Spirit Lake Outlet Tunnel Team Plans to Repair Movement to Tunnel Floor

Total Page:16

File Type:pdf, Size:1020Kb

Spirit Lake Outlet Tunnel Team Plans to Repair Movement to Tunnel Floor Vol. 39, No. 4 July - August 2015 Spirit Lake Outlet Tunnel team plans to repair movement to tunnel floor R Mountain on the move 1.75”Spirit x 1.25” Lake Outlet Tunnel team plans to repair Pantone 032 = Red CMYK = C0, M100, Y80, K0 movement to tunnel floor By Diana Fredlund, Public Aairs Oce hen mountains move, humans The avalanche created a dam of to rise into the more porous pumice Wcan only watch and figure out sediment, ash and fragmented rock, and ash, it could erode the entire dam how to work with the changes. with heavier, less porous materials and possibly send tons of material and below and more erodible pumice and water downstream.” A massive avalanche of rock and ash from pyroclastic flows above it. debris choked Spirit Lake when Mount Snow and rain continued to feed Spirit In the worst-case scenario, St. Helens erupted May 18, 1980, Lake, but without an outlet, the water communities like Castle Rock, Kelso changing the jewel-like lake forever. level rose dangerously close to the and Longview in the Cowlitz River The avalanche completely blocked the more easily erodible material. Valley would be flooded by more than natural outlet where Spirit Lake flowed 60 feet of water and debris. “The U.S. into the North Fork Toutle River and on “The natural dam is strong enough to Forest Service needed to find a way to into the Toutle, Cowlitz and Columbia withstand the weight of water in Spirit stabilize the lake level and the Federal rivers. Lake until it reaches the top layer,” said Emergency Management Agency Chris Budai, Spirit Lake Outlet Tunnel tasked the Corps with finding it,” project manager. “If water levels were Budai said. Mount St. Helens erupted in southwestern Washington May 18, 1980 10 July - August 2015 Corps’pondent ® R Mount St. Helens and Spirit Lake at the tunnel intake are located within the Gifford Pinchot with shotcrete when National Forest in southwestern we excavated it.” Washington. In 1982, President Ronald 1.75” x 1.25” Reagan declared a state of emergency Shotcrete is a and FEMA requested that the U.S. concrete mix that Pantone 032 = Red Army Corps of Engineers develop is “shot” through a CMYK = C0, M100, Y80, K0 and execute a solution to Spirit Lake’s pressurized hose, Photos of Engineers Corps water level problem. allowing the material to adhere to a variety “The first step was to design an of surfaces. Instead interim plan to maintain the lake’s of using shotcrete, the water level until a long-term solution slopes were protected could be developed,” Budai said. The with chain link fabric Corps established a temporary pumping and rock bolts, but the facility on Spirit Lake in November rock was exposed to 1982, which operated until the Spirit freezing and thawing Lake Outlet Tunnel was completed in conditions that caused 1985. a rapid deterioration of the rock slope, Budai It wasn’t as easy as moving equipment said. in and getting repairs started, however. “Fragments of rock In 1982 President Reagan and would break off and Congress created the Mount St. Helens build up behind the (MSH) Mount St. Helens erupted in southwestern National Volcanic Monument within chain link fabric and Washington May 18, 1980. The eruption forever the Gifford Pinchot National Forest. An eventually fall onto changed the jewel-like Spirit Lake, seen here prior to important objective of the legislation the intake air grating May 1980. was to protect natural features and that allows the tunnel allow the environment to develop to function properly. Toutle, Toutle and Cowlitz rivers as it naturally, according to Peter Frenzen, Additionally, ash, pumice and other flows to the Columbia River. staff scientist for the Monument. volcanic material that surrounded the intake was a constant source of material Geologists knew there were some “Spirit Lake and the surrounding that fell on the air grates and blocked areas along the tunnel’s path that area are very remote now, since roads air flow into the tunnel.” could exert additional pressure on the and infrastructure were destroyed in tunnel. These areas are known as shear the blast. As the best known and most Engineers modified the intake air zones, where the pressures could cause studied eruption of the 20th century, grating to allow this debris to drop into the ground to move if the tunnel was we believe it’s important to learn about the shaft and then wash out through the not adequately supported; they also how nature manages its own recovery,” tunnel, eliminating the problem. contained soft, clay gouge material that Frenzen said. “It does create some flows under pressure. challenges, but within the bounds of The intake shaft drops water about public safety we need to preserve this 40 feet into an 8,465-foot long, 11- “The tunnel had to be designed to important natural laboratory.” foot diameter tunnel that the Corps withstand these varying stresses,” constructed through Harry’s Ridge, Budai said. “We knew routine “It definitely posed a challenge which borders Spirit Lake. The water monitoring would be important so we when the Corps began constructing the flows into South Coldwater Creek, could react if we detected any changes outlet tunnel in 1984,” Budai said. “For Coldwater Creek and the North Fork in the tunnel.” example, we couldn’t protect the slopes www.nwp.usace.army.mil 11 ® R 1.75” x 1.25” Pantone 032 = Red CMYK = C0, M100, Y80, K0 Mount St. Helens erupted in southwestern Washington May 18, 1980. After the eruption, fragmented rock, ash and debris choked nearby rivers, threatening local communities downstream. Since its completion in 1985, the capacity means less water can flow to repair the tunnel before the next Corps has repaired the tunnel many without pressurizing the tunnel – the flood season in January 2016. times; most were small repairs to expansion and contraction that occurs restore tunnel integrity. if water completely fills the smaller Because the Monument is managed tunnel. Pressurization can be seen when by the Forest Service, the Gifford A more significant repair was water flows out of a bottle that’s tipped Pinchot National Forest first needed performed in 1997, when tunnel nearly vertical, causing a back-and- to secure funding from its national movement due to pressure build-up in forth motion. In a concrete structure headquarters. As soon as the situation a shear zone caused a partial failure like the Spirit Lake Outlet Tunnel, that was discovered, senior leaders from of some tunnel supports. Pressure can cause damage and failure, since it the Forest Service and the Corps met build-up from that same shear zone can rapidly erode the tunnel rock and to discuss the needed repairs and has caused gradual movement in an undermine the tunnel supports. formulate a funding strategy. area near the 1997 repairs, causing the tunnel to constrict. For nearly 30 years Budai and her team knew the soft Budai and her team began designing the annual inspections showed only clay material was being forced upward the repair plan. “Under normal a gradual constriction in the tunnel’s into the tunnel. “The movement is circumstances a Corps project moves diameter, which engineers monitored much like that of toothpaste being through the design, review, and but decided no action was necessary; in squeezed from a tube,” Budai said. contracting phases in 12 to 18 months,” October 2014 Budai found that was no “The pressure from the material above Budai said. “Our accelerated schedule longer true. the tunnel was forcing the soft material includes design and review in about up into a weaker section of the tunnel.” six weeks. The construction contract is “Our inspection in October found expected to be awarded by early August; one part of the tunnel’s floor had When sharing her findings with the work is scheduled to begin in September moved upward by about a foot and a Forest Service, Budai emphasized 2015 and finish by February 2016.” half, increasing the possibility of a the need to move quickly. During an tunnel collapse,” Budai said. “Another inspection six months later, Budai Fast-tracking the repair project concern is the decreased water capacity found the floor had moved upward means it receives a higher priority for due to the constriction.” Decreased another six inches, reinforcing the need resources while still conducting all the 12 July - August 2015 Corps’pondent ® R quality assurance checks every project fit current and future requirements.” Lake’s water level sustainably into the undergoes. “We are ensuring all design The long-term project will require future.” and review actions are fully in place. formal studies to ensure the repair It means our team is focusing almost work meets all regulations, she added. Mountains move on their1.75” x 1.25”own exclusively on the Tunnel Outlet schedule and many were surprised in Project for a while in order to get the Water continues to flow into Spirit Pantone 032 = Red 2004 when Mount St. HelensCMYK erupted = C0, M100, Y80, K0 work done on time.” Lake and thanks to a team of Corps again. The Spirit Lake Outlet Tunnel and Forest Service scientists, engineers “It’s important to remember these and biologists, the lake will continue was designed to withstand landslides are interim repairs, designed to provide to flow safely through the tunnel and and mudlfows from future eruptions. us time to make more extensive, long- continue its way to the ocean. It’s possible today’s team members won’t term repairs,” Budai said. be working on the project the next time “The cooperation among the agencies “The Forest Service is the lead is outstanding,” Frenzen said.
Recommended publications
  • A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St
    THE NATIONAL ACADEMIES PRESS This PDF is available at http://nap.edu/24874 SHARE A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St. Helens (2018) DETAILS 336 pages | 6 x 9 | PAPERBACK ISBN 978-0-309-46444-4 | DOI 10.17226/24874 CONTRIBUTORS GET THIS BOOK Committee on Long-Term Management of the Spirit Lake/Toutle River System in Southwest Washington; Committee on Geological and Geotechnical Engineering; Board on Earth Sciences and Resources; Water Science and Technology Board; Division on Earth and Life Studies; Board on Environmental Change and Society; FIND RELATED TITLES Division of Behavioral and Social Sciences and Education; National Academies of Sciences, Engineering, and Medicine SUGGESTED CITATION National Academies of Sciences, Engineering, and Medicine 2018. A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St. Helens. Washington, DC: The National Academies Press. https://doi.org/10.17226/24874. Visit the National Academies Press at NAP.edu and login or register to get: – Access to free PDF downloads of thousands of scientific reports – 10% off the price of print titles – Email or social media notifications of new titles related to your interests – Special offers and discounts Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the National Academies Press. (Request Permission) Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy
    [Show full text]
  • Sediment Data-Collection Techniques" (SW1 091TC) (Al 06002.01.362.530)
    CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES TRIP REPORT SUBJECT: U.S. Geological Survey training course entitled "Sediment Data-Collection Techniques" (SW1 091TC) (Al 06002.01.362.530) DATE/PLACE: March 13-18, 2005 Castle Rock, Washington AUTHOR: Donald Hooper, Research Scientist Center for Nuclear Waste Regulatory Analyses (CNWRA) at Southwest Research Instituter (SwRlt) DISTRIBUTION: CNWRA NRC-NMSS SwRl Contracts W. Patrick J. Trapp Record Copy B (IQS) CNWRA Directors D. DeMarco CNWRA Element Managers B. Meehan S. Mohanty J. Rubenstone R. Benke J. Guttman L. Gutierrez E. Whitt CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES TRIP REPORT SUBJECT: U.S. Geological Surveytraining course entitled "Sediment Data-Collection Techniques" (SW1091TC) (Al 06002.01.362.530) DATE/PLACE: March 13-18, 2005 Castle.Rock, Washington AUTHOR: Donald Hooper, Research Scientist Center for Nuclear Waste Regulatory Analyses (CNWRA) at Southwest Research Institutee (SwRl~ PERSONS PRESENT: One staff member from the Center for Nuclear Waste Regulatory Analyses attended the training course. A total of 32 scientists enrolled in the course, which was taught by a team of U.S. Geological Survey staff members with John Gray as course leader and coordinator. BACKGROUND AND PURPOSE OF TRIP: This training course in Castle Rock, Washington, near Mount St. Helens, provided instruction in basic sediment data-collection'techniques with principal emphasis on the following: (i) basic sediment concepts; (ii) sampler characteristics; (iii) field techniques; (iv) direct sampling with suspended sediment, bed material, and bedload samplers; (v) computation of sediment discharge records; (vi) quality-assurance procedures; and (vii) estimating sediment properties from surrogate technologies based on bulk optic, digital optic, laser, acoustic, and pressure- differential principles.
    [Show full text]
  • Magnitude and Frequency of Lahars and Lahgr-Runout Flows in the Toutle-Cowlitz River System
    Magnitude and Frequency of Lahars and Lahgr-Runout Flows in the Toutle-Cowlitz River System U.S. GEOLOGICAL SURVEY PROFESSIONAL PAPER 1447-B SELECTED SERIES OF U.S. GEOLOGICAL SURVEY PUBLICATIONS Periodicals Coal Investigations Maps are geologic maps on topographic or planimetric bases at various scales showing bedrock or surficial geol­ Earthquakes & Volcanoes (issued bimonthly). ogy, stratigraphy, and structural relations in certain coal-resource areas. Preliminary Determination of Epicenters (issued monthly). Oil and Gas Investigations Charts show stratigraphic information for certain oil and gas fields and other areas having petroleum potential. Technical Books and Reports Miscellaneous Field Studies Maps are multicolor or black-and- white maps on topographic or planimetric bases on quadrangle or ir­ Professional Papers are mainly comprehensive scientific reports of regular areas at various scales. Pre-1971 maps show bedrock geology wide and lasting interest and importance to professional scientists and en­ in relation to specific mining or mineral-deposit problems; post-1971 gineers. Included are reports on the results of resource studies and of maps are primarily black-and-white maps on various subjects such as topographic, hydrologic, and geologic investigations. They also include environmental studies or wilderness mineral investigations. collections of related papers addressing different aspects of a single scien­ Hydrologic Investigations Atlases are multicolored or black-and- tific topic. white maps on topographic or planimetric bases presenting a wide range Bulletins contain significant data and interpretations that are of last­ of geohy drologic data of both regular and irregular areas; principal scale ing scientific interest but are generally more limited in scope or is 1:24,000 and regional studies are at 1:250,000 scale or smaller.
    [Show full text]
  • Sediment Yield Following Severe Volcanic Disturbance— a Two-Decade Perspective from Mount St
    Downloaded from geology.gsapubs.org on April 4, 2012 Sediment yield following severe volcanic disturbance— A two-decade perspective from Mount St. Helens J.J. Major* U.S. Geological Survey, Cascades Volcano Observatory, Vancouver, Washington 98661, USA T.C. Pierson R.L. Dinehart U.S. Geological Survey, University of California, Sacramento, California 95819, USA J.E. Costa U.S. Geological Survey, Portland, Oregon 97216, USA ABSTRACT lowing the eruption, and establish a conceptual model for posteruption sedi- Explosive volcanic eruptions perturb water and sediment fluxes in mentary response to a severe explosive eruption. We restrict our discussion watersheds; consequently, posteruption sediment yields can exceed pre- to suspended-sediment yield because bedload data are limited and sus- eruption yields by several orders of magnitude. Annual suspended-sed- pended sediment averaged ≥80% of the total sediment yield (Lehre et al., iment yields following the catastrophic 1980 Mount St. Helens eruption 1983; Simon, 1999). were as much as 500 times greater than typical background level, and they generally declined nonlinearly for more than a decade. Although 1980 MOUNT ST. HELENS ERUPTION sediment yields responded primarily to type and degree of disturbance, The catastrophic 1980 Mount St. Helens eruption affected some wa- streamflow fluctuations significantly affected sediment-yield trends. tersheds severely, others mildly. Watersheds north of the volcano underwent Consecutive years (1995–1999) of above-average discharge reversed the the most severe disturbance and the greatest accumulation of new, loose nonlinear decline and rejuvenated yields to average values measured sediment from deposition by a 2.5 km3 debris avalanche (Glicken, 1998) within a few years of the eruption.
    [Show full text]
  • Cowlitz County Comprehensive Parks, Habitat and Recreation Update
    Cowlitz County Comprehensive Parks, Habitat and Recreation Update Prepared By Cowlitz County Park and Recreation Advisory Board BOARD OF COWLITZ COUNTY COMMISSIONERS Joe Gardner Dennis Weber Arne Mortensen PARK & RECREATION ADVISORY BOARD Mike Karnofski Alice Millward Ron Junker Paul Youmans Drew Davidson Tina Cygrymus Darcy Mitchem Jennifer Keene December 2017 Cowlitz County Parks Comprehensive Parks, Habitat and Recreation Update Page 2 of 40 Table of Contents Vision/Mission Statement and Goals 3 Key Findings and Target Projects 6 Introduction and Case Statement 10 Historical Overview 12 Existing Parks / Recreation & Habitat in Cowlitz County 13 Populations Trends 22 Summary of Research, Public Input, and Background Materials 26 Appendices A Public Input 27 Appendices B Completed or Assisted Projects 29 Appendices C Public Parks Provided by Private Industry 33 Appendices D Cowlitz County Recreation Map 35 Appendices E Cowlitz County Rural Recreation map 36 Appendices F Trail Map of Cowlitz County Trails Map 37 Cowlitz County Parks Comprehensive Parks, Habitat and Recreation Update Page 3 of 40 VISION Cowlitz County Parks Department is recognized for collaboration among public and private partnerships to build a healthy community, protect the natural environment and support high quality of place for all residents, now and into the future. MISSION Meeting community and visitor needs by providing a safe unified system of parks, trails, recreation facilities and natural areas that maintains environmental stewardship and provides diverse
    [Show full text]
  • FLOOD HAZARDS ALONG the TOUTLE and COWLITZ RIVERS, WASHINGTON, from a HYPOTHETICAL FAILURE of CASTLE LAKE BLOCKAGE by Antonius L
    FLOOD HAZARDS ALONG THE TOUTLE AND COWLITZ RIVERS, WASHINGTON, FROM A HYPOTHETICAL FAILURE OF CASTLE LAKE BLOCKAGE By Antonius Laenen and L. L. Orzol U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 87-4055 Prepared in cooperation with the STATE OF WASHINGTON DEPARTMENT OF EMERGENCY MANAGEMENT Portland, Oregon 1987 DEPARTMENT OF THE INTERIOR DONALD PAUL HODEL, Secretary U.S. GEOLOGICAL SURVEY Dallas L. Peck, Director For additional information Copies of this report can be write to: purchased from: Oregon Office Chief U.S. Geological Survey U.S. Geological Survey Books and Open-File Reports Section 847 N.E. 19th Ave., Suite 300 Federal Center Portland, OR 97232 Box 25425 Denver, CO 80225 IV CONTENTS Page Abstract --------------------------------------------------------- 1 Introduction ----------------------------------------------------- 2 Purpose and scope ------------------------------------------- 2 Acknowledgments --------------------------------------------- 3 Hypothetical blockage failure and start of flood ----------------- 6 Flood routing ---------------------------------------------------- 7 The bulking process ----------------------------------------- 10 The debulking process --------------------------------------- 11 The hypothetical flood -------------------------------------- 11 Hypothetical flood with the lake level lowered -------------- 26 Sensitivity of the routing model ---------------------------- 26 Summary and conclusions ------------------------------------------ 26 References cited -------------------------------------------------
    [Show full text]
  • NEPA--Environmental Assessment
    United States Environmental Department of Agriculture Assessment Forest Service Spirit Lake Motorized Access for Core March 2018 Sampling and Inlet Access Gifford Pinchot National Forest Mount St. Helens National Volcanic Monument Skamania County, Washington Legal Land Description: T9N, R5E, Sections 8, 9, 15, 16, 22, 23, 26, 27 Willamette Meridian For Information Contact: Chris Strebig, Spirit Lake Project Manager 501 E 5th Street #404, Vancouver, WA 98661 (360) 891-5052, [email protected] The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation, or marital or family status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice and TDD). USDA is an equal opportunity provider and employer. Environmental Assessment Spirit Lake Motorized Access for Core Sampling and Inlet Access Table of Contents Introduction ................................................................................................................... 4 Need for the Proposal ..................................................................................................
    [Show full text]
  • City of Castle Rock Comprehensive Plan, 2006 ACKNOWLEDGEMENTS
    CITY OF CASTLE ROCK COMPREHENSIVE PLAN JANUARY 2006 City of Castle Rock Comprehensive Plan January, 2006 City of Castle Rock Comprehensive Plan, 2006 ACKNOWLEDGEMENTS The City of Castle Rock expresses its appreciation to the citizens participating in the public meetings, hearings, and workshops held to update the Castle Rock Comprehensive Plan and to the following people and organizations who devoted time and effort in the Plan’s preparation. Castle Rock Planning Commission Gwen Boss Richard Heltemes Mari Hodges Brenda Hornbuckle Leah Medina Nancy Murphy Gordon Snyder Castle Rock City Council Barbara Larsen Julie Bean Greg Marcil Jeff Skeie Ed Smith Khembar Yund Castle Rock Staff Ryana Covington, City Clerk/Treasurer Public Works Director, Dave Vorse City Clerk, Joanne Purvis Bob Heuer, Police Chief Eric Koreis, Fire Chief Tom O’Neill, City Attorney Michael B. Johnson, PE, Engineer Cowlitz-Wahkiakum Council of Governments Erin Erdman, City Planner Stephen H. Harvey, Director Nancy Harris, Adm. Secretary Don Mathison, former City Planner Others Castle Rock School District No. 401 Castle Rock Chamber of Commerce Castle Rock Senior Center Castle Rock Exhibit Hall Ministerial Association City of Castle Rock Comprehensive Plan, 2006 Table of Contents CHAPTERS I. INTRODUCTION Purpose .............................................................................................................. I-1 The Planning Process........................................................................................... I-1 The Study Area...................................................................................................
    [Show full text]
  • The Spirit Lake Dilemma: Engineering a Solution for a Lake with a Problematic Outlet
    PNW Pacific Northwest Research Station INSIDE Analyzing and Quantifying Risk . 3 Next Steps . .5 FINDINGS issue two hundred eighteen / august 2019 “Science affects the way we think together.” Lewis Thomas The Spirit Lake Dilemma: Engineering a Solution for a Lake With a Problematic Outlet IN SUMMARY The Mount St. Helens eruption on May 18, 1980, fundamentally transformed the Rhonda Mazza surrounding landscape. The eruption triggered geophysical processes that are still unfolding. A debris avalanche caused by the eruption, for example, blocked the outlet from Spirit Lake. To prevent the rising lake level from breaching the blockage and potentially flooding communities downstream, the U.S. Army Corps of Engineers built an outlet tunnel to maintain safe lake lev- els. However, the tunnel must be peri- odically closed for repairs, during which time the lake can rise precariously high. In 2015, the Gifford Pinchot National Forest commissioned a study to assess risks associated with alternative outlet options. A team consisting of research- ers from the U.S. Forest Service Pacific Spirit Lake, with Mount St. Helens, Washington, in the background (2015). A debris avalanche triggered by Northwest Research Station, the U.S. a volcanic eruption on May 18, 1980, blocked the lake’s natural outlet. A tunnel was built to safely remove Geological Survey, and Oregon State water from the lake and minimize the risk of catastrophic flooding to communities downstream. Maintaining University authored the study. the tunnel is expensive, so long-term solutions are being explored. At the team’s request, the U.S. Army “When you want to know how things caused a wave that scoured the northern slope Corps of Engineers conducted a dam- safety risk-assessment of long-term solu- really work, study them when they’re of the lake basin.
    [Show full text]
  • Volume II, Chapter 8 Cowlitz Subbasin—Lower Cowlitz
    Volume II, Chapter 8 Cowlitz Subbasin—Lower Cowlitz TABLE OF CONTENTS 8.0 COWLITZ SUBBASIN—LOWER COWLITZ ......................................................... 8-1 8.1 Subbasin Description.................................................................................................. 8-1 8.1.1 Topography & Geology ....................................................................................... 8-1 8.1.2 Climate................................................................................................................. 8-1 8.1.3 Land Use/Land Cover.......................................................................................... 8-1 8.2 Focal Fish Species....................................................................................................... 8-5 8.2.1 Fall Chinook—Cowlitz Subbasin (Lower Cowlitz).............................................. 8-5 8.2.2 Coho—Cowlitz Subbasin ..................................................................................... 8-8 8.2.3 Chum—Cowlitz Subbasin .................................................................................. 8-12 8.2.4 Winter Steelhead—Cowlitz Subbasin (Cowlitz)................................................. 8-14 8.2.5 Cutthroat Trout—Cowlitz River Subbasin......................................................... 8-17 8.3 Potentially Manageable Impacts ............................................................................... 8-19 8.4 Hatchery Programs...................................................................................................
    [Show full text]
  • Mount St. Helens Long-Term Sediment Management Plan (CEQ Project Number 20180179; Region 10 Project Number 84-193-COE)
    ~ US Army Corps Mount St. Helens of Engineers• Long-Term Sediment Portland District Management Plan Record of Decision September 2018 Sediment retention structure and upstream sediment plain on the North Fork Toutle River U.S. Army Corps of Engineers photo RECORD OF DECISION MOUNT ST. HELENS, WASHINGTON LONG-TERM SEDIMENT MANAGEMENT PLAN The Mount St. Helens Limited Re-Evaluation Report (LRR) and Supplemental Environmental Impact Statement (SEIS), both dated 2018, address long-term sediment management actions necessary to maintain flood risk reduction for the cities of Castle Rock, Lexington, Kelso, and Longview, Washington. The purpose of the proposed action is to manage flood risk to established levels of protection (LOP) for the cities of Castle Rock, Lexington, Kelso and Longview, Washington through the year 2035, as authorized by Public Law No. 99‐88 (1985) and Section 339 of the Water Resources Development Act of 2000 (Public Law No. 106- 541), and to do so in a manner that does not jeopardize the continued existence of any endangered species or threatened species or result in the destruction or adverse modification of designated critical habitat. The recommended plan and preferred alternative described in the LRR and SEIS represent a complete and complementary effort that maintains the congressionally-authorized LOP. The recommend plan is contained in the LRR and is the preferred alternative identified in the SEIS. The 2018 LRR and SEIS are incorporated herein by reference. Based on these reports, the reviews of other Federal, State, and local agencies, Tribes, input from the public, and review by my staff, I find the plan recommended by the Commander, Portland District, to be technically feasible, economically justified, in accordance with environmental statutes, and in the public interest.
    [Show full text]
  • Plant Response to 14 Engineered Log Jams on the North Fork Toutle River, WA Sediment Plain
    Portland State University PDXScholar Master of Environmental Management Project Reports Environmental Science and Management 2014 Plant Response to 14 Engineered Log Jams on the North Fork Toutle River, WA Sediment Plain Todd Ashley Portland State University Follow this and additional works at: https://pdxscholar.library.pdx.edu/mem_gradprojects Part of the Environmental Indicators and Impact Assessment Commons, and the Natural Resource Economics Commons Let us know how access to this document benefits ou.y Recommended Citation Ashley, Todd, "Plant Response to 14 Engineered Log Jams on the North Fork Toutle River, WA Sediment Plain" (2014). Master of Environmental Management Project Reports. 45. https://pdxscholar.library.pdx.edu/mem_gradprojects/45 https://doi.org/10.15760/mem.47 This Project is brought to you for free and open access. It has been accepted for inclusion in Master of Environmental Management Project Reports by an authorized administrator of PDXScholar. Please contact us if we can make this document more accessible: [email protected]. Plant Response to 14 Engineered Log Jams on the North Fork Toutle River, WA Sediment Plain by Todd Ashley A project report submitted in partial fulfilment of the requirements for the degree of Master of Environmental Management Thesis Committee: Dr. Jennifer Allen, Chair Dr. Joseph Maser Paul Sclafani Portland State University ©2014 Abstract I sought to evaluate the vegetative response to the installation of the 14 engineered log jams (ELJs) on the North Fork Toutle River (NFTR) Sediment Plain. The NFTR sediment plain is constantly being reworked due to channel bank erosion caused by a combination of processes including flow erosion and gravitational mass failure.
    [Show full text]