TRANSPORTATION

2015-18 Tentative Major Construction Projects

Provincial Highway and Water Management Projects . Major Provincial Highway . Water Management

The attached tentative three-year provincial construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2015-16 and 2017-18, subject to provincial funding and priorities.

 Projects that are under contract or tendered are identified stating the year of construction.  Other projects are being designed, right-of-way being negotiated and the acquisition of permits underway. These projects will commence as planned in the provincial program dependent upon the timely completion of the design and availability of funding.  Minor changes to the program may be required as newer information becomes available. In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year.

Not identified in the program are some of the bridge rehabilitation projects and local improvements, such as: minor slide repairs and intersection upgrades; small carry-over projects from 2014-15; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

GLOSSARY This is a listing of abbreviations used in the following document

@At Ave Avenue Bdry Boundary BF 74817 or (74817-02) Bridge File Number CNR Canadian National Railway Cr Creek Cty County (E) East Junction E East EB or EBL East Bound Lane ECL East Corporate (or City) Limit EID Eastern Irrigation District G/S Grade Separation Structure Hwy Highway Incl Includes Imp Improvement Int Intersection Intch IR Indian Reserve Jct Junction LR Local Road (N) North Junction N North NB or NBL North Bound Lane NCL North Corporate (or City) Limit R or Riv River Rge Range Rd or Rds Road or Roads (S) South Junction S South SB or SBL South Bound Lane SCL South Corporate (or City) Limit sel selective SRA Safety Rest Area St Street SV Summer Village Tr Trail Twp Township UAR Urban Approach Road VIS Vehicle Inspection Station (W) West Junction W West WB or WBL West Bound Lane WCL West Corporate (or City) Limit WID Western Irrigation District Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

1Tributary to Bow River Culvert on Highway 1, 2 km Structure Replacement S of Exshaw (74661-1)

1Bow River Culvert on Highway 1, at Canmore Structure Replacement (74364-1)

11 km E of Hwy 1X - 3 km W of Hwy 68 (EBL & WBL Preservation/Overlay 32 selective)

1East Boundary Stony Indian Reserve - W of Hwy 22 Preservation/Overlay 32 (EBL & WBL)

1Hwy 797 - Town of Strathmore (WBL) Preservation/Overlay 21

1WID Irrigation Canal Bridge on Provincial Highway 1 Structure Replacement near Strathmore (79535-1)

1WID Canal Culvert on Highway 1, 11 km E of Structure Replacement Gleichen (73820-1)

120 km W of Hwy 884 - 1 km W of Hwy 524 (EBL & Preservation/Overlay 64 WBL selective) Contract for 2015 Construction

11 km E of Hwy 41 - 25 km E of Hwy 41 (EBL) Preservation/Overlay 24

1A6 km E of Hwy 22 - 18 km W of Hwy 201 (selective) Preservation/Overlay 21

1ATown of Cochrane - W of Hwy 766 Twinning - 2nd Stage Paving 6 Contract for 2015 Construction 1XHwy 1 - Hwy 1A Preservation/Overlay 6

2Bow River Ivor Strong Bridge on Highway Bridge Substructure Repairs 2/, at (79210-1)

2Wolf Creek Bridge on Highway 2, 9 km SW of Structure Replacement Ponoka (75623 N-1) Contract for 2014 & 2015 Construction

2Wolf Creek Bridge on Highway 2, 9 km SW of Structure Replacement Ponoka (75623 S-2) Contract for 2014 & 2015 Construction

2Hwy 53 - Hwy 13 (NBL & SBL selective) Preservation/Overlay 32

Wednesday, March 18, 2015 Page 1 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

2Highway 616 Over Highway 2 Interchange, 8 km W Bridge Rehabilitation of Millet (75667-1) Contract for 2015 Construction

2Interchange @ 41 Ave SW Interchange - Grade, Base, Paving Contract for 2013, 2014, & 2015 Construction 250 Street Over Highway 2 Flyover, at NW Boundary Bridge Rehabilitation of Leduc (77994-1) Contract for 2014 & 2015 Construction

2Ellerslie Road - N of Hwy 216 (City of Edmonton) Preservation/Overlay 3 (SBL)

2Additional Southbound Lane on Highway 2 between Grading, Base, Full Paving 6 41st Ave and Highway 19 (part of Highway 19 improvements)

2Vimy Approach Road (UAR 79) - Hwy 18 Preservation/Overlay 9

2Redwater River Bridge on Provincial Highway 2 Structure Replacement near Vimy (1219-1)

2Hwy 37 - Town of Morinville (NBL) Preservation/Overlay 12 Contract for 2015 Construction 2Morinville - N of Hwy 18 (selective) Preservation/Overlay 22

21 km E of Hwy 44 - 15 km S of Town of Slave Lake Preservation/Overlay 40

2Sawridge Creek Bridge on Highway 2, at Slave Lake Flood Mitigation (13824-1)

2Little Sucker Culvert on Provincial Highway 2 near Structure Replacement Joussard (76479-1)

2Sucker Creek (Arcadia Creek Bridge ) on Highway 2, Structure Replacement 12 km E of Enilda (76478-1)

2Watercourse Culvert on Provincial Highway 2 near Structure Replacement Maclennan (77551-1)

2Climbing Lanes, West End of Peace River Bridge, W Passing/Climbing Lane 3 of Rge Rd 222 to W of Rge Rd 224

2W End of Peace River bridge to Hwy 2A Preservation/Overlay 12

Wednesday, March 18, 2015 Page 2 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

2Watercourse Culvert on Hwy 2 near Rycroft (86265- Structure Replacement 1)

212 km N of Hwy 59 - Town of Sexsmith (selective) Preservation/Overlay 21 Contract for 2015 Construction 2ASignalization at Hwy 2A and Dunbow Road Intersection Improvement

2AN of McKenzie Road - City of Red Deer Preservation/Overlay 5

2ARoundabout at Highway 2A/597 Intersection Improvement Contract for 2015 Construction 2AHwy 11A - S of Hwy 597 Preservation/Overlay 5

2ACity of Lacombe - N of City of Lacombe Preservation/Overlay 4

2AHwy 2 - S of Hwy 53 Preservation/Overlay 10

2A1 km S of Hwy 2 - Hwy 2 Preservation/Overlay 1

2AGeotechnical / Erosion Control Issues near Gunns Flood Mitigation Creek, E of Hwy 49 (Site # SH26)

3CPR Overpass on Highway 3, at Crowsnest Pass Bridge Rehabilitation (75744-1) Contract for 2014 & 2015 Construction

3Rock Fall Barrier Wall @ Crowsnest Lake Rockfall, Flood Mitigation W of Crowsnest Pass (site # S15)

3Crowlodge Creek Culvert on Highway 3, 18 km SW Structure Replacement of Fort Macleod (70887-1)

3Highway 3 and Coalhurst Access - offset Intersection Improvement deceleration lane & lengthen eastbound acceleration lane

3Hwy 3A - City of Lethbridge (EBL) Preservation/Overlay 22

5Watercourse Culvert on Provincial Highway 5 near Structure Replacement Cardston (801-1)

5Watercourse Culvert on Provincial Highway 5 near Structure Replacement Cardston (241-1)

Wednesday, March 18, 2015 Page 3 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

6Indian Farm Creek Culvert on Provincial Highway 6 Structure Replacement near Pincher Creek (74271-1) Contract for 2015 Construction

6Tributary to Kettles Creek Culvert on Highway 6, 2 Structure Replacement km S of Pincher Creek (13814-1)

9Hwy 838 - Hwy 27 Preservation/Overlay 19

10XRosebud River Bridge on Highway 10X, 3 km S of Structure Replacement Rosedale (70512-1)

11Watercourse Culvert on Provincial Highway 11 near Flood Mitigation Nordegg (76171-1)

114 km E of Hwy 22 - 2 km W of Benalto Access Preservation/Overlay 31 (selective) Contract for 2014 & 2015 Construction

111 km N of Hwy 598 - S of Town of Rocky Mountain Preservation/Overlay 4 House

119 km W of Hwy 921 - Hwy 12 Preservation/Overlay 28 Contract for 2015 Construction 12Hwy 20 - Hwy 792 (Phase 2) Reconstruct/Re-Alignment 12

12Hwy 50 - Town of Stettler Preservation/Overlay 46

13Modeste Creek Culvert on Provincial Highway 13 Structure Replacement near Winfield (73229-1)

136 km W of City of Wetaskiwin - Hwy 2A Preservation/Overlay 6

13Roundabout at Highway 13/21 (W of Camrose) Intersection Improvement

133 km E of Hwy 881 - 3 km E of Hardisty (EB) Passing/Climbing Lane 2

13Hwy 881 (Town of Hardisty) - Hwy 884 Preservation/Overlay 21

15Intersection Improvement: @ Lamoureux Road Intersection Improvement

15City of Edmonton - City of Fort Saskatchewan Preservation/Overlay 5

Wednesday, March 18, 2015 Page 4 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

15Lamont Creek Culvert on Provincial Highway 15 Structure Replacement near Lamont (70841-1)

16Hinton to Town of Edson (EBL & WBL selective) Preservation/Overlay 80 Contract for 2015 Construction 164 km W of Hwy 32 - Hwy 32 (WBL) Preservation/Overlay 4 Contract for 2015 Construction 161 km W of Hwy 748 - 11 km E of Hwy 748 (WBL) Preservation/Overlay 12

16Pointe-Aux-Pins Culvert on Hwy 16, 3 km NW of Structure Replacement Ardrossan (330-1)

161 km E of Hwy 21 - 1 km W of Hwy 830 (EBL) Preservation/Overlay 9

162 km W of Hwy 834 - 7 km W of Town of Mundare Preservation/Overlay 15 (EBL)

1612 km W of Hwy 834 - 2 km W of Hwy 834 (EBL) Preservation/Overlay 10

16E of Hwy 16A - W of Hwy 36 (WBL) Preservation/Overlay 9

163 km E of Hwy 631 to 2.5 km E of Hwy 857 (EB) Preservation/Overlay 12 Contract for 2015 Construction 162 km W of Hwy 870 - Minburn Access (UAR 216) Preservation/Overlay 30 (EBL & WBL)

16Hwy 36 - 1 km W of Village of Innisfree (EBL) Preservation/Overlay 19

16Kenilworth Lake Slide: Construct Retaining Wall Slide Repair Contract for 2015 Construction 16A2 km W of Hwy 60 - 1 km W of City of Edmonton Preservation/Overlay 7 (EBL & WBL) Contract for 2014 & 2015 Construction

17Hwy 45 - 11 km N of Hwy 45 (includes SBL climbing Preservation/Overlay 11 lane, S of ) (cost shared with Saskatchewan Government)

18Thunder Lake Park Road (PAR 107) - Hwy 33 Preservation/Overlay 18

18W of Hwy 2 - Hwy 2 Preservation/Overlay 1

Wednesday, March 18, 2015 Page 5 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

18Town of Westlock - Signalization at Jct Hwy 18 and Signalization / Lighting 108 Avenue (United Farmers of Alberta)

18E of Clyde - Hwy 63 (selective) Preservation/Overlay 33

19West End of Highway 19 at Highway 60 (includes 4 Twinning - Grade, Base, Stage Paving 4 lane realignment for 3.5 km on Hwy 19, upgrades on Hwy 60 for realigned Hwy 19, service road construction, signalized intersections)

19East End of Highway 19 at Highway 2 (includes 6 6 Laning - Grade, Base, Pave 2 lane construction for 1.8 km on Hwy 19, upgrades to ramps at Highway 2, service road construction)

20Hwy 11 - Town of Sylvan Lake (selective) Preservation/Overlay 3 Contract for 2014 & 2015 Construction 21S of Hwy 42 - Hwy 595 Preservation/Overlay 15

21Watercourse Culvert on Provincial Highway 21 near Structure Replacement Armena (74941-1)

21Signalization at Hwy 21 & 625 Signalization / Lighting

22Hwy 549 - Hwy 22X Preservation/Overlay 13

222 km E of Hwy 546 (2013 Flood Damage Repairs) Flood Mitigation

22Hwy 587 - Hwy 54 Preservation/Overlay 17

22Watercourse Culvert, Highway 22 near Dovercourt Structure Replacement (71073-1) Contract for 2014 & 2015 Construction

22Hwy 54 - 10 km N of Hwy 54 Preservation/Overlay 10

22Watercourse Culvert on Hwy 22, 13 km S of Structure Replacement Entwistle (74365-1)

22West of Jct Hwy 22(S) to South of Drayton Valley Reconstruct/Re-Alignment 8 (Phase 2, road realignment for new bridge 74381-1) Contract for 2011, 12, 13, 14 & 2015 Construction

22North Saskatchewan River Bridge E of Drayton Structure Replacement Valley (74381-1) (Phase 2, bridge) Contract for 2011, 12, 13, 14 & 2015 Construction

Wednesday, March 18, 2015 Page 6 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

22Tributary to North Saskatchewan River Culvert, 2 Structure Replacement km N of Drayton Valley (74150-1) Contract for 2014 & 2015 Construction

22Watercourse Culvert on Provincial Highway 22 near Structure Replacement Mayerthorpe (77827-1)

22Watercourse Culvert on Provincial Highway 22 near Structure Replacement Mayerthorpe (77294-1)

22Geohazard site # NC31, 29 km N of Hwy 16 - High Flood Mitigation Water Related Mitigation Work

22X7 km E of Hwy 791 - Hwy 24 Preservation/Overlay 9

23Roundabout Construction at Jct Hwy 23 and 519 Intersection Improvement

27Dogpound Creek Bridge on Highway 27, 15 km W of Structure Replacement Olds (310-1)

27Red Deer River Bridge on Highway 27, at Sundre Flood Mitigation (1980-1)

27Red Deer River Bridge on Highway 27, 12 km SW of Structure Replacement Morrin (9551-1)

27Ghostpine Creek Bridge on Highway 27, 18 km SE Bridge Rehabilitation of Three Hills (1938-1) Contract for 2014 & 2015 Construction

28Highway 28 Over Highway 28A Interchange, 1 km N Bridge Rehabilitation of Gibbons (76625-1) Contract for 2015 Construction

28Various Curve Revisions (3) W of Redwater, Hwy 38, Reconstruct/Re-Alignment 3 N of Redwater

28N of Hwy 28A - Hwy 651 Widen And Overlay 11

28Hwy 651 - W of Hwy 827 Preservation/Overlay 14

29Hwy 15 - Hwy 855 Preservation/Overlay 33

29Intersection Improvement @ Jct Hwy 29 & 45 Intersection Improvement

Wednesday, March 18, 2015 Page 7 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

3215 km N of Hwy 748 - 17 km S of Hwy 43 Preservation/Overlay 21

32Tributary to Judy Creek on Hwy 32 South of Swan Structure Replacement Hills (86253-1)

32Tributary to Freeman River, South of Swan Hills Structure Replacement

32River Bank Protection / Repair at Judy Creek (site # Flood Mitigation SH27)

33Watercourse Culvert on Provincial Highway 33 near Structure Replacement Rich Valley (7450-1)

33Morse River Culvert on Highway 33, 30 km SE of Structure Replacement Swan Hills (75073-1)

33Watercourse Culvert on Hwy 33 (86266-1) Structure Replacement

33Chalmers Creek Culvert on Highway 33, 30 km N of Structure Replacement Swan Hills (76041-1) Contract for 2015 Construction

351 km S of Hwy 986 - 10 km N of Hwy 689 Preservation/Overlay 32

35Hwy 691 - 10 km S of Hwy 692 Preservation/Overlay 28

35Stowe Creek Culvert on Provincial Highway 35 near Structure Replacement Notikewin (71814-1) Contract for 2014 & 2015 Construction

35Meikle River Slide: Landslide Repair, Construct Pile Slide Repair Wall, and Other Work (PH05) Contract for 2015 Construction

35Keg River Bridge on Highway 35, at N Boundary of Bridge Rehabilitation Keg River (73425-1) Contract for 2015 Construction

35Watercourse Culvert on Provincial Highway 35 near Structure Replacement High Level (73438-1)

35Watercourse Culvert on Hwy 35, 40 km S of High Structure Replacement Level (73437-1)

35Loon Creek Culvert on Provincial Highway 35 near Structure Replacement High Level (73444-1)

Wednesday, March 18, 2015 Page 8 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

35Slavey Creek Culvert on Provincial Highway 35 near Structure Replacement Meander River (73430-1) Contract for 2015 Construction

35Watercourse Culvert on Provincial Highway 35 near Structure Replacement Meander River (86163-1)

36Chin Coulee Surface Repair Due to Slide (10 km N Slide Repair 1 of Hwy 61)

362 km N of Hwy 556 - 10 km N of Hwy 561 Preservation/Overlay 20

36S of Hwy 12 - S of Alliance (selective) Preservation/Overlay 21

36Safety Rest Area, 1 km N of Hwy 12 Safety Rest Area

36Hwy 619 - 18 km N of Town of Viking Preservation/Overlay 19

36Intersection Improvement @ Jct Hwy 36 & 45 Intersection Improvement

36Town of Two Hills - Hwy 45 Preservation/Overlay 1

37Hwy 43 - 1 km E of Hwy 44 Preservation/Overlay 31

37Hwy 37/28 Intersection Improvement Intersection Improvement

37Hwy 37/28A Intersection Improvement Intersection Improvement

37Major Intersection Improvement / Realignment at Intersection Improvement Hwys 37/825/15 (W of Ft Saskatchewan)

38Hwy 28 - 2 km E of Hwy 830 (Beaverhill Creek Preservation/Overlay 20 Bridge)

39Flood mitigation: Riprap along Modest Creek and Flood Mitigation some erosion repair (site # NC23) Contract for 2015 Construction

39Eight Mile Creek Culvert on Provincial Highway 39 Structure Replacement near Leduc (402-1) Contract for 2015 Construction

40Evan Thomas Creek (upstream protection rip rap) Flood Mitigation (BF77486-1)

Wednesday, March 18, 2015 Page 9 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

40Rock Fall Barrier Wall @ Mt Baldy Rockfall, S of Flood Mitigation Hwy 1 (site # S 17)

40Rock Fall Barrier Wall @ Galatea Cut Rockfall, S of Flood Mitigation Hwy 1 (site # S18)

40Waiparous Creek Bridge on Provincial Highway 40 Structure Replacement near Cochrane (73899-1)

4019 km S of Hwy 47 - Hwy 47 2nd Stage Paving 19 Contract for 2015 Construction 40Lost Creek Culvert, Hwy 40 near Coalspur (85218-1) Structure Replacement

40McLeod River Erosion Site, 3km NE of Cadomin Flood Mitigation

40Mcleod River Bridge on Highway 40, 6 km NE of Flood Mitigation Cadomin (72641-1)

40Gregg River Erosion Site, 36 km SE of Hinton Flood Mitigation

40Fred Creek Culvert, Hwy 40 N of Hinton (76754-1) Structure Replacement (incl roadwork/slide repair)

40Athabasca River Bridge on Highway 40, 6 km W of Bridge Substructure Repairs Hinton (70580-1)

407 km S of Grande Cache - 5 km N of Grande Cache Preservation/Overlay 11 (selective)

40Within Town of Grande Cache Preservation/Overlay 2

40Mason Creek Culvert on Provincial Highway 40 near Structure Replacement Grande Cache (76529-1) Contract for 2014 & 2015 Construction

40Susa Creek Culvert on Hwy 40, 11 km E of Grande Structure Replacement Cache (76531-1)

40Sterne Creek Culvert on Provincial Highway 40 near Structure Replacement Grande Cache (76530-1)

40Washy Creek Culvert, near Grande Cache (76748-1) Structure Replacement

Wednesday, March 18, 2015 Page 10 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

40Geohazard Site #GP32 - High Water Related Flood Mitigation Mitigation Work (S curves, E of Grande Cache)

40Smoky River Bridge on Highway 40, 1 km N of Structure Replacement Grande Cache (76474-1)

40Sheep Creek Bridge on Highway 40, 23 Km N of Flood Mitigation Grande Cache (79710-1)

40Kakwa River - Cutbank River Preservation/Overlay 32

40Kakwa River Bridge on Highway 40, 93 km S of Flood Mitigation Grande Prairie (79472-1)

40Cutbank River Bridge on Highway 40, 70 km South Flood Mitigation of Grande Prairie (79473-1)

40Bald Mountain Creek Culvert on Highway 40, 32 km Flood Mitigation S of Grande Prairie (79475-1)

41Delmas Coule Culvert on Provincial Highway 41 Structure Replacement near Elkwater (73016-1)

41Sounding Creek Bridge on Provincial Highway 41 Structure Replacement near Oyen (7683-1)

41Hwy 28 (Bonnyville) - N of Hwy 28 Preservation/Overlay 9

431 km E of Hwy 723 - 2 km W of Hwy 724 2nd Stage Paving 22 Contract for 2015 Construction 431 Km W of Hwy 724 - City of Grande Prairie (WBL Preservation/Overlay 18 selective) Contract for 2015 Construction

431 km W of Hwy 724 - City of Grande Prairie (EBL) Preservation/Overlay 19 Contract for 2015 Construction 43Hwy 43X - 2 km E of Hwy 2 2nd Stage Paving 2 Contract for 2015 Construction 43E of Crooked Creek - W of Sturgeon Lake IR West Twinning - 2nd Stage Paving 17 Bdry

432 Km E of Hwy 736 - Young's Point Park Road (PAR Preservation/Overlay 10 135) (WBL)

Wednesday, March 18, 2015 Page 11 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

43Sturgeon Lake IR (W of W Bdry - E Bdry) Twinning - 2nd Stage Paving 19

435 km W of Hwy 49 - Hwy 49 (EBL & WBL) Preservation/Overlay 9

43W of Sturgeon Lake IR to E of Sturgeon Lake IR (W Preservation/Overlay 20 of Valleyview)

43Hwy 49 - 17 km S of Hwy 665 (SBL) Preservation/Overlay 24

43S of the Hamlet of Little Smoky - Town of Fox Creek Preservation/Overlay 21 (WBL) (selective) Contract for 2015 Construction

4315 km W of Hwy 947 - 19 km E of Hwy 947 (WBL Preservation/Overlay 24 selective) Contract for 2015 Construction

43Slide Repairs near Two Creek, SE of Fox Creek Flood Mitigation (Site # GP28)

43Athabasca River Bridge on Highway 43, at NW Flood Mitigation Boundary of Whitecourt (73810-1)

431 Km W of Hwy 33 - Hwy 33 (WBL) Preservation/Overlay 1

43Hwy 43/Onoway Access Intersection Improvement Intersection Improvement

432 Km N of Hwy 633 - Hwy 16 (includes Hwy 16 off Preservation/Overlay 12 ramp) (NBL)

43XW of 116 Street (RR63) - E of Hwy 2 and 43 2nd Stage Paving 7 interchange, N of Grande Prairie Contract for 2015 Construction

441 km N of Hwy 16 - 1 km N of Hwy 642 (selective) Preservation/Overlay 26 Contract for 2015 Construction 441 km N of Hwy 642 - Town of Westlock Preservation/Overlay 38

44Hwy 18 (Westlock) - Hwy 661 Preservation/Overlay 21

44Bear Creek Culvert on Provincial Highway 44 near Structure Replacement Jarvie (9454-1)

441 km S of Hwy 2 - Hwy 2 Preservation/Overlay 1

Wednesday, March 18, 2015 Page 12 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

45Hwy 15 - 1 km E of Hwy 855 (selective) Preservation/Overlay 53 Contract for 2014 & 2015 Construction 45Hwy 41 - Dewberry Access Road (UAR 56) Preservation/Overlay 23 Contract for 2015 Construction 45Hwy 893 - Hwy 17 Preservation/Overlay 43 Contract for 2015 Construction 4714 km S of Hwy 16 - 1 km S of Hwy 16 Preservation/Overlay 13 Contract for 2015 Construction 47Hwy 40 - 14 km S of Hwy 16 (includes Safety Rest Preservation/Overlay 45 Area adjacent to NBL, S of Hwy 16) Contract for 2015 Construction

47Watercourse Culvert on Highway 47, 34 Km SW of Structure Replacement Edson (73283-1)

49Watercourse Culvert on Provincial Highway 49 near Structure Replacement Whitburn (72741-1)

49Watercourse Culvert on Hwy 49, E of Hwy 719 Structure Replacement (86288-1)

49Tributary to Henderson Creek Culvert on Highway Structure Replacement 49, 22 km E of Bay Tree (78868-1)

49Little Smoky River Bridge on Highway 49, 12 km S Bridge Painting of Guy (74440-1) Contract for 2014 & 2015 Construction

53W of Hwy 2 - Hwy 2A Preservation/Overlay 6

54Hwy 22 - 3 km W of Hwy 766 (selective) Preservation/Overlay 21

54Clearwater River Bridge, Hwy 54, 8 km W of Flood Mitigation Caroline (7492-1)

563 km S of Hwy 10 - Hwy 10 Preservation/Overlay 3

561 km S of Hwy 12 - Hwy 53 Preservation/Overlay 29 Contract for 2014 & 2015 Construction 56Big Valley Creek Bridge on Highway 56, 5 km NE of Structure Replacement Big Valley (1877-1) Contract for 2015 Construction

56Town of Stettler (selective) Preservation/Overlay 1

Wednesday, March 18, 2015 Page 13 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

58East Sousa Creek Bridge on Highway 58, 21 km SE Structure Replacement of Chateh (76633-1) Contract for 2015 Construction

581.5 km E of Hwy 35 - 26 km E of Hwy 35 Preservation/Overlay 25 Contract for 2015 Construction 58Watercourse Culvert on Hwy 58, 28 km N of Fort Structure Replacement Vermilion (75715-1)

60Signalization at Hwy 60 & 628 Signalization / Lighting

60Hwy 16A - S of Hwy 16 Preservation/Overlay 4 Contract for 2014 & 2015 Construction 63N of Hwy 55 - S of Wandering R (S of the La Biche Twinning - Base, Stage Paving 20 River to S of Wandering River) Contract for 2014 & 2015 Construction

63S of Wandering River to N of Wandering River Twinning - Base, Stage Paving 28 Contract for 2014 & 2015 Construction 63Median Rest Area / VIS Station, N of Hwy 55 Safety Rest Area (grading, base and paving) Contract for 2014, 2015, & 2016 Construction

63N of Jct Hwy 55 to S of the La Biche River Twinning - Grade, Base, Stage Paving 13 Contract for 2014, 2015, & 2016 Construction 63S of Wandering River to N of Wandering River Twinning - 2nd Stage Paving 28

63Atmore Vehicle Inspection Station (construction of Miscellaneous building on site)

63N of Wandering River - S of House River Twinning - 2nd Stage Paving 35 Contract for 2015 Construction 63Tributary to House River (Bear Creek) Culvert on Twinning - Structure Highway 63, 54 km N of Wandering River (75906-2) Contract for 2013, 2014, & 2015 Construction

63S of House River - S of Marianna Lake Twinning - Grade, Base, Stage Paving 32 Contract for 2013, 2014, & 2015 Construction 63Watercourse Culvert (SBL) on Provincial Highway Twinning - Structure 63 near Wandering River (BF 77637 S) Contract for 2014 & 2015 Construction

63Watercourse Culvert (NBL) on Provincial Highway Twinning - Structure 63 near Wandering River (77637-2) Contract for 2014 & 2015 Construction

63S of House River to S of Mariana Lake Twinning - 2nd Stage Paving 32

Wednesday, March 18, 2015 Page 14 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

63Crow Creek, 70 km N of Wandering River (76033-2) Twinning - Structure Contract for 2013, 2014, & 2015 Construction 63Safety Rest / Truck Staging Area, South of Crow Safety Rest Area Creek (Grade/Base/Pave) Contract for 2013, 2014, & 2015 Construction

63S of Marianna Lake - N of Marianna Lake Twinning - Grade, Base, Stage Paving 25 Contract for 2014, 2015, & 2016 Construction 63Safety Rest Area, N of Crow Lake (SB, Safety Rest Area Grade/Base/Pave) Contract for 2014, 2015, & 2016 Construction

63S of Marianna Lake - N of Algar Tower Preservation/Overlay 38 Contract for 2015 Construction 63S of Horse Creek - S of Hwy 881 Twinning - Grade, Base, Stage Paving 38 Contract for 2013, 2014, & 2015 Construction 63Safety Rest Area, N of Crow Lake (NB, Base/Pave) Safety Rest Area Contract for 2014 & 2015 Construction 63N of Marianna Lake - S of Horse Creek Twinning - Base, Stage Paving 32 Contract for 2014 & 2015 Construction 63Hangingstone River, (75907-1) (Includes 1.3 km Structure Replacement Roadwork) 15 km S of Hwy 881 (SBL) Contract for 2013, 2014, & 2015 Construction

63Safety Rest Area, (S of Hwy 881, SB, Safety Rest Area Grade/Base/Pave) Contract for 2013, 2014, & 2015 Construction

63N of Hangingstone River - S of Hwy 881 Twinning - Grading 12 Contract for 2014 & 2015 Construction 63Parsons Creek Interchange Interchange - Grade, Base, Paving 13 Contract for 2013, 2014, 2015 & 2016 Construction 63Hwy 686 - 48 km N of Hwy 686 (selective) Preservation/Overlay 40 Contract for 2015 Construction 6341 km N of Hwy 686 - 49 km N of Hwy 686 (selective) Preservation/Overlay 6

88Watercourse Culvert on Hwy 88, S of Red Earth Structure Replacement (86187-1)

88S of Hwy 686 - N of 23rd Baseline 2nd Stage Paving 21

88N of Jct Hwy 686 - Willow Creek 2nd Stage Paving 24

88S of Wabasca River (S) - N of Senex Creek 2nd Stage Paving 48

Wednesday, March 18, 2015 Page 15 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

88N of Senex Creek - Wadlin Lake Road 2nd Stage Paving 37

88Wadlin Lake Road -Bear River 2nd Stage Paving 45 Contract for 2015 Construction 88Peace River Bridge , 8 km NW of Fort Vermilion Bridge Substructure Repairs (74227-1) (slope stabilization) Contract for 2014 & 2015 Construction

201CALGARY SOUTH WEST ( Grading, Base, Full Paving 20 to Hwy 8) (future P3 Contract)

216EDMONTON NORTH EAST RING ROAD (Manning Grading, Base, Full Paving 20 Drive - S of Whitemud Drive Interchange) (includes Contract for 2012, 13, 14, 15, & 2016 Construction various interchange upgrades on Hwy 16)

216Southwest - Whitemud Drive 2nd Stage Paving 9 to

216Anthony Henday Drive over North Saskatchewan Bridge Rehabilitation River (85014-E)

216Anthony Henday Drive over North Saskatchewan Bridge Rehabilitation River (85014-W)

501Irrigation Canal Culvert on Provincial Highway 501 Structure Replacement near Mountain View (71538-1)

50124 km W of Town of Milk River - 12 km W of Hwy 4 Preservation/Overlay 16

5052 km E of Hwy 810 - Hwy 2 Preservation/Overlay 13 Contract for 2015 Construction 509Watercourse Culvert on Provincial Highway 509 Structure Replacement near Stand Off (78858-1)

540Stimson Creek Bridge on Provincial Highway 540, Structure Replacement 17 km SE of Longview (1308-1)

5415 km E of Hwy 40 (Site # 3) Flood Mitigation

544Little Sandhill Creek Culvert on Provincial Highway Structure Replacement 544 near Patricia (72027-1)

547Hwy 799 - Hwy 24 Preservation/Overlay 15

Wednesday, March 18, 2015 Page 16 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

549Spring Coule Bridge on Provincial Highway 549 Structure Replacement near Okotoks (1006-1)

549Hwy 22 - Hwy 552 Preservation/Overlay 20

550EID Irrigation Canal Culvert, near Rosemary (71400- Structure Replacement 1)

550Watercourse Culvert on Provincial Highway 550 Structure Replacement near Countess (71403-1)

563Hwy 1 - City of Calgary Preservation/Overlay 7

567Hwy 791 - Hwy 9 Preservation/Overlay 15

581Sheep Coulee Culvert on Provincial Highway 581 Structure Replacement near Carstairs (721-1)

584Flood Mitigation Works, James River Bridge on Flood Mitigation Hwy 584, 10 km NW of Bearberry

587Bowden Creek Bridge on Provincial Highway 587 Structure Replacement near Bowden (257-1)

587Watercourse Bridge on Provincial Highway 587 near Structure Replacement Innisfail (77685-1)

587Kneehills Creek Bridge on Provincial Highway 587 Structure Replacement near Innisfail (2435-1)

590Waskasoo Creek Culvert on Provincial Highway 590 Structure Replacement near Innisfail (775-1)

5901 km E of Hwy 2 - Hwy 791 Preservation/Overlay 8

597Hwy 2 - Town of Blackfalds Preservation/Overlay 3 Contract for 2015 Construction 599Watercourse Culvert on Provincial Highway 599 Structure Replacement near Bulwark (74518-1)

601Paintearth Creek Bridge on Provincial Highway 601, Structure Replacement near Gadsby (7512-1) Contract for 2015 Construction

Wednesday, March 18, 2015 Page 17 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

605Hwy 821 - 11 km E of Hwy 821 Preservation/Overlay 11 Contract for 2015 Construction 611Battle River Bridge on Provincial Highway 611 near Structure Replacement Usona (1546-1)

616Watercourse Culvert on Hwy 616 near Breton Structure Replacement (85038-1)

616Modeste Creek Bridge, 2 km W of Breton (71019-1) Structure Replacement

620W of Hwy 753 - Hwy 22 (Drayton Valley) Preservation/Overlay 52

6253 km E of Hwy 2 - Hwy 21 Preservation/Overlay 17

627Signal Installation and Other Work - Intersection of Signalization / Lighting Hwy 627 & 770

628Town of Stony Plain - 6 km E of Hwy 779 Preservation/Overlay 6

628Anthony Henday Drive - 3 km E of Hwy 216 Preservation/Overlay 4

64614 km E of Hwy 41 - Hwy 897 Preservation/Overlay 27

6511 km W of Hwy 777 - 5 km E of Hwy 777 Preservation/Overlay 8

651Hwy 2 - 10 km E of Hwy 803 (selective) Preservation/Overlay 9

660Hwy 660/882 Intersection Improvement Intersection Improvement

660Hwy 882 - Hwy 882 Preservation/Overlay 0.31

661Hwy 44 - Hwy 2 Preservation/Overlay 24

666Watercourse Culvert on Provincial Highway 666 Structure Replacement near Grovedale (76333-1)

667Hwy 722 - Hwy 43 Preservation/Overlay 7 Contract for 2015 Construction 67014 km W of Hwy 43 - Hwy 43 Preservation/Overlay 14 Contract for 2015 Construction

Wednesday, March 18, 2015 Page 18 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

671Watercourse Culvert on Provincial Highway 671 Structure Replacement near Goodfare (79252-1)

672Hwy 43 - E of Hwy 2 Preservation/Overlay 48

676Watercourse Culvert on Provincial Highway 676 Structure Replacement near Debolt (82114-1)

677Watercourse Culvert on Provincial Highway 677 Structure Replacement near Woking (76959-1)

680Hwy 725 to Hwy 727 Base, Staged Paving 15 Contract for 2015 Construction 681Watercourse Bridge on Provincial Highway 681 near Structure Replacement Blueberry Mountain (76439-1)

682Watercourse Culvert on Provincial Highway 682 Structure Replacement near Fairview (8867-1)

6852 km W of Hwy 735 - Hwy 735 Preservation/Overlay 2

686Watercourse Culvert on Hwy 686 near Trout Lake Structure Replacement (86210-1) Contract for 2015 Construction

686W of Hwy 63 to Hwy 63 Grading, Base, Stage Paving 5 Contract for 2014 & 2015 Construction 689Beaton Creek Bridge on Highway 689, 15 km W of Structure Replacement Dixonville (71442-1)

690Hwy 35 - 3 km W of Hwy 743 (includes Deadwood Preservation/Overlay 12 Slide)

690Watercourse Culvert on Highway 690, 9 km W of Structure Replacement Deadwood (73271-1)

695W of Hwy 35 - Hwy 35 Preservation/Overlay 18 Contract for 2015 Construction 722Intersection Improvement at Jct Highway 667 Intersection Improvement Contract for 2015 Construction 722Redwillow River Bridge on Highway 722, 18 km S of Bridge Rehabilitation Beaverlodge (8036-1) Contract for 2014 & 2015 Construction

Wednesday, March 18, 2015 Page 19 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

727Hwy 49 - Hwy 680 2nd Stage Paving 18 Contract for 2015 Construction 733Watercourse Culvert on Provincial Highway 733 Structure Replacement near Heart Valley (70358-1)

734High Water Related Mitigation Work near James Flood Mitigation River, S of Hwy 584 (site # C30)

734High Water Related Mitigation Work near James Flood Mitigation River, S of Hwy 584 (site # C37)

734Clearwater River Bridge on Highway 734, 40 km SW Flood Mitigation of Caroline (76350-1)

734Elk Creek Bridge, near Nordegg (77583-1) Structure Replacement

734Cripple Creek Bridge on Provincial Highway 734 Structure Replacement near Nordegg (77591-1)

741North Manning Drainage Creek Culvert on Hwy 741 Structure Replacement near Manning (86171-1)

747Watercourse Culvert on Provincial Highway 747 Structure Replacement near Sunset House (77835-1)

749Drainage Ditch Culvert on Provincial Highway 749 Structure Replacement near High Prairie (70388-1)

75217 km S of Hwy 11A - Hwy 11A Preservation/Overlay 18

75445 km N of Hwy 88 - 6 km N of Hwy 813 Preservation/Overlay 51 Contract for 2015 Construction 756Hwy 11 - Crimson Lake Park Road (PAR 102) Preservation/Overlay 5

758Hwy 66 - Hwy 22 Preservation/Overlay 5

759Hwy 39 - Hwy 624 Preservation/Overlay 18

759Hwy 624 - 3 km S of Hwy 627 Preservation/Overlay 7

762Hwy 549 - Hwy 22 Preservation/Overlay 22

Wednesday, March 18, 2015 Page 20 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

7668 km S of Hwy 587 - 3 km S of Hwy 587 Preservation/Overlay 5

7722 km S of Hwy 566 - Hwy 566 Preservation/Overlay 2

779Hwy 628 - 47th Ave (Town of Stony Plain) Reconstruct/Re-Alignment 2

779Town of Stony Plain - 1 km N of Hwy 16 Preservation/Overlay 4 Contract for 2014 & 2015 Construction 785Watercourse Culvert on Hwy 785 near Pincher Structure Replacement Creek (1745-1)

795Hwy 53 - 2 km N of Hwy 53 Preservation/Overlay 2

799Hwy 23 - Hwy 552 Preservation/Overlay 23 Contract for 2015 Construction 801Hwy 661 - Hwy 663 2nd Stage Paving 23 Contract for 2015 Construction 814Clearwater Creek Bridge on Provincial Highway 814 Structure Replacement near Nisku (1721-1)

814Hwy 623 - Hwy 625 Preservation/Overlay 10

815Hwy 597 - 5 km S of Hwy 12 Preservation/Overlay 7 Contract for 2015 Construction 825Watercourse Culvert Under Hwy 825 near Fort Widen Bridge Saskatchewan (85149-1)

825Hwy 37 - Boysdale Rd (incl Intersection Widen And Overlay 5 Improvement)

825Watercourse Culvert on Provincial Highway 825 Widen Bridge near Fort Saskatchewan (559-1)

851Hwy 9 - Farrell Lake Preservation/Overlay 28

852Watercourse Culvert on Provincial Highway 852 Structure Replacement near Gadsby (70870-1)

855Hwy 13 - Hwy 26 Preservation/Overlay 18

Wednesday, March 18, 2015 Page 21 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Major Provincial Highway

872Nelson Creek Culvert on Provincial Highway 872 Structure Replacement near Coronation (8393-1)

881Hwy 13 - Town of Hardisty Preservation/Overlay 2

881Hwy 28 - 6 km N of Hwy 660 Preservation/Overlay 16

884Blood Indian Creek Bridge on Provincial Highway Structure Replacement 884 near Youngstown (7686-1) Contract for 2015 Construction

901Hwy 22X - E of Hwy 22X Preservation/Overlay 0.33

986Daishowa West Hill Slide: Landslide Repair, Slide Repair Construct Pile Wall, and Other Work (site # PH71)

986Culvert on Tributary to Cadotte River on Highway Structure Replacement 986 NE of Peace River (86227-1)

UAR 56Hwy 45 - Village of Dewberry Preservation/Overlay 2 Contract for 2015 Construction UAR 57Hwy 45 - 3 km N of Hwy 45 Preservation/Overlay 3 Contract for 2015 Construction UAR 79Hwy 2 - 1 km E of Hwy 2 Preservation/Overlay 1

UAR 90Hwy 21 - 4 km E of Hwy 21 Preservation/Overlay 4

UAR 150Hwy 29 - 1 km N of Hwy 29 Preservation/Overlay 1

UAR 221Hwy 21 - Village of Delburne Preservation/Overlay 1

LOCAL ROADSmith Dorrien Spray Trail, at Rummel Creek (repair Flood Mitigation scoured area)

LOCAL ROADBenjamin Creek Culvert on Local Road near Structure Replacement Cochrane (77236-1)

LOCAL ROADWatercourse Culvert on Local Road near Bragg Structure Replacement Creek (79293-1)

LOCAL ROADIrrigation Canal Culvert on Local Road near Structure Replacement Mclennan (86072-1)

Wednesday, March 18, 2015 Page 22 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Water Management

CP 2010- Buffalo Lake - Rochon Sands Flood Protection Berm Water Management 00010

CP 2006- Carseland Bow River Headworks Control System Water Management 00021 Upgrade

W16804-01Chain Lakes Flood Handling Upgrade Water Management Contract for 2013, 2014, & 2015 Construction W16834-03Deadfish Canal Rehab (Cessford) Water Management

CP 2006- Dickson Dam Controls System Upgrade Water Management 00014 Contract for 2014 & 2015 Construction

CP2003-Dickson Dam Spillway Gate Coating Water Management

CP 2014- Klein Lake - 2013 Flood Repairs Water Management 00007

CP 2009- Lesser Slave River Weir: Riparian Bypass Channel Water Management 00002 Modifications

CP 2006- Lethbridge Northern Headworks - Supervisory Water Management 00013 Control and Data Aquisition (SCADA) System Upgrades

LITTLE BOW Little Bow Reservoir - Main Dam and Outlet Water Management RESERVOIR Structure Rehabilitation Contract for 2014 & 2015 Construction

LITTLE BOW Little Bow river Canal Flood Mitigation Works - Water Management RIVER Construction Contract for 2014 & 2015 Construction CANAL

CP 2006- Oldman River Dam - Supervisory Control and Data Water Management 00015 Aquisition (SCADA) System Upgrade

CP 2008- Pine Coulee - Aquifier Well Monitoring Water Management 00025 Instrumentation

CP 2005- Sheerness Water Supply System Blowdown Canal Water Management 00011 Rehabilitation

CP 2008- St Mary Dam - Irrigation Control Shaft - Stairway Water Management 00030 Replacement

Wednesday, March 18, 2015 Page 23 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation)

Estimated Highway Location Type of Work Length (km)

Water Management

CP 2011- St Mary Dam - Low Level Outlet (LLO) Valve Water Management 00001 Replacement - Isolation Barrier

CP 2011- St Mary Dam - Low Level Outlet (LLO) Valve Water Management 00001 Replacement - Valve Installation

CP 2011- St Mary Dam - Low Level Outlet (LLO) Valve Water Management 00001 Replacement - Valve Supply

S2158-14Travers Reservoir Structures Rehabilitation Water Management (remaining works)

W17251-02Waterton to St Mary Canal Rehab - Bullhorn Water Management Wasteway Contract for 2015 Construction

TAYLORWaterton St Mary's Headworks System Reach 13 - Water Management Taylor Wasteway Replacement

WOMEN'S Flood Mitigation Work - Construction at Women's Water Management COULEE Coulee

CP 2008- Women's Coulee (Highwood Diversion) River Water Management 00055 Channelizaiton

CP 2008- Women's Coulee (Highwood Diversion) Control Water Management 00015 System

CP 2004- Women's Coulee Canal and Reservoir Rehabilitation Water Management 00010

Wednesday, March 18, 2015 Page 24 of 24