Lapwing Phase Birchwood Phase Walton Phase
Total Page:16
File Type:pdf, Size:1020Kb
S ank ey Brook Key: 2015 S ankey Brook Arpley Landfill Site R iv er Mersey Waste Cell Boundaries Lagoon Extent of Proposed S ewage Works Landfill Operations Proposed Pre-Settlement Contours (at 1m intervals) Restored Areas Refuse Tip River Mersey R iver Mersey Temporary Cap Und C CLW Tank Area Filled and Mud Mud Sewage Works Mea n Hi gh W ater Capped B oro Co nst and Ward Bdy S and CCLW Mud T rack D rain Minor Regrading D rain Mud D rain Mud 15 Operational WasteTipping Refuse Tip B oro Co nst, E D an d Wa rd Bdy Waste Cell under Construction 10 Mud 15 Future Waste Cells 10 15 10 to be constructed 10 M ud Mud 5 20 Penketh Reach River Mersey Materials Excavation Area Mea n High Water Mea n Hi gh Water 10 10 10 Mud 10 15 Bank Quay Reach Site Infrastructure areas Richmond Bank 25 Mud B oro Cons t an d Wa rd Bdy 20 Mea n Hi gh Water Riv er Mersey CCLW 10 10 NOTES: ank 25 15 M ud Mud 30 20 1. Outside of proposed reprofiling 10 Mud 20 10 10 10 5 and materials excavation areas, 30 35 contours are indicated based on P enk eth Bank 25 20 20 Boundary Mud on-site levels late 2014. 15 Cell 5 Walton Phase 30 5 10 15 Mea n High Water 2. Proposed materials excavation 5 C CLW 30 area to be worked as needed. 25 Sand 35 35 35 5 25 10 10 Run corn and Latch ford Can al (disused) 35 P ond Mud 5 D ef Nature Reserve 35 10 P a th (um) 10 Run corn and L atchford Canal Def (di su sed) 30 20 10 35 20 15 15 25 35 5 35 25 M oss Wood 10 30 25 35 30 S and Pit CS 20 Mos s Wood 25 25 30 20 Lapwing Phase 20 5 25 15 25 20 15 15 5 10 Sand Pit 20 CS P ond 20 5 10 15 10 15 CS 15 D rain Birchwood Phase D rain Drain Sand Pit P ond Arpley 10 Landfill 10 Site Runcorn and 5 Latchford CanalD rain(dis) 6.7m Drain Dra in Works Drain 5 10 5.8m B M 6.02m Dra in LA P WING LANE P ond 6.1m P ond B M 8.07m Dra in 8.2m P ond 5.5m Dra in Birch Wood Manchester Ship Canal P ond Moore Bridge P osts 13.7m D rain D rain Drain P ond Drain 6.4m B M 9.79m SM D rain D rain D rain 13.7m CC Warehouse MP .5 Acton Grange Viaduct LA P WIN G LANE Lighting Tower 13.7m Nav igation Light Arpley Landfill Site (Fix ed Amber) Travell in g Crane Pond Tank MP Outfall Tank Tank MP Acton G range Wharf MP P ost Lighting Extension of Operational Life Tower E l S ub Sta P umping Nav igation Light E D and Ward Bdy (disused) S tation (Fixed White) 13.7m Warehouse MP ETL P ump ES Addendum House (Fix ed Amber) Tank Filter Beds ManchesterNav igShip atio n Light Canal Def MP 385500mN 357000mE Runcorn and Latchford Canal P ost Filter Beds E l S ub Sta Figure 1b S ludge Tanks 7.9m MP .25 Nav igation Light V alv e House (Fixed White) Sewage Works Nav igation Light Drain (Fix ed Amber) Def Tank Outfall B M 7.54m 8.5m Drain V alve Site Phasing Plan 2 P ost SM House CCS D ef M P .25 SM Hydraul i c and Valve Sand Pit House Outfall Depot E l Sub Sta S hi p Guage Wire Moor Lane Bridge S lo ping masonry (Swing) P ost Track Date Pond Scale Bellhouse Farm Nursery MOORE L ANE 0 0.5km 1km S lo ping masonry Acton Grange Not to Scale January 2015 Junction Dism an tled Railway S lopi ng masonry Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright & database right 2013. All rights reserved. Ordnance Survey Licence number AL 100036678..