n y Brook ey ank S Key:

2015 S ankey Brook Arpley Landfill Site

R iv er Mersey Waste Cell Boundaries

Lagoon Extent of Proposed

S ewage Works Landfill Operations Proposed Pre-Settlement Contours (at 1m intervals) Restored Areas

Refuse Tip

River Mersey

R iver Mersey Temporary Cap

Und

C CLW Tank Area Filled and

Mud Mud Sewage Works Mea n Hi gh W ater Capped

B oro Co ns t an d Ward Bdy S and CCLW

Mud T rack

D rain Minor Regrading D rain

Mud D rain Mud 15 Operational WasteTipping

Refuse Tip

B oro Co nst, E D an d Wa rd Bdy Waste Cell under Construction 10

Mud

15 Future Waste Cells 10 15

10 to be constructed 10

M ud

Mud 5 20 Reach Materials Excavation Area Mea n High Water Mea n Hi gh Water 10

10

10 Mud 10

15 Bank Quay Reach Site Infrastructure areas Richmond Bank 25 Mud

B oro Cons t an d Wa rd Bdy 20

Mea n Hi gh Water Riv er Mersey CCLW

10

10 NOTES:

ank 25

15 M ud

Mud 30

20 1. Outside of proposed reprofiling

10 Mud 20 10 10

10 5 and materials excavation areas,

30

35 contours are indicated based on

P enk eth Bank 25 20 20 Boundary Mud on-site levels late 2014.

15 Cell 5

Walton Phase 30 5 10 15

Mea n High Water 2. Proposed materials excavation 5

C CLW

30 area to be worked as needed. 25

Sand 35 35

35

5

25

10

10 Run corn and Latch ford Can al (disused) 35 P ond

Mud 5 D ef

Nature Reserve 35 10

P a th (um) 10 Run corn and L atchford Canal Def (di su sed)

30

20 10

35 20

15 15 25 35 5 35

25 M oss Wood 10 30 25

35 30

S and Pit

CS

20 Mos s Wood 25

25 30 20 Lapwing Phase

20 5 25 15 25 20 15 15

5 10 Sand Pit 20

CS P ond 20 5

10 15 10 15

CS 15 D rain Birchwood Phase D rain Drain

Sand Pit P ond Arpley 10 Landfill 10 Site and

5 CanalD rain(dis) 6.7m

Drain

Dra in Works Drain 5 10

5.8m B M 6.02m

Dra in LA P WING LANE P ond 6.1m P ond B M 8.07m Dra in 8.2m

P ond 5.5m Dra in Birch Wood

Manchester Ship Canal P ond Moore Bridge

P osts 13.7m

D ra in

D rain Dra in P ond Drain 6.4m B M 9.79m

SM

D ra in D rain D ra in

13.7m

CC

Warehouse MP .5 Acton Grange Viaduct

LA P WIN G LANE Lighting Tower

13.7m Nav igation Light Arpley Landfill Site (Fix ed Amber) Travell in g Crane

Pond Tank MP Outfall Tank Tank MP Acton G range Wharf MP P ost Lighting Extension of Operational Life Tower E l S ub Sta

P umping Nav igation Light E D and Ward Bdy (disused) S tation (Fixed White) 13.7m Warehouse MP ETL P ump ES Addendum House (Fix ed Amber) Tank Filter Beds ManchesterNav igShip atio n Light Canal Def MP 385500mN 357000mE Runcorn and Latchford Canal P ost

Filter Beds E l S ub Sta Figure 1b S ludge Tanks 7.9m MP .25 Nav igation Light V alv e House (Fixed White) Sewage Works

Nav igation Light Drain (Fix ed Amber) Def Tank Outfall B M 7.54m

8.5m Drain V alve Site Phasing Plan 2 P ost SM House

CCS

D ef M P .25

SM Hydraul i c and Valve Sand Pit House Outfall Depot E l Sub Sta

S hi p Guage Wire Moor Lane Bridge S lo ping masonry (Swing) P ost Track Date Pond Scale Bellhouse Farm Nursery MOORE L ANE 0 0.5km 1km S lo ping masonry Acton Grange Not to Scale January 2015 Junction Dism an tled Railway

S lopi ng masonry Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright & database right 2013. All rights reserved. Ordnance Survey Licence number AL 100036678.