Underground News Index 2010

Total Page:16

File Type:pdf, Size:1020Kb

Underground News Index 2010 UNDERGROUND NEWS ISSN 0306-8617 INDEX 2010 Issues 577 – 588 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY 750 INDEX TO 2010 ISSUES OF UNDERGROUND NEWS Page entries marked * are, or include, photographs or other illustrations. Note:- Incorrect page numbers appeared in the August issue of Underground News, which (mostly) duplicate the page numbers for the July issue. References to the July pages are suffixed ‘J’, and references to the August pages are suffixed ‘A’. A Accidents – derailments:- Gloucester Road, 402J; Hainault Depot, 399A; Highgate Sidings, 636; Neasden Depot, 584; Ruislip Depot, 639; Air burst:- Bayswater, 347; Great Portland Street, 107; Highbury & Islington, 168; Holborn, 106; King’s Cross, 18; Liverpool Street, 409J; Mile End, 345; Perivale, 346; Queensway, 403J; Stratford, 293; Amersham:- North of Amersham, locomotive hauled services 1933-1948, 407A-413A*, S Stock delivery, 73, Animal on track:- Warren Street, 168; Arrestors:- Aldgate, 183*; Watford, 65*; B Bakerloo Line:- LNWR Electric Network reborn, 27-30*, Willesden Junction, turn back bay roads, 169*, Baker Street:- Platform extensions, 171*, 208-209*, 306*, 329*, 546-547*, Balham Blitz Bomb, 718-719*, Barking:- The Fire at Barking, 517-519*, Bells, Whistles and Flags, 8-12*, Body on track, London Bridge, 293, Bogies:-, 1967 Stock last bogie overhaul, 325*, Prototype trailer, 216*, O, P & Q Stock, 631-632*, Type A2, 215*, Type E, 158*, Type K2, 216*, Type N, 158*, Bow Church, station improvements, 21, 751 Brakes:- EP Type, 164, Brickwork falling hazard, 397A, Bridge, Road, D28, undergoing reconstruction, 745*x2, Bridge strike:- East Putney, 711; Kew Gardens, 403J, 711; Budapest Underground Railway Museum: Foldalatti Vasuti Muzeum, 395A-396A*, Burning smell on train/station:- Bank/Monument, 168; Bond Street, 584; Canada Water, 14; Heathrow T4, 402J; Marlborough Road(closed), 220; Piccadilly Circus, 715, Victoria, 639; Waterloo, 398A, 636; Westminster, 107; Willesden Green, 222; Wood Green, 401J; C C2C, Limehouse, new footbridge connection between DLR and C2C opened, 21-22, 280*, Canada Water:- “Bagged” sign outside station, 399J*, The Futures Bright.....The East London Line Re-opens, 394J-400J* Central Line anomaly, 659-661*, Chalfont & Latimer:- Early winter snow, A Stock, 76*, Chesham:- Poor railhead conditions, 17, Chiltern Railways:- Class 168, in the snow, 242, Defective train, 15, “Chord” installation, 111-113*, 123-124, Christmas and New Year Underground and DLR services 2009-2010, 127-128*, Clipping and Scotching, 647-648*, Circle Line:- Destinations since 13 December 2009, 172-173, Preparing for the T-Cup, 23-25*, T-cup prelude, 115-116*, Croxley Tip:- Re-opened 1986-2003, 417J*, Steam and battery locomotives, 277-278*, 327-328*, D Dalston Junction:- Platforms, 421A*, Railway approach, 354*, The Futures Bright.....The East London Line Re-opens, 394J-400J* Tunnels north of station, 396J*, Defective cable:- East Putney, 220; Harrow & Wealdstone, 168; Hatton Cross, 398A; Oakwood, 15; Putney Bridge 169; Richmond, 401J; Stonebridge Park, 170; Waterloo & City, 716; 752 Defective Trains:- Bakerloo Line(1967/1972 Stock), 13, 401J, 403J, 404J, 410J, 399Ax2, 533, 637, 638x3, Central Line(1992 Stock), 18, 129x2, 168, 170, 293, 294, 534, 581, 638, Circle Line(C69/C77 Stock), 220, 293, District Line(C69/C77&D78 Stock), 290, 409J, 401A, 582, 716x2, Hammersmith & City Line(C69/C73 Stock), 16, 18, 129, Jubilee Line(1996 Stock), 169, 222x2, 291x2, 294, 530, 583, 636, 637x4, 638, 639x3, 711, 713, London Overground(Class 378), 166x2, 222x2, Metropolitan Line(A60/A62 Stock), 16, 17, 109x4, 402J, 403J, 400A, 534, 535, 712, 716, Network Rail engineering train, 402A, Northern Line(1995 Stock), 13, 17, 108, 109, 110, 167, 221, 222, 401J, 402A, 714, Piccadilly Line(1973 Stock), 107, 108, 166, 346, 400A, 636, 713, Underground engineering train, 530, 532, 582, Victoria Line(1967 Stock), 14, 16, 18, 107, 166, 169, 294, 535x2, 582, (2009 stock), 398A, 531, 533, 534x3, 637x2, 713, 715, 716, Waterloo & City Line(1992 Stock), 219, 532, Depots and Sidings:- Cromwell Depot(District Railway), 6*, Edgware, 204*, Highgate, 154*, 203*, London Road, 177*, 275*, Neasden, Changes of purpose of car sheds, 456A*, Neasden former steam shed, 66*, S Stock debut, 76*, S Stock stabled, 723*, New Cross, demolished, 357*, Ruislip, 658*, S Stock en route to Berlin, 722-723*, White City, 742*, Derailers at Edgware Road sidings, 201*, Derailments:- Gloucester Road, 402J; Hainault Depot, 399A; Highgate Sidings, 636; Neasden Depot, 584; Ruislip Depot, 639; Destination blinds:- “Astronomical” destination on D Stock, 200*, A Stock, 322*, C Stock, 116*, 1967 Stock, 322*, 1972 Stock, 322*, Detraining passengers, 534*x2, Dislodged tunnel cables:- Baker Street, 714; Finchley Road, 712; Notting Hill Gate, 18; South Kentish Town(closed), 639; Waterloo & City, 165; Wembley Park, 219; District Line:- Extract from Southern Railway Working Timetable appendices 1934, 232-233*, Preparing for the T-Cup, 23-25* 753 District Electric Trains Series:- Part 11 – Every Picture Tells a Story, 5-13*, Part 12 – War and Tanks, 77-86*, Part 13 – Segregation and Disappointment, 157-164*, Part 14 – New for Old, 211-219*, Part 15 – Horseboxes, 281-290*, Part 16 – K Stock and Renumbering, 334-343*, Part 17 – Ls, Ms and Ns, 386J-394J*, Part 18 – A New Broom, 386A-395A*, Part 19 – Metadyne Muddles, 520-530*, Part 20 – More Refurbishment, 572-581*, Part 21 – O, P and Q Details, 625-635*, Part 22 – The War, 702-710*, District Railway:- B Stock rebuilds, District Electric Trains, 78-80*, 211-219* F Stock, District Electric Trains, 81-86*, 157-164*, G Stock, District Electric trains, 211-219*, LTS B Stock, 8*, Cromwell Depot c1905, 6*, Driving Techniques, 12-13, Ealing Broadway c1913, 7*, Gatemens’/Guards’ Usage of Bell, Whistle and Flag, 8-12*, Metadyne Experiments, 389A-391A*, New Ideas, 386A-389A, New Surface Stock Programme, 391A-393A*, Original A Stock at Hounslow Town, 5*, Docklands Light Railway (DLR):- Becton extension, 349, Bow Church, station improvements, 21, DLR Notes, 21*, Limehouse, new footbridge connection between DLR and C2C opened, 21-22, 210*, Mayor’s Transport Strategy, 402A-404A, Mudchute bay platform, 384A*, New stopping points prior to introduction of 3 vehicle trains, 301*, Problems at Canning Town, 324*, South Quay, replacement DLR station opened, 22*, Stratford International branch, 349-350*, Three vehicle trial running, 210*, 622*x2, Three Vehicle Trains and New Timetable, 348-349, Update, 348*, West Ferry, new station entrance, 429J*, West India Quay, now 3 platforms, 301*, Doors, 391J-393J, Driver controls:- Early District type, 161*, F Stock, 163*, P Stock, 629*, Q Stock, 529*, E Ealing Broadway:- c1913, 7*, Person under train on adjacent tracks, 14, East Finchley tunnel, 153* East London Line (see also London Overground):- 754 Class 378 trial running, 209*, LNWR Electric Network reborn, 27-30*, Prior to trial running, 302*, Stations, 354-355*, Thames Tunnel, 353*, The Futures Bright.....The East London Line Re-opens, 394J-400J*, Edgware Road:- Preparing for the T-Cup, 23-25*, Edgware Sidings, iced up trains, 109, Embankment, Preparing for the T-Cup, 23-25* Engineering possession problems:- Ealing Broadway, 17; Green Park, 715; Harrow & Wealdstone, 170; Rayners Lane, 401J; West Hampstead, 714; Engineering work:- Metropolitan Line, 303*, Escalators:- Defects causing part/full station closures:- Balham, 711; Bounds Green, 585; Clapham North, 711; Earl’s Court(Piccadilly), 344x2; Green Park, 13, 294; Heathrow T123, 346; Knightsbridge, 714; Marble Arch, 714; Marylebone, 533x3; Moorgate, 18(partial); Notting Hill Gate(Cent), 221; Southgate, 13; South Wimbledon, 711; Swiss Cottage, 165; Tooting Bec, 711; Tottenham Court Road, 712; Warren Street, 712x3; Warwick Avenue, 639; LU escalators summary:- As at 31 December 2010, 258-259, Reconstruction of King’s Cross Station in the 1930s, 30-34*, Euston-Watford DC lines:- The LNWR Electric Network Reborn, 27-30*, F Fares, TfL, effective January 2011, 728-729*, Father Christmas Logos, 741*x2, Farringdon:- New footbridge and station exterior, 180*, Overhead wires removed from ex-Thameslink Moorgate branch at Farringdon, 201* Finchley Central:- Failure of multiple signal and track circuits after lightning strike, 17, Fire alarm system defect/operation:- Canada Water, 640; Canning Town, 636; Clapham Common, 534; Clapham North, 404J, 582; Covent Garden, 17, 585; Embankment, 636, 637; Green Park, 711; Heathrow T123, 18; Heathrow T4, 637; Highbury & Islington, 636; Holborn, 167, 295, 638; Holland Park, 290; Kentish Town, 584; King’s Cross, 583, 636; Knightsbridge, 533; Liverpool Street, 639; London Bridge, 404J; Marble Arch, 106; Mile End, 18; 755 Old Street, 582; Oxford Circus, 347, 582; Paddington(LU), 106x2, 221x2; St. James’s Park, 14; Seven Sisters, 293; Tooting Bec, 582; Walthamstow Central, 715; Fire near to station:- Clapham Common, 530; Flooding on station:- Edgware Road(Bakerloo), 583; Finsbury Park, 401J, 711; Great Portland Street, 109, 167; Highgate, 110; Holloway Road, 17; Monument, 15; Piccadilly Circus, 220, 532x2; Ravenscourt Park, 582; Tottenham Court Road, 398A; Tower Hill, 294x2; Victoria, 292; West Kensington, 401J; Flooding on track:- Lords(closed), 223; Swiss Cottage, 533; Waterloo, 715; Foldalatti Vasuti Muzeum: Budapest Underground Railway Museum, 395A-396A*, Found in the Files, Review of Booking Facilities on the Underground Railway 1906-1931, 267- 271, From the Papers:- 54-60, 189-194, 252-254, 317-320, 370-373, 423J-425J, 428A-431A,
Recommended publications
  • Southern Railway Stations in South London
    Southern Railway stations in South London The south London area stations of Southern Region of British Railways and its constituents tend to be somewhat neglected, perhaps due to the prevalent suburban electric services, but comprised some fine examples of former company architecture. The following pictures were all taken in August 1973; a few of the sites have since disappeared, many others surely much modernised by now, and some have even been nicely restored...... First, we look at the former South Eastern Railway branch line from Purley to Caterham. Here is Kenley, whose cottage-style station house with very steep-pitched roof and gothic detailing is now a listed building, but privately owned. It dates from the construction of the Caterham Railway in 1856 and is by architect Richard Whittall. Below is Whyteleafe, (left) down side waiting room and footbridge, and the signal box and level crossing at Whyteleafe South...... The signalbox nameboard shows that the station had been re-signed with modern British Rail white enamel plates; in late 1972 I found one of the much more attractive 1950-era station nameplates for sale in an antique shop near Paddington station, for the pricely sum of £2.50p. In contrast the teminus station building at Caterham still displayed its “Southern Electric” enamelware...... Here are two more views at Caterham, with the SE&CR wooden signalbox at right...... Moving on to Anerley, this is an ex London Brighton & South Coast Railway station on its line from London Bridge to West Croydon, just to the north of Norwood Junction. At least part of the main building is thought to date from the line opening in 1839.
    [Show full text]
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • 50 Years Ago – a Postscript
    50 YEARS AGO – A POSTSCRIPT METROPOLITAN MODERNISATION Whilst some of us will recall the late-1950s and early 1960s as the period “when it all happened”, there was a lot going on much earlier. Here is a selection of what happened, details being obtained from the Traffic Circulars of the time. Some items may not be directly relevant but nevertheless are included for interest, if only that London Transport were bringing the Metropolitan Line up to date and ‘in line’ with the rest of the network. Date Brief details 02.01.50 “Stop-and-Proceed” abolished north of Harrow-on-the-Hill and all signals, semi- automatic and automatic, provided with signal post telephones. All trains to receive authority from relevant signalman before passing any signal at danger. Signal boxes affected were Watford Station (JL), Croxley (B), Watford Junction (C), Northwood (E), Pinner (G) and Harrow Station (JB). 01.50 Telephones provided on Chesham line (to signalmen at Chalfont & Latimer and Chesham) at One Mile Post, Two Mile Post and Three Mile Post. 04.06.50 Track slewed on a new alignment 30ft west of present from 1,000ft north of Watford South Junction to 1,500ft south of Watford South Junction, to allow bridges MR78, MR80 and MR81 to be taken out of use. 17.06.50 From midnight, maintenance responsibility for track, works & buildings and signalling between 28½ mile post (Mantles Wood) and 37 miles 195 yards, about ¾ mile south of Aylesbury South Junction, will be transferred from Railway Executive to London Transport. 25.06.50 London Transport to take over responsibility for management of ex-Joint Line from Harrow to Aylesbury South Junction including Watford and Chesham branches.
    [Show full text]
  • A Rail Manifesto for London
    A Rail Manifesto for London The new covered walkway linking Hackney Central and Hackney Downs stations creates an interchange which provides a better connection and more journey opportunities March 2016 A Rail Manifesto for London Railfuture1 seeks to inform and influence the development of transport policies and practices nationally and locally. We offer candidates for the 2016 London Mayoral and Assembly elections this manifesto2, which represents a distillation of the electorate’s aspirations for a developing railway for London, for delivery during the next four years or to be prepared for delivery during the following period of office. Executive Summary Recognising the importance of all rail-based transport to the economy of London and to its residents, commuters and visitors alike, Railfuture wishes to see holistic and coherent rail services across all of London, integrated with all other public transport, with common fares and conditions. Achieving this is covered by the following 10 policy themes: 1. Services in London the Mayor should take over. The 2007 transfer of some National Rail services to TfL has been a huge success, transforming some of the worst services in London into some of the best performing. Railfuture believes it is right that the Mayor should take over responsibility for more rail services in London, either by transferring service operation to TfL or by TfL specifying service levels to the operator, and that this must benefit all of London. 2. Improved Services. Frequencies play an important role in the success of metro and suburban train services. We believe that the Mayor should set out the minimum standards of service levels across London seven days per week for all rail services.
    [Show full text]
  • Submissions to the Call for Evidence from Organisations
    Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee.
    [Show full text]
  • Turning South London Orange Passenger Demand, Proposed Main
    Turning south London orange Passenger demand, proposed main schemes and new stations / interchanges Contents Background .............................................................................................................................................. 1 Current entry+exit demand ...................................................................................................................... 2 By Oyster Zone .......................................................................................................................... 3 By Route Corridor Group ............................................................................................................. 4 Modelling future demand ........................................................................................................................ 5 Interchanges and Connectivity ................................................................................................................. 6 New Services and Objectives .................................................................................................................... 6 Satellite Activity Zones ................................................................................................................ 6 Underlying railway technical changes .......................................................................................... 7 Streatham ‘Virtual Tube’ ............................................................................................................. 8 A new South London Line ...........................................................................................................
    [Show full text]
  • West London Orbital Update PDF 513 KB
    West London Economic Prosperity Board 17th February 2021 Title West London Orbital (Standing Item) Report of Niall Bolger, LB Hounslow Status Public Urgent No Enclosures N/A Andrew Barry-Purssell, West London Planning Policy and Officer Contact Details Infrastructure Delivery Manager, West London Alliance, E: [email protected]; T: 07525 388237 Summary This report provides the Board with an update on work with Transport for London and Network Rail to develop the business case for the West London Orbital. It seeks approval for proposed arrangements for providing funding for the project from the resources secured from the Strategic Investment Pot and for governance arrangements reflecting the fact that the project is being jointly funded and delivered. Recommendations Leaders are asked to: i) NOTE progress in development of the business case for the WLO; ii) AGREE the proposed arrangements for funding the project from Strategic Investment Pot resources held by the West London Alliance; and iii) AGREE the arrangements for governance of the project, including establishment of a Partners Oversight Group 1. WHY THIS REPORT IS NEEDED 1.1 The WLEPB has consistently identified the West London Orbital (WLO) Overground rail line as a shared strategic priority for West London, integral to the sub-region’s sustainable development. The Board has agreed that progress and next steps relating to the WLO should be a standing item on its agenda. The West London Alliance (WLA) and West London boroughs have worked closely with Transport for London (TfL) and the Greater London Authority and Network Rail to develop and refine the business case for the project.
    [Show full text]
  • London Transport Railways
    London Transport Railways The following selection of images is of the stock displayed in the “Underground Centenary” exhibition held at Neasden Depot, which we visited on Saturday 25th May 1963...... Sadly and inexplicably the Metropolitan Railway F class 0-6-2T locomotive L52 featured here was scrapped soon afterwards, but most of the other items, or examples of them were preserved at the later London Transport Museum, on the Bluebell and Worth Valley Railways, and elsewhere. In 1963 and for about 10 years afterwards, there was still plenty of vintage interest to be seen out and about on the London Transport lines. The picture (right) shows a train of Metropolitan F stock at New Cross Gate, East London Line, on 17th August 1963...... and here is an old G stock motor car trailing a District line train out of Richmond station on a very wet and misty morning of 4th April 1964...... On that day we travelled extensively around the extremities of the system on a “Combined Rover” day ticket. At the former Great Eastern Railway station of Woodford, Essex we were surprised to find an “automatic” or “driverless” train trial in progress using one of the experimental units, on the Hainault Loop line. These were the first tests of the system later used on the new Victoria Line. Note the aerial on the front of the cab, and temporary wiring...... The weather did not improve as we ventured on to Epping, then to Ongar....... The latter still retaining its air of a country branch terminus despite the use of modern stock (right) A contrast between station architectures is seen at Cockfosters (below left), an iconic LT 1930s design, and High Barnet (right) almost unaltered from its origins as a Great Northern Railway branch terminus...
    [Show full text]
  • Tall Building Strategy
    Brent Tall Building Strategy Local Plan Evidence & Design Guidance March - 2020 Brent Tall Building Strategy Local Plan Evidence & Design Guidance March 2020 Contents 1. Introduction 3 2. Methodology 4 3. Tall building definition 5 4. Planning context 5 5. How tall and where? 9 6. Public transport accessibility 10 7. Building heights 13 8. Areas of search 15 9. Tall Building Zones 55 10. Design criteria 56 Wembley Park masterplan; a large cluster of tall buildings 2 Brent Tall Building Strategy - March 2020 1. Introduction development. More intensive, street-based, medium-rise development forms similar to Victorian terraces or Edwardian 1.1 This document is part of the evidence base for the Brent Local mansion blocks, can also work. These will have a role to play in Plan. It informs general and location specific policies on tall regenerating Brent. They cannot however support the higher buildings and has been informed by main areas identified for densities that tall buildings can achieve, which are required to meet development in the emerging Local Plan. Its purpose is to support the needs of predicted increases in population. the provision of tall buildings (10 storeys or more, or 30+ metres in height) in the most appropriate locations. 1.6 Some of Brent’s growth areas have seen a significant rise in the number of tall buildings. Wembley is the area where the largest 1.2 It also identifies what is expected for the borough to comply with change has occurred to date. In the right place, and with the right national and London policies in creating a tall building strategy.
    [Show full text]
  • UK Jubilee Line Extension (JLE)
    UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster
    [Show full text]
  • Week 10 Monday 7 May All Day Transport
    Week 10 Monday 7 May all day Transport 29 Feb 2019 Respondent Number: 2145 (John Cox) Contents: (1) Comments on ‘Minor Suggested Change’ MSC.10.21 (2) Comments on Matter M76 ============================================= (1) ‘MINOR SUGGESTED CHANGE’ MSC.10.21 There is a ‘Minor Suggested Change’ MSC.10.21 in T3 Table 10.1, currently adding the wording: “London Overground Extension – West London Orbital” That wording is opposed, because it does not, as claimed, provide “Consistency with other GLA Strategies”. I suggest (given the need for enforced brevity in the table) new wording: “Infrastructure improvements on West London Orbital route, including for a London Overground Extension” Specific improvements on the WLO route are still being studied by the ‘West London Alliance’ of boroughs and by TfL - for instance, whether to fully electrify the route, remove existing level crossings, or replace and widen bridges. Nevertheless, there are certain to be significant infrastructure improvements, particularly on the northern section, the Dudding Hill freight line between LB Ealing at Old Oak Common, via LB Brent just south of Wembley, to LB Barnet at Brent Cross Cricklewood. One result of physical improvements is the chance to add completely new London Overground services. However, there are other benefits of this investment - the railway can more efficiently handle freight traffic (supporting policies SI8, SI10, and T7) and can provide a new passenger route for longer-distance, non-London Overground, south-east regional trains (supporting policy T1), stopping at London’s opportunity areas. The replacement wording above is more positively prepared and justified than the original, and more effectively based on joint working on cross-boundary strategic priorities.
    [Show full text]
  • Aviation Strategy
    House of Commons Transport Committee Aviation Strategy First Report of Session 2013–14 Volume I HC 78-I House of Commons Transport Committee Aviation Strategy First Report of Session 2013–14 Volume I Volume I: Report, together with formal minutes. Oral and written evidence contained in Volume II and additional written evidence contained in Volume III are available on the Committee website at www.parliament.uk/transcom Ordered by the House of Commons to be printed 8 May 2013 HC 78-I Incorporating HC 765 i-vii, Session 2012-13 Published on 10 May 2013 by authority of the House of Commons London: The Stationery Office Limited £15.50 The Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its Associate Public Bodies. Current membership Mrs Louise Ellman (Labour/Co-operative, Liverpool Riverside) (Chair) Steve Baker (Conservative, Wycombe) Sarah Champion (Labour, Rotherham) Jim Dobbin (Labour/Co-operative, Heywood and Middleton) Kwasi Kwarteng (Conservative, Spelthorne) Karen Lumley (Conservative, Redditch) Karl McCartney (Conservative, Lincoln) Lucy Powell (Labour/Co-operative, Manchester Central) Mr Adrian Sanders (Liberal Democrat, Torbay) Iain Stewart (Conservative, Milton Keynes South) Graham Stringer (Labour, Blackley and Broughton) The following were also members of the committee during the Parliament. Angie Bray (Conservative, Ealing Central and Acton), Lilian Greenwood (Labour, Nottingham South), Mr Tom Harris (Labour, Glasgow South), Julie Hilling (Labour, Bolton West), Kelvin Hopkins (Labour, Luton North), Mr John Leech (Liberal Democrat, Manchester Withington) Paul Maynard, (Conservative, Blackpool North and Cleveleys), Gavin Shuker (Labour/Co-operative, Luton South), Angela Smith (Labour, Penistone and Stocksbridge), Julian Sturdy (Conservative, York Outer) Powers The Committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152.
    [Show full text]