Blue River Biosolids Facility, Final Basis of Design Report

Total Page:16

File Type:pdf, Size:1020Kb

Blue River Biosolids Facility, Final Basis of Design Report KC Water Blue River Wastewater Treatment Plant Biosolids Facility BASIS OF DESIGN REPORT FINAL | January 2020 This document is released to the City of Kansas City, Missouri and Shortlisted Respondents as part of the Request for Proposals Package issued January 24, 2020, Project No. 81000821 – Contract Number 1595. This report does not incorporate any modifications made by subsequent addenda since this report was initially issued to Shortlisted Respondents. KC Water Blue River Wastewater Treatment Plant Biosolids Facility BASIS OF DESIGN REPORT FINAL | January 2020 CERTIFICATION PAGE Project/Contract Number __081000821/1595______ Project Title _Blue River Biosolids Facility Project_______ I am responsible for the following sections of the Basis of Design Report: Structural (SEAL) 00005 Construction Certification Page 050113 Modified For WSD 072916 Contract Central BASIS OF DESIGN REPORT | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | KC WATER Contents Chapter 1: Introduction 1.1 Purpose of Design Criteria Documents 1-1 1.1.1 Basis of Design Report Organization 1-1 1.2 Design Criteria for the Representative Project 1-2 1.2.1 Fixed Design Criteria 1-2 1.2.2 Indicative Design Criteria 1-2 1.2.3 Indicative-Preferred Design Criteria 1-2 1.3 Project Overview 1-2 Chapter 2: Performance Requirements 2.1 Introduction 2-1 2.2 Influent Flows and Loads 2-1 2.3 Process Modeling Conditions and Results 2-3 Chapter 3: Project Siting & Existing Facilities 3.1 Existing Site Conditions 3-1 3.1.1 Site Survey & Potholing Data 3-1 3.1.2 LIDAR Information 3-1 3.1.3 Geotechnical Report 3-2 Chapter 4: Treatment Process Design Criteria 4.1 Introduction 4-1 4.2 Drawings and Informational Design Documents 4-1 4.2.1 Drawings 4-1 4.2.2 Informational Only (BIM and Sketchup) 4-2 4.3 General Treatment Equipment Procurement Requirements 4-2 4.4 Sludge Screening 4-2 4.4.1 Process Description 4-2 4.4.2 Basis of Design 4-3 4.4.3 Sludge Screens 4-3 4.4.4 Sludge Pumps 4-4 4.4.5 Support Equipment 4-4 4.4.6 Sludge Screening Building 4-4 FINAL | JANUARY 2020 | i pw://Carollo/Documents/Client/MO/Kansas City/11168A60/Deliverables/_Basis of Design/BRBF Final BODR 20200124 KC WATER | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | BASIS OF DESIGN REPORT 4.4.7 Control Narrative 4-5 4.5 East Holding Tank 4-6 4.5.1 Process Description 4-6 4.5.2 Basis of Design 4-6 4.5.3 Tank Mixing Improvements 4-6 4.5.4 Pre-THP Sludge Supply Loop 4-7 4.5.5 Structural Modifications 4-9 4.5.6 Control Narrative 4-9 4.6 Pre-THP Dewatering and Cake Storage 4-10 4.6.1 Process Description 4-10 4.6.2 Basis of Design 4-10 4.6.3 Pre-THP Centrifuge Feed Pumping 4-11 4.6.4 Pre-THP Dewatering Centrifuges 4-12 4.6.5 Pre-THP Cake Conveyance 4-12 4.6.6 Pre-THP Cake Silos 4-13 4.6.7 Pre-THP Cake Pumping 4-14 4.6.8 Control Narrative 4-14 4.7 Thermal Hydrolysis Process and Steam Generation 4-15 4.7.1 Process Description 4-15 4.7.2 Basis of Design 4-16 4.7.3 Control Narrative 4-21 4.8 Digester Improvements 4-23 4.8.1 Process Description 4-23 4.8.2 Basis of Design 4-24 4.8.3 Sludge Stabilization 4-25 4.8.4 Digester Mixing 4-26 4.8.5 Sludge Heating and Cooling 4-27 4.8.6 Sludge Inlet Piping and Digested Sludge Transfer 4-27 4.8.7 Digester Biogas Collection 4-29 4.8.8 Additional Considerations 4-31 4.8.9 Control Narrative 4-32 4.9 West Holding Tank Improvements 4-33 4.9.1 Process Description 4-33 ii | JANUARY 2020 | FINAL BASIS OF DESIGN REPORT | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | KC WATER 4.9.2 Basis of Design 4-33 4.9.3 Tank Mixing Improvements 4-33 4.9.4 Digester Biogas Storage 4-34 4.9.5 West Holding Tank Supply Loop 4-37 4.9.6 Digester Sludge Recirculation Pumps 4-38 4.9.7 Additional Considerations 4-39 4.9.8 Structural Modifications 4-40 4.9.9 Control Narrative 4-40 4.10 Post-THP Dewatering and Cake Storage 4-44 4.10.1 Process Description 4-44 4.10.2 Basis of Design 4-45 4.10.3 Post-THP Centrifuge Feed Pumping 4-45 4.10.4 Post-THP Dewatering Centrifuges 4-45 4.10.5 Post-THP Cake Conveyance 4-46 4.10.6 Post-THP Cake Silo 4-47 4.10.7 Cake Loadout 4-48 4.10.8 Control Narrative 4-48 4.11 Biogas Processing 4-49 4.11.1 Process Description 4-49 4.11.2 Basis of Design 4-49 4.11.3 Control Narrative 4-50 4.12 Sidestream Treatment 4-51 4.12.1 Process Description 4-51 4.12.2 Basis of Design 4-51 4.12.3 ANITATM Mox 4-52 4.12.4 Additional Considerations 4-55 4.12.5 HVAC/Odor Control Requirements 4-56 4.13 Polymer Storage and Feed Facilities 4-56 4.13.1 Process Description 4-56 4.13.2 Basis of Design 4-56 4.13.3 Pre-THP Polymer Storage Tank and Polymer Recirculation Pumps 4-57 4.13.4 Pre-THP Polymer Blending Units 4-57 4.13.5 Pre-THP Polymer Aging Tanks 4-58 FINAL | JANUARY 2020 | iii KC WATER | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | BASIS OF DESIGN REPORT 4.13.6 Pre-THP Centrifuge Polymer Solution Feed Pumps 4-59 4.13.7 Polymer Slip Injection Pumps 4-59 4.13.8 Post-THP Polymer 4-60 4.13.9 Control Narrative 4-60 4.14 Odor Control Systems 4-63 4.14.1 Process Description 4-63 4.14.2 Basis of Design 4-63 4.14.3 Pre-THP Area Odor Control 4-64 4.14.4 Post-THP Area Odor Control 4-65 4.14.5 Additional Considerations 4-67 4.15 Trickling Filter Snails Removal 4-68 4.16 Deductive Work Items 4-69 4.16.1 Replacement of Solids Building Elevator (Deductive Work Item No. 1) 4-69 4.16.2 Exhaust Stack Demolition (Deductive Work Item No. 2) 4-69 4.16.3 Radio Relocation or Replacement (Deductive Work Item No. 3) 4-69 4.16.4 Trickling Filter Snail Removal System (Deductive Work Item No. 4) 4-69 4.16.5 Second Flare (Deductive Work Item No. 5) 4-69 Chapter 5: Discipline Design Criteria 5.1 Civil 5-1 5.1.1 Codes and Standards 5-1 5.1.2 Survey 5-5 5.1.3 Geotechnical Requirements 5-6 5.1.4 Environmental Requirements 5-6 5.1.5 Demolition 5-7 5.2 Structural 5-7 5.2.1 Basis of Design 5-7 5.2.2 Facilities Requirements 5-11 5.2.3 Codes and Standards 5-13 5.2.4 Structural Design References 5-13 5.2.5 Structural Materials and Specifications 5-14 5.3 Architectural 5-27 5.3.1 Basis of Design 5-27 iv | JANUARY 2020 | FINAL BASIS OF DESIGN REPORT | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | KC WATER 5.3.2 Facilities Requirements 5-27 5.3.3 Codes and Standards 5-35 5.3.4 Materials and Specifications 5-36 5.4 Electrical 5-60 5.4.1 Basis of Design 5-60 5.4.2 Codes and Standards 5-76 5.4.3 Electrical Design References 5-76 5.5 SCADA, Instrumentation & Controls 5-76 5.5.1 Basis of Design 5-76 5.5.2 Codes and Standards 5-77 5.5.3 Control System Design Requirements 5-77 5.5.4 Instrumentation Design Requirements 5-87 5.5.5 SCADA System Application Programming Design Requirements 5-92 5.6 Building Mechanical (HVAC, Plumbing and Fire Protection) 5-93 5.6.1 Basis of Design 5-93 5.6.2 Facilities Requirements 5-96 5.6.3 Codes and Standards 5-99 5.6.4 Mechanical Design References 5-99 5.6.5 Mechanical Piping and Ductwork Materials 5-99 5.7 Mechanical Piping and Valves 5-100 5.7.1 Basis of Design 5-100 5.7.2 Codes and Standards 5-101 5.7.3 Pipe Material Design Requirements 5-102 5.7.4 Valve Design Requirements 5-108 5.7.5 Pipe System Design Requirements 5-113 5.8 Security (Physical and System) 5-114 Chapter 6: Permitting Responsibility Tables Table 2.1 Blue River WWTP Forecasted Population and TSS and BOD5 Loadings 2-1 Table 2.2 Birmingham WWTP Forecasted Population and TSS and BOD5 Loadings 2-2 Table 2.3 Westside WWTP Forecasted Population and TSS and BOD5 Loadings 2-2 FINAL | JANUARY 2020 | v KC WATER | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | BASIS OF DESIGN REPORT Table 2.4 Forecasted Nutrient Load for Blue River WWTP, Birmingham WWTP and Westside WWTP 2-3 Table 2.5 Raw Sludge Production 2-5 Table 2.6 Anaerobic Digestion 2-7 Table 2.7 Dewatering Sidestream 2-9 Table 4.1 Sludge Screening Flows and Loading Design Criteria 4-3 Table 4.2 Sludge Screen Design Criteria 4-3 Table 4.3 Sludge Pump Design Criteria 4-4 Table 4.4 Sludge Screening Support Equipment Design Criteria 4-4 Table 4.5 Sludge Screening Building Design Criteria 4-5 Table 4.6 Existing East Holding Tank Parameters 4-6 Table 4.7 East Holding Tank Mixing Pumps Design Criteria 4-7 Table 4.8 Design Criteria for Pre-THP Sludge Supply Loop Pumps 4-8 Table 4.9 Pre-THP Sludge Supply Loop Pumps Operational Points 4-8 Table 4.10 Pre-THP Sludge Supply Loop Pumps Design Criteria 4-8 Table 4.11 Basis of Design for Pre-THP Dewatering and Cake Storage 4-10 Table 4.12 Design Criteria for Pre-THP Inline Grinders 4-11 Table 4.13 Design Criteria for Pre-THP Centrifuge Feed Pumps 4-11 Table 4.14 Design Criteria for Pre-THP Centrifuges 4-12 Table 4.15 Design Criteria for Reversible Screw Conveyors 4-13 Table 4.16 Design Criteria for Pre-THP Cake Silos 4-13 Table 4.17 Design Criteria for Pre-THP Cake Pumps 4-14 Table 4.18 THP System Design Criteria 4-17 Table 4.19 Design Criteria for Thermally Hydrolyzed Sludge to Digestion 4-24 Table 4.20 Existing Digester Tank Parameters 4-24 Table 4.21 Future Operational Parameters of Blue River WWTP Anaerobic Digesters 4-25 Table 4.22 Design Criteria for the Existing Digester Mixing System 4-26 Table 4.23 Sludge Surface Elevations 4-28 Table 4.24 Sludge Transfer Design Criteria 4-28 Table 4.25 Digester Gas Production 4-30 Table 4.26 Digester Biogas Collection System Capacity 4-31 Table 4.27 West Holding Tank Geometry 4-33 Table 4.28 Design Criteria for West Holding Tank Mixing System 4-34 vi | JANUARY 2020 | FINAL BASIS OF DESIGN REPORT | BLUE RIVER WASTEWATER TREATMENT PLANT BIOSOLIDS FACILITY | KC WATER Table 4.29 Digester Biogas Storage Membrane Design Criteria 4-35 Table 4.30 Design
Recommended publications
  • Evaluation of Boiler Chemical Cleaning Techniques
    INFO—0444 Report Rap CA9400049 Atomic Energy Commission de contrfile Control Board de I'energie atomique INFO-0444 Atomic Energy Commission de controle 1*1 Control Board de I'energie atomique PO Box 1046 CP 1046 Onawa Canada Ottawa. Canada K1P5S9 K1P5S9 EVALUATION OF BOILER CHEMICAL CLEANING TECHNIQUES (AECB Project No. 2.221.1) by Monserco Limited A research report prepared for the Atomic Energy Control Board Ottawa, Canada April 1993 1 Canada Research report EVALUATION OF BOILER CHEMICAL CLEANING TECHNIQUES A report prepared by Monserco Limited under contract to the Atomic Energy Control Board. ABSTRACT Deposits in the secondary side of nuclear steam generators (SG) may cause corrosion and disruptions in steam flow. In the Bruce A reactors such deposits have resulted in the derating of two of the units. Hydrolasing has been successful in removing enough of the deposits to permit operation at 100% power, but a considerable amount of deposit remains in physically inaccessible regions of the generators. The only way to remove these deposits is through chemical cleaning. The EPRI/SGOG process, which has been selected by Ontario Hydro for use at the Bruce A station, is described. This process consists of alternating iron removal and copper removal steps, the two metals which comprise the bulk of the deposit in the Bruce A SGs. The iron removal solvent consists of ethylenediaminetetraacetic acid (EDTA), hydrazine, ammonium hydroxide and a proprietary corrosion inhibitor CCI-801. The copper removal solvent consists of EDTA, ethylene diamine and hydrogen peroxide. Ontario Hydro proposes to dean a bank of four SGs in parallel employing a total of six copper removal steps and four iron removal steps.
    [Show full text]
  • Table of Contents CHAPTER 31 VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM (VPDES) PERMIT REGULATION....1 Part I Definitions and General Program Requirements
    Project 1248 - Final STATE WATER CONTROL BOARD Amendment of Regulations Pertaining to Biosolids After Transfer from the Department of Health Table of Contents CHAPTER 31 VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM (VPDES) PERMIT REGULATION....1 Part I Definitions and General Program Requirements ...........................................................................1 9VAC25-31-10. Definitions. ..................................................................................................................1 9VAC25-31-20. Purpose......................................................................................................................15 9VAC25-31-25. Applicability of incorporated references based on the dates that they became effective..............................................................................................................................................16 9VAC25-31-30. Federal effluent guidelines........................................................................................16 9VAC25-31-40. Exclusions. .................................................................................................................17 9VAC25-31-50. Prohibitions. ..............................................................................................................18 9VAC25-31-60. Effect of a permit.......................................................................................................19 9VAC25-31-70. Continuation of expiring permits...............................................................................20
    [Show full text]
  • Trade Waste Information Sheet Cooling Towers & Boiler Blowdown
    Trade Waste Information Sheet Cooling Towers & Boiler Blowdown Preface Liquid waste generated by industry, small business and commercial enterprises is referred to as trade waste. The Water Supply (Safety and Reliability) Act 2008 prohibits the unauthorised discharge of wastes, other than domestic sewage, into the sewerage system. 1. The definition of trade waste is; - The waterborne waste from business, trade or manufacturing property, other than: Waste that is a prohibited substance; or Human waste; or Stormwater. 2. The definition of Domestic waste is; - Faecal matter and urine of human origin and liquid wastes from sinks, baths, basins, showers and similar fixtures designed for personal hygiene in both residential and commercial properties. Cooling Towers Description of Activity The continuous blowdown, or “bleed off” and other wastewater from both commercial and industrial cooling towers is liquid trade waste. “Comfort and process air-conditioning cooling towers” are defined as cooling towers that are dedicated exclusively to (and are an integral part of) heating, ventilation, air-conditioning or refrigeration systems associated with commercial living space air-conditioning, or commercial process air-conditioning such as computer rooms. The discharge rate from cooling towers in this classification should not exceed 500 L/h. “Industrial Cooling Towers” are cooling towers used in manufacturing for rejecting heat extracted from a manufacturing process. This activity is classified as High Risk and an application must be forwarded to Whitsunday Regional Council. 11. Cooling Towers & Boiler Blowdown Version: 4 Page 1 of 8 Other Issues Commercial and industrial cooling towers generate wastewaters that vary considerably in the contaminants they may contain according to the water treatment utilised.
    [Show full text]
  • Boilers Released 12 December 2017 Trade Waste Discharges from Companies with Boilers Can Harm the Sewerage System
    Boilers Released 12 December 2017 Trade waste discharges from companies with boilers can harm the sewerage system. Proper management practices at each site are needed. This guideline outlines the areas of concern and available technologies for the control of these trade wastes. Key trade waste quality requirements Parameter Generally accepted level pH Between 6-12 units Temperature ≤38 degrees C Total Dissolved Solids ≤3500 mg/L Flow rate to sewer Dependant on capacity of receiving sewer Note: Discharge limits may be varied under certain circumstances for individual dischargers. Typical pre-treatment Live or flash steam must never be discharged directly to sewer. Steam boiler or hot water boiler blowdown is cooled below 38 degrees C via a suitably sized blowdown pit or above ground cooling vessel, discharging to sewer via a gully trap. These must have enough retained water volume at ambient temperature to mix with and cool the incoming blowdown. Australian Standard AS3892 - 2001 has more information about blowdown tank design. Heat exchange systems fed from a flash steam vessel can reduce blowdown temperature to an acceptable level. These provide an opportunity for recycling waste heat back to the system. Accumulated solids captured in blowdown equipment are removed as needed for off-site disposal. Boiler water treatment chemicals are stored in bunds, to prevent leaks and spills from reaching the sewerage system. In-ground blowdown pits are covered and finished above ground level to prevent surface or stormwater entry. More information Mains Water Backflow Protection (AS/NZS 3500.1:2015) Backflow Prevention Requirements - Office of the Technical Regulator Bunding and Blind Tanks Guideline .
    [Show full text]
  • Rockford Board of Education Invitation for Bid on Supplies, Materials, Equipment Or Services for School District No
    ROCKFORD BOARD OF EDUCATION INVITATION FOR BID ON SUPPLIES, MATERIALS, EQUIPMENT OR SERVICES FOR SCHOOL DISTRICT NO. 205 ROCKFORD, ILLINOIS IFB No. 16-44 Roosevelt Community Education Center Boiler Replacement DATE: March 21, 2016 OFFERS WILL BE RECEIVED UNTIL: 2:00 P.M. (CDST) on Tuesday, April 12, 2016 RE: IFB No. 16-44 Roosevelt Community Education Center Boiler Replacement. The purpose of this Invitation for Bid (IFB) is to solicit bids for all the mechanical and electrical work associate with the replacement of the boilers at Roosevelt Community Education Center, 978 Haskell Avenue, Rockford, IL 61103. IFB Opening: Tuesday, April 12, 2016 at 2:00 p.m., Rockford Board of Education, 6th floor Conference Room, 501 Seventh St., Rockford, IL 61104. If you plan to hand deliver your IFB submission on the due date, please note that you must check in on the 3rd floor prior to coming to the 6th floor. Please allow time for this as late submissions will not be accepted. Copies of the bidding documents are available from Onvia DemandStar, by email from the Purchasing Department, BHFX Digital Imaging and Printing, DG Digital Printing, YCS Printing, Inc., or by download from the District’s Purchasing Bids-RFPs webpage at www.rps205.com. A MANDATORY PRE-BID MEETING WILL BE CONDUCTED ON, MONDAY, MARCH 28, 2016 AT 2:30 P.M. (CDST), AT ROOSEVELT COMMUNITY EDUCATION CENTER, 978 HASKELL AVENUE, ROCKFORD, IL 61103 BY OWNER’S REPRESENTATIVE. MEET IN THE LOBBY. Refer all questions relative to the business aspect, Instructions to Bidders, Special Conditions, and questions concerning the technical aspect of the documents to the Purchasing Process Manager by email at [email protected].
    [Show full text]
  • UFC 3-240-13FN Industrial Water Treatment Operation And
    UFC 3-240-13FN 25 May 2005 UNIFIED FACILITIES CRITERIA (UFC) INDUSTRIAL WATER TREATMENT OPERATION AND MAINTENANCE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UFC 3-240-13FN 25 May 2005 UNIFIED FACILITIES CRITERIA (UFC) INDUSTRIAL WATER TREATMENT OPERATION AND MAINTENANCE Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 1 Dec 2005 FOREWORD UFC 3-240-13FN 25 May 2005 FOREWORD \1\ The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the more stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable. UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction. Headquarters, U.S.
    [Show full text]
  • WPDES Permit Fact Sheet for Baker Cheese Factory WI-0050521-10-1
    Permit Modification Fact Sheet General Information Permit Number: WI-0050521-10-1 Permittee Name: Baker Cheese Factory Inc Address: N5279 County Road G City/State/Zip: St. Cloud WI 53079 Discharge Location: Discharge is to an un-named tributary, 1/3-mile North of the intersection of County Roads G and T in Fond du Lac County Receiving Water: A wetland tributary (Baker Creek) to the Mullet River Stream Flow (Q7,10): 0 cfs Stream Classification: Warm water sport fish, non-public water supply Facility Description This facility produces mozzarella cheese. This activity results in the discharge of 11,000 gallons per day of noncontact cooling water and boiler blowdown to an absorption pond via outfall 002. The on-site treatment plant discharges treated process wastewater to a wetland tributary via surface water outfall 003. Whey processing wastewater shall also contribute additional wastewater that must be treated prior to discharge to the wetland tributary. Discharge flows are approximately 0.22 million gallons per day. Currently whey processing wastewater is hauled off-site for further processing. Land application outfalls 001 and 004 are retained from the current permit to allow land application of industrial process wastewater and wastewater biosolids resulting from the wastewater treatment process. Wastewater is treated in an activated sludge process with enhanced biological phosphorus removal, consisting of an influent wetwell/lift station, selector tank, aeration basin, and membrane system for liquid/solids separation. High strength
    [Show full text]
  • Water Recycle As a Sustainability Tool for Industrial Plants
    Water Recycle as a Sustainability Tool for Industrial Plants Darrell Hartwick Buckman Khurram Shahzad Buckman Keywords: Water Conservation, Sequencing Batch Reactor (SBR), Chloride, Stress Corrosion Cracking (SCC), Fertilizer Originally presented at the International Technical Symposium by FFC, October 17-18, 2018 ABSTRACT Water scarcity is becoming an issue in many parts of the world and the ability to maximize water utilization is a key part of sustainable operations. Given the heavy industrial reliance on evaporative cooling systems to reject heat, these systems are a critical component for most plants. In this paper we will discuss the options for minimizing water consumption based upon the principles of minimization, recycling and reuse. Three different approaches will be discussed and illustrated using case histories of actual plants and what was learned from them. INTRODUCTION While there are a variety of different water sources, fresh water is the preferred source since it requires the least treatment for domestic, industrial or agricultural usage. However, the amount of available fresh water is limited and represents less than 0.8% of the total water available. Not only is the amount of fresh water limited, but availability is not uniform, and it varies considerably by geography. Competition for water by different segments makes it a very valuable commodity, and these competing demands will increase in the future. The previous graphic shows the share of fresh water use by section in the 2010 – 2014 time period. Understandably, countries with large populations and varying rainfall can see the majority of the fresh water being used to support agriculture. Domestic water consumption is expected to increase in regions where living standards are rising, and this will put additional pressure on water resources.
    [Show full text]
  • Install an Automatic Blowdown Control System
    Energy Tips – Steam Steam Tip Sheet #23 • April 2004 Industrial Technologies Program Background Install an Automatic Blowdown Control System Industrial Technologies Program To reduce the levels of suspended During the surface blowdown process, a controlled amount of boiler water containing high and total dissolved solids in a dissolved solids concentrations is discharged into the sewer. In addition to wasting water boiler, water is periodically and chemicals, the blowdown process wastes heat energy, because the blowndown liquid is discharged or blown down. High at the same temperature as the steam produced—approximately 366°F for 150 pounds per dissolved solids concentrations square inch gauge (psig) saturated steam—and blowdown heat recovery systems, if available, can lead to foaming and carry- are not 100% efficient. (Waste heat may be recovered through the use of a blowdown heat exchanger or a flash tank in conjunction with a heat recovery system. For more information, over of boiler water into the see Steam Tip Sheet #10, Recover Heat from Boiler Blowdown). steam. This could lead to water hammer, which may damage Advantages of Automatic Control Systems piping, steam traps, or process With manual control of surface blowdown, there is no way to determine the concentration equipment. Surface blowdown of dissolved solids in the boiler water, nor the optimal blowdown rate. Operators do not removes dissolved solids that know when to blow down the boiler, nor for how long. Likewise, using a fixed rate of blow- accumulate near the boiler liquid down does not take into account changes in makeup and feedwater conditions, or varia- surface, and is often a continuous tions in steam demand or condensate return.
    [Show full text]
  • AGENDA Regular City Council Meeting CITY HALL Webster City, Iowa October 1, 2018 5:30P.M
    AGENDA Regular City Council Meeting CITY HALL Webster City, Iowa October 1, 2018 5:30p.m. ROLL CALL Approval of Agenda Pledge of Allegiance A. PETITIONS - COMMUNICATIONS - REQUESTS This is the time of the meeting that a citizen may address the Council on a matter not on the Agenda. Except in cases of emergency, the City Council will not take any action at this meeting, but may ask the City Staff to research the matter or have the matter placed on the Agenda for a future meeting. 1. Public Information B. MINUTES AND CLAIMS The following items have been deemed to be non-controversial, routine actions to be approved by the Council in a single motion. If a Council member, or a member of the audience wishes to have an item removed from this list, it will be considered in its normal sequence on the Agenda. 1. Minutes of September 17, 2018 2. Resolution on Payroll for the period ending September 15, 2018 and paid on September 21, 2018 3. Resolution on Bills Fund List C. GENERALAGENDA 1. COUNCIL MEMORANDUM: Third Reading of a proposed Ordinance, an ordinance amending the Code of Ordinances of the City of Webster City, Iowa, 1996, by amending Chapter 123, Pertaining to Zoning, as it relates to Fences. Ordinance a. Pass and Adopt Ordinance 2. COUNCIL MEMORANDUM: 8-20-18 meeting Third Reading of a proposed Ordinance, an ordinance amending the Code of Ordinances of the City of Webster City, Iowa, 1996, by amending Chapter 99 Pertaining to Sewer Rental. Ordinance a. Pass and Adopt Ordinance 1 of 90 1 City Council Meeting Agenda October 1, 2018 3.
    [Show full text]
  • Water Efficiency Manual
    WaterWater EfficiencyEfficiency ManualManual for Commercial, Industrial and Institutional Facilities BY: N.C. Department of Environment and Natural Resources Division of Pollution Prevention and Enviornmental Assistance Division of Water Resources Land-of-Sky Regional Council, Waste Reduction Partners Water Efficiency Manual for Commercial, Industrial and Institutional Facilities A joint publication of the Division of Pollution Prevention and Environmental Assistance and Division of Water Resources of the N.C. Department of Environment and Natural Resources, and Land-of-Sky Regional Council. May 2009 The information contained in this publication is believed to be accurate and reliable. However, the application of this information is at the reader’s own risk. Mention of products, services or vendors in the publication does not constitute an endorsement by the state of North Carolina, nor the Land-of-Sky Regional Council. The information contained in this publication may be cited freely. State of North Carolina Beverly Eaves Perdue, Governor Dee Freeman, Secretary of the Department of Environment and Natural Resources Gary Hunt, Director of the Division of Pollution Prevention and Environmental Assistance Tom Reeder, Director of the Division of Water Resources When to Use This Guide Now, to determine what you can do to reduce water use, improve efficiency and save money in your operation. As you plan and budget for next year, to determine what programs, equipment and employee participation will be necessary to use water more efficiently. Before you purchase any new water-using domestic fixtures, cooling, heating, processing, landscaping and facility support equipment and service contracts. Before you seek buy-in and support from your management, maintenance and production personnel.
    [Show full text]
  • Install an Automatic Blowdown-Control System
    ADVANCED MANUFACTURING OFFICE Energy Tips: STEAM Steam Tip Sheet #23 Install an Automatic Blowdown-Control System Suggested Actions ■■ Review your blowdown and Background makeup water treatment practices; compare them with To reduce the levels of suspended and total dissolved solids in a boiler, water is periodically discharged or blown down. High dissolved solids concentrations can American Society of Mechanical lead to foaming and carryover of boiler water into the steam. This could lead to Engineers (ASME) practices. water hammer, which may damage piping, steam traps, or process equipment. ■■ If a continuous-blowdown Surface blowdown removes dissolved solids that accumulate near the boiler system is in place, determine the liquid surface and is often a continuous process. savings an automatic blowdown- Suspended and dissolved solids can also form sludge. Sludge must be removed control system could attain. because it reduces the heat-transfer capabilities of the boiler, resulting in poor Install conductivity monitoring fuel-to-steam efficiency and possible pressure vessel damage. Sludge is removed and automatic blowdown- by mud or bottom blowdown. control equipment if the proposed project meets your During the surface blowdown process, a controlled amount of boiler water containing high dissolved solids concentrations is discharged into the sewer. cost-effectiveness criteria. In addition to wasting water and chemicals, the blowdown process wastes heat ■■ Determine the energy savings energy, because the blowdown liquid is at the same temperature as the steam and cost-effectiveness from produced—approximately 366°F for 150-pounds-per-square-inch-gauge (psig) using a heat exchanger to saturated steam—and blowdown heat recovery systems, if available, are not 100% recover energy from the efficient.
    [Show full text]