ALBERTA TRANSPORTATION 2015-18 Tentative Major Construction Projects Provincial Highway and Water Management Projects . Major Provincial Highway . Water Management The attached tentative three-year provincial construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2015-16 and 2017-18, subject to provincial funding and priorities. Projects that are under contract or tendered are identified stating the year of construction. Other projects are being designed, right-of-way being negotiated and the acquisition of permits underway. These projects will commence as planned in the provincial program dependent upon the timely completion of the design and availability of funding. Minor changes to the program may be required as newer information becomes available. In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year. Not identified in the program are some of the bridge rehabilitation projects and local improvements, such as: minor slide repairs and intersection upgrades; small carry-over projects from 2014-15; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects. GLOSSARY This is a listing of abbreviations used in the following document @At Ave Avenue Bdry Boundary BF 74817 or (74817-02) Bridge File Number CNR Canadian National Railway Cr Creek Cty County (E) East Junction E East EB or EBL East Bound Lane ECL East Corporate (or City) Limit EID Eastern Irrigation District G/S Grade Separation Structure Hwy Highway Incl Includes Imp Improvement Int Intersection Intch Interchange IR Indian Reserve Jct Junction LR Local Road (N) North Junction N North NB or NBL North Bound Lane NCL North Corporate (or City) Limit R or Riv River Rge Range Rd or Rds Road or Roads (S) South Junction S South SB or SBL South Bound Lane SCL South Corporate (or City) Limit sel selective SRA Safety Rest Area St Street SV Summer Village Tr Trail Twp Township UAR Urban Approach Road VIS Vehicle Inspection Station (W) West Junction W West WB or WBL West Bound Lane WCL West Corporate (or City) Limit WID Western Irrigation District Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation) Estimated Highway Location Type of Work Length (km) Major Provincial Highway 1Tributary to Bow River Culvert on Highway 1, 2 km Structure Replacement S of Exshaw (74661-1) 1Bow River Culvert on Highway 1, at Canmore Structure Replacement (74364-1) 11 km E of Hwy 1X - 3 km W of Hwy 68 (EBL & WBL Preservation/Overlay 32 selective) 1East Boundary Stony Indian Reserve - W of Hwy 22 Preservation/Overlay 32 (EBL & WBL) 1Hwy 797 - Town of Strathmore (WBL) Preservation/Overlay 21 1WID Irrigation Canal Bridge on Provincial Highway 1 Structure Replacement near Strathmore (79535-1) 1WID Canal Culvert on Highway 1, 11 km E of Structure Replacement Gleichen (73820-1) 120 km W of Hwy 884 - 1 km W of Hwy 524 (EBL & Preservation/Overlay 64 WBL selective) Contract for 2015 Construction 11 km E of Hwy 41 - 25 km E of Hwy 41 (EBL) Preservation/Overlay 24 1A6 km E of Hwy 22 - 18 km W of Hwy 201 (selective) Preservation/Overlay 21 1ATown of Cochrane - W of Hwy 766 Twinning - 2nd Stage Paving 6 Contract for 2015 Construction 1XHwy 1 - Hwy 1A Preservation/Overlay 6 2Bow River Ivor Strong Bridge on Highway Bridge Substructure Repairs 2/Deerfoot Trail, at Calgary (79210-1) 2Wolf Creek Bridge on Highway 2, 9 km SW of Structure Replacement Ponoka (75623 N-1) Contract for 2014 & 2015 Construction 2Wolf Creek Bridge on Highway 2, 9 km SW of Structure Replacement Ponoka (75623 S-2) Contract for 2014 & 2015 Construction 2Hwy 53 - Hwy 13 (NBL & SBL selective) Preservation/Overlay 32 Wednesday, March 18, 2015 Page 1 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation) Estimated Highway Location Type of Work Length (km) Major Provincial Highway 2Highway 616 Over Highway 2 Interchange, 8 km W Bridge Rehabilitation of Millet (75667-1) Contract for 2015 Construction 2Interchange @ 41 Ave SW Edmonton Interchange - Grade, Base, Paving Contract for 2013, 2014, & 2015 Construction 250 Street Over Highway 2 Flyover, at NW Boundary Bridge Rehabilitation of Leduc (77994-1) Contract for 2014 & 2015 Construction 2Ellerslie Road - N of Hwy 216 (City of Edmonton) Preservation/Overlay 3 (SBL) 2Additional Southbound Lane on Highway 2 between Grading, Base, Full Paving 6 41st Ave and Highway 19 (part of Highway 19 improvements) 2Vimy Approach Road (UAR 79) - Hwy 18 Preservation/Overlay 9 2Redwater River Bridge on Provincial Highway 2 Structure Replacement near Vimy (1219-1) 2Hwy 37 - Town of Morinville (NBL) Preservation/Overlay 12 Contract for 2015 Construction 2Morinville - N of Hwy 18 (selective) Preservation/Overlay 22 21 km E of Hwy 44 - 15 km S of Town of Slave Lake Preservation/Overlay 40 2Sawridge Creek Bridge on Highway 2, at Slave Lake Flood Mitigation (13824-1) 2Little Sucker Culvert on Provincial Highway 2 near Structure Replacement Joussard (76479-1) 2Sucker Creek (Arcadia Creek Bridge ) on Highway 2, Structure Replacement 12 km E of Enilda (76478-1) 2Watercourse Culvert on Provincial Highway 2 near Structure Replacement Maclennan (77551-1) 2Climbing Lanes, West End of Peace River Bridge, W Passing/Climbing Lane 3 of Rge Rd 222 to W of Rge Rd 224 2W End of Peace River bridge to Hwy 2A Preservation/Overlay 12 Wednesday, March 18, 2015 Page 2 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation) Estimated Highway Location Type of Work Length (km) Major Provincial Highway 2Watercourse Culvert on Hwy 2 near Rycroft (86265- Structure Replacement 1) 212 km N of Hwy 59 - Town of Sexsmith (selective) Preservation/Overlay 21 Contract for 2015 Construction 2ASignalization at Hwy 2A and Dunbow Road Intersection Improvement 2AN of McKenzie Road - City of Red Deer Preservation/Overlay 5 2ARoundabout at Highway 2A/597 Intersection Improvement Contract for 2015 Construction 2AHwy 11A - S of Hwy 597 Preservation/Overlay 5 2ACity of Lacombe - N of City of Lacombe Preservation/Overlay 4 2AHwy 2 - S of Hwy 53 Preservation/Overlay 10 2A1 km S of Hwy 2 - Hwy 2 Preservation/Overlay 1 2AGeotechnical / Erosion Control Issues near Gunns Flood Mitigation Creek, E of Hwy 49 (Site # SH26) 3CPR Overpass on Highway 3, at Crowsnest Pass Bridge Rehabilitation (75744-1) Contract for 2014 & 2015 Construction 3Rock Fall Barrier Wall @ Crowsnest Lake Rockfall, Flood Mitigation W of Crowsnest Pass (site # S15) 3Crowlodge Creek Culvert on Highway 3, 18 km SW Structure Replacement of Fort Macleod (70887-1) 3Highway 3 and Coalhurst Access - offset Intersection Improvement deceleration lane & lengthen eastbound acceleration lane 3Hwy 3A - City of Lethbridge (EBL) Preservation/Overlay 22 5Watercourse Culvert on Provincial Highway 5 near Structure Replacement Cardston (801-1) 5Watercourse Culvert on Provincial Highway 5 near Structure Replacement Cardston (241-1) Wednesday, March 18, 2015 Page 3 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation) Estimated Highway Location Type of Work Length (km) Major Provincial Highway 6Indian Farm Creek Culvert on Provincial Highway 6 Structure Replacement near Pincher Creek (74271-1) Contract for 2015 Construction 6Tributary to Kettles Creek Culvert on Highway 6, 2 Structure Replacement km S of Pincher Creek (13814-1) 9Hwy 838 - Hwy 27 Preservation/Overlay 19 10XRosebud River Bridge on Highway 10X, 3 km S of Structure Replacement Rosedale (70512-1) 11Watercourse Culvert on Provincial Highway 11 near Flood Mitigation Nordegg (76171-1) 114 km E of Hwy 22 - 2 km W of Benalto Access Preservation/Overlay 31 (selective) Contract for 2014 & 2015 Construction 111 km N of Hwy 598 - S of Town of Rocky Mountain Preservation/Overlay 4 House 119 km W of Hwy 921 - Hwy 12 Preservation/Overlay 28 Contract for 2015 Construction 12Hwy 20 - Hwy 792 (Phase 2) Reconstruct/Re-Alignment 12 12Hwy 50 - Town of Stettler Preservation/Overlay 46 13Modeste Creek Culvert on Provincial Highway 13 Structure Replacement near Winfield (73229-1) 136 km W of City of Wetaskiwin - Hwy 2A Preservation/Overlay 6 13Roundabout at Highway 13/21 (W of Camrose) Intersection Improvement 133 km E of Hwy 881 - 3 km E of Hardisty (EB) Passing/Climbing Lane 2 13Hwy 881 (Town of Hardisty) - Hwy 884 Preservation/Overlay 21 15Intersection Improvement: @ Lamoureux Road Intersection Improvement 15City of Edmonton - City of Fort Saskatchewan Preservation/Overlay 5 Wednesday, March 18, 2015 Page 4 of 24 Tentative Government-Owned Transportation Projects Near Completion, Underway or Scheduled in 2015-2018 Major Provincial Highway and Water Management Projects (Major Construction and Rehabilitation) Estimated Highway Location Type of Work Length (km) Major Provincial Highway 15Lamont
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages26 Page
-
File Size-