction Spanish Language - All students are required to select a language track during the fall and spring. The courses below are each taught individually during summer however, Spanish language is not mandatory during summer. Track I Prerequisite: None 14 SPAN 187, SPAN 187, SPAN 287, SPAN 287 Track II Prerequisite: 2 semesters of college Spanish 12 SPAN 287, SPAN 287, SPAN 387, SPAN 387 Track III Prerequisite: 4 semesters of college Spanish 9 SPAN 387, SPAN 387, SPAN 487 Track IV Prerequisite: 6 semesters of college Spanish 6 SPAN 487, SPAN 487 Summer Session I 2017 Contemporary Spanish Art 1 SPAN 387 Spanish Economic and Political Institutions of the European 3 PSC 405J English Union Gender and Gaze: Women Behind the Camera 3 WMST 490 English Language, Ideology, and Gender in Cross-Cultural 1 ENG 416C English Perspective Madrid Field Study 1 ANTH 490 English Sailing 1 KIN 499 English Spain in the American Literary Imagination 3 Under Review English Spanish Composition for Heritage Speakers 3 Under Review Spanish Spanish Conversation and Oral Skills 2 SPAN 387 Spanish Spanish Culture and Civilization 1 SPAN 387 Spanish Topics in Spanish Culture (composed of Contemporary Spanish Art, Spanish Culture & Civilization, and Madrid 3 SPAN 387 Spanish & English Field Study) Twentieth-Century and Contemporary Spanish Short 3 SPAN 487 Spanish Story Summer Session II 2017 Cultural Identities through Film 3 FIS 497 English Sailing 1 KIN
    [Show full text]
  • The Local Area
    The Local Area The Costa Blanca The Costa Blanca, or White Coast, is made up of two clearly distinct scenic sectors. To the north, a line of mountains runs parallel to the sea, descending periodically to form cliffs, and, to the south, a vast plain of sand patches, palm trees and salt deposits make up the backdrop for the beaches. From cosmopolitan towns and resorts where life goes on 24 hours a day to sleepy little villages where the peace and tranquillity is unique, the Costa Blanca is the kind of place, which offers something for everyone. The Costa Blanca has an excellent year round climate and the humidity is low. It enjoys more than 2,800 hours of sunshine throughout the year and an average annual temperature of 19.3°C. The beaches are one of the biggest attractions and most of them comprise of clean, white sand. The Costa Blanca has been awarded more blue flags than anywhere else in Europe. Most of the resorts offer a wide range of water sports and there are plenty of golf courses to choose from. The area is well serviced by two airports. Alicante (El Altet) airport is situated in the middle of the Costa Blanca and Murcia (San Javier) airport is further to the south. A new international airport is currently under construction in the Murcia region and will provide even more flights to and from international destinations in the near future. Alicante Alicante is in the bay formed by the Cabo de las Huertas and the Cabo de Santa Pola and at the foot of Mount Bencantil.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • Benidorm Spain Travel Guide
    Benidorm Costa Blanca - Spain Travel Guide by Doreen A. Denecker and Hubert Keil www.Alicante-Spain.com Free Benidorm Travel Guide This is a FREE ebook! Please feel free to : • Reprint this ebook • Copy this PDF File • Pass it on to your friends • Give it away to visitors of your website*) • or distribute it in anyway. The only restriction is that you are not allowed to modify, add or extract all or parts of this ebook in any way (that’s it). *) Webmaster! If you have your own website and/or newsletter, we offer further Costa Blanca and Spain material which you can use on your website for free. Please check our special Webmaster Info Page here for further information. DISCLAIMER AND/OR LEGAL NOTICES: The information presented herein represents the view of the author as of the date of publication. Be- cause of the rate with which conditions change, the author reserves the right to alter and update his opinion based on the new conditions. The report is for informational purposes only. While every at- tempt has been made to verify the information provided in this report, neither the author nor his affili- ates/partners assume any responsibility for errors, inaccuracies or omissions. Any slights of people or organizations are unintentional. If advice concerning legal or related matters is needed, the services of a fully qualified professional should be sought. This report is not intended for use as a source of legal or accounting advice. You should be aware of any laws which govern business transactions or other business practices in your country and state.
    [Show full text]
  • Pliego De Prescripciones Técnicas Particulares Para La Contratación De Los Servicios De Redacción De Proyecto De Construcción
    REDACCIÓN DEL PROYECTO DE CONSTRUCCIÓN DE NUEVOS ACCESOS EN ESTACIONES DE FERROCARRILS DE LA GENERALITAT VALENCIANA PLIEGO DE PRESCRIPCIONES TÉCNICAS PARTICULARES PARA LA CONTRATACIÓN DE LOS SERVICIOS DE REDACCIÓN DE PROYECTO DE CONSTRUCCIÓN “REDACCIÓN DEL PROYECTO DE CONSTRUCCIÓN DE NUEVOS ACCESOS EN ESTACIONES DE FERROCARRILS DE LA GENERALITAT VALENCIANA” VALENCIA, abril de 2018 Pág. 1 de 69 CSV:15HEKP9L-1DEYNXVN-X8MT32F2 URL de validación:https://www.tramita.gva.es/csv-front/index.faces?cadena=15HEKP9L-1DEYNXVN-X8MT32F2 CSV:1LBQILNS-75H712EP-14XFX9YP URL de validació:https://www.tramita.gva.es/csv-front/index.faces?cadena=1LBQILNS-75H712EP-14XFX9YP REDACCIÓN DEL PROYECTO DE CONSTRUCCIÓN DE NUEVOS ACCESOS EN ESTACIONES DE FERROCARRILS DE LA GENERALITAT VALENCIANA ÍNDICE ÍNDICE ................................................................................................................................................................... 2 1. OBJETO DEL PLIEGO ...................................................................................................................................... 3 2. OBJETO DEL CONTRATO ................................................................................................................................ 3 3. RESPONSABILIDAD CONTRACTUAL DEL CONTRATISTA .................................................................................. 3 3.1. RESPONSABILIDAD DEL CONTRATISTA ................................................................................................. 4 3.2. PERSONAL DEL CONTRATISTA
    [Show full text]
  • The Pliocene Mediterranean Infilling of the Messinian Erosional Surface: New Biostratigraphic Data Based on Calcareous Nannofossils (Bajo Segura Basin, SE Spain)
    Geologica Acta, Vol. 13, Nº 3, September 2015, 211-228 DOI: 10.1344/GeologicaActa2015.13.3.4 The Pliocene Mediterranean infilling of the Messinian Erosional Surface: New biostratigraphic data based on calcareous nannofossils (Bajo Segura Basin, SE Spain) C. LANCIS1 J.E. TENT-MANCLÚS1* J.A. FLORES2 J.M. SORIA1 1Departamento de Ciencias de la Tierra y del Medio Ambiente, Universidad de Alicante Apto. 99. 03080 San Vicente del Raspeig. Alicante, Spain. Lancis E-mail: [email protected], Tent-Manclús E-mail: [email protected], Soria E-mail: [email protected] Fax: (+ 34) 965909862 2Departamento de Geología, Universidad de Salamanca Plaza de la Merced s/n, 37008-Salamanca, Spain. E-mail: [email protected] Fax: (+ 34) 923294514 *Corresponding author ABS TRACT The Bajo Segura Basin (eastern Betic Cordillera) is a Mediterranean marginal basin where the Messinian Erosional Surface (MES), formed during the Messinian Salinity Crisis sea-level fall, is well developed. Overlying this major discontinuity the lower Pliocene transgressive sediments record the reflooding of the Mediterranean and the return to an open marine environment, the continental shelf being rebuilt after the Messinian erosion. The stratigraphic and biostratigraphic study of six sections allows two transgressive-regressive sequences filling the MES to be distinguished, correlated with the previously distinguished Mediterranean offshore seismic units. Ten calcareous nannofossil bioevents have been identified. The lower sequence can be dated according to nannofossil biozones NN12 to NN14 and the upper sequence by NN15 to NN16. The boundary between both lower Pliocene sedimentary sequences occur after the first common occurrence (FCO) of Discoaster asymmetricus found in the uppermost sediments of the lower sequence and before the first occurrence (FO) of Discoaster tamalis in the lowermost part of the upper sequence.
    [Show full text]
  • Alicante's Cultural Guide
    Table of Contents Country Profile: Spain ..................................................................................................................................1-6 Country Overview: History, Quick Facts, Government, Educational System…………………..........................................2-4 Alicante Overview: History, Quick Facts, Economy....................................................................................................4-6 Practical Information ...................................................................................................................................6-9 Making Phone Calls .......................................................................................................................................................6 Emergency Numbers .....................................................................................................................................................7 Handling Money...........................................................................................................................................................7-8 Weather........................................................................................................................................................................8-9 Being a North American Abroad .................................................................................................................9-12 Culture Shock..................................................................................................................................................................9
    [Show full text]
  • A Timeline of WHO's Response to COVID-19 in the WHO European
    A timeline of WHO’s response to COVID-19 in the WHO European Region A living document (Version 2.0 from 31 December 2019 to 31 December 2020) www.euro.who.int Address requests about publications of the WHO Regional Office for Europe to: Publications, WHO Regional Office for Europe, UN City, Marmorvej 51, DK-2100 Copenhagen Ø, Denmark Alternatively, complete an online request form for documentation, health information, or for permission to quote or translate, on the Regional Office website (http://www.euro.who.int/pubrequest). Document number: WHO/EURO:2021-1772-41523-56652 Originally published as EUR/RC70/Inf.Doc./7, under the title A timeline of WHO’s response to COVID-19 in the WHO European Region: a living document (version 1.0 from 31 December 2019 to 30 July 2020) in 2020. © World Health Organization 2021 Some rights reserved. This work is available under the Creative Third-party materials. If you wish to reuse material from this Commons Attribution-NonCommercial-ShareAlike 3.0 IGO work that is attributed to a third party, such as tables, figures licence (CC BY-NC-SA 3.0 IGO; https://creativecommons.org/ or images, it is your responsibility to determine whether licenses/by-nc-sa/3.0/igo). permission is needed for that reuse and to obtain permission from the copyright holder. The risk of claims resulting from Under the terms of this licence, you may copy, redistribute and infringement of any third-party-owned component in the work adapt the work for non-commercial purposes, provided the rests solely with the user.
    [Show full text]
  • El Ciclo Hidrosocial En Benidorm: Un Modelo De Gestión Concertado, Integral Y Sostenible Del Agua
    SEMINARIO AGUA Y TURISMO Alicante, 1-2 de Octubre 2015 Instituto Interuniversitario de Geografía Universidad de Alicante El ciclo hidrosocial en Benidorm: un modelo de gestión concertado, integral y sostenible del agua. Antonio M. Rico Amorós y Carlos Baños Castiñeira Instituto Interuniversitario de Geografía Universitat d´Alacant INDICE 1.-Sequías y escasez de agua: un problema no resuelto hasta la configuración del Consorcio de Aguas de la Marina Baja. 2.- El ciclo hidrosocial en la escala comarcal: un modelo de armonización de usos y de adaptación a las sequías para garantizar el flujo urbano-turístico del agua. 3.-El metabolismo hídrico de Benidorm: una gobernanza eficiente del ciclo urbano del agua acompañada de iniciativas privadas para reducir el consumo turístico. 4.-Conclusiones EL SUMINISTRO DE AGUA POTABLE: UN PROBLEMA SECULAR Pozo Rabasa 35 l/s Pozo Golondro 20 l/s ADAPTACIÓN A LAS SEQUÍAS Y CONFIGURACIÓN DEL CONSORCIO Acuerdos verbales con regantes uso Convenios para intercambio de “agua Convenios para intercambio de conjunto de flujos e infraestructuras blanca” por depurada. Pactos verbales “agua blanca” por regenerada. con Callosa d´En Sarrià Acuerdo con Callosa d´En Sarrià 1967, Federico Silva 1977, Constitución del Muñoz visita Benidorm Consorcio de Aguas de la 2001, Integración en la Junta Central Usuarios del Vinalopó, Marina Baja. para aprovechar trasvase Júcar-Vinalopó 1965, Concesión de Sequía de 1999 a 2002, Sequía de 2014- Sequía 1978, trasvase naval Sequía 1990-95 Nuevos pozos Guadalest (90 l/s) Conexión con la
    [Show full text]
  • Diseño Del Tabique Que Separa La Cabina Del Conductor Del Resto Del Vagón En Trenes Y Trenes-Tranvía
    UNIVERSIDAD DE VALLADOLID ESCUELA DE INGENIERIAS INDUSTRIALES Grado en Ingeniería en Diseño Industrial y Desarrollo del Producto “Ledway”: Diseño del tabique que separa la cabina del conductor del resto del vagón en trenes y trenes-tranvía Autor: Santos Villaverde, Celia Responsable de Intercambio en la UVa Sánchez Bascones, María Isabel Universidad de destino Universidad Politécnica de Valencia, ETSID Valladolid, septiembre 2017. TFG REALIZADO EN PROGRAMA DE INTERCAMBIO TÍTULO: “Ledway”: Diseño del tabique que separa la cabina del conductor del resto del vagón en tranvías y trenes-tranvía ALUMNO: Celia Santos Villaverde FECHA: 18 septiembre 2017 CENTRO: ETSID, Universidad Politécnica de Valencia TUTOR: Marina Puyuelo Cazorla RESUMEN Y PALABRAS CLAVE RESUMEN: El proyecto de ingeniería que se presenta en las siguientes páginas y que pretende abarcar todo el proceso del proyecto, desde la conceptualización de la idea hasta la fabricación del producto, responde a la propuesta para el diseño y desarrollo del tabique que separa la cabina del conductor del resto del vagón de tranvías y tren-tranvías. Se busca como objeBvo principal la convergencia de la ergonomía y simplificar la transmisión de información entre la empresa y los usuarios, sin dejar de lado la uBlidad, tanto para el maquinista como para el pasajero. Se han idenBficado y uBlizado elementos representaBvos del Metro de Valencia como el recorrido y colores plasmados en el mapa oficial de la red de tranvías para conseguir uniformidad y simplicidad de cara al usuario. PALABRAS CLAVE:
    [Show full text]