Proposed Stockton Rifle Range Site Planning Proposal
Total Page:16
File Type:pdf, Size:1020Kb
Proposed Stockton Rifle Range Site Planning Proposal Defence Housing Australia Transport Study Report May 2017 Mark Waugh Pty Ltd ABN 67 106 169 180 Document History and Status Issue Rev. Issued To Qty Date Approved for Release Draft Rev01 DHA 1 30 Jul 16 M Waugh FINAL DRAFT Rev02 DHA, NPC 1 30 Sep 16 M Waugh FINAL Rev03 DHA, NPC 1 31 Oct 16 M Waugh FINAL Rev04 DHA, NPC 1 25 Nov 16 M Waugh FINAL Rev05 DHA, NPC 1 05 May 17 M Waugh Printed: 5 May 2017 Last Saved: 5 May 2017 File Name: C:\Users\Mark.Waugh\Documents\WORK\PROJECTS ACTIVE\ON HOLD\BTF2016093 DHA Stockton\REPORT\Rifle Range\FINAL Rev05 050517\BTF2016093 DHA Stockton RR Transport Report Rev05.Docx Author: Mark Waugh Name of Organisation: Defence Housing Australia Name of Project: Defence Housing Australia Stockton Transport Studies Name of Document: RIFLE RANGE TRANSPORT REPORT Document Version: FINAL Rev05 Project Number: BTF2016093RR COPYRIGHT: The concepts and information contained in this document are the property of Mark Waugh Pty Ltd. Use or copying of this document in whole or in part without the written permission of Mark Waugh Pty Ltd is an infringement of copyright. P0650 Small Holdings Subdivision Boundary Rd, Medowie. Transport and Access Report Rev04 ` Page i Contents Document History and Status ...................................................................................................................................................................... i Contents ............................................................................................................................................................................................................... 2 1 Executive Summary .............................................................................................................................................................................. 3 1.1 Background ................................................................................................................................................................................... 3 1.2 Summary ........................................................................................................................................................................................ 3 1.3 Conclusion and Next Steps ..................................................................................................................................................... 5 2 Introduction and Background .......................................................................................................................................................... 6 2.1 Background ................................................................................................................................................................................... 6 2.2 Site Context ................................................................................................................................................................................... 6 2.3 Objectives of Traffic Investigation ....................................................................................................................................... 7 3 Existing Conditions ............................................................................................................................................................................... 8 3.1 Road Network............................................................................................................................................................................... 8 3.2 Traffic Surveys and Site Observations ............................................................................................................................. 13 3.3 Cycling Facilities ....................................................................................................................................................................... 13 3.4 Public Transport Services ...................................................................................................................................................... 13 3.5 Road Authority Liaison .......................................................................................................................................................... 14 3.6 Crash History ............................................................................................................................................................................. 14 4 Development Proposals ................................................................................................................................................................... 15 4.1 Rifle Range ................................................................................................................................................................................. 15 4.2 Access, Trip Distribution and Assignment Assumptions .......................................................................................... 15 4.3 Traffic Generation .................................................................................................................................................................... 15 5 Existing Network Performance ..................................................................................................................................................... 16 5.1 Road Network............................................................................................................................................................................ 16 5.2 Intersection Performance ..................................................................................................................................................... 17 6 Future Network Performance ........................................................................................................................................................ 19 6.1 Road Network............................................................................................................................................................................ 19 6.2 Potential Intersection Layouts ............................................................................................................................................ 19 6.3 Modelled Intersection Performance ................................................................................................................................. 22 6.4 Recommended Access Strategy ......................................................................................................................................... 22 7 Summary and Conclusions ............................................................................................................................................................. 23 7.1 Summary ..................................................................................................................................................................................... 23 7.2 Conclusion .................................................................................................................................................................................. 23 Appendix A. Rifle Range Draft Indicative Master Plan ............................................................................................................ 24 Appendix B. Newcastle Cycling Map .............................................................................................................................................. 25 Appendix C. Public Transport Maps ................................................................................................................................................ 26 Appendix D. Crash History .................................................................................................................................................................. 28 Appendix E. Traffic Movement Survey Results .......................................................................................................................... 29 Appendix F. Traffic Modelling Summaries ................................................................................................................................... 30 BTF2016093 DHA Stockton RR Transport Report Rev05.docx FINAL Page 2 1 Executive Summary 1.1 Background DHA has an ongoing requirement for additional housing in the Newcastle area to cater for Newcastle based Defence members and their families and to replace existing DHA dwellings that do not meet current standards. DHA has recently purchased two surplus Defence sites at Stockton with the objective of obtaining the necessary planning approvals and developing them for a mix of housing for ADF personnel and the private market. These two sites (Fort Wallace and the Stockton Rifle Range) are located just a few kilometres north of the Newcastle CBD across the Hunter River on the Stockton Peninsula. As such the sites are comparatively close to Williamtown RAAF Base (approx. 11 to 12 km by road). This report present the transport investigations into the Rifle Range site in support of the rezoning proposal. Site details are: Rifle Range Title Lot 5 DP233358 Area 111.35ha Council Port Stephens (subject to amalgamation) Existing Land use Zoning E2 – Environmental Conservation A number of earlier assessments of the site have been prepared over a number of years. As part of this work, notional development yields were prepared