Visitor Guide to Mount St. Helens (Volcano Review)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Signage Drowning Prevention - Washington State Parks and Recreation Commission
OFFICE OF FINANCIAL MANAGEMENT LOSS PREVENTION REVIEW TEAM DROWNING PREVENTION WASHINGTON STATE PARKS AND RECREATION COMMISSION REPORT TO THE DIRECTOR OF THE OFFICE OF FINANCIAL MANAGEMENT NOVEMBER 2005 TABLE OF CONTENTS Section 1 - Executive Summary ................................................................................... 1 Drowning as an Issue for State Parks .......................................................................... 1 What Drowning Costs................................................................................................... 2 Summary of Recommendations ................................................................................... 4 Team Members ............................................................................................................ 5 Section 2 - Introduction ................................................................................................ 6 The Program ................................................................................................................ 6 This Review.................................................................................................................. 6 Methodology................................................................................................................. 6 Scope Of The Problem................................................................................................. 7 Section 3 – Risk Assessment of the Incidents Triggering Review ........................... 8 Summary Description of Incidents............................................................................... -
Geologic Map of the Simcoe Mountains Volcanic Field, Main Central Segment, Yakama Nation, Washington by Wes Hildreth and Judy Fierstein
Prepared in Cooperation with the Water Resources Program of the Yakama Nation Geologic Map of the Simcoe Mountains Volcanic Field, Main Central Segment, Yakama Nation, Washington By Wes Hildreth and Judy Fierstein Pamphlet to accompany Scientific Investigations Map 3315 Photograph showing Mount Adams andesitic stratovolcano and Signal Peak mafic shield volcano viewed westward from near Mill Creek Guard Station. Low-relief rocky meadows and modest forested ridges marked by scattered cinder cones and shields are common landforms in Simcoe Mountains volcanic field. Mount Adams (elevation: 12,276 ft; 3,742 m) is centered 50 km west and 2.8 km higher than foreground meadow (elevation: 2,950 ft.; 900 m); its eruptions began ~520 ka, its upper cone was built in late Pleistocene, and several eruptions have taken place in the Holocene. Signal Peak (elevation: 5,100 ft; 1,555 m), 20 km west of camera, is one of largest and highest eruptive centers in Simcoe Mountains volcanic field; short-lived shield, built around 3.7 Ma, is seven times older than Mount Adams. 2015 U.S. Department of the Interior U.S. Geological Survey Contents Introductory Overview for Non-Geologists ...............................................................................................1 Introduction.....................................................................................................................................................2 Physiography, Environment, Boundary Surveys, and Access ......................................................6 Previous Geologic -
A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St
THE NATIONAL ACADEMIES PRESS This PDF is available at http://nap.edu/24874 SHARE A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St. Helens (2018) DETAILS 336 pages | 6 x 9 | PAPERBACK ISBN 978-0-309-46444-4 | DOI 10.17226/24874 CONTRIBUTORS GET THIS BOOK Committee on Long-Term Management of the Spirit Lake/Toutle River System in Southwest Washington; Committee on Geological and Geotechnical Engineering; Board on Earth Sciences and Resources; Water Science and Technology Board; Division on Earth and Life Studies; Board on Environmental Change and Society; FIND RELATED TITLES Division of Behavioral and Social Sciences and Education; National Academies of Sciences, Engineering, and Medicine SUGGESTED CITATION National Academies of Sciences, Engineering, and Medicine 2018. A Decision Framework for Managing the Spirit Lake and Toutle River System at Mount St. Helens. Washington, DC: The National Academies Press. https://doi.org/10.17226/24874. Visit the National Academies Press at NAP.edu and login or register to get: – Access to free PDF downloads of thousands of scientific reports – 10% off the price of print titles – Email or social media notifications of new titles related to your interests – Special offers and discounts Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the National Academies Press. (Request Permission) Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy -
Anthropological Study of Yakama Tribe
1 Anthropological Study of Yakama Tribe: Traditional Resource Harvest Sites West of the Crest of the Cascades Mountains in Washington State and below the Cascades of the Columbia River Eugene Hunn Department of Anthropology Box 353100 University of Washington Seattle, WA 98195-3100 [email protected] for State of Washington Department of Fish and Wildlife WDFW contract # 38030449 preliminary draft October 11, 2003 2 Table of Contents Acknowledgements 4 Executive Summary 5 Map 1 5f 1. Goals and scope of this report 6 2. Defining the relevant Indian groups 7 2.1. How Sahaptin names for Indian groups are formed 7 2.2. The Yakama Nation 8 Table 1: Yakama signatory tribes and bands 8 Table 2: Yakama headmen and chiefs 8-9 2.3. Who are the ―Klickitat‖? 10 2.4. Who are the ―Cascade Indians‖? 11 2.5. Who are the ―Cowlitz‖/Taitnapam? 11 2.6. The Plateau/Northwest Coast cultural divide: Treaty lines versus cultural 12 divides 2.6.1. The Handbook of North American Indians: Northwest Coast versus 13 Plateau 2.7. Conclusions 14 3. Historical questions 15 3.1. A brief summary of early Euroamerican influences in the region 15 3.2. How did Sahaptin-speakers end up west of the Cascade crest? 17 Map 2 18f 3.3. James Teit‘s hypothesis 18 3.4. Melville Jacobs‘s counter argument 19 4. The Taitnapam 21 4.1. Taitnapam sources 21 4.2. Taitnapam affiliations 22 4.3. Taitnapam territory 23 4.3.1. Jim Yoke and Lewy Costima on Taitnapam territory 24 4.4. -
Lewis River Hydroelectric Project Relicensing
United StatesDepartment of the Interior FISH AND WILDLIFE SERVICE Western Washington Fish and Wildlife Office 510 DesmondDr. SE, Suite 102 Lacey,Washington 98503 In ReplyRefer To: SCANNED 1-3-06-F-0177 sEPI 5 2006 MagalieR. Salas,Secretary F6deralEnergy Regulatory Commission 888First Sffeet,NE WashingtonD.C. 24426 Attention:Ann Ariel Vecchio DearSecretary Salas: This documenttransmits the U.S. Fish and Wildlife Service's(Service) Biological Opinion on the effectsto bull trout(Salvelinus confluentus),northern spotted owls (Srrlxoccidentalis caurina)and bald eagles(Haliaeetus leucocephalus) fromthe relicensingof the Lewis River HydroeiectricProjects: Merwin (FERC No. 935),Yale (FERC No. 2071),Swift No. 1 (FERC No. Zr 11),and swift No. 2 (FERCNo. 2213). Theaction that comprises this consultationunder theEndangered Species Act of 1973,as amended (16 U.S.C. l53I et seq.)is therelicensing of the Lewis-RiverHydroelectric Projects by the FederalEnergy Regulatory Commission and the interdependentactions contained in the SettlementAgreement (PacifiCorp et aL.2004e),dated November30,2004,and Washington Department of Ecology's401 Certifications. Consultationfor the relicensingof the Lewis River Plojectswas initiated by the Commission's letterto the Servicewhich was received in our officeon October11,2005. Based on our letter datedMarch15,2006,the deadline for completingthis consultationwas extended by mutual agreementuntil May 5, 2006. On June12,2006,with concurrenceby thelicensees,we submittedanother request for an extensionto SeptemberI,2006, to -
Soc 1-1 10.1 Socioeconomics Resource Study (Soc 1)
PacifiCorp/Cowlitz PUD Lewis River Hydroelectric Projects FERC Project Nos. 935, 2071, 2111, 2213 TABLE OF CONTENTS 10.0 SOCIOECONOMICS.................................................................................... SOC 1-1 10.1 SOCIOECONOMICS RESOURCE STUDY (SOC 1).......................... SOC 1-1 10.1.1 Study Objectives......................................................................... SOC 1-1 10.1.2 Study Area .................................................................................. SOC 1-2 10.1.3 Methods ...................................................................................... SOC 1-5 10.1.4 Key Questions............................................................................. SOC 1-7 10.1.5 Results......................................................................................... SOC 1-8 10.1.6 Discussion................................................................................. SOC 1-49 10.1.7 Schedule.................................................................................... SOC 1-51 10.1.8 References................................................................................. SOC 1-52 10.1.9 Comments and Responses on Draft Report .............................. SOC 1-57 SOC 1 Appendix 1 Text of RCW 54.28.050 SOC 1 Appendix 2 Descriptive Text of Money Generation Model LIST OF TABLES Table 10.1-1. Local sources of socioeconomic information...................................SOC 1-5 Table 10.1-2. 1990 population distribution by age in the secondary study area. ................................................................................................SOC -
Lewis River Hydroelectric Projects FERC Project Nos
Lewis River Hydroelectric Projects FERC Project Nos. 935, 2071, 2111, 2213 Photo courtesy of Kim McCune, PacifiCorp – June 2018 2018 Annual Report Annual Summary of License Implementation and Compliance: Aquatic and Terrestrial Resources April 12, 2019 Lewis River Hydroelectric Projects FERC Nos. 935, 2071, 2111, 2213 Annual Summary of License Implementation and Compliance: Aquatic and Terrestrial Resources 2018 Annual Report ©2005 PACIFICORP | PAGE 1 Lewis River Hydroelectric Project (FERC Nos. 935, 2071, 2111 & 2213) Annual Report 2018 ___________________________________________________________________________________________________ Table of Contents 1.0 INTRODUCTION ............................................................................................................................................ 7 1.1 BACKGROUND ................................................................................................................................. 8 1.1.1 Lewis River Settlement Agreement ............................................................................................. 8 1.1.2 Environmental Impact Statement ............................................................................................... 8 1.1.3 Agency Terms and Conditions ................................................................................................... 8 1.1.4 Endangered Species Act Consultations ...................................................................................... 9 1.1.5 Water Quality Certifications ..................................................................................................... -
Campings Washington Amanda Park - Rain Forest Resort Village - Willaby Campground - Quinault River Inn
Campings Washington Amanda Park - Rain Forest Resort Village - Willaby Campground - Quinault River Inn Anacortes - Pioneer Trails RV Resort - Burlington/Anacortes KOA - Cranberry Lake Campground, Deception Pass SP Anatone - Fields Spring State Park Bridgeport - Bridgeport State Park Arlington - Bridgeport RV Parks - Lake Ki RV Resort Brinnon - Cove RV Park & Country Store Bainbridge Island - Fay Bainbridge Park Campground Burlington Vanaf hier kun je met de ferry naar Seattle - Burlington/Anacortes KOA - Burlington RV Park Battle Ground - Battle Ground Lake State Park Chehalis - Rainbow Falls State Park Bay Center - Bay Center / Willapa Bay KOA Cheney Belfair - Ponderosa Falls RV Resort - Belfair State Park - Peaceful Pines RV Park & Campground - Tahuya Adventure Resort Chelan - Lake Chelan State Park Campground Bellingham - Lakeshore RV Park - Larrabee State Park Campground - Kamei Campground & RV Park - Bellingham RV Park Chinook Black Diamond - RV Park At The Bridge - Lake Sawyer Resort - KM Resorts - Columbia Shores RV Resort - Kansakat-Palmer State Park Clarkston Blaine - Premier RV Resort - Birch Bay State Park - Chief Timothy Park - Beachside RV Park - Hells Canyon Resort - Lighthouse by the Bay RV Resort - Hillview RV Park - Beachcomber RV Park at Birch Bay - Jawbone Flats RV Park - Ball Bayiew RV Park - Riverwalk RV Park Bremerton Colfax - Illahee State Park - Boyer Park & Marina/Snake River KOA Conconully Ephrata - Shady Pines Resort Conconully - Oasis RV Park and Golf Course Copalis Beach Electric City - The Driftwood RV Resort -
Family Activities Handbook
Youth & Adult Participant and Parent/Guardian Commitment In Mountaineers Family Activities, youth participants must be accompanied by an adult who agrees to be their supervisor. If the leader’s child is participating, there should be an additional adult who takes responsibility for that child, so that the trip leader can focus on the safety of the group, without the distraction of taking care of a youth participant. Adults participating in a family activity may supervise more than one youth, and youth can attend without their parents/guardians as long as they are with another adult. Because many of our locations have party-size maximums dictated by the land manager, often times a family activity can only accommodate a handful of families. Because of this, and because families typically need to plan far in advance, it is very important that families commit to attending the activity. A last-minute cancellation will prevent families from attending who could have attended with more notice, and may significantly impact the feel of the activity. Families who frequently cancel at the last minute may risk denial of participation in future family activities. Electronics Cell phones, music and video games are typically not a part of the Mountaineers programs. They detract from the wilderness experience and from the community. Youth are encouraged to leave all electronics out of sight (or at home) during Mountaineers programs. Youth who choose to use cell phones, gps units or other electronics may do so, with the leader’s permission, as long as it creates no disruption of the wilderness experience for others. -
RV Sites in the United States Location Map 110-Mile Park Map 35 Mile
RV sites in the United States This GPS POI file is available here: https://poidirectory.com/poifiles/united_states/accommodation/RV_MH-US.html Location Map 110-Mile Park Map 35 Mile Camp Map 370 Lakeside Park Map 5 Star RV Map 566 Piney Creek Horse Camp Map 7 Oaks RV Park Map 8th and Bridge RV Map A AAA RV Map A and A Mesa Verde RV Map A H Hogue Map A H Stephens Historic Park Map A J Jolly County Park Map A Mountain Top RV Map A-Bar-A RV/CG Map A. W. Jack Morgan County Par Map A.W. Marion State Park Map Abbeville RV Park Map Abbott Map Abbott Creek (Abbott Butte) Map Abilene State Park Map Abita Springs RV Resort (Oce Map Abram Rutt City Park Map Acadia National Parks Map Acadiana Park Map Ace RV Park Map Ackerman Map Ackley Creek Co Park Map Ackley Lake State Park Map Acorn East Map Acorn Valley Map Acorn West Map Ada Lake Map Adam County Fairgrounds Map Adams City CG Map Adams County Regional Park Map Adams Fork Map Page 1 Location Map Adams Grove Map Adelaide Map Adirondack Gateway Campgroun Map Admiralty RV and Resort Map Adolph Thomae Jr. County Par Map Adrian City CG Map Aerie Crag Map Aeroplane Mesa Map Afton Canyon Map Afton Landing Map Agate Beach Map Agnew Meadows Map Agricenter RV Park Map Agua Caliente County Park Map Agua Piedra Map Aguirre Spring Map Ahart Map Ahtanum State Forest Map Aiken State Park Map Aikens Creek West Map Ainsworth State Park Map Airplane Flat Map Airport Flat Map Airport Lake Park Map Airport Park Map Aitkin Co Campground Map Ajax Country Livin' I-49 RV Map Ajo Arena Map Ajo Community Golf Course Map -
Lewis River ~ Including Clear, Quartz, Siouxon, Pine, Rush, Smith Creeks & the Muddy River
Photo by Susan Saul Wild and Scenic Rivers Support Local Communities The legendary volcanoes in southwestern Washington and the spectacular rivers that originate on their slopes are valuable to the health, economy, and cultural identity of local communities. Rivers like the Green, Cispus, and Lewis provide drinking water to thousands of local residents, world-class recreation, and a high quality of life for local residents. Designating the rivers and key tributaries in Volcano Country under the Wild and Scenic Rivers Act will increase long- term potential for recreation and tourism in the area, ensure cool clean water for fish and people, and protect these natural treasures for future generations. Just a few of the benefits of Wild and Scenic designation include: RECREATION, TOURISM, AND THE ECONOMY: According to the Outdoor Industry Association, outdoor recreation brings in more than $11.7 billion annually to our state, supports an estimated 115,000 jobs, and generates $650 million in annual sales tax revenue. Travel and tourism provide nearly 8000 jobs – or 14 percent of jobs across all economic sectors – in Lewis, Cowlitz, and Skamania counties. In addition to putting a river “on the map” for visitors and outdoor enthusiasts, a Wild and Scenic River designation can lead to access improvements and foster growth in river-based outdoor recreation and tourism. For example, a recent study of the Wild and Scenic section of the Rogue River found that commercial rafting, fishing, and other recreation contributed $30 million a year to the State of Oregon’s economy. The White Salmon and the Klickitat River are two positive examples of Wild and Scenic Rivers in Washington that benefit local recreation economies. -
Magnitude and Frequency of Lahars and Lahgr-Runout Flows in the Toutle-Cowlitz River System
Magnitude and Frequency of Lahars and Lahgr-Runout Flows in the Toutle-Cowlitz River System U.S. GEOLOGICAL SURVEY PROFESSIONAL PAPER 1447-B SELECTED SERIES OF U.S. GEOLOGICAL SURVEY PUBLICATIONS Periodicals Coal Investigations Maps are geologic maps on topographic or planimetric bases at various scales showing bedrock or surficial geol Earthquakes & Volcanoes (issued bimonthly). ogy, stratigraphy, and structural relations in certain coal-resource areas. Preliminary Determination of Epicenters (issued monthly). Oil and Gas Investigations Charts show stratigraphic information for certain oil and gas fields and other areas having petroleum potential. Technical Books and Reports Miscellaneous Field Studies Maps are multicolor or black-and- white maps on topographic or planimetric bases on quadrangle or ir Professional Papers are mainly comprehensive scientific reports of regular areas at various scales. Pre-1971 maps show bedrock geology wide and lasting interest and importance to professional scientists and en in relation to specific mining or mineral-deposit problems; post-1971 gineers. Included are reports on the results of resource studies and of maps are primarily black-and-white maps on various subjects such as topographic, hydrologic, and geologic investigations. They also include environmental studies or wilderness mineral investigations. collections of related papers addressing different aspects of a single scien Hydrologic Investigations Atlases are multicolored or black-and- tific topic. white maps on topographic or planimetric bases presenting a wide range Bulletins contain significant data and interpretations that are of last of geohy drologic data of both regular and irregular areas; principal scale ing scientific interest but are generally more limited in scope or is 1:24,000 and regional studies are at 1:250,000 scale or smaller.