AMTRAK) Mechanical Bulletins, 2003 - 2009

Total Page:16

File Type:pdf, Size:1020Kb

AMTRAK) Mechanical Bulletins, 2003 - 2009 Description of document: Master Index of National Railroad Passenger Corporation (AMTRAK) Mechanical Bulletins, 2003 - 2009 Requested date: 18-April-2009 Released date: 15-June-2009 Posted date: 09-September-2009 Title of document Mechanical Bulletin Master Index, Calendar Year(s) 2003 – 2009 Source of document: FOIA Request National Railroad Passenger Corporation Freedom of Information Office 60 Massachusetts Avenue, N.E. Washington, D.C. 20002 Fax: 202-906-2169 The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website. NATIONAL RAILROAD PASSENGER CORPORATION 60 Vlassacnusftts P,Ve'lUf, Nt, Washillqton, DC 20002 AIVlTRAK ~, June 15,2009 Re: Freedom of Information Act Request We are further responding to your April 18, 2009 request for information made under the Freedom of Infonnation Act (FOIA). Your request seeks the records described below: 1. The index or listing of Amtrak Mechanical Bulletins ( all years) 2. A copy of each of Amtrak Mechanical Bulletins numbered 09-01 through MB 09- 20. You have indicated in your letter that if we are not able to provide an index of all the mechanical bulletins, that we could supply you with a paper listing or printout and limit the years to 2000 to the present. We have been advised by Amtrak's Mechanical Department that the Index only goes back to 2003. In regard to your request, please find enclosed records that have been determined to be responsive to your request. The names of Amtrak employees and their phone numbers have been redacted from the enclosed records. This information is being withheld pursuant to exemption 6 of the FOIA on the basis that disclosure would constitute a clearly unwarranted invasion of the personal privacy of these individuals. If you wish to appeal Amtrak's decision to withhold the above-mentioned infonnation, pursuant to Amtmk's FOIA regulations (49 CFR 701.10), you may file an appeal with Eleanor D. Acheson, Vice President, General Counsel and Corporate Secretary, within thirty days of the date of this letter, specifying the relevant facts and the basis for your appeal. Your appeal may be sent to Ms. Acheson at the above address. June J5, 2009 Page 2 If you have any questions regarding your request, please feel free to contact me at 202/906-3741. For ease of reference your request has been assigned tracking number 09- FOI-0004S. Sincerely, j/u Sharron Hawkins Freedom ofInformation Officer Enclosure IM-58t66 Mechanical Bulletin Master Index Calendar Year 2003 2003 TITLE EQUIPMENT MB# DATE Ground Relay Award N/A MB-03-001 12/15/2003 Calendar Year 2004 2004 TITLE EQUIPMENT MB# DATE American Battery Charging Prototype Battery Charger Superliner car # 32037 MB-04-001 1/1512004 Amfleet I HVAC Controls Amfleet I Car # 82027 & 2124~ MB-04-002 1/9/2004 Ground Relay Award N/A MB-04-003 1/9/2004 HVAC Controllers on Amfleet I & 11 Equipment Amfleet I car # 82036 MB-04-004 2/19/2004 Inspection Criteria for Baggage Car Roll-Up Doors Bag Cars w/roll-up doors MB-04-005 3/1/2004 Heater Element, Drain Cartridge used on Through-floor Drain Lines on all Amfleet Equipment All Amfleet Equipment MB-04-007 5/26/2004 Installation of Prototype Amfleet I & 11 Master Door Controller for Testing Amfleet I & II MB-04-010 5/12/2004 Po Ii Disc Inspection and Wear Test Amfleet I & II Amfleet I & II MB-04-011 5/12/2004 Mechanical Department Winter Operation Preparation Schedule All Equipment MB-04-012 6/912004 Ground Relay Award N/A MB-04-013 Updated NRPC 3126, MAP 10C ExteriorllnteriorCalendar Day Inspection N/A MB-04-014 Compliance with SMP 49601 & Wheel Defects and Measurement N/A MB-04-016 9/14/2004 Compliance with SMP 49601 & Wheel Defects and Measurement N/A MB-04-016U 9/14/2004 Test of Cobra "Tread Guard" Brake Shoes on Blue Water Trains 364 & 365 Blue Water Trains 364 & 365 MB-04-018 8/912004 Securement of Amfleet Air Tanks Amfleet MB-04-019 8/19/2004 Amfleet II Body Side Door Window Replacement Amfleet II MB-04-020 8/20/2004 Application of SABIWABCO Disc Actuator Cylinders on Amfleet I Trucks Amfleet I MB-4-021 8/31/2004 AUX Panel Search, Unit 175 P-42 Locomotives P-42 Locomotives MB-04-022 9/912004 Torsion Bars, Superliner I Trucks Superliner I MB-04-024 10/11/2004 Software Matrix for P-42DC, P-40DC, & P-32ACDM Locomotives P-42DC, P-40DC, & P-32ACD MB-04-027 11/9/2004 Calendar Year 2005 2005 TITLE EQUIPMENT MB# DATE Amfleet I & II, Viewliner, Cab Public Address Systems per Car Type Car, HEP,Superliner I & II MB-05-01 1/3/2005 27 Point Jumpers MB-05-02 1/3/2005 Strato Hose 22-120-0300X All Equipment MB-05-03 1/5/2005 Flex Coupling Change for Oil Separator on Turbo Charged EMD 645 EMD 645 Engines MB-05-04 2/10/2005 Amf II, View, Heritg. Antifreeze Circuit Operation DinerlCrew Dorm MB-05-05 1/2112005 Dialight LED' Type Marker Light Endurance Test Amfleet I (Prototype) MB-05-06 1/21/2005 GE P-32, P-40, P-42, P- GE Traction Motor Combo Drain Plug 32DM Locos MB-05-07 1/27/2005 Superliner I Reman Sleeper # Non-Metallic Waste Pipe 32052 MB-05-08 1/27/2005 Door Closed Propulsion Interlock Modification P-42 Locos (1-207) MB-05-09 2/9/2005 Do Not Use Wax on Rubber or Stainless Steel Floors All Equipment MB-05-10 2/24/2005 Hoppecke Test Batteries Amf. I cars 44707 & 85004 MB-05-11 2/25/2005 Railphone Vandalism Equip. wlrailphones MB-05-12 3/2/2005 Fuel Transfer Pump Circuit Breaker Indentification for General Electric P-42DC, P-40DC, and Locomotives P32DM Diesel Locomotives MB-05-13 3/4/2005 Conversion of Refrigeration to R404A Amfleet II Car Number 28002 Amfleet II #28002 MB-05-15 3/16/2005 Conformity to CFR49, Part 238 Heritage Baggage Cars MB-05-17 6/812005 Inspect Handbrake for Proper Operation All Equipment MB-05-18 3/21/2005 Safety and Security Measures Mechanical Department MB-05-21 4/11/2005 Rim Thickness Condemning Limit Change AEM-7 MB-05-24 4/22/2005 Inspection of Emergency Guide Bolts Sup. I MD-76 Trucks MB-05-25 6/24/2005 Amf, Hor, Sup, Surf, View, Cab cars (9600 series), Michigan coaches (44550 Inspection of Brake Discs series) MB-05-26 5/4/2005 Horizons 54049, 54067, Horizon Fleet NC Condenser Fan Pressure Switch 54515 MB-05-27 5/11/2005 Private Car Daily Inspections Private Cars MB-05-29 6/912005 Viewliner Sleepers 62043, Test Operation of Douwe Egbert, C-110 Coffeemakers 62036,62040,62021,62019 MB-05-31 6/8/2005 Hub and Bore Magnetic Particle Inspection Stencil New Wheels MB-05-32 6/8/2005 High Pressure Fuel Line Replacement GE Locomotives MB-05-33 6/15/2005 Testing of New Toilet Dump Valve AEM-7 Loco, Unit 911 MB-05-34 6114/2005 Position of Blower Low Speed Switch on AEM-7 AC Locomotives During Hot Weather Conditions AEM-7 Electric Locos MB-05-35 6/20/2005 GE Locomotive Downloads GE Locomotives MB-05-36 6/2012005 GE Locomotive Downloads (Update) GE Locomotives MB-05-36U 10/5/2005 Modification of Cut Lever Bar Field Fix MP-15 Switchers 530 to 539 MB-05-37 6/24/2005 Field Replacement of Emergency Guide Bolts Sup. I, MD-76 Trucks MB-05-38 7/1/2005 Maintenance Alerts & Mechanical Bulletins on Amtrak's Intranet All MB-05-39 7/1/2005 Upper & Lower Journal Bearing Housings Manufactured by Timken P-32DM, P-40, P-42 Locos MB-05-40 7/8/2005 Removal of Slotted Style Heritage Brake Discs cars MB-05-41 7/29/2005 Low Lube Oil Pressure Line from Engine Block to Manifold for the GE P-32DM, P-40, P-42 CCP Transducer locos MB-05-42 8/11/2005 Recall of Amphenol/Pyle National 27 Pin Jumpers All Types MB-05-43 8/29/2005 Setting Car Body Height after Removal of Shims from the Upper Primary Suspension Superliner I, MD-76 Trucks MB-05-44 8/19/2005 Overhaul of Superliner I Truck Side Bearings Superliner I, MD-76 Truck MB-05-45 8/12/2005 (MB-05-45 Attachment) MD-76 Truck Assembly Superliner I, MD-76 Truck MB-05-45 8/12/2005 Calendar Day Inspection of Truck Side Bearings Superliner I, MD-76 Truck MB-05-46 10/31/2005 Inspection of Handbrake Assembly Baggage cars 1200 series MB-05-47 8/10/2005 Superliner I cars 38010, Emergency Guide Bolt Test Cars 34005,32006,31040 MB-05-48 8/12/2005 Prototype ACC & Temperature Control Panels Amf.
Recommended publications
  • Pacific Surfliner-San Luis Obispo-San Diego-October282019
    PACIFIC SURFLINER® PACIFIC SURFLINER® SAN LUIS OBISPO - LOS ANGELES - SAN DIEGO SAN LUIS OBISPO - LOS ANGELES - SAN DIEGO Effective October 28, 2019 Effective October 28, 2019 ® ® SAN LUIS OBISPO - SANTA BARBARA SAN LUIS OBISPO - SANTA BARBARA VENTURA - LOS ANGELES VENTURA - LOS ANGELES ORANGE COUNTY - SAN DIEGO ORANGE COUNTY - SAN DIEGO and intermediate stations and intermediate stations Including Including CALIFORNIA COASTAL SERVICES CALIFORNIA COASTAL SERVICES connecting connecting NORTHERN AND SOUTHERN CALIFORNIA NORTHERN AND SOUTHERN CALIFORNIA Visit: PacificSurfliner.com Visit: PacificSurfliner.com Amtrak.com Amtrak.com Amtrak is a registered service mark of the National Railroad Passenger Corporation. Amtrak is a registered service mark of the National Railroad Passenger Corporation. National Railroad Passenger Corporation, Washington Union Station, National Railroad Passenger Corporation, Washington Union Station, One Massachusetts Ave. N.W., Washington, DC 20001. One Massachusetts Ave. N.W., Washington, DC 20001. NRPS Form W31–10/28/19. Schedules subject to change without notice. NRPS Form W31–10/28/19. Schedules subject to change without notice. page 2 PACIFIC SURFLINER - Southbound Train Number u 5804 5818 562 1564 564 1566 566 768 572 1572 774 Normal Days of Operation u Daily Daily Daily SaSuHo Mo-Fr SaSuHo Mo-Fr Daily Mo-Fr SaSuHo Daily 11/28,12/25, 11/28,12/25, 11/28,12/25, Will Also Operate u 1/1/20 1/1/20 1/1/20 11/28,12/25, 11/28,12/25, 11/28,12/25, Will Not Operate u 1/1/20 1/1/20 1/1/20 B y B y B y B y B y B y B y B y B y On Board Service u låO låO låO låO låO l å O l å O l å O l å O Mile Symbol q SAN LUIS OBISPO, CA –Cal Poly 0 >v Dp b3 45A –Amtrak Station mC ∑w- b4 00A l6 55A Grover Beach, CA 12 >w- b4 25A 7 15A Santa Maria, CA–IHOP® 24 >w b4 40A Guadalupe-Santa Maria, CA 25 >w- 7 31A Lompoc-Surf Station, CA 51 > 8 05A Lompoc, CA–Visitors Center 67 >w Solvang, CA 68 >w b5 15A Buellton, CA–Opp.
    [Show full text]
  • The Signal Bridge
    THE SIGNAL BRIDGE Volume 18 NEWSLETTER OF THE MOUNTAIN EMPIRE MODEL RAILROADERS CLUB Number 5B MAY 2011 BONUS PAGES Published for the Education and Information of Its Membership NORFOLK & WESTERN/SOUTHERN RAILWAY DEPOT BRISTOL TENNESSEE/VIRGINIA CLUB OFFICERS LOCATION HOURS President: Secretary: Newsletter Editor: ETSU Campus, Business Meetings are held the Fred Alsop Donald Ramey Ted Bleck-Doran: George L. Carter 3rd Tuesday of each month. Railroad Museum Meetings start at 7:00 PM at Vice-President: Treasurer: Webmaster: ETSU Campus, Johnson City, TN. John Carter Duane Swank John Edwards Brown Hall Science Bldg, Room 312, Open House for viewing every Saturday from 10:00 am until 3:00 pm. Work Nights each Thursday from 5:00 pm until ?? APRIL 2011 THE SIGNAL BRIDGE Page 2 APRIL 2011 THE SIGNAL BRIDGE Page 3 APRIL 2011 THE SIGNAL BRIDGE II scheme. The "stripe" style paint schemes would be used on AMTRAK PAINT SCHEMES Amtrak for many more years. From Wikipedia, the free encyclopedia Phase II Amtrak paint schemes or "Phases" (referred to by Amtrak), are a series of livery applied to the outside of their rolling stock in the United States. The livery phases appeared as different designs, with a majority using a red, white, and blue (the colors of the American flag) format, except for promotional trains, state partnership routes, and the Acela "splotches" phase. The first Amtrak Phases started to emerge around 1972, shortly after Amtrak's formation. Phase paint schemes Phase I F40PH in Phase II Livery Phase II was one of the first paint schemes of Amtrak to use entirely the "stripe" style.
    [Show full text]
  • Northeast Corridor Chase, Maryland January 4, 1987
    PB88-916301 NATIONAL TRANSPORT SAFETY BOARD WASHINGTON, D.C. 20594 RAILROAD ACCIDENT REPORT REAR-END COLLISION OF AMTRAK PASSENGER TRAIN 94, THE COLONIAL AND CONSOLIDATED RAIL CORPORATION FREIGHT TRAIN ENS-121, ON THE NORTHEAST CORRIDOR CHASE, MARYLAND JANUARY 4, 1987 NTSB/RAR-88/01 UNITED STATES GOVERNMENT TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2.Government Accession No. 3.Recipient's Catalog No. NTSB/RAR-88/01 . PB88-916301 Title and Subtitle Railroad Accident Report^ 5-Report Date Rear-end Collision of'*Amtrak Passenger Train 949 the January 25, 1988 Colonial and Consolidated Rail Corporation Freight -Performing Organization Train ENS-121, on the Northeast Corridor, Code Chase, Maryland, January 4, 1987 -Performing Organization 7. "Author(s) ~~ Report No. Performing Organization Name and Address 10.Work Unit No. National Transportation Safety Board Bureau of Accident Investigation .Contract or Grant No. Washington, D.C. 20594 k3-Type of Report and Period Covered 12.Sponsoring Agency Name and Address Iroad Accident Report lanuary 4, 1987 NATIONAL TRANSPORTATION SAFETY BOARD Washington, D. C. 20594 1*+.Sponsoring Agency Code 15-Supplementary Notes 16 Abstract About 1:16 p.m., eastern standard time, on January 4, 1987, northbound Conrail train ENS -121 departed Bay View yard at Baltimore, Mary1 and, on track 1. The train consisted of three diesel-electric freight locomotive units, all under power and manned by an engineer and a brakeman. Almost simultaneously, northbound Amtrak train 94 departed Pennsylvania Station in Baltimore. Train 94 consisted of two electric locomotive units, nine coaches, and three food service cars. In addition to an engineer, conductor, and three assistant conductors, there were seven Amtrak service employees and about 660 passengers on the train.
    [Show full text]
  • Amtrak SMP 28603 Mechanical Standards for Operating Privately
    Amtrak Equipment Maintenance Department Standard Maintenance Procedure SMP NO.: 28603 ISSUE DATE: January 12, 1982 REVISION DATE: September 13, 2013 TITLE: Mechanical Standard for Operating Privately Owned Cars in Amtrak Trains EQUIPMENT TYPE MAINTENANCE TYPE All Passenger Trains L – Locomotive Locomotives Cars C – Cars All Locomotives All Cars X All Types C All Maintenance – L/C Acela HST Power Car Acela Baggage Daily – L/C AEM-7 Amfleet I Cafe 30 Day – C Cab Car: (Under Cars) Amfleet II Coach Quarterly –L/C Car Movers Auto Carrier Diner Semi-Annual – L/C Commuter Commuter Dinette Annual – L/C F59PHI Freight Lounge 720 Day – L GP38-3 Heritage HEP Sleeper COT&S – C GP15D Horizon Other: Initial Terminal – L/C HHP8 Material Handling Cars Intermediate Terminal – L/C MP15 X Private Cars Modification – L/C Non Powered Control Units Superliner I Overhaul – L/C P32-8 Superliner II Running Repair – L/C P32AC-DM Surfliner Seasonal – C P-40 Talgo Wheels – L/C P-42 Turboliner Facility SW1001 Viewliner Other: SW1200 X Other: Railroad Business Cars SW1500 Turboliner Talgo Other: 1.0 PURPOSE This document describes the Amtrak Mechanical Department requirements for the handling in Amtrak trains of privately owned passenger cars, as well as railroad-owned business cars of freight carriers which have an Amtrak operating agreement. For the purpose of this document, a passenger car is defined as a vehicle meeting Association of American Railroads (AAR) or American Public Transportation Association Standard S-034 for the construction of passenger equipment cars, or similar standard for older cars, for operation in passenger train service, and does not include caboose cars, freight cars, or maintenance of way equipment.
    [Show full text]
  • Senate Hearings Before the Committee on Appropriations
    S. HRG. 111–983 Senate Hearings Before the Committee on Appropriations Departments of Transportation and Housing and Urban Development and Related Agencies Appropriations Fiscal Year 2011 111th CONGRESS, SECOND SESSION H.R. 5850/S. 3644 DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT DEPARTMENT OF TRANSPORTATION NATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK) NONDEPARTMENTAL WITNESSES WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Departments of Transportation and Housing and Urban Development, and Related Agencies Appropriations, 2011 (H.R. 5850/S. 3644) S. HRG. 111–983 TRANSPORTATION AND HOUSING AND URBAN DEVELOPMENT, AND RELATED AGENCIES AP- PROPRIATIONS FOR FISCAL YEAR 2011 HEARINGS BEFORE A SUBCOMMITTEE OF THE COMMITTEE ON APPROPRIATIONS UNITED STATES SENATE ONE HUNDRED ELEVENTH CONGRESS SECOND SESSION ON H.R. 5850/S. 3644 AN ACT MAKING APPROPRIATIONS FOR THE DEPARTMENTS OF TRANS- PORTATION AND HOUSING AND URBAN DEVELOPMENT, AND RE- LATED AGENCIES FOR THE FISCAL YEAR ENDING SEPTEMBER 30, 2011, AND FOR OTHER PURPOSES Department of Housing and Urban Development Department of Transportation National Railroad Passenger Corporation (Amtrak) Nondepartmental witnesses Washington Metropolitan Area Transit Authority Printed for the use of the Committee on Appropriations ( Available via the World Wide Web: http://www.gpo.gov/fdsys U.S. GOVERNMENT PRINTING OFFICE 54–989 PDF WASHINGTON : 2011 For sale by the Superintendent of Documents, U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: toll free (866) 512–1800; DC area (202) 512–1800 Fax: (202) 512–2104 Mail: Stop IDCC, Washington, DC 20402–0001 COMMITTEE ON APPROPRIATIONS DANIEL K. INOUYE, Hawaii, Chairman ROBERT C. BYRD, West Virginia THAD COCHRAN, Mississippi PATRICK J. LEAHY, Vermont CHRISTOPHER S. BOND, Missouri TOM HARKIN, Iowa MITCH MCCONNELL, Kentucky BARBARA A.
    [Show full text]
  • 20210419 Amtrak Metrics Reporting
    NATIONAL RAILROAD PASSENGER CORPORATION 30th Street Station Philadelphia, PA 19104 April 12, 2021 Mr. Michael Lestingi Director, Office of Policy and Planning Federal Railroad Administrator U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 Dear Mr. Lestingi: In accordance with the Metrics and Minimum Standards for Intercity Passenger Rail Service final rule published on November 16, 2020 (the “Final Rule”), this letter serves as Amtrak’s report to the Federal Railroad Administration that, as of April 10, 2021, Amtrak has provided the 29 host railroads over which Amtrak currently operates (listed in Appendix A) with ridership data for the prior month consistent with the Final Rule. The following data was provided to each host railroad: . the total number of passengers, by train and by day; . the station-specific number of detraining passengers, reported by host railroad whose railroad right-of-way serves the station, by train, and by day; and . the station-specific number of on-time passengers reported by host railroad whose railroad right- of-way serves the station, by train, and by day. Please let me know if you have any questions. Sincerely, Jim Blair Sr. Director, Host Railroads Amtrak cc: Dennis Newman Amtrak Jason Maga Amtrak Christopher Zappi Amtrak Yoel Weiss Amtrak Kristin Ferriter Federal Railroad Administration Mr. Michael Lestingi April 12, 2021 Page 2 Appendix A Host Railroads Provided with Amtrak Ridership Data Host Railroad1 Belt Railway Company of Chicago BNSF Railway Buckingham Branch Railroad
    [Show full text]
  • Appendix 6-B: Chronology of Amtrak Service in Wisconsin
    Appendix 6-B: Chronology of Amtrak Service in Wisconsin May 1971: As part of its inaugural system, Amtrak operates five daily round trips in the Chicago- Milwaukee corridor over the Milwaukee Road main line. Four of these round trips are trains running exclusively between Chicago’s Union Station and Milwaukee’s Station, with an intermediate stop in Glenview, IL. The fifth round trip is the Chicago-Milwaukee segment of Amtrak’s long-distance train to the West Coast via St. Paul, northern North Dakota (e.g. Minot), northern Montana (e.g. Glacier National Park) and Spokane. Amtrak Route Train Name(s) Train Frequency Intermediate Station Stops Serving Wisconsin (Round Trips) Chicago-Milwaukee Unnamed 4 daily Glenview Chicago-Seattle Empire Builder 1 daily Glenview, Milwaukee, Columbus, Portage, Wisconsin Dells, Tomah, La Crosse, Winona, Red Wing, Minneapolis June 1971: Amtrak maintains five daily round trips in the Chicago-Milwaukee corridor and adds tri- weekly service from Chicago to Seattle via St. Paul, southern North Dakota (e.g. Bismark), southern Montana (e.g. Bozeman and Missoula) and Spokane. Amtrak Route Train Name(s) Train Frequency Intermediate Station Stops Serving Wisconsin (Round Trips) Chicago-Milwaukee Unnamed 4 daily Glenview Chicago-Seattle Empire Builder 1 daily Glenview, Milwaukee, Columbus, Portage, Wisconsin Dells, Tomah, La Crosse, Winona, Red Wing, Minneapolis Chicago-Seattle North Coast Tri-weekly Glenview, Milwaukee, Columbus, Portage, Wisconsin Hiawatha Dells, Tomah, La Crosse, Winona, Red Wing, Minneapolis 6B-1 November 1971: Daily round trip service in the Chicago-Milwaukee corridor is increased from five to seven as Amtrak adds service from Milwaukee to St.
    [Show full text]
  • All Aboard Indiana October 2018
    ALL INDIANA ABOARD The Official Newsletter of the Volume 5, Number 10 October 2018 IN THIS ISSUE: Nickel Plate Express—A New Page Three Central Indiana Excursion Train An Amtrak Trip to Virginia’s Shenandoah National Park By Dagny Zupin, Communications Coordinator, Nickel Plate Express Please come aboard Indiana’s newest passenger rail service! Operating from Atlanta, Indiana, the Page Four Nickel Plate Express provides excursions on 12.6 miles of the historic Nickel Plate Road. Update from Save the Nickel Plate What is Nickel Plate Express? The Nickel Plate Express provides year-round excursions based in Hamilton County. They are a Page Five non-profit managed by parent company Nickel Plate Heritage Railroad. In addition to operating Commentary: Indianapolis excursions, the organization manages a 150-year-old train depot in Arcadia, IN. The depot serves Complicity on Rail as an interactive humanities museum that pays homage to the history of Hamilton County. Nickel Abandonment Reveals a Void Plate Heritage Railroad handles marketing and programming for the Nickel Plate Express, while in Regional Transit Leadership partner organization Atlanta Pacific Railroad provides operational assistance. Page Six Mission: Nickel Plate Heritage Railroad will provide a moving entertainment and education experi- Train, Vehicle Collision ence for all generations Results in Fatality on US 12, County Line Road Atlanta Pacific Railroad, LLC. Atlanta Pacific Railroad, LLC. operates rail service for the Nickel Plate Express. Atlanta Pacific is Page Seven owned by long-time railroad operator, Tom Hoback. Hoback is well known for his ownership and Lafayette Amtrak Station— management of Indiana Rail- Updates road, one of the most successful Bullets from the Board regional railroads in the country.
    [Show full text]
  • Transportation: Request for Passenger Rail Bonding -- Agenda Item II
    Legislative Fiscal Bureau One East Main, Suite 301 • Madison, WI 53703 • (608) 266-3847 • Fax: (608) 267-6873 Email: [email protected] • Website: http://legis.wisconsin.gov/lfb October 31, 2019 TO: Members Joint Committee on Finance FROM: Bob Lang, Director SUBJECT: Department of Transportation: Request for Passenger Rail Bonding -- Agenda Item II REQUEST On October 3, 2019, the Department of Transportation (DOT) submitted a request under s. 85.061 (3)(b) of the statutes for approval to use $13,248,100 BR in GPR-supported, general obligation bonding from DOT's passenger rail route development appropriation to fund the required state match for a recently awarded Federal Railroad Administration (FRA) grant for the purchase of six single-level coach cars and three cab-coach cars to be placed into service in the Milwaukee- Chicago Hiawatha corridor. BACKGROUND DOT is required to administer a rail passenger route development program funded from a transportation fund continuing appropriation (SEG) and a general fund-supported, general obligation bonding appropriation (BR). From these sources, DOT may fund capital costs related to Amtrak service extension routes (the Hiawatha service, for example) or other rail service routes between the cities of Milwaukee and Madison, Milwaukee and Green Bay, Milwaukee and Chicago, Madison and Eau Claire, and Madison and La Crosse. Under the program, DOT is not allowed to use any bond proceeds unless the Joint Finance Committee (JFC) approves the use of the proceeds and, with respect to any allowed passenger route development project, the Department submits evidence to JFC that Amtrak, or the applicable railroad, has agreed to provide rail passenger service on that route.
    [Show full text]
  • Effect of Vehicle Performance at High Speed and High Cant Deficiency
    Proceedings of the ASME/ASCE/IEEE 2011 Joint Rail Conference JRC2011 March 16-18, 2011, Pueblo, Colorado, USA JRC2011-56066 EXAMINATION OF VEHICLE PERFORMANCE AT HIGH SPEED AND HIGH CANT DEFICIENCY Brian Marquis Jon LeBlanc U.S. Department of Transportation, Research and U.S. Department of Transportation, Research and Innovative Technology Administration, Volpe Innovative Technology Administration, Volpe National Transportation Systems Center National Transportation Systems Center Cambridge, Massachusetts, United States Cambridge, Massachusetts, United States Ali Tajaddini U.S. Department of Transportation, Federal Rail Road Administration, Office of Research and Development, Washington D.C., United States ABSTRACT The research for this paper was part of work done for the FRA In the US, increasing passenger speeds to improve trip time to support the FRA Railroad Safety Advisory Committee usually involves increasing speeds through curves. Increasing (RSAC) Track Working Group’s Vehicle Track Interaction speeds through curves will increase the lateral force exerted on (VTI) Task Force. The mission of the VTI task force was to track during curving, thus requiring more intensive track update Parts 213 and 238 of the Code of Federal Regulations maintenance to maintain safety. These issues and other (CFR) regarding rules for high speed (above 90mph) and high performance requirements including ride quality and vehicle cant deficiency (about 5 inches) operations. The task force stability, can be addressed through careful truck design. focused on a number of issues including refinement of VTI Existing high-speed rail equipment, and in particular their safety criteria, track geometry standards, vehicle qualification bogies, are better suited to track conditions in Europe or Japan, procedures and requirements and track inspection in which premium tracks with little curvature are dedicated for requirements, all with a focus on treating the vehicle and track high-speed service.
    [Show full text]
  • Amtrak Cascades Fleet Management Plan
    Amtrak Cascades Fleet Management Plan November 2017 Funding support from Americans with Disabilities Act (ADA) Information The material can be made available in an alternative format by emailing the Office of Equal Opportunity at [email protected] or by calling toll free, 855-362-4ADA (4232). Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711. Title VI Notice to Public It is the Washington State Department of Transportation’s (WSDOT) policy to assure that no person shall, on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with WSDOT’s Office of Equal Opportunity (OEO). For additional information regarding Title VI complaint procedures and/or information regarding our non-discrimination obligations, please contact OEO’s Title VI Coordinator at 360-705-7082. The Oregon Department of Transportation ensures compliance with Title VI of the Civil Rights Act of 1964; 49 CFR, Part 21; related statutes and regulations to the end that no person shall be excluded from participation in or be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance from the U.S. Department of Transportation on the grounds of race, color, sex, disability or national origin.
    [Show full text]
  • Q1-2 2021 Newsletter
    Northwest Rail News 1st & 2nd Quarter 2021 statewide ‘High Speed Ground Transportation’ Reviving a Rail (HSGT) system. The next year, the Federal Railroad Administration (FRA) designated the Pacific Revolution: How Northwest Rail Corridor, which runs through the HSR in Washington heart of Seattle, as a high-speed rail (HSR) corridor. With the results of the earlier HSGT study in, the Can Get Back On 1993 Washington State Legislature passed RCW Chapter 47.79 and created something revolutionary: Track By Patrick Carnahan — Seattle, WA a goal to build a regional HSR network connecting Seattle with Portland, Spokane, and Vancouver, Amidst the fallout of the coronavirus pandemic, British Columbia by 2030. As recommended by the interest in passenger rail has increased markedly study, Washington and Oregon began implementing across the United States. With an enthusiastically modern intercity passenger rail service on existing pro-rail federal administration now in power, talk of tracks between Vancouver, BC and Eugene, OR, with our nation’s “second great railroading revolution” the goal of increasing this service’s top speed to 110 has begun among advocates and transit blogs from mph. From this came Amtrak Cascades, one of the coast to coast. But is this only our second, or even nation’s most successful intercity passenger rail third, attempt at such a revolution? What about the services. Following the study’s vision, the one that started in the Pacific Northwest around 30 Washington State and Oregon Departments of years ago, the one that aimed to create the most Transportation (WSDOT and ODOT) both created advanced rail system in North America? bold long-range plans for Cascades that would dramatically increase the line’s frequency and Where It Started usefulness.
    [Show full text]