Clarity in Cleats

Total Page:16

File Type:pdf, Size:1020Kb

Clarity in Cleats D E C K H A R D WARE Midship cleats are often mounted on the toerail where they are backed and Clarity in reinforced by the thick solid fiberglass at the hull-to-deck joint. Although only two bolts secure the cleat, the usual loads Cleats on a spring line will align with the bolt pattern. A breast-line would not. Note that using an eyesplice here defeats a key advantage of a cleat: allowing a line to be cast off under load. The concept of a cleat as a securing mechanism goes back to the 1400s, when antecedents to modern horn- type belaying cleats began to arrive on the scene. Eventually iron and bronze cast renditions were bolted to timber deck planking that incorporated ad- ditional under-deck reinforcement and load-spreading backing blocks. Today, in a era of stiff, light, foam-core Are boatbuilders taking this essential decks, there’s a need to carefully con- sider how energy is dissipated around piece of deck hardware for granted? cleat attachment points. For one thing, n average, a sailboat that’s used 60 yet most essential piece of hardware. higher-density “infills” are necessary Otimes a year actually spends only For centuries, timber-built craft re- in regions where bolts secure a cleat to about 6 percent of its annual cycle un- lied upon one or two parallel vertical a cored deck. Some builders avoid this derway. During the rest of the time, it’s posts, often call “bitts,” that passed extra effort by placing cleats near the either tied up, moored, anchored, or through the deck after being fastened toerail, where the core is eliminated and hauled out for maintenance, and when to the keelson, floor frames, and deck the two fiber re-inforced plastic (FRP) tallied up, this time can total as much beams. Lines were secured to these skins of the deck have been brought as 94 percent of the year. That means “Samson posts,” a nickname that allud- together. This can be an adequate ap- that cleats (and docklines), rather than ed to pillars that only Samson was able proach as long the laminate is thick the person at the helm, will likely be in to tear down. The trend to secure these enough or backed with a reinforcing control of your sailboat’s destiny when line-handling bitts to major structural (load-spreading) plate or extra units of the worst squall lines and cold fronts components of the vessel was based FRP, and shoulder washers are used. batter the fleet. upon function rather than fashion, and In addition to the structural issues From this data, we can draw two im- it stemmed from the huge tension loads involved, there are concerns over line portant conclusions. The first is that we that could be imparted by docklines, leads and the need to make cleat use as all need to spend more time underway, tow warps, and anchor rodes. Bitts, safe and efficient as possible. It’s easy to Photos by Ralph Naranjo and the second underscores the impor- along with the spoon-bow sloops and lose sight of how much energy a cleat tance of the cleat as an elegantly simple, schooners that sported them, have all must handle. In addition to steady-state but disappeared from the line loads (normally in shear), there are waterfront, but the need a variety of angle and load oscillations for secure points to attach associated with surging line loads. Fluc- the cleats that usurped the tuations in the intensity can be linked to role of the Samson post are tidal rise and fall, along with force mul- as important as ever. tipliers such as gusts and boat wakes. Seiching, for example, is a low-fre- quency sloshing akin to what happens This heavy-duty bitt on in a bowl of soup that’s held in shaky the Coast Guard Rescue hands. The net effect of such outside 47 cutter is also found on forces is to accelerate a tied-up ves- many oceangoing yachts. sel, adding a tension oscillation to the The bitts can accommo- docklines or anchor rode. In many West date multiple turns and Coast harbors, submarine canyons en- thick-diameter lines. hance this large-scale undulation, and 8 MARCH 2010 WWW.PRACTICAL-SAILOR.COM D E S I G N D ETAILS Race-boat Alternatives he object of a racing boat is to keep moving, not sit Tstill, so it’s no real surprise that cleats aren’t a high- priority item. Aside from adding weight, cleats are notori- ously effective at snagging sheets and guys, pushing them further down the list of “must haves” on a good racing boat. In fact, some racing boats we looked at for this article did not even have cleats on the foredeck to take an anchor or bowline. The weld on this eyelet (right) is not designed to take the loads in the direction of pull of a dockline. Also, releasing the line under load will require a knife. Other makers, however, found folding designs and pop-up cleats (far right) to be a fair compromise. But corrosion and grit soon take the “pop” out of pop-up cleats. For cruising boats, PS still recommends the no-nonsense fixed cleats, always at the ready when you need them. seiching can greatly increase the wear and hardware and securing methodol- this meant on the transom rather than and tear on both lines and cleats. ogy were sound enough to do the job. the deck itself. The result was a new set Cleats are the lynchpin in keeping a In a few cases, such as with the “flip- of point loads on the hull skin, plus a vessel where it belongs when conditions up” horn cleats found of the luxury very awkward perch for line-handlers. deteriorate. Recognizing their impor- line of Oyster Yachts, there were true This lackadaisical approach to cleat tance, we sent Practical Sailor Techni- design innovations. But we also noted placement and the growing trend in the cal Editor Ralph Naranjo to the recent that some of the other hide-away cleat race-boat fraternity toward eliminating Annapolis and Miami boat shows on designs had to cope with water drainage “cleat clutter” altogether, occasionally a mission to scrutinize the amount of and less-than-robust support structure, resulted in docklines being tied to pul- attention designers, builders, and bro- compromises that may not pay off in the pit stanchions, chainplates, and even kers have been placing on these crucial long run. Even worse, some designers stays and shrouds! components. On his checklist were bul- and builders seem to have dubbed cleats It seemed that less and less concern let points such as hardware positioning, passé, substituting hard points such a was given to the ergonomics of handling fastening means, and most importantly, rings and eyes as alternatives for line at- a line on a cleat. It’s understandable that how the cleat handled the job at hand. tachment. A few builders seemed to be a foredeck crew in the midst of a spin- He also looked to see whether the cleats placing cleats wherever they could find naker peel doesn’t want obstructions in (and chocks when used) were large room to stick them. And in some cases, the middle of their “court,” especially enough to accommodate appropriate sized lines and anti-chafe gear. And finally, if a storm was in the forecast, how would the “doubling up” of dock- lines be handled? These cleat-focused show visits re- vealed more than we initially antici- pated: They highlighted that in many cases, a seafaring tradition lives on, The Sparkman & Stephens-designed yawl Manitou, the “floating White House” sailed by John F. Kennedy while he was president, sports a tradi- tional Samson post. Passing through the deck and tying into the stem below, the Samson post is engineered to withstand heavy anchoring and mooring loads. PRACTICAL SAILOR MARCH 2010 9 D E C K H A R D WARE 1 2 3 Picks and Pans ones with lethal horns eager to snag 1. The four-bolt cleat on the custom S&S a lazy guy or sheet. But from the op- Palawan VI takes snubbing loads from the posite point of view, a crew adjusting anchor in a location that is easy to work. docklines in a rough, gale-swept harbor needs easy access to securely mounted 2. A pop-up cleat and a open chock hardware. keep the decks clear. But sharp bends at A growing concern is that many the chocks invite chafe, and tight cleats manufacturers seem more concerned impede doubling of lines for a storm. with how cleats and chocks look, rather than how they work. The most impor- 3. Big bitts and a hefty winch cleat stand tant consideration is whether or not a ready to accept multiple lines or rodes. deck cleat carrying a full load can be handled without potentially sacrific- 4. The Friendship 53’s chocks and cleats ing fingers. are elegant, but leave little room for Sheet-handling cleats in the cockpit fingers or chafing gear. belay lines that have been load damp- ened via turns around a winch drum. 5. The hawsehole on the Cabo Rico 56 Just the opposite is true with a deck allows room for big lines and chafe gear, cleat. The energy contained in a stretch- ing bow or spring line goes directly to a 4 but leading sternlines to a winch can bend the winch’s spindle, or worse. cleat. The load in the line is only slightly abated by a partial or full turn around the cleat, and when a crew member has a line in “hand,” good cleat placement allows a quick wrap to be taken without any appendages having to be placed in harm’s way.
Recommended publications
  • Mast Furling Installation Guide
    NORTH SAILS MAST FURLING INSTALLATION GUIDE Congratulations on purchasing your new North Mast Furling Mainsail. This guide is intended to help better understand the key construction elements, usage and installation of your sail. If you have any questions after reading this document and before installing your sail, please contact your North Sails representative. It is best to have two people installing the sail which can be accomplished in less than one hour. Your boat needs facing directly into the wind and ideally the wind speed should be less than 8 knots. Step 1 Unpack your Sail Begin by removing your North Sails Purchasers Pack including your Quality Control and Warranty information. Reserve for future reference. Locate and identify the battens (if any) and reserve for installation later. Step 2 Attach the Mainsail Tack Begin by unrolling your mainsail on the side deck from luff to leech. Lift the mainsail tack area and attach to your tack fitting. Your new Mast Furling mainsail incorporates a North Sails exclusive Rope Tack. This feature is designed to provide a soft and easily furled corner attachment. The sail has less patching the normal corner, but has the Spectra/Dyneema rope splayed and sewn into the sail to proved strength. Please ensure the tack rope is connected to a smooth hook or shackle to ensure durability and that no chafing occurs. NOTE: If your mainsail has a Crab Claw Cutaway and two webbing attachment points – Please read the Stowaway Mast Furling Mainsail installation guide. Step 2 www.northsails.com Step 3 Attach the Mainsail Clew Lift the mainsail clew to the end of the boom and run the outhaul line through the clew block.
    [Show full text]
  • Anticipating Anchoring Story and Photos by Jeff Merrill
    power voyaging Anticipating anchoring STORy ANd phOTOS by JEff MERRIll he freedom to explore which goes into great detail Let’s presume that the Tremote cruising grounds on a number of theoretical windlass (horizontal or verti- and to anchor out overnight aspects and practical applica- cal) and anchor (so many or for days at a time is one tions for a variety of situa- variations) have already been of the great attractions of tions. Over time voyagers selected and installed on the trawler lifestyle. Under- generally develop techniques your trawler and are appro- standing how your ground for setting their anchor, priately sized to provide breaking it loose and you with sufficient holding securely stowing the strength. With this article ground tackle while I’d like to share some com- underway — practice, mon sense techniques you fine-tune and keep can adapt to your trawler learning. that will improve your com- There are many fort level and to help you factors involved in “dial-in” your anchoring selecting a safe place routine. Be sure that the to drop the hook — connection between your wind, tide, currents, anchor and chain (swivel other boats, etc. You with Loctite or shackles with seizing wire on the pins) is secure so it can’t disconnect. Above, an tackle connects your Securing the anchor anchor bridle floating palace to the It is vitally important that setup evenly sea floor and being your anchor, when raised distributes the properly prepared will and stowed on its roller, load. Right, an give you more con- is secure in place and not anchor keeper fidence to visit new free to wobble around.
    [Show full text]
  • Last Voyage of the Hornet: the Story That Made Mark Twain Famous
    Last Voyage of the Hornet: The Story that Made Mark Twain Famous Kristin Krause Royal Fireworks Press Unionville, New York For Greg, Duncan, and Luke – Never give up. Copyright © 2016, Royal Fireworks Publishing Co., Inc. All Rights Reserved. Royal Fireworks Press P.O. Box 399 41 First Avenue Unionville, NY 10988-0399 (845) 726-4444 fax: (845) 726-3824 email: [email protected] website: rfwp.com ISBN: 978-0-88092-265-4 Printed and bound in Unionville, New York, on acid-free paper using vegetable-based inks at the Royal Fireworks facility. Publisher: Dr. T.M. Kemnitz Editors: Dr. T. M. Kemnitz, Rachel Semlyen, and Jennifer Ault Book and cover designer: Kerri Ann Ruhl 8s6 ps Chapter 1 The clipper ship Hornet drifted across the mirroring waters of the Pacific Ocean in a blistering hot calm. Not a breath of wind stirred on deck, but upper air currents filled the skysails and royals, gently propelling the vessel along. The morning air was already sweltering. The crew, all barefoot and mostly shirtless, moved lethargically in the tropical heat. Those not on duty sought shade where they could find it or lazily dangled fishing lines in the water. All the hatches, skylights, and portholes were open to admit air, making it tolerable for those below decks. Since crossing the equator two days before, the ship had been slipping slowly north through a series of hot and windless days. But that was about to change. The captain of the Hornet was Josiah Mitchell, fifty-three years old, capable and levelheaded, with an inexpressive face hidden under a bushy beard.
    [Show full text]
  • UNIT 3.5 N M a N U a L Thanks for Buying a Harken Jib Reefing and Furling System
    I N S T R U MKIII C Jib Reefing & T Furling Systems I O UNIT 3.5 N M A N U A L Thanks for buying a Harken Jib Reefing and Furling System. It will give you reliable service with minimal maintenance, but does require proper assembly and basic care. This manual is an important part of the total reefing system. Please take the time to read it carefully before assembling or using your furling system. These instructions may look intimidating, but they are very simple and use photos and drawings throughout to make assembly easy. Many sections will not apply to your boat or to your installation. If you have questions which cannot be answered by the manual or your dealer, please feel free to give us a call. We’ll be happy to do anything we can to make your sailing safer and more fun. 2 Unit 3.5 MKIII January 2007 Parts 6-7 Sailmaker Instructions 8 Preparation for Assembly 10 – 12 This section tells how to measure the headstay, prepare the wire and cut foil to length if they have not been supplied ready to assemble. Assembly 13 – 20 Assembly of the unit is explained in this section Commissioning 21 – 23 Commissioning covers how to install the assembled unit on the boat and make it operational. Operation 24 – 28 This section explains system use. It also discusses tensioning the headstay and converting to racing. Troubleshooting & Repair 29 – 30 The Assembly and Operation Trouble Shooting guides explain how to correct problems. Your seven-year limited warranty is explained on page 30.
    [Show full text]
  • Sailing Course Materials Overview
    SAILING COURSE MATERIALS OVERVIEW INTRODUCTION The NCSC has an unusual ownership arrangement -- almost unique in the USA. You sail a boat jointly owned by all members of the club. The club thus has an interest in how you sail. We don't want you to crack up our boats. The club is also concerned about your safety. We have a good reputation as competent, safe sailors. We don't want you to spoil that record. Before we started this training course we had many incidents. Some examples: Ran aground in New Jersey. Stuck in the mud. Another grounding; broke the tiller. Two boats collided under the bridge. One demasted. Boats often stalled in foul current, and had to be towed in. Since we started the course the number of incidents has been significantly reduced. SAILING COURSE ARRANGEMENT This is only an elementary course in sailing. There is much to learn. We give you enough so that you can sail safely near New Castle. Sailing instruction is also provided during the sailing season on Saturdays and Sundays without appointment and in the week by appointment. This instruction is done by skippers who have agreed to be available at these times to instruct any unkeyed member who desires instruction. CHECK-OUT PROCEDURE When you "check-out" we give you a key to the sail house, and you are then free to sail at any time. No reservation is needed. But you must know how to sail before you get that key. We start with a written examination, open book, that you take at home.
    [Show full text]
  • Sunfish Sailboat Rigging Instructions
    Sunfish Sailboat Rigging Instructions Serb and equitable Bryn always vamp pragmatically and cop his archlute. Ripened Owen shuttling disorderly. Phil is enormously pubic after barbaric Dale hocks his cordwains rapturously. 2014 Sunfish Retail Price List Sunfish Sail 33500 Bag of 30 Sail Clips 2000 Halyard 4100 Daggerboard 24000. The tomb of Hull Speed How to card the Sailing Speed Limit. 3 Parts kit which includes Sail rings 2 Buruti hooks Baiky Shook Knots Mainshoat. SUNFISH & SAILING. Small traveller block and exerts less damage to be able to set pump jack poles is too big block near land or. A jibe can be dangerous in a fore-and-aft rigged boat then the sails are always completely filled by wind pool the maneuver. As nouns the difference between downhaul and cunningham is that downhaul is nautical any rope used to haul down to sail or spar while cunningham is nautical a downhaul located at horse tack with a sail used for tightening the luff. Aca saIl American Canoe Association. Post replys if not be rigged first to create a couple of these instructions before making the hole on the boom; illegal equipment or. They make mainsail handling safer by allowing you relief raise his lower a sail with. Rigging Manual Dinghy Sailing at sailboatscouk. Get rigged sunfish rigging instructions, rigs generally do not covered under very high wind conditions require a suggested to optimize sail tie off white cleat that. Sunfish Sailboat Rigging Diagram elevation hull and rigging. The sailboat rigspecs here are attached. 650 views Quick instructions for raising your Sunfish sail and female the.
    [Show full text]
  • Setting, Dousing and Furling Sails the Perception of Risk Is Very Important, Even Essential, to Organization the Sense of Adventure and the Success of Our Program
    Setting, Dousing and Furling Sails The perception of risk is very important, even essential, to Organization the sense of adventure and the success of our program. The When at sea the organization for setting and assurance of safety is essential dousing sails will be determined by the Captain to the survival of our program and the First Mate. With a large and well- and organization. The trained crew, the crew may be able to be broken balancing of these seemingly into two groups, one for the foremast and one conflicting needs is one of the for the mainmast. With small crews, it will most difficult and demanding become necessary for everyone to know and tasks you will have in working work all of the lines anywhere on the ship. In with this program. any event, particularly if watches are being set, it becomes imperative that everyone have a good understanding of all lines and maneuvers the ship may be asked to perform. Safety Sailing the brigantines safely is our primary goal and the Los Angeles Maritime Institute has an enviable safety record. We should stress, however, that these ships are NOT rides at Disneyland. These are large and powerful sailing vessels and you can be injured, or even killed, if proper procedures are not followed in a safe, orderly, and controlled fashion. As a crewmember you have as much responsibility for the safe running of these vessels as any member of the crew, including the ship’s officers. 1. When laying aloft, crewmembers should always climb and descend on the weather side of the shrouds and the bowsprit.
    [Show full text]
  • LEXIQUE NAUTIQUE ANGLAIS-FRANÇAIS – 2E ÉDITION, NUMÉRIQUE, ÉVOLUTIVE, GRATUITE
    Aa LEXIQUE NAUTIQUE ANGLAIS-FRANÇAIS – 2e ÉDITION, NUMÉRIQUE, ÉVOLUTIVE, GRATUITE « DIX MILLE TERMES POUR NAVIGUER EN FRANÇAIS » ■ Dernière mise à jour le 19 octobre 2017 ■ Présenté sur MS Word 2011 pour Mac ■ Taille du fichier 2,3 Mo – Pages : 584 - Notes de bas de page : 51 ■ Ordre de présentation : alphabétique anglais ■ La lecture en mode Page sur deux colonnes est recommandée Mode d’emploi: Cliquer [Ctrl-F] sur PC ou [Cmd-F] sur Mac pour trouver toutes les occurrences d’un terme ou expression en anglais ou en français AVERTISSEMENT AUX LECTEURS Ouvrage destiné aux plaisanciers qui souhaitent naviguer en français chez eux comme à l’étranger, aux instructeurs, modélistes navals et d’arsenal, constructeurs amateurs, traducteurs en herbe, journalistes et adeptes de sports nautiques et lecteurs de revues spécialisées. Il subsiste moult coquilles, doublons et lacunes dont l’auteur s’excuse à l’avance. Des miliers d’ajouts et corrections ont été apportés depuis les années 80 et les entrées sont dorénavant accompagnées d’un ou plusieurs domaines. L’auteur autodidacte n’a pas fait réviser l’ouvrage entier par un traducteur professionnel mais l’apport de généreux plaisanciers, qui ont fait parvenir corrections et suggestions depuis plus de trois décennies contribue à cet ouvrage offert gracieusement dans un but strictement non lucratif, pour usage personnel et libre partage en ligne avec les amoureux de la navigation et de la langue française. Les clubs et écoles de voile sont encouragés à s’en servir, à le diffuser aux membres et aux étudiants. Tous droits réservés de propriété intellectuelle de l’ouvrage dans son ensemble (Copyright 28.10.1980 Ottawa); toutefois la citation de courts extraits est autorisée et encouragée.
    [Show full text]
  • Investigation of Abandoned WW II Wrecks in Palau
    Investigation of Abandoned WW II Wrecks in Palau Tomo Ishimura1 Abstract Over forty Japanese vessels were sunken in the water of Palau during WWII. Some wrecks sunk in the shallow water at a depth of 20 meters or less and were salvaged. Other wrecks at 30 meters depth or more still remain and are legally protected by the authority of Palau Government but are seriously threatened by illegal treasure hunters. Initial efforts to identify human remains of Japanese soldiers were made in 2005. As part of an archaeology advisory team for the Japanese Government I carried out underwater surveys of sunken WWII vessels in Palau. In 2010 and 2011, I conducted investigations of the WWII vessels again, together with on-shore research on sites and features associated with the Japanese occupation period, funded by the Takanashi Foundation for Arts and Archaeology (Japan). The research revealed that the most of the vessels sunken in Palau were not genuine military vessels of Japanese Imperial Navy or Army but converted vessels originally built for non-combat purposes. These vessels were slow in speed and not well-equipped for combat activity. Most of them were destroyed by American aerial bombing on March 30th 1944. The evening before (March 29th) the main force of the Japanese Combined Fleet, including its flagship Musashi, retreated from Palau. It is clear that the vessels left in Palau were abandoned as a “third wheel” of the Combined Fleet. These abandoned-converted vessels include cargo carriers, tankers, whaling boats and fishing boats. This implies that Japanese troops were experiencing a difficult and desperate campaign at that time.
    [Show full text]
  • Direction Island Unidentified (Cocos Keeling Islands) Inspection Report
    Direction Island Unidentified (Cocos Keeling Islands) Inspection Report M. McCarthy Report—Department of Maritime Archaeology Western Australian Museum, No. 195. 2005 Technical Data Site Name: Direction Island unidentified. Date lost: Mid 19th Century? Finders: Paul Fitzgerald & Bob Bower Date of Inspection: 2/11/2004 Personnel: M. McCarthy OIC: (Department of Maritime Archaeology, WA Maritime Museum) G. Henderson (WA Maritime Museum) W. Murray (Parks Australia) R. Thorn (Parks Australia) A. Granger (Parks Australia) Approximate Location c. 0.5 nm., south of Direction in Port Refuge at the north east corner of the lagoon at the Cocos (Keeling) Islands GPS. 12°05. 924’S., 96°52.815’E (Datum Used...WGS 84...) Chart No: BA 2510: South Keeling File No: 239/81 File Name: Cocos Island Area Sailing Directions: Enter through the eastern passage to Port Refuge, which lies south of Horsburgh Island and north of Direction Island in the South Keeling lagoon, Cocos (Keeling) Islands. Steer south towards Home Island along the navigation markers until opposite the second port marker adjacent to Prison Island. Caution is required as shallow waters exist beyond Port Refuge. Site Photographs: Video: Direction Island Wreck (Parks Australia collection/ MADWAM Collection) Site Conditions on inspection Sea and Swell: Calm Surge: Nil Visibility: 20m plus Current: Nil Sea-bed coverage: The wreck lies on a clean sand bottom. Chemical Measurements : To be assessed on a subsequent inspection. These data would include temperature, salinity, Ph, dissolved O2, corrosion potentials. Biological Data: Colonising fauna: While there is some colonisation of the exposed fastenings by coral, it is not uniformly evident.
    [Show full text]
  • RS Tera and Thank You for Choosing an RS Product
    Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER Contents 1. Introduction......................................................... 1 2. Technical data.................................................... 2 3. Commissioning................................................. 3 - 20 3.1 - Preparation.............................................................. 4 3.2 - Unpacking................................................................ 4 3.3 - Pack contents.......................................................... 4 - 5 3.4 - Adding the toestraps ................................................ 6 - 7 3.5 - Adding the toestrap elastic ...................................... 7 3.6 - Adding the rope handles .......................................... 8 3.7 - Adding the rear strop ............................................... 9 3.8 - Adding the bung ....................................................... 9 3.9 - Adding the righting lines .......................................... 10 3.10 - Adding ther painter ................................................ 10 3.11 - Rigging the mast .................................................... 11 - 12 3.12 - Stepping the mast .................................................. 12 3.13 - Rigging the boom ................................................... 13 - 17 3.14 - Rudder and daggerboard ...................................... 18 - 20 4. Sailing hints........................................................... 21 - 26 4.1 - Introduction..............................................................
    [Show full text]
  • Trabalhos De Arqueologia 18
    Sources for Lusitanian shipbuilding ❚ RICHARD BARKER ❚ Introduction “...Still there is more. In the ancient archives of the kingdom, at whose head I found myself, there exists a most ancient manuscript that is a contract between the king D. Afonso III and the Master of the Knights of Santiago, Paio Peres. In that document it is determined that the tribute of mermaids and other animals fished on the beaches of the same Order ought to be paid not to the Master but to the Kings. From which it is easy to collect that mermaids were frequent in our waters, seeing that a law had been promulgated about them. Enough: it is not worth continuing to speak of tritons, sea-nymphs and mermaids, and we renew the thread of the discourse”. Damião de Gois, Lisboa de Quinhentos, 1554 (Gois, 1554-1937, p. 30)1, offers this sad tale of over-fishing in the third quarter of the thirteenth century. The same might have been said of the wrecks of Portuguese ships, whose absence had been the source of some woe to schol- ars such as João da Gama Pimentel Barata and Octávio Lixa Filgueiras. After all, it was Por- tuguese ships that really opened up the world in the fifteenth century, and even much of the so-called Spanish Armada had actually been seized from the Portuguese arsenals. Happily, the sirens have finally led our Portuguese colleagues to the true fishing grounds. Perhaps the mer- maids will follow. Portugal has a maritime history out of all proportion to its size, but after a brief survey, towards the overall theme of the conference, this paper will concentrate on three aspects of nau- tical archaeology that have been illuminated by the contents of Portuguese libraries.
    [Show full text]