Ninth Physical Plan

Total Page:16

File Type:pdf, Size:1020Kb

Ninth Physical Plan Federal Department Of Town And Country Planning Malaysia Ministry Of Urban Wellbeing, Housing And Local Government 19 November 2013 Federal Department Of Town And Country Planning Malaysia OVERVIEW OF NPP2 1.0 What is NPP? 2.0 Overview of NPP2 3.0 NPP2 Implementation 4.0 Challenges in Implementing NPP2 5.0 Challenges in NPP3 6.0 NPP2 Monitoring Federal Department Of Town And Country Planning Malaysia 1.0 WHAT IS NPP ? strategic policies for the purpose of determining the general TOWN AND COUNTRY PLANNING NPP? directions and trends of the ACT 1976, ACT 172 physical development of the - DEVELOPMENT PLAN SYSTEM - nation NATIONAL PHYSICAL PLAN functions of NPP (national strategic spatial planning) strengthening national planning by providing a REGIONAL PLAN spatial dimension to national socio-economic (involving 2 or more states to tackle any policies significant strategic issues) STATE STRUCTURE PLAN coordinating sectoral agencies by providing the (policies on development and use of land spatial expression to sectoral policies in a state) providing a framework for regional, state and LOCAL PLAN (detailed and site specified development local planning facilitation and control at the local level) SPECIAL AREA PLAN provide physical planning to ensure (detailed planning of areas needing sustainable development special treatment) Federal Department Of Town And Country Planning Malaysia 2.0 OVERVIEW OF NPP2 first NPP • First NPP prepared in 2005 was made under the provision of Section 6B, Town and Country Planning Act, 1976 (Act 172). • Approved by the cabinet on the 20th April 2005 and by National Physical Planning Council (NPPC) on the 26th April 2005. • Section 6B(4) of Act 172 – NPP shall be reviewed NPP2 every 5 years in tandem • NPP2 was endorsed with the review of the National th Year Development Plans, or as by NPPC on 13 and when directed by NPPC. August 2010 and was launched on 8th November 2010. Federal Department Of Town And Country Planning Malaysia cont… NATIONAL DEVELOPMENT PLANNING FRAMEWORK VISION 2020 AUTHORITY NATIONAL TRANSFORMATION PROGRAMME Central Government Agencies, Ministries/ 1Malaysia ETP, 10th Malaysia Departments/Agencies People First, GTP, 2010 2010 Plan, at the Federal Level Performance Now, 2009 2010 LEVEL 1 : NATIONAL PLANNING 5 Years Malaysia Plan National Physical Plan Sectoral Policies/Plans LEVEL 2 : REGIONAL/ STATE PLANNING STATE/ State Governments & REGIONAL/ Economic Corridor REGIONAL SECTORAL MASTERPLAN/STATE Authorities DEVELOPMENT POLICIES/ PLANS STRUCTURE PLAN PLAN LEVEL 3 : LOCAL PLANNING Local Authorities LOCAL PLAN SPECIAL AREA PLAN Federal Department Of Town And Country Planning Malaysia cont… NPP2 GOAL & OBJECTIVES the establishment of an efficient, equitable and sustainable national spatial framework to guide the overall development of the country towards goal achieving developed and high-income nation status by 2020. 1. to rationalise and consolidate the national spatial planning framework supported by key strategic infrastructure for economic efficiency and global competitiveness. 2. to optimise utilisation of land 3. to promote more balanced and natural resources for regional development for sustainable development and national economic integration and biodiversity conservation. objectives social unity 5. to facilitate efficient integrated inter-state 4. to enhance spatial and environmental connectivity and public common users’ space quality, diversity and safety for a high provision for social interaction and sustainable quality of life and liveability. communities in line with the 1Malaysia concept Federal Department Of Town And Country Planning Malaysia cont… NPP2 DEVELOPMENT STRATEGY ‘Concentrated Decentralisation’ GREATER KL/ KLANG VALLEY IS WITHIN THE KL CONURBATION UNDER NPP2 Punca k Selayang Gombak Alam Sg. Hulu Kelang Ampang Buloh Damansara Kapar Meru Seri Kembangan Puchong Pulau Serdang Indah Kajang Teluk Bandar Pulau Panglima Baru Bangi Carey Garang Morib Batu Laut Sg. Pelek • By 2020 – urbanisation in Penisular Malaysia is 75% and 70% of urban population will be in these 4 Conurbation. • Concentrated Decentralisation Strategy - Concentrating scarce resources to a few priority urban area for optimal outcome. - Decentralisation in key economic corridors for regional balance. • Urban emphasis: - Urban agglomerations as drivers of economic growth - Viable world -class city & livable - Compact and efficient urban areas Federal Department Of Town And Country Planning Malaysia cont… NPP2 NATIONAL SPATIAL FRAMEWORK 2020 • Achieve an integrated and sustainable land use planning, coordinated with other sectoral policies/plans. • Provides the general directions of physical development in the nation. • Forms the basis for detailed development plans at regional, state and local. • Ensure resources are optimally used, avoid duplication in infrastructure investments and strive for sustainable development. Federal Department Of Town And Country Planning Malaysia cont… NPP2 THEMES & POLICIES THEME 1 THEME 2 THEME 3 THEME 4 THEME 5 THEME 6 THEME 7 THEME 8 Enhancing Conserving Sustainable Managing Conserving Natural Integrating Providing Economic Agriculture Tourism Changing Human Resources, National & Urban Appropriate Resources & Rural Development Settlements Biodiversity & the Transportation Infrastructure Competitiveness Development Environment Network Integrated Integrated Prime Agriculture Growth Environmental Infrastructure Concentrated Promote Transportation Areas Conurbations Sensitive Areas Services Decentralisation Sustainable Network Tourism Major Water Supply Development Central Forest Conurbations Rail Network Strategic Granary Spine Areas Urban Sewerage Regional Balance Regeneration Coastal & Marine Road Network Ecosystem Solid Waste Special Features Paddy Land Tourism Products Small & Highland Airports & Flood Protection Intermediate Development Seaports Cooperation with Town ASEAN Rural Living Power Supply Development Environment Transit Oriented Water Resources Development Planning (TOD) Tourism Natural Gas Standards Industrial Infrastructure Orang Asli Urban & Public Development Land Use Climate Change Settlements Transport ICT Information Directly Related To ‘City Competitiveness’ Federal Department Of Town And Country Planning Malaysia41 policies and 254 measures in total 3.0 IMPLEMENTATION OF THE NPP2 POLICIES PRINCIPLE KEY ENABLING IMPLEMENTING INITIATIVES • the TCP Dept is statutorily required AGENCIES to prepare the NPP and review it in THEME 1 : SETTING A NATIONAL SPATIAL FRAMEWORK tandem with the 5 YMP. NPP1 – Translate NPP2 into State Concentrated Federal & State Structure Plans, Local Plans • need to monitor and report the Decentralisation Agencies, Act 172 and projects of Ministries NPP implementation to the Strategy National Physical Planning Council. THEME 2 : ENHANCING EECONOMIC COMPETITIVENESS • have no authority and financial NPP2 – Federal & State Locate urban based Concentrating Agencies, MoE, MDec, activities and main resources to implement NPP. These growth in strategic Act 172, MoT infrastructure facilities in are done by implementing agencies conurbations strategic urban centres. at the; EPU, corridor o Economic diversification authorities – ECERDC, o Bridging the digital divide federal ministries/departments, NPP3 – Reduce NCIA, IRDA), Act 172, o Provide key infrastructure regional imbalance Min of Tourism, Min of o Provide technical training state government’ works, Min of h and social development local authorities. Human Resources programmes o Promote projects in Regional Growth Areas • for each NPP, policy measures and EPU, Min Foreign o Establish SEZ implementing agencies are Cooperation with Affairs, State agencies, o Exporting professional ASEAN countries Act 172, MOF, services identified. For policies in theme 1 professional services o Cross border and 2, these are summarized as development Industrial follows. development in o Siting of new industrial conformity with MITI, SEDC, Act 172, estates, service clusters IMP3 MOF and SEZ Federal Department Of Town And Country Planning Malaysia 4.0 CHALLENGES IN NPP2 IMPLEMENTATION • long gestation period to implement spatial development policies • weak monitoring and updating capacity • lack of database for strategic zones, conurbations and urban centres • lack of suitable policy indicators • poor incorporation of NPP2 into sectoral planning and development thus weakening the link between NPP2 and budgetary allocations Federal Department Of Town And Country Planning Malaysia 5.0 CHALLENGES IN NPP3 1. achieving vision 2020 & the 4 pillars of national transformation – only 6 years left 2. accelerating regional balance still far from achieving inclusive growth– still wide income and development disparities between the east and west coast. Federal Department Of Town And Country Planning Malaysia cont… 5.0 CHALLENGES IN NPP3 3. enchancing global competitiveness Translate economic ‘cone’ into spatial planning at the local level The cone illustrates economic output per kilometer square. Cities represented by higher cones are more dense in terms of economic activities Sumber:RMK-10 Kuala Terengganu Local Plan Federal Department Of Town And Country Planning Malaysia cont… 5.0 CHALLENGES IN NPP3 Key Building Blocks for Liveable Cities and Sustainable Communities Federal Department Of Town And Country Planning Malaysia 5.0 CHALLENGES IN NPP3 4. new innovative technologies 5. threats of climate change and geo hazards 6. low level of renewable energy and green technology utilisation 7. declining inner
Recommended publications
  • Selangor Journal L SEPTEMBER 2020
    Sultan calls for firm New digital platforms Practising fairness in More to Morib than Exciting proposals action to woo investors the Dewan meets the eye for Budget 2021 5 7 11 14 8&9 FREE SEPTEMBER 2020 EDITION www.selangorjournal.my SELANGOR Budget THE Selangor government is all set for an economic rebound after months of finan- cial slump following the Covid-19 outbreak. Formulating programmes and initiatives for all that promise to leave no one behind, Men- teri Besar Dato’ Seri Amirudin Shari says now is the time for the state to forge ahead as the nation’s economic reactor. The state administration recently organ- ised the 2021 Selangor Budget Dialogue, bringing together a team of stakeholders and experts to share their views for a bet- ter future. Details of the dialogue will act as a blueprint for the state’s upcom- MORE ON ing budget. PAGES 2to4 2 NEWS Selangor Journal l SEPTEMBER 2020 Grow and support local talent, says expert BY IDA NADIRAH IBRAHIM, SHERILYN PANG, AFIX REDZUAN, KHAIRUL AZRAN HUSSIN, NADIAH ZAMLUS, NORRASYIDAH ARSHAD, ZAREEF MUZAMMIL & ALIFF FIKRI PHOTO BY HAFIZ OTHMAN & FIKRI YUSOF SHAH ALAM - Malaysia, particularly Se- langor, has to focus on producing a quality talent pool to be able to compete globally. Founder and group chief executive of- ficer of Aerodyne Group, Kamarul A, said this should be one of the medium-to-long term solutions in new wealth creation for the country, especially in adapting to the new digital economy. He said Malaysia should also shift from being a traditionally technology-consum- ing country to a technology-producing nation.
    [Show full text]
  • Urban-Scale Material Flow Analysis: Malaysian Cities Case Study
    www.sciencetarget.com Urban - Scale Material Flow Analysis: Malaysian Cities Case Study Farah Ayuni Shafie 1* , Dasimah Omar 2 , Subramaniam Karuppannan 1 , and Nabilah Ismail 1 1 Faculty of Health Sciences, Universiti Teknologi Mara, Puncak Alam, Selangor, Malaysia 2 Faculty of Architecture, Surveying and Planning, Universiti Teknologi Mara, Shah International Journal of Alam, Malaysia Environment and Sustainability [IJ ES ] Abstract. Urban metabolism studies h ighlight the consumption of input ISSN 1927 - 9566 resources, the process within the system together from the source, use phase Vol. 5 No. 2 , pp. 45 - 5 3 and recycling of wastes. The aim of this study was to assess urban metabolism in (2016) three cities in Malaysia; Kuala Lumpur, Ampang Jaya and Selayang by using Material Flow Analysis (MFA). The data that was analysed included electricity inputs, water inputs, food (rice, eggs and sugar) inputs, carbon dioxide outputs, wastewater outputs and solid waste outputs. The national data were down - scaled to prov ide regional data where deemed necessary. The electricity consump tion of 0.188 koe/cap/day in Klang Valley contributed to carbon dioxide of 0.455 kg/cap/day, while 95.32% of water consumption became wastewater. Consumption of 0.38 kg/cap/day of ‘rice, egg s and sugar’ contributed in the production of 4.5 kg/cap/day of solid wastes. The urban metabolism approach provides information on urban management at city level such as material cycling, energy efficiency and waste management and may also assist in decis ion making for future urban development planning as well as providing an informed and rapid assessment on the environmental performance of urban area.
    [Show full text]
  • CIMB Auto Finance Centre
    CIMB Auto Finance Centre No 64, 1st Floor,Wisma Jayanita Jalan Raja Muda Abdul Aziz 1 KUALA LUMPUR (KUL) - 3071 Kampung Baru 50300 Kuala Lumpur 2nd Floor, 2468, Jalan Mutiara Timur Satu 2 CHERAS (CHS) - 3070 Taman Mutiara Cheras, 56100 Kuala Lumpur No 151, 2nd floor Jalan 2/3A off 12 KM Jalan Ipoh 3 SELAYANG (SLG) - 3067 68100 Batu Caves Kuala Lumpur A-3-3 3rd Floor, Block A Jaya One 4 PETALING JAYA (PJY) - 3066 No 72A Jalan Universiti Selangor Darul Ehsan 1st Floor, 16 Jalan TK1/11A Plaza Kinrara 5 PUCHONG (PCG) - 3083 47100 Puchong Selangor Darul Ehsan No 22-2, 2nd floor, Jalan Tiara 2A/KU1 6 KLANG (KLG) - 3064 Bandar Baru Klang 41150 Klang, Selangor Darul Ehsan Lot 8B 1st floor Jalan Pensyarah U1/28 7 SHAH ALAM (SHA) - 3065 Glenmarie 8 Business Park 40150 Shah Alam Selangor Darul Ehsan 2nd Floor, Block A-2, MKH Avenue Jalan Avenue 1A 8 KAJANG (KJG) - 3068 43000 Kajang Selangor Darul Ehsan No 35-3, 3rd floor, Jalan SP2/1 Taman Serdang Perdana 9 SERDANG PERDANA (SER) - 3087 Seksyen 2, 43300 Seri Kembangan Selangor Darul Ehsan No 165 & 167, 2nd floor Jalan NB2 2/2 10 JOHOR BAHRU 2 (JB2) - 3052 Taman Nusa Bestari 2 81300 Skudai, Johor Bahru Johor Darul Takzim Level 2, 73 Jalan Molek 3/1 Taman Molek 11 JOHOR BAHRU 1 (JB1) - 3086 81100 Johor Bahru Johor Darul Takzim 1st Floor, No 1A, Jalan Flora Utama 4 Taman Flora Utama 12 BATU PAHAT (BTU) - 3051 Bukit Pasir, 83000 Batu Pahat Johor Darul Takzim 2nd Floor 13 MELAKA (MLK) - 3055 No.
    [Show full text]
  • CAC) Negeri Selangor NEGERI SELANGOR DIKEMASKINI 9/4/2021 JAM 12.00 TGH PKD PETALING PKD GOMBAK LOKASI CAC WAKTU OPERASI NO
    Senarai COVID-19 Assessment JABATAN KESIHATAN Centre (CAC) Negeri Selangor NEGERI SELANGOR DIKEMASKINI 9/4/2021 JAM 12.00 TGH PKD PETALING PKD GOMBAK LOKASI CAC WAKTU OPERASI NO. TELEFON LOKASI CAC WAKTU OPERASI NO. TELEFON ISNIN-JUMAAT KK KUANG 03-60371092 011-64055718 10.00 PG – 12.00 TGH STADIUM MELAWATI (Telegram) ISNIN – JUMAAT SEKSYEN 13, 011-58814350 KK RAWANG 03-60919055 9.00 PG – 12.00 TGH ISNIN- KHAMIS SHAH ALAM 011-58814280 KK SELAYANG BARU 2.00 – 4.00 PTG 03-61878564 (Hanya waktu operasi sahaja) KK TAMAN EHSAN JUMAAT 03-62727471 2.45 – 4.00 PTG KK SUNGAI BULOH 03-61401293 PKD KLANG ---------------------- LOKASI CAC WAKTU OPERASI NO. TELEFON KK BATU ARANG 03-60352287 NO. TEL. BILIK KK GOMBAK SETIA 03-61770305 ISNIN – KHAMIS GERAKAN CDC 8.30 PG – 12.30 TGH KK AU2 DAERAH 03-42519005 Patient Clinical Assesment ( ) KK BATU 8 03-61207601/7607/ 03-61889704 2.00 – 5.00 PTG 7610 STADIUM HOKI (Home Assessment Monitoring) 010-9797732 KK HULU KELANG 03-41061606 PANDAMARAN (WhatsApp) JUMAAT (Hanya waktu operasi sahaja) 8.30 – 11.30 PG PKD SEPANG (Patient Clinical Assesment) 3.00 – 5.00 PTG LOKASI CAC WAKTU OPERASI NO. TELEFON (Home Assessment Monitoring) ISNIN – KHAMIS 011-11862720 8.00 PG – 1.00 PTG (Hanya waktu operasi sahaja) PKD KUALA LANGAT STADIUM MINI JUMAAT 019-6656998 BANDAR BARU LOKASI CAC WAKTU OPERASI NO. TELEFON 8.00 PG – 12.15 TGH (WhatsApp) SALAK TINGGI (Hanya waktu operasi sahaja) KK TELOK PANGLIMA SABTU & CUTI UMUM Email: GARANG ISNIN – KHAMIS 9.00 PG – 12.00 TGH [email protected] 2.00 PTG – 4.00 PTG KK TELOK DATOK JUMAAT 03-31801036 / PKD HULU SELANGOR 3.00 PTG – 4.30 PTG KK BUKIT 014-3222389 LOKASI CAC WAKTU OPERASI NO.
    [Show full text]
  • The Impacts of Supermarkets and Hypermarkets from the Perspectives of Fresh Fruit and Vegetable (Ffv) Wholesalers and Retailers
    Journal of Agribusiness Marketing • Vol.Amin 4 (2011): Mahir 21-37et al. THE IMPACTS OF SUPERMARKETS AND HYPERMARKETS FROM THE PERSPECTIVES OF FRESH FRUIT AND VEGETABLE (FFV) WHOLESALERS AND RETAILERS Amin Mahir Abdullah* Fatimah Mohamad Arshad Ismail Abd Latif ABSTRACT The importance of the retail sector to economic growth has been very significant. The rapid growth of the sector is partly contributed by the emergence of supermarkets and hypermarkets that are mostly foreign- owned. This has raised some concerns by the local conventional retailers including fresh fruit and vegetable (FFV) retailers. The government has reacted to the concerns by introducing new guidelines to developing new hypermarkets in this country. This study investigates the impacts of these two types of retailers on local FFV wholesalers and retailers. Data from personal interviews with FFV retailers and wholesalers were analysed. Results of the analyses showed that supermarkets and hypermarkets did impose competition on conventional wholesalers and retailers. However, they have also brought some changes to FFV retail business, such as promoting quality products, and a better and a systematic marketing approach. Keywords: Fresh fruit, vegetable, supermarkets, hypermarkets, wholesalers, retailers INTRODUCTION Malaysia’s food retail industry has progressed rapidly in parallel to the changes in the developed economy that is, the growth of hypermarkets and retailers as the major retail centres for consumers to buy foods and consumer goods. This development is brought about by the globalisation process, in particular the free flow of capital between countries and enhanced by the Foreign Direct Investment policy of the country. This development, however, poses a challenge to the traditional distribution network.
    [Show full text]
  • Acara E-TARANNUM Acara E-DAIE CILIK Acara E-HAFAZAN
    KEPUTUSAN RASMI e-MAHRAJAN ISLAMI PROGRAM ADAB DAN NILAI (ADNI) SEKOLAH RENDAH PPD GOMBAK 2021 Acara e-TARANNUM KATEGORI SEKOLAH RENDAH (LELAKI) PANGKAT NO. K/P NAMA PESERTA SEKOLAH ACARA SEKOLAH KEBANGSAAN TAMAN JOHAN 100324031355 AKIFF RAYYAN BIN SHAHROUL e-TARANNUM SELASIH SEKOLAH KEBANGSAAN TAMAN NAIB JOHAN 090225101075 ARFAN FIRAS BIN HAIRUL AZAM e-TARANNUM SERI GOMBAK 2 SEKOLAH KEBANGSAAN MERBAU TEMPAT KETIGA 090520100825 MUHAMMAD AFIQ ISKANDAR BIN HAZRIN e-TARANNUM SEMPAK KATEGORI SEKOLAH RENDAH (PEREMPUAN) PANGKAT NO. K/P NAMA PESERTA SEKOLAH ACARA SEKOLAH KEBANGSAAN SERI JOHAN 090404100414 NURSOBRINA BINTI ABDUL GHANI e-TARANNUM KUNDANG SEKOLAH KEBANGSAAN TAMAN NAIB JOHAN 110401060352 NUR HUSNINA MAISARAH BINTI MOHAMED FAIZAL e-TARANNUM EHSAN SEKOLAH KEBANGSAAN SG TUA TEMPAT KETIGA 100330102084 AISYA KHASIF SALIMA BINTI MOHAMAD YUSRI e-TARANNUM BAHARU Acara e-DAIE CILIK KATEGORI SEKOLAH RENDAH (LELAKI) PANGKAT NO. K/P NAMA PESERTA SEKOLAH ACARA SEKOLAH KEBANGSAAN BANDAR JOHAN 100816140283 MUHAMMAD ADAM IMAN BIN SHUKRI e-DAIE CILIK TASIK PUTERI SEKOLAH KEBANGSAAN SG TUA NAIB JOHAN 090402140375 FARISH SHAMIE BIN ABU TALIB e-DAIE CILIK BAHARU SEKOLAH KEBANGSAAN MERBAU TEMPAT KETIGA 090824100621 MUHAMMAD MIFZZAL BIN MAT AREH e-DAIE CILIK SEMPAK KATEGORI SEKOLAH RENDAH (PEREMPUAN) PANGKAT NO. K/P NAMA PESERTA SEKOLAH ACARA SEKOLAH KEBANGSAAN BANDAR JOHAN 090413100758 PUTERI ISSABEL JESLISA BINTI IBRAHIM e-DAIE CILIK TASIK PUTERI SEKOLAH KEBANGSAAN (2) TAMAN NAIB JOHAN 090903101446 NUR AFRINA BINTI ROSLAN e-DAIE CILIK SELAYANG SEKOLAH
    [Show full text]
  • Senarai Semua Lokasi Hotspot Wifi Smart Selangor Adalah Seperti Berikut
    Senarai semua lokasi hotspot WiFi Smart Selangor adalah seperti berikut:- No. Site Address Category 1 Masjid Nurul Yaqin Mosque Kampung Melayu Seri Kundang, 48050 Rawang, Selangor 2 Pusat Gerakan Khidmat Masyarakat (DUN Kuang) Government 6-1-A, Jalan 7A/2, Bandar Tasik Puteri, 48000 Rawang, Selangor 3 HOSPITAL SUNGAI BULOH_300014, 47000 Hospital Sungai Buloh Selangor 4 HOSPITAL SUNGAI BULOH_300014 Hospital 5 HOSPITAL SUNGAI BULOH_300014 Hospital 6 HOSPITAL SUNGAI BULOH_300014 Hospital 7 HOSPITAL SUNGAI BULOH_300014 Hospital 8 HOSPITAL SUNGAI BULOH_300014 Hospital 9 Perodua Service Centre Jln Sungai Pintas, No.14, Commercial Jalan TSB 10, Taman Industri Sg. Buloh 47000 Shah Alam selangor 10 TESCO RAWANG_300026, No.1, Jalan Rawang Mall 48000 Rawang Selangor 11 TM POINT RAWANG, TM Premises Lot 21, Jalan Maxwell 48000 Rawang 12 Stadium MPS, Jalan Persiaran 1, Bandar Baru Stadium Selayang, 68100 Batu Caves, Selangor 13 Pejabat Cawangan Rawang, Jalan Bandar Rawang Government 2, Bandar Baru Rawang, 48000 Rawang, Selangor 14 No. 309 Felda Sungai Buaya, 48010 Rawang, Residential Selangor area 15 Traffic Light Chicken Rice Sungai Choh, 48009 F&B outlet Rawang, Selangor 16 Pejabat Khidmat Rakyat (DUN Rawang) Government No.13, Jalan Bersatu 8 (Tingkat Bawah), Taman Bersatu, 48000 Rawang, Selangor 17 WTC Restoran F&B Outlet Rawang new town, 48000 Rawang, Selangor 18 Medan Selera MPS F&B Outlet Rawang Integrated Industrial Park, 45000 Rawang, Taman Tun Teja, Rawang, Selangor 19 Medan Selera F&B Outlet Bandar Country Homes, 48000 Rawang, Selangor 20 Kompleks JKKK, Selayang Baru, JKR 750C, Dewan Government Orang Ramai, Jalan Besar Selayang Baru, 68100 Batu Caves, Selangor 21 Pejabat Ahli Parlimen Selayang,12A, Jalan SJ 17, Government Taman Selayang Jaya, 68100 Batu Caves, Selangor No.
    [Show full text]
  • Personalia Ahli Majlis Majlis Perbandaran Selayang Bagi Penggal 2021-2022
    Tarikh Kemaskini 16 Februari 2021 PERSONALIA AHLI MAJLIS MAJLIS PERBANDARAN SELAYANG BAGI PENGGAL 2021-2022 JAWATANKUASA YANG Nama Ahli Majlis Alamat No. Tel/Faks/Email Zon DIANGGOTAI Tuan Ahmad Farizal bin Manaff (PKR) Pusat Khidmat Ahli No. Tel : ZON 1 1. J/K Perkhidmatan & Majlis / Jawatankuasa 018-278 0968 Teknologi Maklumat Penduduk Zon 1 MPS - Kg. Simpang Tiga - Desa Gemilang 2. J/K Infrastruktur Lot 1200 Batu 8 1/2 Email : - Kg. Sg. Chinchin - Taman Bukit Lela Gombak Utara [email protected] - Kg. Gombak Utara - Taman Mutiara Gombak 3. J/K Kemasyarakatan 53100 Kuala Lumpur [email protected] - Kg. Orang Asli - Taman Permai Jaya - Gombak Utara - Kg. Batu 11, 12, 13 Gombak - Kg. Sg. Salak - Universiti Islam Antarabangsa - Kg. Sg. Pusu - Villa Bestari YAD Dato' Paduka Raja Tan Sri Dato' Hj Wan Mahmood Pejabat Orang Besar No Tel. Pejabat : 03-6126 1499 ZON 2 1. J/K Kewangan bin Pawan Teh P.S.M, D.S.I.S, P.B.S Daerah Gombak Faks : 03-6120 7494 Dato' Orang Kaya Maha Bijaya Bgn. Sultan Sulaiman H/P : 013-350 7099 Taman Gombak Jaya 2. J/K Infrastruktur Orang Besar Daerah Gombak Persiaran Pegawai Taman Cemerlang Bandar Baru Selayang Email : Taman Kamariah 3. J/K Kemasyarakatan 68100 Batu Caves [email protected] Kg. Tengah Gombak 4. J/K Pusat Setempat (OSC) Selangor Darul Ehsan [email protected] Kg. Kerdas Taman Setia Gombak Kg. Kenangan Gombak Setia Taman Perwira Taman Harmonis Kg. Sentosa Tambahan PERSONALIA AHLI MAJLIS MAJLIS PERBANDARAN SELAYANG BAGI PENGGAL 2021-2022 1 Alamat No. Tel/Faks/Email Zon JAWATANKUASA YANG Nama Ahli Majlis DIANGGOTAI Tuan Ahmad Usamah bin Zulkifli Pusat Khidmat Ahli Majlis / No.
    [Show full text]
  • Ngo Clinics & Services
    NGO CLINICS & SERVICES Kuala Lumpur ACTS Clinic - Arrupe Address: 44A, Jalan Padang Belia, 50470 Brickfields, Kuala Lumpur Tel: +60322722585 Mon–Fri: 9:00am – 1:00pm & 2:00pm–5:00pm Sun: 9:00am–1:00pm Brickfields Services: Primary Care Services, mental health services, voluntary counselling, testing for HIV. Community Health Care Centre (CHCC) - PT Foundation Address: No. 2 (Level 1), Jalan Haji Salleh, Sentul, 51100, Kuala Lumpur Tel: +60340511163 / +60340513611 HIV Screening: Sentul Tue: 2:00pm–4:15pm & 7:00pm–8:15pm Thu: 10:00am–11:30pm & 2:00pm–4:45pm Sat: 10:00am–12.30pm & 3:00pm–4:45pm Counselling: By appointment only Services: HIV screening & counselling. Health Equity Initiatives Address: 26-1A, 1st Floor, Jalan Vivekananda, 50470 Brickfields, Kuala Lumpur Tel: +60322724957 By appointment only Brickfields Services: Psychiatric and psychological interventions, community based mental health promotion and preventive services. NGO CLINICS & SERVICES HumanKind Kuala Lumpur Address: Block B, Level 3, Mahsa Avenue, Off Jalan Universiti, Kuala Lumpur (by appointment only) Buddy Bear Helpline (Psychological first aid): 1800-18-BEAR (2327) Text Helpline: Buddy Bear Facebook Counselling for Children (Online / In-person): HumanKind (Sign up for appointment) Helpline Mon-Sun: 12pm–12am Text Helpline Mon-Sun: 6pm-12am Jalan Universiti Services: Psychological helpline and counselling for children age 6-17 years old (online/in person). HOPE Worldwide Free Clinic Address: 101A, 1st Floor, Jalan Sentul, Primary Care Services, mental health services, voluntary counselling, testing for HIV. 50150 Kuala Lumpur Tel: +60340454637 Sentul Tue & Thu: 10:00am–1:00pm & 2:00pm-4:00pm Services: Primary care services. Tzu-Chi Free Clinic Address: 221, 4th Floor, Wisma LTS, Jalan Pudu, 55100 Kuala Lumpur Tel: +60392261673 / +60183783727 Mon, Tue, Thu, Fri: 9:00am-12:30pm and 1:30pm–4:30pm Wed: 1:30pm-4:30pm Sun: 9:00am–12.30pm Jalan Pudu Services: Please click on the link below for further information on services.
    [Show full text]
  • Download File
    Cooperation Agency Japan International Japan International Cooperation Agency SeDAR Malaysia -Japan About this Publication: This publication was developed by a group of individuals from the International Institute of Disaster Science (IRIDeS) at Tohoku University, Japan; Universiti Teknologi Malaysia (UTM) Kuala Lumpur and Johor Bahru; and the Selangor Disaster Management Unit (SDMU), Selangor State Government, Malaysia with support from the Japan International Cooperation Agency (JICA). The disaster risk identification and analysis case studies were developed by members of the academia from the above-mentioned universities. This publication is not the official voice of any organization and countries. The analysis presented in this publication is of the authors of each case study. Team members: Dr. Takako Izumi (IRIDeS, Tohoku University), Dr. Shohei Matsuura (JICA Expert), Mr. Ahmad Fairuz Mohd Yusof (Selangor Disaster Management Unit), Dr. Khamarrul Azahari Razak (Universiti Teknologi Malaysia Kuala Lumpur), Dr. Shuji Moriguchi (IRIDeS, Tohoku University), Dr. Shuichi Kure (Toyama Prefectural University), Ir. Dr. Mohamad Hidayat Jamal (Universiti Teknologi Malaysia), Dr. Faizah Che Ros (Universiti Teknologi Malaysia Kuala Lumpur), Ms. Eriko Motoyama (KL IRIDeS Office), and Mr. Luqman Md Supar (KL IRIDeS Office). How to refer this publication: Please refer to this publication as follows: Izumi, T., Matsuura, S., Mohd Yusof, A.F., Razak, K.A., Moriguchi, S., Kure, S., Jamal, M.H., Motoyama, E., Supar, L.M. Disaster Risk Report by IRIDeS, Japan; Universiti Teknologi Malaysia; Selangor Disaster Management Unit, Selangor State Government, Malaysia, 108 pages. August 2019 This work is licensed under a Creative Commons Attribution-Non Commercial-Share Alike 4.0 International License www.jppsedar.net.my i Acknowledgement of Contributors The Project Team wishes to thank the contributors to this report, without whose cooperation and spirit of teamwork the publication would not have been possible.
    [Show full text]
  • Communal Landscape Design: Implementation at Low-Cost Flat in Selayang, Selangor
    VOL. 3 ISSUE 1, 2021 04 COMMUNAL LANDSCAPE DESIGN: IMPLEMENTATION AT LOW-COST FLAT IN SELAYANG, SELANGOR *Mazlina Mansor, Haza Hanurhaza Md Jani, Putri Haryati Ibrahim & Norhanis Diyana Nizarudin Department of Landscape Architecture, Kulliyyah of Architecture & Environmental Design, IIUM ABSTRACT LANDSCAPE COMMUNAL SPACE This paper presents the process of implementing a communal landscape A landscaped communal space is an outdoor area that provides additional design project for a low-cost flat in Selangor. The project aimed to rejuvenate facilities for residents to enjoy, relax and socialize. The enhancement of the existing communal area into a unique outdoor landscape space that is communal spaces will increase the functional value of the space and the vibrant in use, comfortable and beautiful. There are five main phases in the surrounding areas. Effective communal spaces that have been designed well process of implementing the project: (1) planning and site selection, (2) site would have a strong aesthetic appeal to invite users to spend time in them. It inventory and analysis, (3) design proposal, (4) presentation of project to the is suggested that open-air communal areas’ design will make the outdoor client and the residents’ management body (JMB), and (5) implementation of landscape of a building inviting and attractive to users. The resulting activity in the project on-site. The project involved the cooperation of various groups, these spaces would make the buildings within the surrounding look livelier, including the client, local authority, the students from the Bachelor of enhancing the neighbourhood’s overall appearance (Yushu, 2015). Communal Landscape Architecture programme and ARCLA Society, the academic staff of spaces include the following facilities: outdoor working areas (if it is an office IIUM, and Selayang Mulia flat residents at Batu Caves.
    [Show full text]
  • Issues and Problems Towards the Sustainable Dam Management System in Malaysia
    International Journal of Innovation, Management and Technology, Vol. 5, No. 6, December 2014 Issues and Problems towards the Sustainable Dam Management System in Malaysia Norlida Ismail downstream reaches to have lower diversity‖ [2]. Dams Abstract—Sustainable Dam Management Systems involve have a major affect on rivers mainly through the changes in the whole aspect of management in order to overcome the the timing, size, and low and high flows, finally producing a management issues and problems in dam development. Dam hydrology regime significantly differing with the pure management systems also help to reduce the reverse impact impoundment natural flow regime [3]. ―builds a dam on a between dams, humans and the environment. Usually, river can block or delay moves upstream fish and will developing dams affect humans and the environment in the form of changes in ecological, and socio-economic instead of contribute decline and extinction species event. Especially humans and the environment having an impact on the dam in the species which depend on longitudinal movement along the form of urban development pressures, land use conflicts, the stream‖ [4]. Power dams release significant amounts of climate change, earthquakes, landslides and the old dam carbon dioxide and methane, and occasionally produce more structure. The main purpose of this study is to identify the of these greenhouse gases than power plants running on issues and problems regarding sustainable dam management fossil fuels [5]. Occasionally dams are used to the diseases systems in Malaysia and to highlight the significant issues and vector breeding. According to Goldsmith, dam reservoirs problems in dam management systems in Malaysia.
    [Show full text]