n y Brook ey ank S Key:
2015 S ankey Brook Arpley Landfill Site
R iv er Mersey Waste Cell Boundaries
Lagoon Extent of Proposed
S ewage Works Landfill Operations Proposed Pre-Settlement Contours (at 1m intervals) Restored Areas
Refuse Tip
River Mersey
R iver Mersey Temporary Cap
Und
C CLW Tank Area Filled and
Mud Mud Sewage Works Mea n Hi gh W ater Capped
B oro Co ns t an d Ward Bdy S and CCLW
Mud T rack
D rain Minor Regrading D rain
Mud D rain Mud 15 Operational WasteTipping
Refuse Tip
B oro Co nst, E D an d Wa rd Bdy Waste Cell under Construction 10
Mud
15 Future Waste Cells 10 15
10 to be constructed 10
M ud
Mud 5 20 Penketh Reach River Mersey Materials Excavation Area Mea n High Water Mea n Hi gh Water 10
10
10 Mud 10
15 Bank Quay Reach Site Infrastructure areas Richmond Bank 25 Mud
B oro Cons t an d Wa rd Bdy 20
Mea n Hi gh Water Riv er Mersey CCLW
10
10 NOTES:
ank 25
15 M ud
Mud 30
20 1. Outside of proposed reprofiling
10 Mud 20 10 10
10 5 and materials excavation areas,
30
35 contours are indicated based on
P enk eth Bank 25 20 20 Boundary Mud on-site levels late 2014.
15 Cell 5
Walton Phase 30 5 10 15
Mea n High Water 2. Proposed materials excavation 5
C CLW
30 area to be worked as needed. 25
Sand 35 35
35
5
25
10
10 Run corn and Latch ford Can al (disused) 35 P ond
Mud 5 D ef
Nature Reserve 35 10
P a th (um) 10 Run corn and L atchford Canal Def (di su sed)
30
20 10
35 20
15 15 25 35 5 35
25 M oss Wood 10 30 25
35 30
S and Pit
CS
20 Mos s Wood 25
25 30 20 Lapwing Phase
20 5 25 15 25 20 15 15
5 10 Sand Pit 20
CS P ond 20 5
10 15 10 15
CS 15 D rain Birchwood Phase D rain Drain
Sand Pit P ond Arpley 10 Landfill 10 Site Runcorn and
5 Latchford CanalD rain(dis) 6.7m
Drain
Dra in Works Drain 5 10
5.8m B M 6.02m
Dra in LA P WING LANE P ond 6.1m P ond B M 8.07m Dra in 8.2m
P ond 5.5m Dra in Birch Wood
Manchester Ship Canal P ond Moore Bridge
P osts 13.7m
D ra in
D rain Dra in P ond Drain 6.4m B M 9.79m
SM
D ra in D rain D ra in
13.7m
CC
Warehouse MP .5 Acton Grange Viaduct
LA P WIN G LANE Lighting Tower
13.7m Nav igation Light Arpley Landfill Site (Fix ed Amber) Travell in g Crane
Pond Tank MP Outfall Tank Tank MP Acton G range Wharf MP P ost Lighting Extension of Operational Life Tower E l S ub Sta
P umping Nav igation Light E D and Ward Bdy (disused) S tation (Fixed White) 13.7m Warehouse MP ETL P ump ES Addendum House (Fix ed Amber) Tank Filter Beds ManchesterNav igShip atio n Light Canal Def MP 385500mN 357000mE Runcorn and Latchford Canal P ost
Filter Beds E l S ub Sta Figure 1b S ludge Tanks 7.9m MP .25 Nav igation Light V alv e House (Fixed White) Sewage Works
Nav igation Light Drain (Fix ed Amber) Def Tank Outfall B M 7.54m
8.5m Drain V alve Site Phasing Plan 2 P ost SM House
CCS
D ef M P .25
SM Hydraul i c and Valve Sand Pit House Outfall Depot E l Sub Sta
S hi p Guage Wire Moor Lane Bridge S lo ping masonry (Swing) P ost Track Date Pond Scale Bellhouse Farm Nursery MOORE L ANE 0 0.5km 1km S lo ping masonry Acton Grange Not to Scale January 2015 Junction Dism an tled Railway
S lopi ng masonry Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright & database right 2013. All rights reserved. Ordnance Survey Licence number AL 100036678.