Lapwing Phase Birchwood Phase Walton Phase

Lapwing Phase Birchwood Phase Walton Phase

S ank ey Brook Key: 2015 S ankey Brook Arpley Landfill Site R iv er Mersey Waste Cell Boundaries Lagoon Extent of Proposed S ewage Works Landfill Operations Proposed Pre-Settlement Contours (at 1m intervals) Restored Areas Refuse Tip River Mersey R iver Mersey Temporary Cap Und C CLW Tank Area Filled and Mud Mud Sewage Works Mea n Hi gh W ater Capped B oro Co nst and Ward Bdy S and CCLW Mud T rack D rain Minor Regrading D rain Mud D rain Mud 15 Operational WasteTipping Refuse Tip B oro Co nst, E D an d Wa rd Bdy Waste Cell under Construction 10 Mud 15 Future Waste Cells 10 15 10 to be constructed 10 M ud Mud 5 20 Penketh Reach River Mersey Materials Excavation Area Mea n High Water Mea n Hi gh Water 10 10 10 Mud 10 15 Bank Quay Reach Site Infrastructure areas Richmond Bank 25 Mud B oro Cons t an d Wa rd Bdy 20 Mea n Hi gh Water Riv er Mersey CCLW 10 10 NOTES: ank 25 15 M ud Mud 30 20 1. Outside of proposed reprofiling 10 Mud 20 10 10 10 5 and materials excavation areas, 30 35 contours are indicated based on P enk eth Bank 25 20 20 Boundary Mud on-site levels late 2014. 15 Cell 5 Walton Phase 30 5 10 15 Mea n High Water 2. Proposed materials excavation 5 C CLW 30 area to be worked as needed. 25 Sand 35 35 35 5 25 10 10 Run corn and Latch ford Can al (disused) 35 P ond Mud 5 D ef Nature Reserve 35 10 P a th (um) 10 Run corn and L atchford Canal Def (di su sed) 30 20 10 35 20 15 15 25 35 5 35 25 M oss Wood 10 30 25 35 30 S and Pit CS 20 Mos s Wood 25 25 30 20 Lapwing Phase 20 5 25 15 25 20 15 15 5 10 Sand Pit 20 CS P ond 20 5 10 15 10 15 CS 15 D rain Birchwood Phase D rain Drain Sand Pit P ond Arpley 10 Landfill 10 Site Runcorn and 5 Latchford CanalD rain(dis) 6.7m Drain Dra in Works Drain 5 10 5.8m B M 6.02m Dra in LA P WING LANE P ond 6.1m P ond B M 8.07m Dra in 8.2m P ond 5.5m Dra in Birch Wood Manchester Ship Canal P ond Moore Bridge P osts 13.7m D rain D rain Drain P ond Drain 6.4m B M 9.79m SM D rain D rain D rain 13.7m CC Warehouse MP .5 Acton Grange Viaduct LA P WIN G LANE Lighting Tower 13.7m Nav igation Light Arpley Landfill Site (Fix ed Amber) Travell in g Crane Pond Tank MP Outfall Tank Tank MP Acton G range Wharf MP P ost Lighting Extension of Operational Life Tower E l S ub Sta P umping Nav igation Light E D and Ward Bdy (disused) S tation (Fixed White) 13.7m Warehouse MP ETL P ump ES Addendum House (Fix ed Amber) Tank Filter Beds ManchesterNav igShip atio n Light Canal Def MP 385500mN 357000mE Runcorn and Latchford Canal P ost Filter Beds E l S ub Sta Figure 1b S ludge Tanks 7.9m MP .25 Nav igation Light V alv e House (Fixed White) Sewage Works Nav igation Light Drain (Fix ed Amber) Def Tank Outfall B M 7.54m 8.5m Drain V alve Site Phasing Plan 2 P ost SM House CCS D ef M P .25 SM Hydraul i c and Valve Sand Pit House Outfall Depot E l Sub Sta S hi p Guage Wire Moor Lane Bridge S lo ping masonry (Swing) P ost Track Date Pond Scale Bellhouse Farm Nursery MOORE L ANE 0 0.5km 1km S lo ping masonry Acton Grange Not to Scale January 2015 Junction Dism an tled Railway S lopi ng masonry Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright & database right 2013. All rights reserved. Ordnance Survey Licence number AL 100036678..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us